You are on page 1of 6

Factory Test Report

Project Name: Power Grid Network Strengthening Project under PGCB (PGCB/GtoG/01)

Buyer: Jiangsu Etern Co.,Ltd

Production Name: UPS(inverter) Panel

Type and specification:IGBT(inverter)

Standard:IEC60146

Inspection Date:

Place of inspection: Zhejiang,China

Hangzhou Zhonhen Electric Co., Ltd.

Page 1 of 3
UPS (inverter) Panel Test Report

No. Check Item Standard Result

1.1 Insulation Voltage 2820VDC/ 1min


1.2 Insulation resistance ≥2MΩ/500VDC
Live part Safety check
1.3 Leakage Current ≤3.5mA
1.4 Resistance to earth ≤0.1Ω
Ambient Temparature C
Voltage Frequency THD Voltage
No-Load
220V (AC Mode) 220V AC
220 V-15%
220V+15%
2.1 Electrical characteristics Input No-Load
110V DC
110V (DC Mode)
110V-15%
110V+15%
Voltage harmonic<2%
Current Harmonic<15%
2.3 Dynamic voltage transient range A. Dynamic voltage transient range between 207V and 253V.
B. Transient recovery time ≤111ms.
2.4 Transient recovery time

2.5 low DC warning function


Low DC warning on LCD(<110V)
2.6 Low DC protection function

2.7 Time to Utility/Battery transfer


Electrical characteristics 0 ms
2.8 Time to Bypass /Inverter transfer

2.9 Charge Current


0.1C
2.10 Output Overload

2.11 LCD Function


running in good condition
2.12 Communicate function

Page 2 of 3
UPS (inverter) Panel Test Report

No. Check Item Standard Result

2.13 Audible noise Audible noise <65dB

3.1 The frame and the structural parts are clean, beautiful, no exposed bottom, scratch.

3.2 The name label of panel shall be consistent with the drawing, and be clear and distinguishable

All kinds of labels are complete and correct; the brands and specifications of components are correct
3.3 Appearance and assembly (including all components and terminal blocks should be pasted (installed) with complete label
inspection numbers), and they are consistent with the technical drawings.

3.4 Check whether the cabinet door can be opened and closed freely.

3.5 The cabinet surface shall be free from deformation, scratch, paint dropping, bubble, dirt, dust, etc.

Display and Monitoring


3.6 System failure may be displayed.
Function
3.7 Function test Input switching Priority of the inverter input: AC input, DC input.
4.1 Withstand voltage tester CS2670A
Test Instrument
4.2 Digital multimeter FLUKE8

Operator: QC Inspector:
Witness:

Production past test and allow to leave factory :

Date: Result:

Page 3 of 3
tory Test Report

ect under PGCB (PGCB/GtoG/01)

Zhonhen Electric Co., Ltd.

Page 4 of 3
erter) Panel Test Report

Result

C
Frequency THD

Page 5 of 3
erter) Panel Test Report

Result

CS2670AX
FLUKE87V

QC Inspector:

Page 6 of 3