You are on page 1of 4

FACADE DETAIL 1A

FACADE DETAIL 1B

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

30 29 29" 28' 27'' 27' 26'' 26' 25'' 25' 24'' 24' 23''' 23'' 22''' 22 21'' 20'' 20' 19'' 19' 18'' 18' 17'' 17' 16'' 16' 15'' 15' 14' 14

1st ELEVATION - FRONT SIDE


SCALE: 1/NTS

Steel Post & Tension Steel Post & Tension


see Structure Dwg. see Structure Dwg.

Canopy Roof
Steel Beam & Post
Bended ACP see Structure Dwg.
Covered by ACP

Airport Signage
Top floor Grill Ornament ACP Grill Ornament ACP Tanaman Rambat
Lettering Airport Signage Backwall
+15.55 Stainless Steel Allumunium Composite Panel
Plate
Tree Branches Ornament
Allumunium Composite
Polycarbonate Roof Panel
5th floor Hang on Ramp Cover Box
Concrete
+12.00 Parapet &
Listplank

4th floor Concrete


+9.00 Parapet &
Listplank

Planter Box
3rd floor Concrete
+6.00 Parapet &
Listplank
ISO PT

2nd floor Concrete


+3.00 Parapet &
Listplank

1st floor
AS BUILT DRAWING
Parapet & Listplank
Pre-Cast Concrete Tree Branches Ornament
Tree Branches Ornament
Allumunium Composite Panel
Allumunium Composite Panel

8.00 8.00 8.00 8.00 8.00 8.00 8.00

30 29 29"
26' 25" 25' 24" 24'

FACADE DETAIL 1A FACADE DETAIL 1B


SCALE: 1:200 SCALE: 1:200
Steel Post
see Structure Dwg.
Tension Cable
see Structure Dwg.

Ramp Cover Steel Beam & Post


Ramp Cover Tree Branches Ornament Covered by ACP
Tree Branches Ornament Allumunium Composite Panel
Polycarbonate Roof
Allumunium Composite Panel Hang on Ramp Cover Box
Concrete Planter Box Atap Box Louvre Tree Branches Ornament
Ramp Cover Allumunium Composite Panel
Allumunium Grill
Concrete
Top floor Parapet &
Tanaman Rambat Atap Box
+15.55 Louvre
Listplank

5th floor
+12.00 Fly Over by others.
Grill Ornament ACP

4th floor
+9.00

3rd floor
+6.00 Connecting Bridge

2nd floor
+3.00

1st floor

ISO PT

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

AS BUILT DRAWING

S R Q P O N M L K

2nd ELEVATION - WEST SIDE


SCALE: 1:250
FACADE DETAIL 3A FACADE DETAIL 3B FACADE DETAIL 3C

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

14 14' 15' 15'' 16' 16'' 17' 17'' 18' 18'' 19' 19'' 20' 20'' 21'' 22 22''' 23'' 23''' 24' 24'' 25' 25'' 26' 26'' 27' 27'' 28' 29" 29 30

3rd ELEVATION - TERMINAL SIDE


SCALE: 1/NTS

8.00 8.00

Steel Post & Tension Steel Post & Tension Steel Post & Tension Steel Post & Tension
see Structure Dwg. see Structure Dwg. see Structure Dwg. see Structure Dwg.

Canopy Roof Canopy Roof


Bended ACP Bended ACP

Steel Beam & Post Steel Beam & Post


see Structure Dwg. see Structure Dwg.
Covered by ACP Covered by ACP
Tanaman Rambat

Concrete Planter Box


Parapet & Listplank
Pre-Cast Concrete
Concrete
Planter Box
Parapet & Listplank Parapet & Listplank
Pre-Cast Concrete Pre-Cast Concrete

Parapet & Listplank


Pre-Cast Concrete
Concrete
Planter Box
ISO PT

Parapet & Listplank Parapet & Listplank


Pre-Cast Concrete Pre-Cast Concrete
Commercial Backwall
10mm Glass Curtain Parapet & Listplank
Allumunium Moulion Pre-Cast Concrete
Concrete
Planter Box
Parapet & Listplank Parapet & Listplank
Pre-Cast Concrete Pre-Cast Concrete
Tree Branches
Ornament
Parapet & Listplank
AS BUILT DRAWING
Allumunium
Composite Panel Glass Bottom Caping Pre-Cast Concrete 6.70
Metal Sheet Concrete
Parapet & Listplank Parapet & Listplank Planter Box
Pre-Cast Concrete Pre-Cast Concrete

GRC Grooving

8.00 8.00 8.00 8.00

14 14' Parking Building Parameter 18' 19 Solid Wall 19' Parking Building Parameter 29 30
Block Masonry GRC Panel w/ Grooving Block Masonry
Plaster Finish Plaster Finish

FACADE DETAIL 3A FACADE DETAIL 3B FACADE DETAIL 3C


SCALE: 1:200 SCALE: 1:200 SCALE: 1:200
Steel Beam & Post
Steel Post Covered by ACP
see Structure Dwg. Ramp Cover
Tree Branches Ornament Tanaman Rambat Polycarbonate Roof
Allumunium Composite Panel Hang on Ramp Cover Box
Tension Cable Tree Branches Ornament
Atap Box Louvre
see Structure Dwg. Allumunium Composite Panel
Ramp Cover Tanaman Rambat
Allumunium Grill
Atap Box Top floor
Louvre Concrete Planter Box +15.55

5th floor
Fly Over by others. +12.00

4th floor
+9.00
Advertisment

Advertisment

Advertisment

Advertisment

Advertisment
by others

by others

by others

by others

by others
8.24

8.24

8.24

8.24

8.24
Connecting Bridge Advertisment 3rd floor
5.24

by others +6.00

6.80 3.80 3.80 3.80 3.80 3.80 2nd floor


+3.00

1st floor

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00


ISO PT

K L M N O P Q R S

AS BUILT DRAWING

4th ELEVATION - EAST SIDE


SCALE: 1:250

You might also like