You are on page 1of 3

SRL-W500/1000 Mixer

Item Unit Structure&material


1 The total volume of the pot L Hot mix:500L; cooling mix:1000L
2 Effective volume L Hot mix: 375 : cooling mix:670
3 Motor power KW Hot mix: 75: cooling mix: 22
4 Frequency converter — ABB
5 Mix time min Hot mix:8-10 cooling mix:12-15
6 Paddle speed ration r/min Hot mix:430/860;cooling mix:50
7 Hot mix pot structure and material — 内 Inner: thickness is 8mm SUS304 steel
   Paddle Qty pcs Hot mix:3pcs Cooling mix:2sets
8 Cooling mix pot structure and — 6mm SUS304 stainless steel
material
   Paddle material — ZG1Cr18Ni9Ti
9 Lid material — Aluminium
10 Lid open — Pneumatic
11 Hot pot outer carbon steel — 3mm
12 Hot mix heating type — Since friction , electric heating
13 Cold mix cooling structure and — Pot wall and the rock water cooling (≤20℃≤0.06Mpa)
media
14 Lid sealing method — Dual-channel high-temperature rubber seal
15 Power voltage — 380V 50Hz
16 Using gas source — Compressed air:0.39-0.49Mpa
17 Hot mix heating power — 12kw
18 Motor — Xi’an Xima motor
19 Main electrical components — Pick Angle、relay、button、temperature control etc
20 Electric elements Delixi

Total Price: USD18,000.00

SGK-250 AUTOMATIC BELLING MACHINE


Technical data:
Belling scope: ¢50—¢250mm
Belling center height: 1000+10mm
Length of belling pipe 4000—6000mm
Total motor power: 20 KW
Heating power of heating-stove: 13KW
The maximum temperature: 280℃
The power of the oil pump: 3.7KW
Working pressure of hydraulic-pressure system: 4-6.3mpa
Hydraulic-pressure oil: 46#
Equip the Mitsubishi PLC(FX1N-60MR) control system
Moulds:
The U type 50mm,63mm,75mm,90mm,110mm,160mm,200mm,250mm
The R type: 50mm,63mm,75mm,90mm,110mm,160mm,200mm,250mm

SKG-250 automatically belling machine: USD11,000.00


R mold:USD6.000.00
Umold: USD2,000.00

Total Price: USD19,000.00

Payment terms: 30%in advance, 70% before shipping


Delivery time: 60workdays once we get your 30% deposit
QC: Machinery main parts--12 months. Out of warranty, we charge the cost
of spare parts.
TEST AND INSTALLATION: The seller arrange technicians to adjust in
buyer's factory. If buyer need to try out the machine in seller’s factory, the
buyer should supply the raw material.

ATTENTION: The buyer should afford all expenses for test and installation
abroad (including round-trip ticket fee, accommodation and food expenses
and so on)

You might also like