PETROLEUM PAKISTAN LIMITED
HAZOP STUDY
CHECK LIST
BPPL‐ADV‐CL‐01
Issue Date:
Description: BOILER HAZOP Study
Node: 4. Condensate from Flash Vessel (FV‐01) to Condensate Tank (CT‐01) through Preheater (PH‐01)
P&ID No: 6162‐B01‐063‐007
Line No: 8" CR‐1209‐0111‐25H
Process Parameters Keyword Causes Consequences Safeguard
Low level in flash vessel. Flash Vessel Low Level Alarm LT- 1200
Steam along with condensate comes in Flash Vessel High Level in Condensate tank. Feed available. High level alarm available on
Water temperature rises. condensate tank.
Condensate tank temperature low and TT-1200 available. High level alarm
Preheater PH‐01 tube leakage takes place
level will rise available on condensate tank.
High PRV‐1200,1201 may malfunction Flash Vessel FV-01 over pressurization PSV-504 available on flash vessel
Pressure
Steam with condensate is coming in FV‐01 Flash Vessel FV-01 over pressurization PSV-504 available on flash vessel
Low PSV pop up NA
Level Low level in condensate tank will trip pump
through logic I-1201.
Low Preheater PH-01 outlet flange leak Low level in HP deaerator. Operator's monitoring as per SOP.
Hot condensate exposure can burn
working men. may travel to boiler resulting
Contaminates
in foaming in steam drum
Contaminates High RFO Heaters leakages may take place Heater Tube Choking may lead to lower Lab testing of water sample
DW temperature.
Page No: 1 of 1
Revision No: 00
Recommendations
SOPM to be followed.
Maintenance/Inspection plans to be
followed.
NA
Operator Intervention
do
NA