PROJECT : PROPOSED CONSTRUCTION OF A RESIDENTIAL BUILDING In PLOT - D,


R.S.No - 328 / 1, OF MANAPAKKAM VILLAGE, AT LAKSHMI NAGAR FIRST CROSS STREET,
SRIPERUMBATHUR TALUK, KUNDRATHUR PANCHAYAT UNION, KANCHIPURAM DISTRICT.
___________________________________________________________________________________

TITLE: DETAILED ESTIMATE FLOOR: GROUND FLOOR & FIRST FLOOR


___________________________________________________________________________________

SUB TITLE: QUANTITY CALCULATIONS


___________________________________________________________________________________

SI.no DESCRIPTION OF ITEMS NO L B D/H QUANTITY


___________________________________________________________________________________

UPTO BASEMENT LEVEL


1 Earth Work excavation for foundation
trenches.
columns 16 4'0" 4'0" 6'0" 1536.00
1536.0 C.ft

2 Sand filling in foundation with river Sand 16 4'0" 4'0" 0'3" 64.00
64.0 C.ft

3 Laying Plain cement concrete in foundation


pits in 1:4:8 mix using (1.5" jelly) 16 4'0" 4'0" 0'6" 128.00
40mm granite metal. 128.0 C.ft

4 R.C.C Footings in cement concrete 1:2:4


using 3/4" jelly and providing necessary
reinforcements including concreting,
curing, etc. complete.
Mat 16 4'0" 4'0" 1'0" 256.00
2 2
Slope 16 (4'0") +(0'9") /2 1'0" 132.50
388.50 C.ft
5 Brickwork in C.M.1:6 using first class
chamber bricks for basement
9" th Wall 4 14'0" --- 6'0" 336.00
4 17'9" --- 6'0" 426.00
6 16'9" --- 6'0" 603.00
1365.0 S.ft
6 Reinforced cement concrete in mix
1:2:4 using 3/4" jelly and providing
necessary reinforcements including
shuttering,curing,etc.,complete.
a) Earth Beam 1 245'0" 0'9" 0'9" 137.13
b) Belt Beam 1 245'0" 0'9" 0'6" 91.88
c) Columns 16 6'0" 1'0" 0'9" 72.00
301.0 C.ft

7 Wall plastering with CM 1:5 mix 1/2" thick


inside the basement 1 245'0" --- 6'0" 1470.00
1470.0Sq.ft

8 sand filling in basement including


consolidation 1 45'0" 28'0" 6'0" 7560.00
7560.0 C.ft

Page 1 of 7
___________________________________________________________________________________

SI.no DESCRIPTION OF ITEMS NO L B D/H QUANTITY


___________________________________________________________________________________

UPTO LINTEL LEVEL

9 Reinforced cement concrete in mix


1:2:4 using 3/4" jelly and providing
necessary reinforcements including
shuttering,curing,etc.,complete.
a) Lintel Beam
a) For 9" tk wall 1 245'0" 0'9" 0'6" 91.88
b) For 4 1/2" tk wall 1 32'0" 0'4.5" 0'6" 24.00
b) Sun shade (above all doors & windows) 12 6'6" 2'0" 0'3" 39.00
c) Loffts 1 80'0" 2'0" 0'3" 40.00
d) columns 16 1'0" 0'9" 7'0" 84.00
279.0 C.ft
558.0 C.ft
10 Brickwork in C.M.1:6 using first class
chamber bricks for superstructure
a) For 9" tk wall 1 245'0" --- 7'0" 1715.00
b) For 4 1/2" tk wall 1 32'0" --- 7'0" 224.00
Deductions of Openings
MD - Main Door 1 4'0" --- 7'0" 28.00
W - Window 10 5'0" --- 4'0" 200.00
D & D1 - Door 8 3'0" --- 7'0" 168.00
V - Ventilator 2 3'0" --- 2'0" 12.00
1531.0 S.ft
UPTO ROOF LEVEL 3062.0 S.ft

11 Reinforced cement concrete in mix


1:2:4 using 3/4" jelly and providing
necessary reinforcements including
shuttering,curing,etc.,complete.
a) Roof Slab 1 40'0" 32'6" 0'5" 541.67
b) Roof Beam 1 245'0" 0'9" 0'9" 137.81
c) Columns 16 1'0" 0'9" 3'0" 36.00
715.50 C.ft
12 Brickwork in C.M.1:6 using first class 1430.0 C.ft
chamber bricks for superstructure
a) For 9" tk wall 1 245'0" --- 3'0" 735.00
b) For 4 1/2" tk wall 1 32'0" --- 3'0" 96.00
831.0 S.ft
13 Supplying and fixing of Teak wood doors 1662.0 S.ft
and windows using well seasoned wood
including polishing fixing in position with
necessary fittings, etc., complete.
MD - Main Door 1 4'0" --- 7'0" 28.00
W - Window 10 5'0" --- 4'0" 200.00
D & D1 - Door 8 3'0" --- 7'0" 168.00
V - Ventilator 2 3'0" --- 2'0" 12.00
408.0 S.ft
816.0 S.ft

Page 2 of 7
___________________________________________________________________________________

SI.no DESCRIPTION OF ITEMS NO L B D/H QUANTITY


___________________________________________________________________________________

FINISHING WORKS

14 Laying Plain cement concrete in flooring


pits in 1:4:8 mix using (1.5" jelly) 1 26'0" 18'0" 0'6" 936.00
40mm granite metal. 936.0 C.ft

15 Flooring with 2'X2' of Tile in CM 1:5


including laying, polishing and etc., 1 28'6" --- 59'0" 1681.50
complete. 1681.50 S.ft
3363.0 S.ft
16 Plastering in CM 1:5 1/2" tk for Walls
a) Inner walls 1 475'0" --- 10'0" 4750.00
Deductions of Openings
MD - Main Door 1 4'0" --- 7'0" 28.00
W - Window 10 5'0" --- 4'0" 200.00
D & D1 - Door 8 3'0" --- 7'0" 168.00
V - Ventilator 2 3'0" --- 2'0" 12.00
4342.0 S.ft
8684.0 S.ft

b) Oudside walls 1 180'0" --- 10'0" 1800.00


Deductions of Openings
MD - Main Door 1 4'0" --- 7'0" 28.00
W - Window 10 5'0" --- 4'0" 200.00
V - Ventilator 2 3'0" --- 2'0" 12.00
1560.0 S.ft
3120.0 S.ft
17 Plastering in CM 1:5 1/2" tk for Ceiling 1 28'6" --- 59'0" 1681.50
1681.50 S.ft
18 White washing with lime coating over a 3363.0 S.ft
coat of primer for inner, outer Walls and
Ceiling. Same as item No 16(a)+16(b)+17 7583.50
7583.50 S.ft
15167.0 S.ft
19 Colour Washing with MATT two coats
over a coat of primer for outer walls Same as item No 16(b) 1560.00
1560.0 S.ft
3120.0 S.ft
20 Colour Washing with Distember two coats
over a coat of primer for Inner walls Same as item No 16(a) 4342.00
4342.0 S.ft
OPEN TERRACE 8684.0 S.ft

21 Reinforced cement concrete in mix


1:2:4 using 3/4" jelly and providing
necessary reinforcements including
shuttering,curing,etc.,complete.
Columns 16 1'0" 0'9" 3'0" 36.00
36.0 C.ft

Page 3 of 7
___________________________________________________________________________________

SI.no DESCRIPTION OF ITEMS NO L B D/H QUANTITY


___________________________________________________________________________________

22 Brick work in C.M. 1:6 using first class


chamber bricks for super structures 1 159'0" --- 3'0" 477.00
477.0 S.ft
23 Plastering in C.M. 1:6, 1/2" tk for walls
Inner Walls 1 159'0" --- 6'9" 1073.25
1073.25 S.ft

24 Color washing with MATT two coats over a


coat of primer for parapet walls. 2 159'0" --- 3'0" 954.00
954.0 S.ft

25 Weathering course with brick jelly concrete


over roof slab including labours, materials
etc., complete. 1 28'6" --- 59'0" 1681.50
1681.50 S.ft

26 Finishing the top roof with one course of


machine pressed tiles in C.M.1:3 mixed
with water proofing compound including
labours, materials,etc.,complete. 1 28'6" --- 59'0" 1681.50
1681.50 S.ft
MISCELLANEOUS ITEMS

27 Provision for Staircase

28 Provision for Electrification installations.

29 Provisions for Water supply, Sump, OHT,


& sanitary arrangements

30 Provisions for 9" Compound wall upto 5'0"


Height & Gate arrangements