You are on page 1of 25

SUBMISSION RETURN

Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
1.12.08 Ashuganj 132/33kV AIS Substation
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
1 GtoG01/HBED/B97S/R01-01 R1 PSLD 1 2021-05-23 380 - 23/05/21 x 2021-09-21 1364 - 21/09/21 x 121
GtoG01/HBED/B97S/R02 R0 132kV Control Room Layout 2 2021-07-29 539 - 29/07/21 x 2021-11-17 1727 - 17/11/21 x 111
GtoG01/HBED/B97S/R03 R0 Detail Protection Scheme (T3A Incomer) 62 2021-10-24 737 - 24/10/21 x 2021-11-08 1658 - 08/11/21 x 15
GtoG01/HBED/B97S/R04 R0 Detail Protection Scheme (T4A Incomer) 59 2021-10-24 737 - 24/10/21 x 2021-11-08 1658 - 08/11/21 x 15
GtoG01/HBED/B97S/R05 R1 EM Panel Scheme 19 2022-05-16 1753 - 16/05/21 x 2022-06-02 973 - 02/06/22 x 17

1.12.08 Dohazari 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
2 GtoG01/HBED/B81S/R01-01 R0 PSLD 1 2021-05-23 385 - 23/05/21 x 2021-07-26 1003 - 26/07/21 x 64
GtoG01/HBED/B81S/R01-01 R0 132kV Control Room Layout 1 2021-08-31 606 - 31/08/21 x 2021-09-05 1241 - 05/09/21 x 5
GtoG01/HBED/B81S/R02 R2 132kV Control Room Layout 1 2022-12-20 3023 - 20/12/22 x 2023-01-12 58 - 12/01/23 x x
GtoG01/HBED/TR/R01 R1 Detail Protection Scheme (T1) 63 2021-12-05 921 - 05/12/21 x 2021-12-08 1882 - 08/12/21 x 3
GtoG01/HBED/TR/R02 R1 Detail Protection Scheme (T2) 52 2021-12-05 921 - 05/12/21 x 2021-12-08 1882 - 08/12/21 x 3
GtoG01/HBED/TRA/R01 R1 Detail Protection Scheme (T1A) 62 2021-12-05 921 - 05/12/21 x 2021-12-08 1882 - 08/12/21 x 3
GtoG01/HBED/TRA/R02 R1 Detail Protection Scheme (T2A) 59 2021-12-05 921 - 05/12/21 2021-12-08 1882 - 08/12/21 x 3
GtoG01/HBED/B81S/R09 R1 EM Panel Scheme 22 2022-05-16 1750 - 16/05/22 x 2022-06-02 975 - 02/06/22 x 17

1.12.08 B.Baria 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
3 GtoG01/HBED/B75S/R01-01 R0 PSLD 1 2021-05-23 382 - 23/05/21 x 2021-08-10 1090 - 10/08/21 x 79
GtoG01/HBED/B75S/R02 R0 132kV Control Room Layout 1 2021-07-29 541 - 29/07/21 x 2021-09-02 1228 - 02/09/21 x 35
GtoG01/HBED/B75S/R03 R1 Detail Protection Scheme (T3A) 59 2021-10-17 724 - 17/10/21 x 2021-10-31 1597 - 31/10/21 x 14

1.12.08 Gallamari 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
4 GtoG01/HBED/B82S/R01-01 R1 PSLD 1 2021-09-23 669 - 23/09/21 x 2021-10-04 1435 - 04/10/21 x 11
GtoG01/HBED/B82S/R02 R1 132kV Control Room Layout 1 2021-08-31 610 - 29/07/21 x 2021-09-29 1417 - 29/09/21 x 29
GtoG01/HBED/B82S/R03 R0 Detail Protection Scheme (T1A) 65 2021-11-22 870 - 22/11/21 x 2021-12-08 1907 - 13/12/21 x 16
GtoG01/HBED/B82S/R04 R0 Detail Protection Scheme (T2A) 65 2021-11-22 870 - 22/11/21 x 2021-12-13 1907 - 13/12/21 x 21

1.12.08 Patuakhali 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
5 GtoG01/HBED/B58S/R01-01 R0 PSLD 1 2021-09-05 559 - 05/09/21 x 2021-09-05 1239 - 05/09/21 x 0
GtoG01/HBED/B58S/R02 R0 132kV Control Room Layout 1 2021-10-13 713 - 13/10/21 x 2021-10-26 1573 - 26/10/21 x 13
GtoG01/HBED/B58S/R04 R0 Detail Protection Scheme (E08/E09) 87 2021-12-15 976 - 15/12/21 x 2022-01-06 50 - 06/01/22 x 22
ETERN-PGCB-BOQ-PATUAKHALI-001 - BOQ list (RTU) 2023-01-10 3161 - 10/01/23 x 2023-02-20 332 - 20/02/23 x 41
ETERN-PGCB-IO-PATUAKHALI-002 - IO List 2023-01-10 3161 - 10/01/23 x 2023-02-20 332 - 20/02/23 x 41

1.12.08 Joypurhat 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
6 GtoG01/HBED/B60S/R01-01 R0 PSLD 1 2021-05-23 383 - 23/05/21 x 2021-06-19 1159 - 19/06/21 x 27
GtoG01/HBED/B60S/R02 R0 132kV Control Room Layout 1 2021-09-02 616 - 02/09/21 x 2021-09-12 1293 - 12/09/21 x 10
GtoG01/HBED/B60S/R04 R0 Detail Protection Scheme (E06/E07/E08) 86 2021-11-29 902 - 29/11/21 x 2021-12-19 1944 - 19/12/21 x 20
GtoG01/HBED/B60S/R05 R1 EM Panel Scheme 20 2022-05-16 1751 - 16/05/22 x 2022-06-02 971 - 02/06/22 x 17

1.12.08 Sirajganj 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
7 GtoG01/HBED/B95S/R01-01 R0 PSLD 1 2021-08-24 592 - 24/08/21 x 2021-09-01 1217 - 01/09/21 x 8
GtoG01/HBED/B95S/R02 R0 132kV Control Room Layout 1 2021-08-31 609 - 31/08/21 x 2021-09-05 1238 - 05/09/21 x 5
GtoG01/HBED/TR/R01 R1 Detail Protection Scheme (T1) 63 2021-12-05 921 - 05/12/21 x 2021-12-08 1882 - 08/12/21 x 3
GtoG01/HBED/TR/R02 R1 Detail Protection Scheme (T2) 52 2021-12-05 921 - 05/12/21 x 2021-12-08 1882 - 08/12/21 x 3
GtoG01/HBED/TRA/R01 R1 Detail Protection Scheme (T1A) 62 2021-12-05 921 - 05/12/21 x 2021-12-08 1882 - 08/12/21 x 3
GtoG01/HBED/TRA/R02 R1 Detail Protection Scheme (T2A) 59 2021-12-05 921 - 05/12/21 2021-12-08 1882 - 08/12/21 x 3
GtoG01/HBED/B95S/R07 R1 EM Panel Scheme 22 2022-05-16 1754 - 16/05/22 x 2022-06-02 974 - 02/06/22 x 17

1.12.08 Niamatpur 132/33kV AIS Substation

Page 1 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
8 GtoG01/HBED/B91S/R01-01 R1 PSLD 1 2021-10-24 749 - 24/10/21 x 2021-11-01 1613 - 01/11/21 x 8
GtoG01/HBED/B91S/R02 R0 132kV Control Room Layout 1 2021-10-24 748 - 24/10/21 x 2021-11-01 1612 - 01/11/21 x 8
GtoG01/HBED/B91S/R03 R1 Detail Protection Scheme (T2&T3) 91 2022-01-02 1083 - 02/01/22 x 2022-01-16 094 - 16/01//22 x 14
GtoG01/HBED/B91S/R05 R1 Detail Protection Scheme (T2A&T3A) 62 2022-01-02 1083 - 02/01/22 x 2022-01-16 094 - 16/01//22 x 14
GtoG01/HBED/B91S/R07 R1 Detail Protection Scheme (Rahanpur 1&2) 96 2022-01-02 1083 - 02/01/22 x 2022-01-16 094 - 16/01//22 x 14
GtoG01/HBED/B91S/R09 R1 EM Panel Scheme 39 2022-05-16 1755 - 16/05/22 x 2022-06-02 972 - 02/06/22 x 17

1.12.08 Chandraghona 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
9 N/A

1.12.08 Bakulia 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
10 N/A

1.12.08 Julda 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
11 N/A

1.12.08 Patnitola 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
12 GtoG01/HBED/B17S/R01 R1 PSLD 1 2021-12-01 916 - 01/12/21 x 2021-12-23 1982 - 23/12/21 x 22
GtoG01/HBED/B17S/R03-01 R1 132kV Control Room Layout 1 2021-11-15 839 - 15/11/21 x 2021-12-02 1828 - 02/12/21 x 17
GtoG01/HBED/B17S/R03-02 R1 33kV Control Room Layout 1 2021-12-07 935 - 07/12/21 x 2021-12-15 1938 - 15/12/21 x 8
GtoG01/HBED/B17S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2022-04-10 1594 - 10/04/22 x 2022-05-11 799 - 11/05/22 x 31
R1 Detail Protection Scheme (System Archeitecture) 1 2022-06-16 1934 - 16/06/22 x 2022-07-07 1218 - 07/07/22 x 21
R1 Detail Protection Scheme (System Archeitecture) 1 2022-08-31 2354 - 31/08/22 x 2022-09-22 1665 - 22/09/22 x 22
SYSAT-01 R2 System Architecture 1 2023-03-21 3585 - 21/03/23 x 2023-04-06 583 - 06/04/2023 x 16
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (Line Distance) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Line Distance) 93 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07//22 x 46
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (Txr Prot) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Txr Prot) 97 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R06 R0 Detail Protection Scheme (Patnitola BBP-NA) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (Chakaria BBP) 109 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B17S/R07 R0 Detail Protection Scheme (BC) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (BC) 86A 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R08 R0 Detail Protection Scheme (Txr Incomer) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R4 Detail Protection Scheme (Txr Incomer) 135 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R09 R0 Detail Protection Scheme (33kV Feeder) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (33kV Feeder) 58 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B17S/R10 R0 EM Panel Scheme 87 2022-09-01 2376 - 01/09/22 x 2022-09-15 1623 - 15/09/22 x 14
R0 EM Panel Scheme 88 2023-03-06 3459 - 06/03/23 x 2023-03-27 497 - 27/03/23 x
GtoG01/HBED/B17S/R12 R0 SAS Panel 1&2 FD 40 2022-04-10 1594 - 10/04/22 x 2022-05-11 799 - 11/05/22 x 31
R1 SAS Panel 1&2 FD 40 2022-06-16 1934 - 16/06/22 x 2022-07-07 1218 - 07/07/22 x 21
R1 SAS Panel 1&2 FD 40 2022-08-31 2354 - 31/08/22 x 2022-09-22 1665 - 22/09/22 x 22
- SAS GTP & IEC Certificate 2022-12-11 2948 - 11/12/22 x 2023-01-02 003 - 02/01/23 x 22
- Ethernet Switch & GPS (SAS) 2023-01-15 3182 - 15/01/23 x 2023-01-31 218 - 31/01/23 x
- SAS Panel 1&2 FD 40 2023-03-21 3585 - 21/03/23 x 2023-04-06 583 - 06/04/2023 x
R2 SAS Panel 1&2 FD 41 2023-05-07 3811 - 07/05/23 x 2023-05-22 772 - 22/05/23 x
SAS Panel 1&2 FD 41 2023-07-26 4415 - 26/07/23 x 2023-08-16 1397 - 16/08/23 x
R3 SAS Panel FD 41 2023-10-17 5067 - 17/10/23 x 2023-10-30 1953 - 30/10/23 x
GtoG01/HBED/B17S/R17 R0 Station Common Control panel 23 2022-04-10 1594 - 10/04/22 x 2022-05-11 799 - 11/05/22 x 31
R1 Station Common Control panel 24 2022-06-16 1934 - 16/06/22 x 2022-07-07 1218 - 07/07/22 x 21
R1 Station Common Control panel 24 2022-08-31 2354 - 31/08/22 x 2022-09-22 1665 - 22/09/22 x 22
- SAS GTP & IEC Certificate 2022-12-11 2948 - 11/12/22 x 2023-01-02 003 - 02/01/23 x 22
- Ethernet Switch & GPS (SAS) 2023-01-15 3182 - 15/01/23 x 2023-01-31 218 - 31/01/23 x
R1 Station Common Control panel 31 2023-03-21 3585 - 21/03/23 x 2023-04-06 583 - 06/04/2023 x

Page 2 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
R2 Station Common Control panel 31 2023-05-07 3811 - 07/05/23 x 2023-05-22 772 - 22/05/23 x
R2 Station Common Control panel (Common BCU) 31 2023-07-26 4414 - 26/07/23 x 2023-08-16 1398 - 16/08/23 x
R1 Station Common Control panel (Common BCU) 26 2023-10-23 5104 - 23/10/23 x

1.12.08 Rahanpur 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
13 GtoG01/HBED/B26S/R01 R1 PSLD 1 2021-12-09 948 - 09/12/21 x 2022-01-03 14 - 03/01/22 x 25
GtoG01/HBED/B26S/R03-01 R2 132kV Control Room Layout 1 2021-07-03 2026 - 03/07/22 x 2021-07-05 1190 - 05/07/22 x 2
GtoG01/HBED/B26S/R03-02 R2 33kV Control Room Layout 1 2021-07-03 2025 - 03/07/21 x 2021-07-05 1191 - 05/07/22 x 2
SYSAT-01 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-20 4165 - 20/06/23 x 2023-07-04 1041 - 04/07/23 x
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (Line Distance) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Line Distance) 93 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07//22 x 46
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (Txr Prot) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Txr Prot) 97 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R07 R0 Detail Protection Scheme (BC) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (BC) 86A 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R08 R0 Detail Protection Scheme (Txr Incomer) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R4 Detail Protection Scheme (Txr Incomer) 135 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R09 R0 Detail Protection Scheme (33kV Feeder) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (33kV Feeder) 58 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B26S/R10 R0 EM Panel Scheme 84 2022-09-14 2467 - 14/09/22 x 2022-10-04 1744 - 15/09/22 x 20
R0 EM Panel Scheme 86 2023-03-06 3460 - 06/03/23 x 2023-03-27 502 - 27/03/23 x 21
GtoG01/HBED/B26S/R17 R0 Station Common Control panel

1.12.08 Muktagacha 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
14 GtoG01/HBED/B22S/R01 R1 PSLD 1 2021-12-02 920 - 02/12/21 x 2022-01-03 13 - 03/01/22 x 32
SYSAT-01 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-20 4163 - 20/06/23 x 2023-07-04 1034 - 04/07/23 x
GtoG01/HBED/B22S/R03-01 R1 132kV Control Room Layout 1 2021-11-08 801 - 08/11/21 x 2021-11-23 1757 - 23/11/21 x 15
GtoG01/HBED/B22S/R03-02 R1 33kV Control Room Layout 1 2021-11-14 829 - 14/11/21 x 2021-11-15 1786 - 15/11/21 x 1
GtoG01/HBED/B22S/R041 R0 Detail Protection Scheme (132kV Line - Type B) 93 2022-06-23 1988 - 23/06/2022 x 2022-07-22 1301 - 22/07/22 x 29
R0 Detail Protection Scheme (132kV Line) 93 2022-09-12 2452 - 12/09/2022 x 2022-10-04 1742 - 04/10/22 x 22
R1 Detail Protection Scheme (132kV Line Diff) 94 2022-11-23 2875 - 23/11/22 x 2022-12-18 2152 - 18/12/22 x 25
GtoG01/HBED/B22S/R04(01) R0 Detail Protection Scheme (132kV Line Dis-1) 93 2022-12-10 3019 - 20/12/22 x 2023-01-12 59 - 12/01/23 x 33
GtoG01/HBED/B22S/R04(02) R0 Detail Protection Scheme (132kV Line Dis-2) 93 2022-12-10 3019 - 20/12/22 x 2023-01-12 59 - 12/01/23 x 33
GtoG01/HBED/B22S/R05 R1 Detail Protection Scheme (132kV TR-1) 97 2022-06-23 1988 - 23/06/2022 x 2022-07-22 1301 - 22/07/22 x 29
R0 Detail Protection Scheme (132kV TR-1) 97 2022-09-12 2452 - 12/09/2022 x 2022-10-04 1742 - 04/10/22 x 22
R1 Detail Protection Scheme (132kV TR-1) 97 2022-11-23 2874 - 23/11/22 x 2022-12-18 2151 - 18/12/22 x 25
GtoG01/HBED/B22S/R05(2) R0 Detail Protection Scheme (132kV TR-2 & 3) 2023-03-14 3525 - 14/03/23 x 2023-03-28 522 - 28/03/23 x 14
GtoG01/HBED/B22S/R06 R0 Detail Protection Scheme (132kV BB) 124 2022-06-23 1988 - 23/06/2022 x 2022-07-22 1301 - 22/07/22 x 29
R0 Detail Protection Scheme (132kV BB) 152 2022-09-12 2452 - 12/09/2022 x File Misssing by PGCB
R0 Detailed Protection Scheme (132kV BB) 152 2023-01-17 3198 - 17/01/23 x 2023-02-05 242 - 05/02/23 x
GtoG01/HBED/B22S/R07 R0 Detail Protection Scheme (132kV BC) 86 2022-06-23 1988 - 23/06/2022 x 2022-07-22 1301 - 22/07/22 x 29
R0 Detail Protection Scheme (132kV BC) 105 2022-09-12 2452 - 12/09/2022 x 2022-10-04 1742 - 04/10/22 x 22
R1 Detail Protection Scheme (132kV BC) 109 2022-11-23 2873 - 23/11/22 x 2022-12-18 2150 - 18/12/22 x 25
GtoG01/HBED/B22S/R08 R0 Detail Protection Scheme (33kV Incoming) 100 2022-09-12 2452 - 12/09/2022 x Missing by PGCB
R0 Detail Protection Scheme (33kV Incoming) 101 2023-01-16 3189 - 16/01/2023 2023-02-05 241 - 05/02/23 x
GtoG01/HBED/B22S/R09 R0 Detail Protection Scheme (33kv Feeder) 55 2022-09-12 2452 - 12/09/2022 x Missing by PGCB
R0 Detail Protection Scheme (33kv Feeder) 55 2023-01-16 3188 - 16/01/2023 x 2023-02-05 243 - 05/02/23 x
GtoG01/HBED/B22S/R10 R0 EM Panel Scheme 111 2022-09-12 2453 - 12/09/22 x 2022-10-04 1746 - 04/10/22 x 22
R0 EM Panel Scheme 111 2022-12-28 3055 - 28/12/22 x 2023-01-12 60 - 12/01/23 x
R1 EM Panel Scheme 110 2023-01-18 3211 - 18/01/23 x 2023-02-05 235 - 05/02/23 x
GtoG01/HBED/B22S/R11 R0 Detail Protection Scheme (132kV BS) 82 2022-06-23 1988 - 23/06/22 x 2022-07-22 1301 - 22/07/22 x 29
R0 Detail Protection Scheme (132kV BS) 86 2022-09-12 2452 - 12/09/2022 x 2022-10-04 1742 - 04/10/22 x 22
R1 Detail Protection Scheme (132kV BS) 104 2022-11-23 2873 - 23/11/22 x 2022-12-18 2150 - 18/12/22 x 25
GtoG01/HBED/B22S/R17 R0 Station Common Control panel

1.12.08 Chakaria 132/33kV AIS Substation

Page 3 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
15 GtoG01/HBED/B29S/R01-01 R0 PSLD 1 2021-12-09 943 - 09/12/21 x 2022-01-03 15 - 03/01/22 x 25
GtoG01/HBED/B29S/R03-01 R2 132kV Control Room Layout 1 2021-02-10 1302 - 10/02/22 x 2021-02-23 342 - 23/02/22 x 13
GtoG01/HBED/B26S/R03-02/A R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
SYSAT-01 R0 Detail Protection Scheme (System Archeitecture) 2 2023-06-15 4131 - 15/06/23 x 2023-07-04 1038 - 04/07/23 x
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (Line Dist) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Line Dist) 93 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07//22 x 46
GtoG01/HBED/B29S/R041 R0 Detail Protection Scheme (Line Diff) (Matarbari) 93 2023-01-10 3153 - 10/01/23 x 2023-01-24 23.147 - 24/01/23 x
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (Txr Prot) 93 2022-01-27 1219 - 27/01/22 x 2022-03-22 425 - 03/03//22 x 54
R3 Detail Protection Scheme (Txr Prot) 97 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B29S/R05(1) R0 Detail Protection Scheme (TR1/2 Prot) 2023-05-07 3815 - 07/05/23 x 2023-05-28 809 - 28/05/23 x
GtoG01/HBED/B29S/R05(2) R0 Detail Protection Scheme (TR3/4 Prot) 2023-05-07 3814 - 07/05/23 x 2023-05-28 810 - 28/05/23 x
R0 Detail Protection Scheme (TR3/4 Prot) 2023-07-13 4288 - 13/07/23 x 2023-07-31 1239 - 31/07/23 x
GtoG01/HBED/B17S/R06 R0 Detail Protection Scheme (Patnitola BBP-NA) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (Chakaria BBP) 109 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B17S/R07 R0 Detail Protection Scheme (BC) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (BC) 86A 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R08 R0 Detail Protection Scheme (Txr Incomer) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R4 Detail Protection Scheme (Txr Incomer) 135 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B29S/R08(1) R0 Detail Protection Scheme (33kV Incomer TR1A/TR2A) 2023-05-07 3812 - 07/05/23 x 2023-05-28 812 - 28/05/23 x
GtoG01/HBED/B29S/R08(2) R0 Detail Protection Scheme (33kV Incomer TR3A/TR4A) 2023-05-07 3813 - 07/05/23 x 2023-05-28 810 - 28/05/23 x
R0 Detail Protection Scheme (33kV Incomer TR3/TR4) ) 2023-07-13 4287 - 13/07/23 x 2023-07-31 1241 - 31/07/23 x
GtoG01/HBED/B17S/R09 R0 Detail Protection Scheme (33kV Feeder) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (33kV Feeder) 58 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B29S/R10 R0 EM Panel Scheme 109 2022-09-14 2467 - 14/09/22 x 2022-10-04 1744 - 04/10/22 x 20
R0 EM Panel Scheme 2023-03-06 3461 - 06/03/23 x 2023-03-27 498 - 27/03/23 x 21
GtoG01/HBED/B29S/R17 R0 Station Common Control panel

1.12.08 Bakerganj 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
16 GtoG01/HBED/B28S/R01 R0 PSLD 1 2022-01-09 1123 - 09/01/22 x 2022-01-16 093 - 16/01/22 x 7
R0 PSLD 1 2022-10-24 2729 - 24/10/22 x 2022-11-09 1965 - 09/11/22 x 16
GtoG01/HBED/B28S/R03-01 R2 132kV Control Room Layout 1 2021-03-02 1397 - 02/03/22 x 2021-03-21 510 - 21/03/22 x 19
GtoG01/HBED/B26S/R03-02/A R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
SYSAT-01 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-20 4161 - 20/06/23 x 2023-07-04 1040 - 04/07/23 x
GtoG01/HBED/B20S/R04 R0 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-01 3069 - 01/01/23 x 2023-01-12 61 - 12/01/23 x
R1 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-22 3235 - 22/01/23 x 2023-02-05 240 - 05/02/23 x
GtoG01/HBED/B28S/R05 R0 Detail Protection Scheme (TR1/TR2 CRP) 89 2023-05-15 3894 - 15/05/23 x 2023-06-04 862 - 04/06/23 x
GtoG01/HBED/B28S/R07 R0 Detail Protection Scheme (BC) 2023-01-04 3104 - 04/01/23 x 2023-01-25 170 - 25/01/23 x
GtoG01/HBED/B28S/R08 R0 Detail Protection Scheme (33kV Incomer TR1A/TR2A) 2023-05-15 3893 - 15/05/23 x 2023-06-04 861 - 04/06/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B28S/R10 R0 EM Panel Scheme 2023-04-16 3754 - 16/04/23 x 2023-05-20 710 - 10/05/23 x
GtoG01/HBED/B28S/R17 R0 Station Common Control panel

1.12.08 Phulpur 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
17 GtoG01/HBED/B21S/R01 R0 PSLD 1 2022-01-09 1121 - 09/01/22 x 2022-01-16 92 - 16/01/22 x 7
R0 PSLD 1 2022-10-24 2728 - 24/10/22 x 2022-11-09 1968 - 09/11/22 x 16
GtoG01/HBED/B21S/R03-01 R2 132kV Control Room Layout 1 2022-02-27 1361 - 27/02/22 x 2022-03-21 511 - 21/03/22 x 22
GtoG01/HBED/B26S/R03-02/A R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
SYSAT-01 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-20 4164 - 20/06/23 x 2023-07-04 1037 - 04/07/23 x
GtoG01/HBED/B20S/R04 R0 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-01 3069 - 01/01/23 x 2023-01-12 61 - 12/01/23 x
R1 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-22 3235 - 22/01/23 x 2023-02-05 240 - 05/02/23 x
GtoG01/HBED/B21S/R05(1) R0 Detail Protection Scheme (TR1/2 CRP) 87 2023-05-14 3872 - 14/05/23 x 2023-06-01 840 - 01/06/23 x
GtoG01/HBED/B21S/R05(2) R0 Detail Protection Scheme (TR3 CRP) 2023-05-14 3871 - 14/05/23 x 2023-06-01 841 - 01/06/23 x
GtoG01/HBED/B21S/R05(3) R0 Detail Protection Scheme (TR4 CRP) 87 2023-05-14 3870 - 14/05/23 x 2023-06-01 843- 01/06/23 x

Page 4 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
GtoG01/HBED/B21S/R07 R0 Detail Protection Scheme (BC) 2023-01-04 3101 - 04/01/23 x 2023-01-25 164 - 25/01/23 x
GtoG01/HBED/B21S/R08(1) R0 Detail Protection Scheme (33kV Incomer TR1A/TR2A) 2023-05-14 3869 - 14/05/23 x 2023-06-01 839 - 01/06/23 x
GtoG01/HBED/B21S/R08(2) R0 Detail Protection Scheme (33kV Incomer TR3A) 110 2023-05-14 3868 - 14/05/23 x 2023-05-28 807 - 28/05/23 x
GtoG01/HBED/B21S/R08(3) R0 Detail Protection Scheme (33kV Incomer TR4A) 107 2023-05-14 3867 - 14/05/23 x 2023-05-28 806 - 28/05/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B21S/R10 R0 EM Panel 2023-03-06 3463 - 06/03/23 x 2023-03-27 496 - 27/03/23 x
GtoG01/HBED/B21S/R17 R0 Station Common Control panel

1.12.08 Marjal 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
18 GtoG01/HBED/B15S/R01 R0 PSLD 1 2022-01-02 1077 - 02/01/22 x 2022-01-16 87 - 16/01/22 x 14
GtoG01/HBED/B15S/R03-01 R0 132kV Control Room Layout 1 2022-03-16 1404 - 06/03/22 x 2022-03-21 508 - 21/03/22 x 5
GtoG01/HBED/B26S/R03-02/A R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
GtoG01/HBED/B15S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2023-05-07 3821 - 07/05/23 x 2023-05-28 801- 28/05/23 x
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (Line Dist) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Line Dist) 93 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07//22 x 46
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (Txr Prot) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Txr Prot) 97 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B15S/R06 R0 Detail Protection Scheme (BBP) 106 2022-09-22 2527 - 22/09/22 x 2022-10-13 1797 - 13/10/22 x 21
GtoG01/HBED/B17S/R07 R0 Detail Protection Scheme (BC) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (BC) 86A 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R08 R0 Detail Protection Scheme (Txr Incomer) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R4 Detail Protection Scheme (Txr Incomer) 135 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R09 R0 Detail Protection Scheme (33kV Feeder) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (33kV Feeder) 58 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B15S/R10 R0 EM Panel 2023-03-06 3466 - 06/03/23 x 2023-03-27 492 - 27/03/23 x
GtoG01/HBED/B15S/R17 R0 Station Common Control panel

1.12.08 Sathia 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
19 GtoG01/HBED/B19S/R01 R0 PSLD 1 2021-12-01 1075 - 02/01/22 x 2022-01-16 85 - 16/01/22 x 46
GtoG01/HBED/B19S/R03-01 R1 132kV Control Room Layout 1 2022-04-10 1592 - 10/04/22 x 2022-04-27 754 - 27/04/22 x 17
GtoG01/HBED/B26S/R03-02/A R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
GtoG01/HBED/B19S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-22 4185 - 22/06/23 x 2022-07-17 1123 - 17/07/23 x
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (Line Dist) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Line Dist) 93 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07//22 x 46
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (Txr Prot) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Txr Prot) 97 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R07 R0 Detail Protection Scheme (BC) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (BC) 86A 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R08 R0 Detail Protection Scheme (Txr Incomer) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R4 Detail Protection Scheme (Txr Incomer) 135 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R09 R0 Detail Protection Scheme (33kV Feeder) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (33kV Feeder) 58 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B26S/R10 R0 EM Panel Scheme 84 2022-09-14 2467 - 14/09/22 x 2022-09-15 1744 - 15/09/22 x 1
GtoG01/HBED/B19S/R10 R0 EM Panel Scheme 111 2023-04-16 3760 - 16/04/23 x 2023-05-10 708 - 10/05/23 x
GtoG01/HBED/B19S/R17 R0 Station Common Control panel

1.12.08 Gaibandha 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
20 GtoG01/HBED/B30S/R01 R0 PSLD 1 2022-01-02 1076 - 02/01/22 x 2022-02-16 84 - 16/01/22 x 45
GtoG01/HBED/B30S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-22 4188 - 22/06/23 x 2023-07-12 1095 - 12/07/23 x 20

Page 5 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
GtoG01/HBED/B30S/R03-01 R1 132kV Control Room Layout 1 2022-06-14 1920 - 14/06/22 x 2022-06-27 1139 - 27/06/22 x 13
GtoG01/HBED/B26S/R03-02/A R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (Line Dist) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Line Dist) 93 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07//22 x 46
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (Txr Prot) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Txr Prot) 97 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R07 R0 Detail Protection Scheme (BC) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (BC) 86A 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R08 R0 Detail Protection Scheme (Txr Incomer) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R4 Detail Protection Scheme (Txr Incomer) 135 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R09 R0 Detail Protection Scheme (33kV Feeder) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (33kV Feeder) 58 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B26S/R10 R0 EM Panel Scheme 84 2022-09-14 2467 - 14/09/22 x 2022-10-04 1744 - 04/10/22 x 20
GtoG01/HBED/B30S/R10 R0 EM Panel Scheme 2023-04-16 3759 - 16/04/23 x 2023-05-10 707 - 10/05/23 x
GtoG01/HBED/B30S/R17 R0 Station Common Control panel

1.12.08 Pirganj 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
21 GtoG01/HBED/B16S/R01 R0 PSLD 1 2022-01-02 1078 - 02/01/22 x 2022-01-16 91 - 16/1/22 x 14
R1 PSLD 1 2023-01-09 3145 - 09/01/23 x 2023-01-25 157 - 25/01/23 x
GtoG01/HBED/B16S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2023-05-07 3820 - 07/05/23 x 2023-05-28 804 - 28/05/23 x
GtoG01/HBED/B16S/R03-01 R1 132kV Control Room Layout 1 2022-02-10 1299 - 10/02/22 x 2022-02-23 341 - 23/02/22 x 13
GtoG01/HBED/B26S/R03-02/B R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
GtoG01/HBED/B20S/R04 R0 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-01 3069 - 01/01/23 x 2023-01-12 61 - 12/01/23 x
R1 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-22 3235 - 22/01/23 x 2023-02-05 240 - 05/02/23 x
GtoG01/HBED/B16S/R05 R0 Detail Protection Scheme (Txr Prot) 133 2023-05-29 3981 - 29/05/23 x 2023-06-20 979 - 20/06/23 x
GtoG01/HBED/B16S/R07 R0 Detail Protection Scheme (BC) 151 2023-01-04 3099 - 04/01/23 x 2023-01-25 162 - 25/01/23 x
GtoG01/HBED/B16S/R08 R0 Detail Protection Scheme (TR1A) 2023-05-29 3980 - 29/05/23 x 2023-06-20 980 - 20/06/23 x
GtoG01/HBED/B16S/R08 R0 Detail Protection Scheme (TR2A) 2023-05-29 3979 - 29/05/23 x 2023-06-20 980 - 20/06/23 x
GtoG01/HBED/B16S/R08 R0 Detail Protection Scheme (TR3A) 2023-05-29 3978 - 29/05/23 x 2023-06-20 980 - 20/06/23 x
GtoG01/HBED/B16S/R08 R0 Detail Protection Scheme (TR4A) 2023-05-29 3977 - 29/05/23 x 2023-06-20 980 - 20/06/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B16S/R10 R0 EM Panel Scheme 2023-04-16 3755 - 16/04/23 x 2023-05-10 705 - 10/05/23 x
GtoG01/HBED/B16S/R17 R0 Station Common Control panel

1.12.08 Dinajpur 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
22 GtoG01/HBED/B23S/R01 R1 PSLD 1 2022-01-02 1079 - 02/01/22 x 2022-01-16 88 - 16/01/22 x 14
GtoG01/HBED/B23S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2023-05-07 3819 - 07/05/23 x 2023-05-28 803 - 28/05/23 x
GtoG01/HBED/B23S/R03-01 R0 132kV Control Room Layout 1 2022-03-06 1405 - 06/03/22 x 2022-03-22 509 - 21/03/22 x 16
GtoG01/HBED/B26S/R03-02/A R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (Line Dist) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Line Dist) 93 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07//22 x 46
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (Txr Prot) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Txr Prot) 97 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R07 R0 Detail Protection Scheme (BC) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (BC) 86A 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R08 R0 Detail Protection Scheme (Txr Incomer) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R4 Detail Protection Scheme (Txr Incomer) 135 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R09 R0 Detail Protection Scheme (33kV Feeder) 50 2022-02-15 1320(A) - 15/02/22 x 2022-07-03 407 - 03/03/22 x 138
R1 Detail Protection Scheme (33kV Feeder) 58 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B26S/R10 R0 EM Panel Scheme 84 2022-09-14 2467 - 14/09/22 x 2022-10-04 1744 - 15/09/22 x 20

Page 6 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
GtoG01/HBED/B23S/R10 R0 EM Panel Scheme 2023-04-16 3758 - 16/04/23 x 2023-05-10 711 - 10/05/23 x
GtoG01/HBED/B17S/R17 R0 Station Common Control panel

1.12.08 Taraganj 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
23 GtoG01/HBED/B24S/R01 R0 PSLD 1 2022-01-02 1082 - 02/01/22 x 2022-10-13 1799 - 13/10/22 x
R1 PSLD 1 2022-11-16 2844 - 16/11/22 x 2022-12-01 2091 - 01/12/22 x 15
GtoG01/HBED/B24S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2023-05-07 3818 - 07/05/23 x 2023-05-28 802 - 28/05/23 x
GtoG01/HBED/B24S/R03-01 R0 132kV Control Room Layout 1 2022-03-06 1403 - 06/03/22 x 2022-03-21 507 - 21/03/22 x 15
GtoG01/HBED/B26S/R03-02/B R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
GtoG01/HBED/B20S/R04 R0 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-01 3069 - 01/01/23 x 2023-01-12 61 - 12/01/23 x
R1 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-22 3235 - 22/01/23 x 2023-02-05 240 - 05/02/23 x
GtoG01/HBED/B24S/R05 R0 Detail Protection Scheme (Txr Prot) 126 2023-05-18 3922 - 18/05/23 x 2023-06-04 861 - 04/06/23 x
GtoG01/HBED/B24S/R06 R0 Detail Protection Scheme (BBP) 106 2022-09-22 2526 - 22/09/22 x 2022-10-13 1799 - 13/10/22 x 21
R1 Detail Protection Scheme (BBP) 106 2023-01-08 3132 - 08/01/23 x 2023-01-25 165 - 25/01/23 x
GtoG01/HBED/B24S/R07 R0 Detail Protection Scheme (BC) 151 2023-01-04 3097 - 04/01/23 x 2023-01-25 161 - 25/01/23 x 21
GtoG01/HBED/B24S/R08 R0 Detail Protection Scheme (33kV Incomer TR1) 155 2023-05-18 3921 - 18/05/23 x 2023-06-04 865 - 04/06/23 x
GtoG01/HBED/B24S/R08 R0 Detail Protection Scheme (33kV Incomer TR2) 155 2023-05-18 3918 - 18/05/23 x 2023-06-04 865 - 04/06/23 x
GtoG01/HBED/B24S/R08 R0 Detail Protection Scheme (33kV Incomer TR3) 155 2023-05-18 3917 - 18/05/23 x 2023-06-04 865 - 04/06/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 155 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B24S/R10 R0 EM Panel 2023-03-06 3462 - 06/03/23 x 2023-03-27 500 - 27/03/23 x 21
GtoG01/HBED/B24S/R17 R0 Station Common Control panel

1.12.08 Bonpara 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
24 GtoG01/HBED/B20S/R01 R0 PSLD 1 2022-01-02 1080 - 02/01/22 x 2022-01-16 89 - 16/01/22 x 14
R0 PSLD 1 2023-01-09 3144 - 09/01/23 x 2023-01-25 156 - 25/01/23 x
GtoG01/HBED/B20S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-22 4186 - 22/06/23 x 2023-07-12 1095 - 12/07/23 x
GtoG01/HBED/B20S/R03-01 R0 132kV Control Room Layout 1 2022-02-27 1360 - 27/02/222 x 2022-03-13 464 - 13/03/22 x 14
GtoG01/HBED/B26S/R03-02/B R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
GtoG01/HBED/B20S/R04 R0 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-01 3069 - 01/01/23 x 2023-01-12 61 - 12/01/23 x
R1 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-22 3235 - 22/01/23 x 2023-02-05 240 - 05/02/23 x
GtoG01/HBED/B20S/R05 R0 Detail Protection Scheme (Txr Prot) (Type B) 2023-01-03 3090 - 03/01/23 x 2023-01-23 135 - 23/01/23 x
R0 Detail Protection Scheme (Txr CRP) 139 2023-07-25 4409 - 25/07/23 x 2023-08-13 1363 - 13/08/23 x
GtoG01/HBED/B20S/R06 R0 Detail Protection Scheme (BBP) 106 2023-01-03 3088 - 03/01/23 x 2023-01-25 172 - 25/01/23 x
GtoG01/HBED/B20S/R07 R0 Detail Protection Scheme (BC) 151 2023-01-04 3098 - 04/01/23 x 2023-01-25 163 - 25/01/23 x
GtoG01/HBED/B20S/R08 R0 Detail Protection Scheme (Txr 33kV Incomer) 2023-07-23 4349 - 23/07/23 x 2023-08-08 1338 - 08/08/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B20S/R10 R0 EM Panel 2023-03-06 3469 - 06/03/23 x 2023-03-27 501 - 27/03/23 x
GtoG01/HBED/B20S/R17 R0 Station Common Control panel

1.12.08 Kaliganj 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
25 GtoG01/HBED/B25S/R01 R0 PSLD 1 2022-10-23 2725 - 23/10/22 x 2022-11-09 1966 - 09/11/22 x 17
SYSAT-01 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-20 4162 - 20/06/23 x 2023-07-04 1035 - 04/07/23 x
GtoG01/HBED/B25S/R03-01 R0 132kV Control Room Layout 1 2023-03-13 3513 - 13/03/23 x 2023-03-28 524 - 28/03/23 x
GtoG01/HBED/R03-02/A R0 33kV Control Room Layout 1 2023-03-13 3513 - 13/03/23 x 2023-03-28 523 - 28/03/23 x
GtoG01/HBED/B20S/R04 R0 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-01 3069 - 01/01/23 x 2023-01-12 61 - 12/01/23 x
R1 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-22 3235 - 22/01/23 x 2023-02-05 240 - 05/02/23 x
GtoG01/HBED/B25S/R05 R0 Detail Protection Scheme (TR1/2 CRP) 2023-05-15 3892 - 15/05/23 x 2023-06-04 871 - 04/06/23 x
R0 Detail Protection Scheme (TR1/2 CRP) 2023-07-16 4294 - 16/07/23 x 2023-07-31 1234 - 31/07/23 x
GtoG01/HBED/B25S/R05 R0 Detail Protection Scheme (TR3/4 CRP) 2023-05-15 3891 - 15/05/23 x 2023-06-04 871 - 04/06/23 x
R0 Detail Protection Scheme (TR3/4 CRP) 2023-07-16 4293 - 16/07/23 x 2023-07-31 1234 - 31/07/23 x
GtoG01/HBED/B25S/R06 R0 Detail Protection Scheme (BBP) 2023-01-03 3089 - 03/01/23 x 2023-01-25 168 - 25/01/23 x
GtoG01/HBED/B25S/R07 R0 Detail Protection Scheme (BC) 2023-01-04 3103 - 04/01/23 x 2023-01-25 166 - 25/01/23 x

Page 7 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
GtoG01/HBED/B25S/R08(1) R0 Detail Protection Scheme (33kV Incomer TR1A/TR2A) 2023-05-15 3890 - 15/05/23 x 2023-06-04 871 - 04/06/23 x
R0 Detail Protection Scheme (33kV Incomer TR1A/TR2A) 2023-07-16 4292 - 16/07/23 x 2023-07-31 1236 - 31/07/23 x
GtoG01/HBED/B25S/R08(2) R0 Detail Protection Scheme (33kV Incomer TR3A/TR4A) 2023-05-15 3889 - 15/05/23 x 2023-06-04 871 - 04/06/23 x
R0 Detail Protection Scheme (33kV Incomer TR3A/TR4A) 2023-07-16 4291 - 16/07/23 x 2023-07-31 1236 - 31/07/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B25S/R10 R0 EM Panel 2023-03-06 3468 - 06/03/23 x 2023-03-28 525 - 28/03/23 x
GtoG01/HBED/B25S/R17 R0 Station Common Control panel

1.12.08 Moulvibazar 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
26 GtoG01/HBED/B27S/R01 R0 PSLD 1 2022-10-23 2724 - 23/10/22 x 2022-11-09 1969 - 09/11/22 x 17
SYSAT-01 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-15 4132 - 15/06/23 x 2023-07-04 1033 - 04/07/23 x
GtoG01/HBED/B27S/R03-01 R0 132kV Control Room Layout 1 2022-05-17 1768 - 17/05/22 x 2022-06-09 1014 - 09/06/22 x 23
GtoG01/HBED/B26S/R03-02/B R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
GtoG01/HBED/B20S/R04 R0 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-01 3069 - 01/01/23 x 2023-01-12 61 - 12/01/23 x
R1 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-22 3235 - 22/01/23 x 2023-02-05 240 - 05/02/23 x
GtoG01/HBED/B27S/R05 R0 Detail Protection Scheme (TR1 CRP) 2023-05-15 3900 - 15/05/23 x 2023-06-01 844 - 01/06/23 x
R0 Detail Protection Scheme (TR1 CRP) 2023-07-16 4301 - 16/07/23 x 2023-07-31 1249 - 31/07/23 x
GtoG01/HBED/B27S/R05 R0 Detail Protection Scheme (TR2 CRP) 2023-05-15 3899 - 15/05/23 x 2023-06-01 844 - 01/06/23 x
R0 Detail Protection Scheme (TR2 CRP) 2023-07-16 4300 - 16/07/23 x 2023-07-31 1249 - 31/07/23 x
GtoG01/HBED/B27S/R07 R0 Detail Protection Scheme (BC) 2023-01-04 3102 - 04/01/23 x 2023-01-25 167 - 25/01/23 x
GtoG01/HBED/B27S/R08 R0 Detail Protection Scheme (33kV Incomer TR1A) 2023-05-15 3898 - 15/05/23 x 2023-06-01 844 - 01/06/23 x
R0 Detail Protection Scheme (33kV Incomer TR1) 2023-07-16 4299 - 16/07/23 x 2023-07-31 1250 - 31/07/23 x
GtoG01/HBED/B27S/R08 R0 Detail Protection Scheme (33kV Incomer TR2A) 2023-05-15 3897 - 15/05/23 x 2023-06-01 844 - 01/06/23 x
R0 Detail Protection Scheme (33kV Incomer TR2) 2023-07-16 4298 - 16/07/23 x 2023-07-31 1250 - 31/07/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B27S/R10 R0 EM Panel 2023-03-06 3465 - 06/03/23 x 2023-03-27 494 - 27/03/23 x
GtoG01/HBED/B27S/R17 R0 Station Common Control panel 3465 - 06/03/23

1.12.08 Atrai 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
27 GtoG01/HBED/B18S/R1 R0 PSLD 1 2022-01-02 1081 - 02/01/22 x 2022-01-16 86 - 16/01/22 x 14
GtoG01/HBED/B18S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-22 4187 - 22/06/23 x 2022-07-17 1122 - 17/07/23 x
GtoG01/HBED/B18S/R03-01 R0 132kV Control Room Layout 1 2022-09-05 2403 - 05/09/22 x 2022-09-18 1628 - 18/09/22 x 13
GtoG01/HBED/B18S/R03-02 R0 33kV Control Room Layout 1 2022-09-04 2378 - 04/09/22 x 2022-09-18 1627 - 18/09/22 x 14
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (Line Dist) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Line Dist) 93 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07//22 x 46
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (Txr Prot) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Txr Prot) 97 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R07 R0 Detail Protection Scheme (BC) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (BC) 86A 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R08 R0 Detail Protection Scheme (Txr Incomer) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R4 Detail Protection Scheme (Txr Incomer) 135 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R09 R0 Detail Protection Scheme (33kV Feeder) 50 2022-02-15 1320(A) - 15/02/22 x 2022-07-03 407 - 03/03/22 x 138
R1 Detail Protection Scheme (33kV Feeder) 58 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B26S/R10 R0 EM Panel Scheme 84 2022-09-14 2467 - 14/09/22 x 2022-10-04 1744 - 04/10/22 x 20
GtoG01/HBED/B18S/R10 R0 EM Panel Scheme 111 2023-04-16 3757 - 16/04/23 x 2023-05-10 704 - 10/05/23 x
GtoG01/HBED/B18S/R17 R0 Station Common Control panel

1.12.08 Aricha 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
28 GtoG01/HBED/B14S/R01 R0 PSLD 1 2022-11-28 2888 - 28/11/22 x 2022-12-12 2154 - 18/12/22 x
GtoG01/HBED/B14S/R03-01 R1 132kV Control Room Layout 1 2022-06-14 1921 - 14/06/22 x 2022-06-22 1101 - 22/06/22 x 8

Page 8 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
GtoG01/HBED/B26S/R03-02/B R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
GtoG01/HBED/B14S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2023-06-22 4184 - 22/06/23 x 2022-07-17 1124 - 17/07/23 x
GtoG01/HBED/B20S/R04 R0 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-01 3069 - 01/01/23 x 2023-01-12 61 - 12/01/23 x
R1 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-22 3235 - 22/01/23 x 2023-02-05 240 - 05/02/23 x
GtoG01/HBED/B14S/R05 R0 Detail Protection Scheme (Txr Prot) 2023-07-23 4348 - 23/07/23 x 2023-08-13 1368 - 13/08/23 x
GtoG01/HBED/B14S/R07 R0 Detail Protection Scheme (BC) 2023-01-04 3100 - 04/01/23 x 2023-01-25 160 - 25/01/23 x
GtoG01/HBED/B14S/R08 R0 Detail Protection Scheme (33kV Incomer) 2023-07-23 4347 - 23/07/23 x 2023-08-13 1369 - 13/08/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B14S/R10 R0 EM Panel Scheme 2023-04-16 3756 - 16/04/23 x 2023-05-10 709 - 10/05/23 x
GtoG01/HBED/B17S/R17 R0 Station Common Control panel

1.12.08 Mymensingh 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
29 GtoG01/HBED/B70S/R01 R2 PSLD 1 2022-01-16 1160 - 16/01/22 x 2022-01-30 189 - 30/01/22 x 14
GtoG01/HBED/B70S/R03 R3 132kV Control Room Layout 1 2022-04-12 1608 - 12/04/22 x 2022-04-21 716 - 21/04/22 x 9
SYSAT-01 R0 Detail Protection Scheme (System Archeitecture) 2 2023-06-15 4130 - 15/06/23 x 2023-07-04 1039 - 04/07/23 x
GtoG01/HBED/B70S/R04 R0 Detail Protection Scheme (Line Dist) 102 2022-12-18 2988 - 18/12/22 x 2023-01-05 20 - 05/01/23 x
R0 Detail Protection Scheme (Line Dist) 78 2023-03-21 3584 - 21/03/23 x 2023-01-18 584 - 06/04/23 x
GtoG01/HBED/B70S/R041 R0 Detail Protection Scheme (Line Diff) 2023-01-08 3131 - 08/01/23 x 2023-01-18 23.110 - 18/01/23 x
GtoG01/HBED/B70S/R042 R0 Detail Protection Scheme (Simense Line Diff) 97 2023-03-21 3584 - 21/03/23 x 2023-01-18 584 - 06/04/23 x
GtoG01/HBED/B87S/R05 R0 Detail Protection Scheme (Tx) 97 2022-09-22 2519 - 22/09/22 x 2022-10-13 1798 - 13/10/22 x 21
R1 Detail Protection Scheme (Tx) 97 2023-01-09 3137 - 09/01/23 x 2023-01-25 23.0150 - 25/01/23 x 16
GtoG01/HBED/B70S/R06 R0 Detail Protection Scheme (BBP) 159 2022-09-22 2520 - 22/09/22 x 2022-10-04 1745 - 04/10/22 x 12
GtoG01/HBED/B70S/R07 R0 Detail Protection Scheme (BC) 100 2022-10-12 2635 - 12/10/22 x 2022-10-27 1894 - 27/10/22 x 15
GtoG01/HBED/B87S/R08 R0 Detail Protection Scheme (33kV Incoming) 93 2022-09-22 2519 - 22/09/22 x 2022-10-13 1798 - 13/10/22 x 21
R1 Detail Protection Scheme (33kV Incoming) 93 2023-01-09 3136 - 09/01/23 x 2023-01-25 155 - 25/01/23 x 16
GtoG01/HBED/B70S/R10 R0 EM Panel 2023-03-06 3464 - 06/03/23 x 2023-03-27 499 - 27/03/23 x 21
GtoG01/HBED/B17S/R17

1.12.08 Kishorganj 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
30 GtoG01/HBED/B87S/R01 R2 PSLD 1 2022-01-16 1161 - 16/01/22 x 2022-01-30 190 - 30/01/22 x 14
GtoG01/HBED/B87S/R03-01 R1 132kV Control Room Layout 1 2021-11-14 835 - 14/11/21 x 2021-11-28 1787 - 28/11/21 x 14
SYSAT-01 R0 Detail Protection Scheme (System Archeitecture) 2 2023-06-15 4129 - 15/06/23 x 2023-07-04 1036 - 04/07/23 x
GtoG01/HBED/B87S/R04 R0 Detail Protection Scheme (132kV Line Dist) 93 2022-12-18 2989 - 18/12/22 x 2023-01-05 19 - 05/01/23 x 18
GtoG01/HBED/B87S/R05 R0 Detail Protection Scheme (Tx) 97 2022-09-22 2519 - 22/09/22 x 2022-10-13 1798 - 13/10/22 x 21
R1 Detail Protection Scheme (Tx) 97 2023-01-09 3135 - 09/01/23 x 2023-01-24 23.142 - 24/01/23 x 15
GtoG01/HBED/B87S/R06 R0 Detail Protection Scheme (BBP) 92 2022-09-22 2521 - 22/09/22 x 2022-10-13 1800 - 13/10/22 x 21
GtoG01/HBED/B87S/R07 R0 Detail Protection Scheme (BC) 78 2022-10-12 2634 - 12/10/22 x 2022-10-27 1895 - 27/10/22 x 15
GtoG01/HBED/B87S/R08 R0 Detail Protection Scheme (33kV Incoming) 93 2022-09-22 2519 - 22/09/22 x 2022-10-13 1798 - 13/10/22 x 21
R1 Detail Protection Scheme (33kV Incoming) 93 2023-01-09 3134 - 09/01/23 x 2023-01-25 23.0149 - 25/01/23 x 16
GtoG01/HBED/B87S/R10 R0 EM Panel 66 2023-03-06 3467 - 06/03/23 x 2023-03-27 503 - 27/03/23 x 21
GtoG01/HBED/B17S/R17 R0 Station Common Control panel

1.12.08 Khulna (S) 230/132kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
31 GtoG01/HBED/B44S/R01 R1 PSLD 1 2021-08-24 590 - 24/08/21 x 2021-09-01 1219 - 01/09/21 x 8
GtoG01/HBED/B44S/R03 R0 132kV Control Room Layout 1 2021-10-04 696 - 04/10/21 x 2021-10-21 1552 - 21/10/21 x 17
GtoG01/HBED/B44S/W04 R1 Detail Protection Scheme (230kV Line Con.) 53 2022-11-27 2885 - 27/11/22 x 2022-12-18 2153 - 18/12/22 x
GtoG01/HBED/B44S/R04 R0 Detail Protection Scheme 71 2022-02-01 1245 - 01/02/2022 x 2022-02-23 346 - 23/02/22 x 22
R1 Detail Protection Scheme (230kV Line Pro.) 74 2022-11-27 2885 - 27/11/22 x 2022-12-18 2153 - 18/12/22 x
GtoG01/HBED/B44S/R03 R0 EM Panel Scheme 19 2022-10-10 2621 - 10/10/22 x 2022-10-23 1858 - 23/10/22 x 13
DFDR - Confirmation Regarding Existing DFDR (not acceptable) 2023-09-18 4833 - 18/09/23 x 2023-10-08 2327 - 08/10/23 x

1.12.08 Noapara 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS

Page 9 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
32 GtoG01/HBED/B92S/R01-01 R0 PSLD 1 2021-05-20 384 - 20/05/21 x 2021-10-05 1447 - 05/10/21 x 138
GtoG01/HBED/B92S/R02 R1 132kV Control Room Layout 1 2021-09-26 675 - 26/09/21 x 2021-09-29 428 - 29/09/21 x 3
GtoG01/HBED/B17S/R03 R0 Detail Protection Scheme (T1) 74 2022-01-30 1220 - 30/01/22 x 2022-05-11 801 - 11/05/22 x 101
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (T2) 62 2022-01-30 1220 - 30/01/22 x 2022-05-11 801 - 11/05/22 x 101
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (TA) 62 2022-01-30 1220 - 30/01/22 x 2022-05-11 801 - 11/05/22 x 101
GtoG01/HBED/B17S/R07 R1 EM Panel Scheme 22 2022-05-16 1756 - 16/05/22 x 2022-06-02 970 - 02/06/22 x 17

1.12.08 Siddhirganj 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
33 GtoG01/HBED/B99S/R01-01 R0 PSLD 1 2021-05-24 395 - 24/05/21 x 2021-10-12 1498 - 12/10/21 x 141
GtoG01/HBED/B99S/R02 R1 132kV Control Room Layout 1 2021-09-23 670 - 23/09/221 x 2021-09-29 1433 - 29/09/21 x 6
R2 Revised 132kV Control Room Layout 1 2021-06-08 4058 - 08/06/23 x 2023-06-25 1019 - 25/06/23 x 747
GtoG01/HBED/B99S/R03 R3 Detail Protection Scheme (TR3) 105 2022-03-08 1434 - 08/03/22 x 2022-05-25 889 - 25/05/22 x 78
GtoG01/HBED/B99S/R04 R3 Detail Protection Scheme (T3A) 57 2022-03-08 1434 - 08/03/22 x 2022-05-25 889 - 25/05/22 x 78
GtoG01/HBED/B99S/R05 R2 EM Panel Scheme 19 2022-05-15 1752 - 15/05/22 x 2022-06-02 969 - 02/06/22 x 18
ETERN-PGCB-BOQ-SIDDHIRGANJ-001 - BOQ list (RTU) 2023-01-10 3160 - 10/01/23 x 2023-02-20 329 - 20/02/23 x
ETERN-PGCB-IO-SIDDHIRGANJ-002 - IO List 2023-01-10 3160 - 10/01/23 x 2023-02-20 329 - 20/02/23 x

1.12.08 Kurigram 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
34 GtoG01/HBED/B59S/R01-01 R0 PSLD 1 2022-01-09 1122 - 09/01/22 x 2022-01-30 178 - 30/01/22 x 21
GtoG01/HBED/B26S/R02 R0 132kV Control Room Layout 1 2022-01-03 1238 - 03/01/22 x 2022-02-14 283 - 14/02/22 x 42
R0 Revised 132kV Control Room Layout 1 2023-10-18 5074 - 18/10/23 x 2023-10-22 1910 - 22/10/23 x x
GtoG01/HBED/B59S/R04 R0 Detail Protection Scheme (Line) 91 2022-05-16 1757 - 16/05/22 x 2022-06-09 1013 - 09/06/22 x 24
ETERN-PGCB-BOQ-KURIGRAM-001 - BOQ list (RTU) 2023-01-10 3164 - 10/01/23 x 2023-02-20 332 - 20/02/23 x
ETERN-PGCB-IO-KURIGRAM-002 - IO List 2023-01-10 3164 - 10/01/23 x 2023-02-20 332 - 20/02/23 x

1.12.08 Thakurgaon 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
35 GtoG01/HBED/B65S/E01-01 R2 PSLD 1 2022-02-20 1337 - 20/02/22 x 2022-05-08 780 - 08/05/22 x 77
GtoG01/HBED/B65S/R02 R0 132kV Control Room Layout 1 2022-02-20 1336 - 20/02/22 x 2022-03-03 424 - 03/03/22 x 11
GtoG01/HBED/B65S/R03 R0 Detail Protection Scheme (Line) 134 2022-07-26 2175 - 26/07/22 x 2022-08-07 1382 - 07/08/22 x 12
GtoG01/HBED/B65S/R04 R0 EM Panel Scheme 16 2022-07-26 2175 - 26/07/22 x 2022-08-07 1382 - 07/08/22 x 12
ETERN-PGCB-BOQ-THAKURGAON-001 - BOQ list (RTU) 2023-01-10 3159 - 10/01/23 x 2023-02-20 329 - 20/02/23 x
ETERN-PGCB-IO-THAKURGAON-002 - IO List 2023-01-10 3159 - 10/01/23 x 2023-02-20 329 - 20/02/23 x

1.12.08 Panchagarh 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
36 GtoG01/HBED/B62S/R01-01 R0 PSLD 1 2022-02-20 1335 - 20/02/22 x 2022-03-03 420 - 03/03/22 x 11
GtoG01/HBED/B62S/R2 R0 132kV Control Room Layout 1 2022-02-20 1334 - 20/02/22 x 2022-03-03 423 - 03/03/22 x 11
GtoG01/HBED/B62S/R03 R1 Detail Protection Scheme 94 2022-04-10 1593 - 10/04/22 x 2022-05-11 800 - 11/05/22 x 31
ETERN-PGCB-BOQ-PANCHAGARH-001 BOQ list (RTU)
- 2023-01-10 3162 - 10/01/23 x 2023-02-20 330 - 20/02/23 x
ETERN-PGCB-IO-PANCHAGARH-002 IO List
BOQ list (RTU)
- 2023-04-09 3696 - 09/04/23 x 2023-04-18 646 - 18/04/23 x
IO List

1.12.08 Lalmonirhat 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
37 GtoG01/HBED/B88S/R01-01 R1 PSLD 1 2022-03-03 1390 - 03/03/22 x 2022-03-22 512 - 22/03/22 x 19
GtoG01/HBED/B88S/R02 R0 132kV Control Room Layout 1 2022-03-14 1459 - 14/03/22 x 2022-03-22 513 - 22/03/22 x 8
GtoG01/HBED/B88S/R03 R0 Detail Protection Scheme (132kV Line) 2022-06-27 1997 - 27/06/22 x 2022-07-24 1299 - 24/07/22 x 27
GtoG01/HBED/B88S/R04 R0 EM Panel Scheme 2022-06-27 1997 - 27/06/22 x 2022-07-24 1299 - 24/07/22 x 27
ETERN-PGCB-BOQ-LALMONIRHAT-001 - BOQ list (RTU) 2023-01-10 3163 - 10/01/23 x 2023-02-20 328 - 20/02/23 x 41
ETERN-PGCB-IO-LALMONIRHAT-002 - IO List 2023-01-10 3163 - 10/01/23 x 2023-02-20 328 - 20/02/23 x 41
BOQ for RTU & IO List (Lalmonirhat, Patuakhali, Kurugram,
- Comments Reply Against Approved Drawing 2023-03-21 3583 - 21/03/23 x
Siddhirganj, Thakurgaon)

Page 10 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
1.12.08 Jessore 132/33kV AIS Substation
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
38 GtoG01/HBED/B86S/R01 R2 PSLD 1 2022-01-16 1159 - 16/01/22 x 2022-01-30 188 - 30/01/22 x 14
GtoG01/HBED/B86S/R03 R0 132kV Control Room Layout 1 2022-08-11 2260 - 11/08/22 x 2022-08-25 1479 - 25/08/22 x 14
R1 132kV Control Room Layout 1 2022-09-14 2476 - 14/09/22 x 2022-10-04 1784 - 04/10/22 x 20
R2 132kV Rev. Control Room Layout 1 2023-08-20 4583 - 20/08/23 x 2023-09-07 1582 - 07/09/23 x x
GtoG01/HBED/B86S/R04 R0 Detail Protection Scheme (132kV Line) 2023-07-13 4282 - 13/07/23 x 2023-07-31 1247 - 31/07/23 x
R1 Detail Protection Scheme (132kV Line) 97 2023-08-30 4669 - 30/08/23 x 2022-09-17 1649 - 17/09/23 x
GtoG01/HBED/B86S/R05(1) R0 Detail Protection Scheme (132kV TR1/TR2 CRP) 2023-10-12 5000 - 12/10/23 x 2023-10-26 1931 - 26/10/23 x
GtoG01/HBED/B86S/R06 R0 Detail Protection Scheme (132kV BBP) 2023-07-13 4284 - 13/07/23 x 2023-07-31 1252 - 31/07/23 x
GtoG01/HBED/B86S/R07 R0 Detail Protection Scheme (132kV BC) 2023-07-13 4283 - 13/07/23 x 2023-07-31 1245 - 31/07/23 x
R0 Detail Protection Scheme (132kV BC) 83 2023-08-30 4671 - 30/08/23 x 2022-09-17 1650 - 17/09/23 x
GtoG01/HBED/B86S/R08(1) R0 Detail Protection Scheme (33kV Incoming TR1/TR2) 93 2023-10-12 5001 - 12/10/23 x 2022-10-30 1944 - 30/10/23 x
GtoG01/HBED/B86S/R08(2) R0 Detail Protection Scheme (33kV Incoming TR3) 78 2023-10-12 5002 - 12/10/23 x 2023-11-01 1971 - 01/11/23 x
GtoG01/HBED/B86S/R10 R0 EM Panel 2023-07-13 4281 - 13/07/23 x 2023-07-31 1255 - 31/07/23 x

1.12.08 Cox's Bazar 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
39 GtoG01/HBED/B80S/R01-01 R0 PSLD 1 2021-12-09 944 - 09/12/21 x 2022-01-03 22.17 - 03/01/22 x 25
R1 PSLD 1 2022-01-16 1162 - 16/01/23 x 2022-01-30 179 - 30/01/22 x
R2 PSLD 1 2023-03-27 3615 - 27/03/23 x 2023-04-13 618 - 13/04/23 x
GtoG01/HBED/B80S/R03-01 R1 132kV Control Room Layout 1 2021-11-15 841 - 15/11/21 x 2021-11-28 1789 - 28/11/21 x 13
GtoG01/HBED/B80S/R06 R0 Detail Protection Scheme BBP 82 2023-10-26 5137 - 26/10/23 x

GtoG01/HBED/B80S/R10 R0 EM Panel 2023-07-23 4346 - 23/07/23 x 2023-08-13 1370 - 13/08/23 x

BBP - Regarding BBP 2023-09-27 4833 -27/09/23 x 2023-10-16 2414 - 16/10/23 x

1.12.08 Bottail. Kushtia 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
40 GtoG01/HBED/B72S/R01-01 R0 PSLD 1 2021-12-09 950 - 09/12/21 x 2022-01-03 20 - 03/01/22 x 25
R2 PSLD 1 2022-01-16 1158 - 16/01/22 x 2022-01-30 180 - 30/01/22 x 14
GtoG01/HBED/B72S/R03 R1 132kV Control Room Layout (rev) 1 2021-10-24 738 - 24/10/21 x 2021-10-27 1585 - 27/10/21 x 3
GtoG01/HBED/B72S/R04(1) R0 Detail Protection Scheme (Line Distance) 2023-03-27 3611 - 27/03/23 x 2023-04-13 620 - 13/04/23 x
GtoG01/HBED/B72S/R04(2) R0 Detail Protection Scheme (Line Distance) 2023-07-04 4209 - 04/07/23 x 2023-07-19 1139 - 19/07/23 x
GtoG01/HBED/B72S/R05(3) R0 Detail Protection Scheme (132kV TX TR3) 101 2023-01-03 3094 - 03/01/23 x 2023-01-25 171 - 25/01/23 x
GtoG01/HBED/B72S/R05(1) R0 Detail Protection Scheme (132kV TX TR1) 101 2023-03-22 3587 - 22/03/23 x 2023-04-13 624 - 13/04/23 x
GtoG01/HBED/B72S/R05(2) R0 Detail Protection Scheme (132kV TX TR2) 101 2023-03-27 3610 - 27/03/23 x 2023-04-13 622 - 13/04/23 x
GtoG01/HBED/B72S/R06 R0 Detail Protection Scheme (BBP) 2023-01-03 3093 - 03/01/23 x 2023-01-25 174 - 25/01/23 x
GtoG01/HBED/B72S/R07 R0 Detail Protection Scheme (BC) 2023-01-03 3092 - 03/01/23 x 2023-01-25 169 - 25/01/23 x
GtoG01/HBED/B72S/R08(1) R0 Detail Protection Scheme (33kV Trafo Incomer TR3) 80 2023-01-03 3091 - 03/01/23 x 2023-01-25 169 - 25/01/23 x
GtoG01/HBED/B72S/R08(2) R0 Detail Protection Scheme (33kV Trafo Incomer TR1) 80 2023-03-22 3593 - 22/03/23 x 2023-04-13 623 - 13/04/23 x

GtoG01/HBED/B72S/R08(3) R0 Detail Protection Scheme (33kV Trafo Incomer TR2) 80 2023-03-27 3609 - 27/03/23 x 2023-04-13 621 - 13/04/23 x

GtoG01/HBED/B72S/R10 R0 EM Panel 2023-07-03 4208 - 03/07/23 x 2023-07-18 1132 - 18/0723 x

1.12.08 Saidpur 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
41 GtoG01/HBED/B94S/R01 R0 PSLD 1 2022-04-05 1575 - 05/04/22 x 2022-04-26 748 - 26/04/22 x 21
R2 PSLD 1 2022-06-02 1867 - 02/06/22 x 2022-07-06 1210 - 06/07/22 x 34
GtoG01/HBED/B94S/R03-01 R2 132kV Control Room Layout 1 2022-06-12 1909 - 12/06/22 x 2022-07-03 1173 - 03/07/22 x 21
R1 132kV Control Room Layout 1 2022-08-22 2297 - 22/08/22 x 2022-09-06 1549 - 06/09/22 x x 15
GtoG01/HBED/B94S/R04(1) R0 Detail Protection Scheme (132kV Line Dis. CRP) 2023-10-12 5005 - 12/10/23 x 2023-10-23 1916 - 23/10/23 x
GtoG01/HBED/B94S/R05(2) R0 Detail Protection Scheme (132kV TR2/3 CRP) 2023-10-12 5010 - 12/10/23 x 2023-10-25 1923 - 25/10/23 x
GtoG01/HBED/B94S/R06 R0 Detail Protection Scheme (BBP) 2023-10-12 5003 - 12/10/23 x 2023-10-22 1904 - 22/10/23 x
GtoG01/HBED/B94S/R07 R0 Detail Protection Scheme (BC) 2023-10-12 5004 - 12/10/23 x 2023-10-30 1948 - 30/10/23 x
R0 Detail Protection Scheme (BC) 2023-11-07 5241 - 07/11/23 x
GtoG01/HBED/B94S/R08(1) R0 Detail Protection Scheme (33kV Incoming TR2/3 CRP) 123 2023-10-12 5009 - 12/10/23 x 2023-10-25 1924 - 25/10/23 x

Page 11 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
GtoG01/HBED/B94S/R08(2) R0 Detail Protection Scheme (33kV Incoming TR4 CRP) 2023-10-12 5006 - 12/10/23 x 2023-10-25 1925 - 25/10/23 x
GtoG01/HBED/B94S/R08(3) R0 Detail Protection Scheme (33kV Incoming TR5 CRP) 2023-10-12 5007 - 12/10/23 x 2023-10-25 1926 - 25/10/23 x
GtoG01/HBED/B94S/R10 R0 EM Panel 2023-07-23 4344 - 23/07/23 x 2023-08-08 1339 - 08/08/23 x

1.12.08 Mirpur 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
42 GtoG01/HBED/B89S/R01 R0 PSLD 1 2023-01-23 3194 - 17/01/23 x 2023-02-05 239 - 05/02/23 x 13
GtoG01/HBED/B89S/R03-01 R0 132kV Control Room Layout 1 2023-02-19 3380 - 19/02/23 x 2023-03-09 414 - 09/03/23 x
GtoG01/HBED/B89S/R041(1) R0 Detail Protection Scheme (132kV Line) 2023-07-12 4273 - 12/07/23 x 2023-07-31 1242 - 31/07/23 x
R0 Detail Protection Scheme (132kV Line Diff.) 98 2023-08-13 4534 - 13/08/23 x 2023-08-30 1520 - 30/08/23 x
GtoG01/HBED/B89S/R05 R0 Detail Protection Scheme (TR1/TR3) 2023-07-12 4277 - 12/07/23 x 2023-07-31 1251 - 31/07/23 x
GtoG01/HBED/B89S/R05 R0 Detail Protection Scheme (TR2) 2023-07-12 4276 - 12/07/23 x 2023-07-31 1251 - 31/07/23 x
GtoG01/HBED/B89S/R06 R0 Detail Protection Scheme (BBP) 105 2023-07-12 4275 - 12/07/23 x 2023-07-31 1243 - 31/07/23 x
GtoG01/HBED/B89S/R07 R0 Detail Protection Scheme (BC) 2023-07-12 4274 - 12/07/23 x 2023-07-31 1244 - 31/07/23 x
R0 Detail Protection Scheme (BC) 82 2023-08-30 4673 - 30/08/23 x 2023-09-17 1651 - 17/09/23 x
GtoG01/HBED/B89S/R08(1) R0 Detail Protection Scheme (33kv Incoming TR1/3) 2023-07-12 4272 - 12/07/23 x 2023-07-31 1248 - 31/07/23 x
GtoG01/HBED/B89S/R08(2) R0 Detail Protection Scheme (33kv Incoming TR2) 2023-07-12 4271 - 12/07/23 x 2023-07-31 1248 - 31/07/23 x
GtoG01/HBED/B89S/R08 R0 Detail Protection Scheme (33kV Incoming TR1/2/3) 2023-10-01 4905 - 01/10/23 x 2023-10-15 1845 - 15/10/23 x
GtoG01/HBED/B89S/R10 R0 EM Panel 2023-07-23 4345 - 23/07/23 x 2023-08-13 1364 - 13/08/23 x

1.12.08 Jamalpur 132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
43 GtoG01/HBED/B85S/E01-01 R0 PSLD 1 2022-09-28 2572 - 28/09/22 2022-10-16 1802 - 16/10/22 x
R1 PSLD 1 2022-11-13 2815 - 13/11/22 x 2022-11-24 2046 - 24/11/22 x 11

1.12.08 Barapukuria(N) 230/132kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
44 GtoG01/HBED/B13S/R01 R0 PSLD 1 2021-08-21 601 - 31/08/21 x 2021-09-21 1368 - 21/09/21 x 31
R1 PSLD 1 2023-10-03 4916 - 03/10/23 x 2023-10-15 1847 - 15/10/23 x x
GtoG01/HBED/B13S/R03 R1 Control Room Layout 1 2022-02-08 1286 - 08/02/22 x 2022-04-21 711 - 21/04/22 x 72
R2 Control Room Layout 1 2023-11-07 5248 - 07/11/23 x
GtoG01/HBED/B13S/R02 R0 System Architechture 1 2021-11-10 823 - 10/11/21 x 2021-12-05 1849 - 5/12/21 x 25
R1 System Architechture 1 2022-05-08 1707 - 08/05/22 x 2022-05-25 888 - 25/05/22 x 17
R2 System Architechture 1 2022-06-23 1989 - 23/06/22 x 2022-07-24 1300 - 24/07/22 x 31
GtoG01/HBED/B13S/R15 R0 SAS Panel Functional Diagram 35 2022-05-08 1707 - 08/05/22 x 2022-05-25 888 - 25/05/22 x 17
R1 SAS Panel Functional Diagram 35 2022-06-23 1989 - 23/06/22 x 2022-07-24 1300 - 24/07/22 x 31
R2 SAS Panel Functional Diagram 37 2022-12-11 2952 - 11/12/22 x 2022-12-29 2234 - 29/12/22 x
R3 Ethernet Switch & GPS 37 2023-01-15 3181 - 15/01/23 x 2023-01-31 219 - 31/01/23 x
GtoG01/HBED/B13S/R23 R0 Interlocking 2021-11-10 823 - 10/11/21 x 2021-12-05 1849 - 5/12/21 x 25
GtoG01/HBED/B13S/R24 R0 Trip Matrix & panel arrangement 2021-11-10 823 - 10/11/21 x 2021-12-05 1849 - 5/12/21 x 25
GtoG01/HBED/B13S/R04 R0 Detail Protection Scheme (230kV Line Protection) 2023-01-03 3086 - 03/01/23 x 2023-01-25 23.0152 - 25/01/23 x
R0 Detail Protection Scheme (230kV Line Protection) 49 2023-03-28 3624 - 28/03/23 x 2023-04-24 658 - 24/04/23 x
R4 Detail Protection Scheme (230kV Line Protection) 57 2023-07-16 4308 - 16/07/23 x 2023-07-31 1256 - 31/07/23 x
GtoG01/HBED/B13S/R05 R0 Detail Protection Scheme (230kV Line Control) 2023-01-03 3085 - 03/01/23 x 2023-01-25 23.0151 - 25/01/23 x
R0 Detail Protection Scheme (230kV Line Control) 79 2023-03-28 3623 - 28/03/23 x 2023-04-24 660 - 24/04/23 x
R4 Detail Protection Scheme (230kV Line Control) 87 2023-07-16 4307 - 16/07/23 x 2023-07-31 1256 - 31/07/23 x
GtoG01/HBED/B13S/R06 R0 Detail Protection Scheme (230kV BC Protection) 2023-01-03 3084 - 03/01/23 x 2023-01-25 23.0154 - 25/01/23 x
R3 Detail Protection Scheme (230kV BC Protection) 36 2023-03-28 3622 - 28/03/23 x 2023-04-24 659 - 24/04/23 x
R4 Detail Protection Scheme (230kV BC Protection) 34 2023-07-16 4305 - 16/07/23 x 2023-07-31 1256 - 31/07/23 x
GtoG01/HBED/B13S/R07 R0 Detail Protection Scheme (230kV BC Control) 130 2023-01-03 3083 - 03/01/23 x 2023-01-25 23.0153 - 25/01/23 x
R3 Detail Protection Scheme (230kV BC Control) 130 2023-03-28 3621 - 28/03/23 x 2023-04-24 661 - 24/04/23 x
R4 Detail Protection Scheme (230kV BC Control) 144 2023-07-16 4306 - 16/07/23 x 2023-07-31 1256 - 31/07/23 x
GtoG01/HBED/B13S/R08 R0 Detail Protection Scheme (230kV BBP) 2023-01-03 3082 - 03/01/23 x 2023-01-25 23.0158 - 25/01/23 x
R3 Detail Protection Scheme (230kV BBP) 94 2023-03-28 3626 - 28/03/23 x 2023-04-24 662 - 24/04/23 x
R4 Detail Protection Scheme (230kV BBP) 111 2023-07-31 4450 - 31/07/23 x 2023-08-24 1477 - 24/08/23 x

Page 12 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
GtoG01/HBED/B13S/R09 R0 Detail Protection Scheme (33kV incoming) 2023-01-03 3081 - 03/01/23 x 2023-01-25 159 - 25/01/23 x
R3 Detail Protection Scheme (33kV incoming) 66 2023-03-28 3625 - 28/03/23 x 2023-04-24 657 - 24/04/23 x
R4 Detail Protection Scheme (33kV incoming) 72 2023-07-31 4449 - 31/07/23 x 2023-08-24 1476 - 24/08/23 x

1.12.08 Tangail 230/132kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
45 GtoG01/HBED/B11S/R01-01 R0 PSLD 1 2021-12-26 1030 - 26/12/21 x 2022-01-10 64 - 10/01/22 x 15
R0 PSLD 1 2022-01-18 1181 - 18/01/22 x 2022-04-28 773 - 28/04/22 x 100
R1 PSLD 1 2022-05-09 1713 - 09/05/22 x
GtoG01/HBED/B11S/R01 R1 PSLD 1 2023-09-18 4826 - 18/09/23 x 2023-10-02 1761 - 02/10/23 x
132kV GIS LCC R2 132kV GIS LCC drawing of Tangail 230/132kV GIS Substation 2022-06-21 1962 - 21/06/22 x 2022-07-21 1290 - 21/07/22 x 30
230kV GIS LCC R0 230kV GIS LCC drawing of Tangail 230/132kV GIS Substation 2022-07-04 2029 - 04/07/22 x 2022-07-21 1290 - 21/07/22 x 17

1.12.08 Kabirpur 230/132kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
46 GtoG01/HBED/B10S/R01 R1 PSLD 1 2022-05-09 1714 - 09/05/22 x 2022-05-25 886 - 25/05/22 x 16
132kV(50kA) GIS LCC drawing of Kabirpur 230/132kV GIS Substation for
132kV GIS LCC R0 392 2022-07-25 2166 - 25/07/22 x 2022-09-06 1556 - 06/09/22 x 43
ZF16-252)
230kV GIS LCC - 230kV 50kA 1 2023-03-14 3528 - 14/03/23 x 2023-04-05 575 - 05/04/23 x
GtoG01/HBED/B10S/R02 R0 Panel Arrangement of Control Room 1 2023-01-16 3185 - 16/01/23 x 2023-02-02 223 - 02/02/23 x
GtoG01/HBED/B10S/R02 R2 Panel Arrangement of Control Room (Rev.) 1 2023-10-12 4637 - 28/08/23 x 2023-09-03 1557 - 03/09/23 x x
- - Secondary Scope Confirmation - 2023-08-29 5017 - 12/10/23 x 2023-10-26 2519 - 26/10/23

1.12.08 Sylhet(S) 230/132kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
47 GtoG01/HBED/B12S/R01 R0 PSLD 1 2023-09-12 4785 - 12/09/23 x 2023-10-01 1750 - 01/10/23 x 19
R1 PSLD 1 2023-10-17 5066 - 17/10/23 x 2023-10-19 1894 - 19/10/23 x
Scope Confirmation - Scope for 2 line Bays - 2023-10-23 5109 - 23/10/23 x

1.12.08 Khulna (C) 230/132kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
48 GtoG01/HBED/B04S/R01 R2 PSLD 1 2022-05-09 1175 - 09/05/22 x 2022-05-25 890 - 25/05/22 x 16
GtoG01/HBED/B10S/R02 R0 Panel Arrangement of Control Room 1 2023-08-28 4660 - 29/08/23 x 2023-09-07 1577 - 07/09/23 x
R1 Panel Arrangement of Control Room 1 2023-10-01 4904 - 01/10/23 x 2023-10-09 1804 - 09/10/23 x x
R1 Panel Arrangement of Control Room 1 2023-10-11 4978 - 11/10/23 x x
GtoG01/HBED/B04S/R04 R0 Detail Protection Scheme (230kV Line) 101 2022-12-19 3004 - 19/12/22 x 2023-01-16 89 - 16/01/23 x 28
R2 Detail Protection Scheme (230kV Line) 104 2023-04-04 3661 - 04/04/23 x 2023-04-24 652 - 24/04/23 x
R2 Detail Protection Scheme (230kV Line) 104 2023-07-19 4340 - 19/07/23 x 2023-07-31 1267 - 31/07/23 x
GtoG01/HBED/B04S/R06 R0 Detail Protection Scheme (230kV Txr Prot) 113 2022-12-19 3003 - 19/12/22 x 2023-01-16 81 - 16/01/23 x
R2 Detail Protection Scheme (230kV Txr Prot) 116 2023-04-04 3660 - 04/04/23 x 2023-04-24 652 - 24/04/23 x
R2 Detail Protection Scheme (230kV Txr Prot) 116 2023-07-19 4339 - 19/07/23 x 2023-07-31 1267 - 31/07/23 x
GtoG01/HBED/B04S/R08 R0 Detail Protection Scheme (AVR) 93 2022-12-19 3017 - 19/12/22 x 2023-01-16 93 - 16/01/23 x
R2 Detail Protection Scheme (AVR) 76 2023-04-04 3664 - 04/04/23 x 2023-04-24 652 - 24/04/23 x
R3 Detail Protection Scheme (AVR) 76 2023-07-19 4343 - 19/07/23 x 2023-07-31 1267 - 31/07/23 x
GtoG01/HBED/B04S/R09 R0 Detail Protection Scheme (230kV BC) 97 2022-12-19 3000 - 19/12/22 x 2023-01-16 82 - 16/01/23 x
R2 Detail Protection Scheme (230kV BC) 101 2023-04-04 3663 - 04/04/23 x 2023-04-24 652 - 24/04/23 x
R3 Detail Protection Scheme (230kV BC) 101 2023-07-19 4342 - 19/07/23 x 2023-07-31 1267 - 31/07/23 x
GtoG01/HBED/B04S/R10 R0 Detail Protection Scheme (230kV BBP) 58 2022-12-19 2999 - 19/12/22 x 2023-01-16 87 - 16/01/23 x
R2 Detail Protection Scheme (230kV BBP) 74 2023-04-04 3662 - 04/04/23 x 2023-04-24 652 - 24/04/23 x
R3 Detail Protection Scheme (230kV BBP) 74 2023-07-19 4341 - 19/07/23 x 2023-07-31 1267 - 31/07/23 x
GtoG01/HBED/B04S/R11 R0 Detail Protection Scheme (132kV Incomer) 66 2022-12-19 3016 - 19/12/22 x 2023-01-16 84 - 16/01/23 x
GtoG01/HBED/B04S/R13 R0 Detail Protection Scheme (132kV Line) 75 2022-12-19 2998 - 19/12/22 x 2023-01-16 80 - 16/01/23 x
GtoG01/HBED/B04S/R20 R0 Detail Protection Scheme (132kV Txr) 84 2022-12-19 2997 - 19/12/22 x 2023-01-16 83 - 16/01/23 x
GtoG01/HBED/B04S/R23 R0 Detail Protection Scheme (132kV BC) 75 2022-12-19 2996 - 19/12/22 x 2023-01-16 88 - 16/01/23 x
GtoG01/HBED/B04S/R24 R0 Detail Protection Scheme (132kV BS) 78 2022-12-19 3013 - 19/12/22 x 2023-01-16 86 - 16/01/23 x

Page 13 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
GtoG01/HBED/B04S/R25 R0 Detail Protection Scheme (132kV BBP) 134 2022-12-19 2995 - 19/12/22 x 2023-01-16 85 - 16/01/23 x
GtoG01/HBED/B04S/R26 R0 Detail Protection Scheme (33kV Incomer) 117 2022-12-19 3014 - 19/12/22 x 2023-01-16 89 - 16/01/23 x
GtoG01/HBED/B04S/R29 R0 Detail Protection Scheme (33kV Earth Txr) 60 2022-12-19 3015 - 19/12/22 x 2023-01-16 90 - 16/01/23 x
GtoG01/HBED/B04S/R31-PANEL 1 R0 DFDR Panel -1 2023-01-10 3156 - 10/1/23 x 2023-01-25 186 - 25/01/23 x
GtoG01/HBED/B04S/R31-PANEL 2 R0 DFDR Panel -2 2023-01-10 3156 - 10/1/23 x 2023-01-25 186 - 25/01/23 x
DFDR Panel Drawing R0 DFDR Panel Drawing 2023-07-03 4205 - 03/07/23 x 2023-07-05 1056 - 05/07/23 x
GIS LCC - 230kV 50kA GIS LCC 2023-04-11 3719 - 11/04/23 x 2023-05-14 723 - 14/05/23 x
- 132kV 50kA GIS LCC 2023-05-22 3948 - 22/05/23 x 2023-06-13 925 - 13/06/23 x

1.12.08 Dhamrai 230/132kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
49 GtoG01/HBED/B07S/R01 R3 PSLD 1 2022-05-09 1716 - 09/05/22 x 2022-05-25 883 - 25/05/22 x 16
R4 PSLD (Rev.) 1 2023-09-18 4829 - 18/09/23 x 2023-10-01 1748 - 01/10/23 x x
GtoG01/HBED/B07S/R02 R1 Panel Arrangement of Control Room 1 2023-03-14 3531 - 14/03/23 x 2023-04-06 582 - 06/04/23 x
GtoG01/HBED/B07S/R02 R1 Panel Arrangement of Control Room (Rev.) 1 2023-08-28 4635 - 28/08/23 x 2023-09-07 1578 - 07/09/23 x x
GIS LCC - 132kV 40kA GIS LCC 2023-03-14 3529 - 14/03/23 x 2023-04-05 576 - 05/04/23 x
- 132kV 40kA GIS LCC 289 2023-08-31 4691 - 31/08/23 x 2023-09-10 1600 - 10/09/23 x
- 230kV 50kA GIS LCC 2023-03-14 3529 - 14/03/23 x 2023-04-05 576 - 05/04/23 x

1.12.08 Rangpur 230/132kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
50 GtoG01/HBED/B09S/R01 R2 PSLD 1 2022-05-09 1717 - 09/05/22 x 2022-05-25 884 - 25/05/22 x 16
GtoG01/HBED/B09S/R02 R0 Panel Arrangement of Control Room 1 2023-03-27 3612 - 27/03/23 x 2023-04-13 616 - 13/04/23 x
R1 Panel Arrangement of Control Room (Rev.) 1 2023-08-28 4636 - 28/08/23 x 2023-09-10 1610 - 10/09/23 x x
GIS LCC - 230kV 50kA & 132kV 40kA GIS LCC 2023-03-14 3530 - 14/03/23 x 2023-04-14 626 - 14/04/23 x

1.12.08 Gazaria 230/132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
51 GtoG01/HBED/B02S/R01 R0 PSLD 1 2022-07-17 2085 - 17/07/22 x 2022-08-02 1378 - 04/08/22 x 16
R1 PSLD 1 2023-07-25 4400 - 25/07/23 x 2023-08-13 1369 - 13/08/23 x
R1 PSLD 1 2023-09-10 4758 - 10/09/23 x 2023-10-01 1745 - 01/10/23 x x
GtoG01/HBED/B02S/R02 R0 Panel Arrangement of Control Room 1 2023-07-23 4379 - 23/07/23 x 2023-08-13 1362 - 13/08/23 x
230kV 50kA GIS LCC
GIS LCC - 2023-04-12 3726 - 12/04/23 x 2023-07-16 1119 - 16/07/23 x
132kV 40kA GIS LCC

1.12.08 Jessore 230/132kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
52 GtoG01/HBED/B08S/R01 R0 PSLD 1 2022-05-19 1952 - 19/05/22 x 2022-07-07 1219 - 07/07/22 x 49
GtoG01/HBED/B08S/R02 R0 Panel Arrangement of 230kV Control Room 1 2023-08-13 4535 - 13/08/23 x 2023-08-31 1525 - 31/08/23 x
230kV 50kA GIS LCC
GIS LCC - 1 2023-04-12 3728 - 12/04/23 x 2023-06-14 726 - 14/05/23 x
132kV 40kA GIS LCC
IDM-T607 R0 DFDR Panel Drawing 2023-11-02 5211 - 02/11/23 x

1.12.08 Palashbari 230/132kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
53 GtoG01/HBED/B06S/R01 R0 PSLD 1 2021-08-21 2785 - 03/11/22 x 2022-11-20 2010 - 20/11/22 x
R0 PSLD 1 2023-09-11 4776 - 11/09/23 x 2023-10-01 1746 - 01/10/23 x x
GtoG01/HBED/R06-02 R0 Panel Arrangement of 33kV Control Room 1 2023-06-14 4115 - 14/06/23 x 2023-07-04 1042 - 04/07/23 x
R0 Panel Arrangement of 33kV Control Room 1 2023-10-09 4960 - 09/10/23 x 2023-10-19 1892 - 19/10/23 x
GtoG01/HBED/B06S/R02A R0 Panel Arrangement of 230kV Control Room 1 2023-08-14 4553 - 14/08/23 x 2023-08-22 1448 - 22/08/23 x
230kV 50kA GIS LCC
GIS LCC - 2023-04-12 3727 - 12/04/23 x 2023-06-14 725 - 14/06/23 x
132kV 40kA GIS LCC

1.12.08 Bibiyana 230/132kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS

Page 14 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
54 GtoG01/HBED/B03S/01 R0 PSLD 1 2023-09-12 4784 - 12/09/23 x 2023-10-01 1750 - 01/10/23 x 19

1.12.08 Madhobdi 230/132kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
55 GtoG01/HBED/B05S/R01 R0 PSLD 1 2022-05-19 1951 - 19/05/22 x 2022-07-07 1220 - 07/07/22 x 49
GtoG01/HBED/B05S/R02 R0 Panel Arrangement of Control Room 1 2023-05-21 3940 - 21/05/23 x 2023-06-15 980 - 15/06/23 x
R0 Panel Arrangement of Control Room 1 2023-07-12 4266 - 12/07/23 x 2023-07-31 1235 - 31/07/23 x
GtoG01/HBED/B05S/R02 R1 (Rev.) Panel Arrangement of Control Room 1 2023-08-28 4634 - 28/08/23 x 2023-09-03 1558 - 03/09/23 x x
GIS LCC - 230kV 50kA GIS LCC 2023-04-11 3720 - 11/04/23 x 2023-05-14 724 - 14/05/23 x
- 132kV 50kA GIS LCC 2023-05-22 3949 - 22/05/23 x 2023-06-13 927 - 13/06/23 x

1.12.08 Bandarban 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
56 GtoG01/HBED/B41S/R01 R0 PSLD 1 2022-09-13 4795 - 13/09/23 x 2023-10-09 1807 - 09/10/23 x
R1 PSLD 1 2022-10-12 5012 - 12/10/23 x 2023-10-15 1848 - 15/10/23 x

1.12.08 Hemayetpur 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
57 GtoG01/HBED/B34S/R01 R0 PSLD 1 2022-09-01 2373 - 01/09/22 x 2022-09-15 1620 - 15/09/22 x 14

1.12.08 Shabgram 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
58 GtoG01/HBED/B35S/R01 R0 PSLD 1 2022-09-01 2370 - 01/09/22 x 2022-09-15 1616 - 15/09/22 x 14
132kV GIS LCC R0 132kV GIS LCC drawing of Shabgram 230/132kV GIS Substation 2022-07-27 2178 - 27/07/22 x 2022-08-23 1458 - 23/08/22 x

1.12.08 Bandar 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
59 GtoG01/HBED/B33S/R01 R0 PSLD 1 2022-10-18 2689 - 18/10/22 x 2022-11-09 1970 - 09/11/22 x 22

1.12.08 Boardbazar 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
60 GtoG01/HBED/B32S/R01 R0 PSLD 1 2022-09-01 2371 - 01/09/22 x 2022-09-15 1619 - 15/09/22 x 14

1.12.08 Jalshiri 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
61 GtoG01/HBED/B39S/R01 R0 PSLD 1 2022-09-01 2372 - 01/09/22 x 2022-09-15 1617 - 15/09/22 x 14

1.12.08 Sylhet(E) 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
62 GtoG01/HBED/B36S/R01 R0 PSLD 1 2022-09-01 2369 - 01/09/22 x 2022-09-18 1626 - 18/09/22 x 17

1.12.08 Sylhet(N) 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
63 GtoG01/HBED/B37S/R01 R0 PSLD 1 2022-09-01 2368 - 01/09/22 x 2022-09-18 1625 - 18/09/22 x 17

1.12.08 Abdullahpur 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
64 GtoG01/HBED/B40S/R01 R0 PSLD 1 2022-12-04 2908 - 04/12/22 x 2022-12-22 2190 - 22/12/22 x

1.12.08 Ashulia 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
65 GtoG01/HBED/B31S/R01 R0 PSLD 1 2022-09-01 2375 - 01/09/22 x 2022-09-15 1622 - 15/09/22 x 14

1.12.08 Baipyle (Dhaka EPZ) 132/33kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
66 GtoG01/HBED/B38S/R01 R1 PSLD 1 2022-09-01 2374 - 01/09/22 x 2022-09-15 1621 - 15/09/22 x 14

Page 15 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
1.12.08 Comilla(N) 230/132kV AIS Substation
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
67 GtoG01/HBED/B48S/R01-01 R0 PSLD 1 2021-11-08 799 - 08/11/21 x 2021-11-28 1791 - 28/11/21 x 20
R1 PSLD 1 2022-01-18 1175 - 18/01/22 x 2022-04-28 773 - 28/04/22 x
R1 PSLD 1 2023-03-29 3632 - 29/03/23 x 2023-04-24 611 - 24/04/23 x 26
- PSLD (Scope)- confirmed 1 2023-05-10 3851 - 10/05/23 x 2023-08-29 2029 - 29/08/23 x
R1 PSLD 1 2023-09-18 4825 -18/09/23 x 2023-10-09 1806 - 09/10/23 x
R1 PSLD 1 2023-10-12 4994 - 12/10/23 x 2023-10-16 1861 - 16/10/23 x
GtoG01/HBED/B48S/R02 R0 Control Room Layout 1 2021-11-08 800 - 08/11/21 x 2023-01-11 109 - 11/01/23 x
R1 Layout of Control Room 2023-02-16 3370 - 16/02/23 x 2023-02-28 385 - 28/02/23 x 12
GtoG01/HBED/B48S/R03 R0 Detail Protection Scheme (230kV ATR-3 CRP) 2023-10-01 4902 - 01/10/23 x 2023-10-19 1900 - 19/10/23 x
R0 Detail Protection Scheme (230kV ATR-3 CRP) 2023-11-01 5192 - 01/11/23 x
GtoG01/HBED/B48S/R04 R0 Detail Protection Scheme (230kV ATR-3 AVR Control) 2023-11-01 5190 - 01/11/23 x
GtoG01/HBED/B48S/R05 R0 132kV Incoming CRP 2023-10-01 4901 - 01/10/23 x 2023-10-19 1901 - 19/10/23 x
R0 132kV Incoming CRP 2023-11-01 5191 - 01/11/23 x
GtoG01/HBED/B48S/R06 R0 230kV BBP 2023-10-22 5099 - 22/10/23 x 2023-11-08 2023 - 08/11/23 x
GtoG01/HBED/B48S/R07 R0 132kV BBP 2023-10-22 5100 - 22/10/23 x 2023-11-02 23. - 02/11/23 x
GtoG01/HBED/B48S/R08 R0 230kV & 132kV EMP Panel 2023-10-01 4896 - 01/10/23 x 2022-10-15 1846 - 15/10/23 x
RA1_613_31 R0 DFDR Panel Drawing 2023-10-29 5157 - 29/10/23 x 2023-11-08 2022 - 08/11/23 x

1.12.08 Rampura 230/132kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
68 GtoG01/HBED/B52S/R01 R1 PSLD 1 2021-11-18 797 - 18/11/21 x 2021-11-28 1788 - 28/11/21 x 16
R1 PSLD 1 2022-01-18 1175 - 18/01/22 x 2022-04-28 773 - 28/04/22 x
R4 PSLD 1 2022-09-18 2487 - 18/09/22 x 2022-10-04 1749 - 04/10/22 x
GtoG01/HBED/B52S/R01 R5 PSLD 1 2022-11-16 2838 - 16/11/22 x 2022-12-11 2132 - 11/12/22 x x
GtoG01/HBED/B52S/R02 R0 Control Room Layout 1 2021-11-08 798 - 08/11/21 x 2021-11-25 1784 - 25/11/21 x
R1 Control Room Layout (Rev.) 1 2023-08-22 4611 - 22/08/23 x 2023-07-09 1579 - 07/09/23 x x
GtoG01/HBED/B52S/R03 R0 Detail Protection Scheme (230kV ATR-4 Control & Protection) 2023-07-04 4215 - 04/07/23 x 2023-07-19 1142 - 19/07/23 x
R1 Detail Protection Scheme (230kV ATR-4 Control & Protection) 216 2023-08-22 4600 - 22/08/23 x 2023-09-07 1580 - 07/09/23 x
GtoG01/HBED/B52S/R06 R0 Detail Protection Scheme (132kV Incoming CRP) 59 2023-07-04 4212 - 04/07/23 x 2023-07-19 1142 - 19/07/23 x
R1 Detail Protection Scheme (132kV Incoming CRP) 166 2023-08-22 4599 - 22/08/23 x 2023-09-04 1563 - 04/09/23 x
GtoG01/HBED/B52S/R07 R0 230kV EM Panel 21 2023-07-04 4211 - 04/07/23 x 2023-07-23 1173 - 23/07/23 x
GtoG01/HBED/B52S/R08 R0 132kV EM Panel 21 2023-07-04 4210 - 04/07/23 x 2023-07-23 1172 - 23/07/23 x
GtoG01/HBED/B52S/R09 R0 Detail Protection Scheme (230kV ATR-4 AVR CRP) 2023-09-12 4787 - 12/09/23 x 2023-09-25 1728 - 25/09/23 x
GtoG01/HBED/B52S/R10 R0 Detail Protection Scheme (230kV ATR-3 AVR CRP) 2023-09-12 4786 - 12/09/23 x 2023-09-25 1729 - 25/09/23 x
GtoG01/HBED/B52S/R11 R0 Detail Protection Scheme (230kV ATR-1 AVR CRP) 2023-09-12 4788 - 12/09/23 x 2023-09-25 1730 - 25/09/23 x
RA3_1019_31 R0 DFDR Panel Drawing 2023-10-29 5155 - 29/10/23 x 2023-11-06 2004 - 06/11/23 x

1.12.08 Barisal(N) 230/132/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
69 GtoG01/HBED/B57S/R01-01 R0 PSLD 1 2021-05-23 381 - 23/05/21 x 2021-10-04 1438 - 04/10/21 x 134
GtoG01/HBED/B57S/R02 R0 132kV Control Room Layout 1 2021-04-10 695 - 04/10/21 x 2021-10-10 1483 - 10/10/21 x 183
GtoG01/HBED/Barisal/R04 R0 Detailed Protection Scheme (132kV OHL C&P) 81 2023-01-17 3196 - 17/01/23 x 2023-02-05 238 - 05/02/23 x 19
- Reply Regarding Comment - 2023-04-06 3645 - 06/04/23 x 2023-05-02 678(1) - 02/05/23 x
R1 Detailed Protection Scheme (132kV Line C&P) 82 2023-08-22 4603 - 22/08/23 x 2023-09-07 1586 - 07/09/23 x
1KHF340867 RC SCMS 6 2022-08-10 2252 - 10/08/22 x 2022-09-01 1527 - 01/09/22 x 22
1KHF378456 RC Feeder Block Diagram 12 2022-08-10 2252 - 10/08/22 x 2022-09-01 1527 - 01/09/22 x 22
1KHF378457 RB 132kV Interlocing Concept 5 2022-08-10 2252 - 10/08/22 x 2022-09-01 1527 - 01/09/22 x 22
1KHF378458 RC Mimic Diagram 10 2022-08-10 2252 - 10/08/22 x 2022-09-01 1527 - 01/09/22 x 22
132kV I/O List R2 132kV I/O List 12 2022-08-10 2252 - 10/08/22 x 2022-09-01 1527 - 01/09/22 x
GtoG01/HBED/Barisal/R07 R0 EM Panel 22 2023-01-17 3195 - 17/01/23 x 2023-02-05 238 - 05/02/23 x
- Reply Regarding Comment - 2023-04-06 3645 - 06/04/23 x 2023-05-02 678(2) - 02/05/23 x
R1 EM Panel 17 2023-08-22 4604 - 22/08/23 x 2022-09-07 1589 - 07/09/23 x

1.12.08 Hathazari 230/132kV AIS Substation

Page 16 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
70 GtoG01/HBED/B50S/R01 R0 PSLD 1 2023-10-15 5030-15/10/2023 2023-10-29 1937 - 29/10/23 x

1.12.08 Fenchuganj 230/132kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
71 GtoG01/HBED/B49S/R01 R6 PSLD 1 2022-07-25 2165 - 25/07/22 x 2022-08-17 1435 - 17/08/22 x 23
GtoG01/HBED/B49S/R01 R0 132kV Control Room Layout 1 2022-07-25 2164 - 25/07/22 x 2022-08-17 1434 - 17/08/22 x
132kV Control Room Layout 1 2022-09-29 2585 - 29/09/22 x 2022-10-16 1803 - 16/10/22 x
132kV Control Room Layout 2022-12-20 3024 - 20/12/22 x 2023-01-16 95 - 16/01/23 x
1KHF328836, 1KHF378459, 1KHF378460, 1KHF378461, SAS Overview, 230kV & 132kV Feeder Block Diagram, Interlocking
A 2022-05-08 1706 - 08/05/22 x 2022-05-16 825 - 16/05/22 x
1KHF378462 Concept - 230kV & 132kV, 230kV & 132kV IO List
SAS Overview, 230kV & 132kV Feeder Block Diagram, Interlocking
B 2023-05-10 3850 - 10/05/23 x 2023-05-28 808 - 28/05/23 x
Concept - 230kV & 132kV
SAS Overview, 230kV & 132kV Feeder Block Diagram, Interlocking
- 2023-08-30 4674 - 30/08/23 x 2023-09-17 1648 - 17/09/23 x
Concept - 230kV & 132kV
SAS Overview, 230kV & 132kV Feeder Block Diagram, Interlocking
- 2023-10-15 5036 - 15/10/23 x
Concept - 230kV & 132kV
IO List - 230kV, 132kV & 33kV IO list 2023-07-05 4221 - 05/07/23 x 2023-07-23 1175 - 23/07/23 x
- Reply Regarding IO List 2023-09-04 4714 - 04/09/23 x
B6_T312_01 R0 DFDR Panel Drawing 2023-10-29 5156 - 29/10/23 x

1.12.08 Bibiyana 400/230kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
72 GtoG01/HBED/B43S/R01-01 R0 PSLD 1 2021-08-31 604 - 31/08/21 x 2021-09-21 1294 - 12/09/21 x 21
1KHF3387534 R-H SCMS - System Overview Diagram 7 2022-09-21 2510 - 21/09/22 x 2022-10-03 1733 - 03/10/22 x 12
1KHF378466 R-C 230kV Feeder Block Diagram 14 2022-09-21 2510 - 21/09/22 x 2022-10-03 1733 - 03/10/22 x 12
1KHF378467 R-B Interlocking Concept 7 2022-09-21 2510 - 21/09/22 x 2022-10-03 1733 - 03/10/22 x 12
1KHF378468 R-C Mimic Diagram 29 2022-09-21 2510 - 21/09/22 x 2022-10-03 1733 - 03/10/22 x 12
GtoG01/HBED/B43S/R02 R0 Panel Arrangement of Control Room (SPR-2) 1 2023-10-10 4978 - 10/10/23 x 2023-10-19 1891 - 19/10/23 x
GtoG01/HBED/B43S/R03 R0 230kV Diameter - 6 Control Panel 142 2023-01-12 3172 - 12/01/23 x 2023-01-26 190 - 26/01/23 x
- Reply Regarding Comment 2023-04-06 3646 - 06/04/23 x
GtoG01/HBED/B43S/R04 R0 Detail Protection Scheme (230kV Line Protection) [Sylhet S-1] 82 2023-01-12 3171 - 12/01/23 x 2023-01-26 190 - 26/01/23 x
- Reply Regarding Comment 2023-04-06 3646 - 06/04/23 x
GtoG01/HBED/B43S/R05 R0 Detail Protection Scheme (230kV Line Protection) [Sylhet S-2] 106 2023-01-12 3171 - 12/01/23 x 2023-01-26 190 - 26/01/23 x
- Reply Regarding Comment 2023-04-06 3646 - 06/04/23 x
GtoG01/HBED/B43S/R06 R0 EM Panel Scheme 21 2023-01-12 3170 - 12/01/23 x 2023-01-26 190 - 26/01/23 x
- Reply Regarding Comment 2023-04-06 3646 - 06/04/23 x
RA1_1114_31 R0 DFDR Panel Drawing 2023-10-29 5159 - 29/10/23 x

1.12.08 Sirajganj 230/132kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
73

1.12.08 Ishuardi 230/132kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
74 GtoG01/HBED/B51S/R01 R0 PSLD 1 2023-01-30 3279 - 30/01/23 x 2023-02-14 292 - 14/02/23 x
R0 PSLD 1 2023-10-12 5018 - 12/10/23 x 2023-10-26 1921 - 26/10/23 x
GtoG01/HBED/B51S/R02 R0 Panel Arrangement of SPR 1 2023-10-12 5019 - 12/10/23 x 2023-10-22 1908 - 22/10/23 x

1.12.08 Bogra(S) 230/132kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
75 GtoG01/HBED/B47S/R01 R0 PSLD 1 2022-08-29 2338 - 29/08/22 x 2022-09-13 1600 - 13/09/22 x 15
GtoG01/HBED/B47S/R02 R1 132kV Control Room Layout 1 2022-09-18 2448 - 18/09/22 x 2022-10-04 1747 - 04/10/22 x 16
GtoG01/HBED/B47S/R03 R0 Detail Protection Scheme (230kV ATR C&P) 2023-05-29 3991 - 29/05/23 x 2023-06-15 941 - 15/06/23 x
R1 Detail Protection Scheme (230kV ATR C&P) 147 2023-07-17 4321 - 17/07/23 x 2023-07-26 1205 - 26/07/23 x
GtoG01/HBED/B47S/R04 R0 Detail Protection Scheme (230kV ATR-4 AVR Control) 2023-05-29 3990 - 29/05/23 x 2023-06-15 943 - 15/06/23 x
R1 Detail Protection Scheme (230kV ATR-4 AVR Control) 2023-08-16 4559 -16/08/23 x 2023-09-04 1563 - 04/09/23 x

Page 17 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
GtoG01/HBED/B47S/R05 R0 Detail Protection Scheme (132kV Incoming C&P) 2023-05-29 3989 - 29/05/23 x 2023-06-15 942 - 15/06/23 x
R1 Detail Protection Scheme (132kV Incoming C&P) 118 2023-07-24 4398 - 24/07/23 x 2023-08-01 1237 - 01/08/23 x
GtoG01/HBED/B47S/R06 R0 Detail Protection Scheme (132kV Line C&P) 2023-05-29 3988 - 29/05/23 x 2023-06-15 944 - 15/06/23 x
R1 Detail Protection Scheme (132kV Line C&P) 135 2023-07-24 4398 - 24/07/23 x 2023-07-30 1225 - 30/07/23 x
GtoG01/HBED/B47S/R08 R0 EM Panel 2023-05-29 3987 - 29/05/23 x 2023-06-15 945 - 15/06/23 x
RA2_1275_21 R0 DFDR Panel Drawing 2023-10-29 5158 - 29/10/23 x

1.12.08 Kaliakoir 400/230kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
76 GtoG01/HBED/B42S/R01 R1 PSLD 1 2023-01-11 3169 - 11/01/23 x 2023-01-26 187 - 26/01/23 x
R2 PSLD 1 2023-07-24 4397- 24/07/23 x 2023-08-13 1367 - 13/08/23 x
R2 PSLD 1 2023-10-19 5085 - 19/10/23 x
B6_T314_01 & RA1_1116_31 R0 400kV & 230kV DFDR Panel Drawing 2023-10-29 5160 - 29/10/23 x

1.12.08 Sambhuganj 400/230/33kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
77 GtoG01/HBED/B01S/R01 R0 PSLD 1 2022-12-18 2994 - 18/12/22 x 2023-01-05 18 - 05/01/23 x
R2 PSLD 1 2023-07-23 4376 - 23/07/23 x 2023-08-13 1366 - 13/08/23 x
R2 PSLD 1 2023-10-08 4941 - 08/10/23 x 2023-10-19 1893 - 19/10/23 x
GtoG01/HBED/R03-02/B-1 R0 33kV Control Room Layout 1 2023-01-10 3152 - 10/01/23 x 2023-01-26 188 - 26/01/23 x
GtoG01/HBED/R03-02/B R0 33kV Control Room Layout 1 2023-07-09 4236 - 09/07/23 x 2023-07-31 1254 - 31/07/23 x
GtoG01/HBED/R03-02 R0 33kV Control Room Layout 1 2023-09-18 4827 - 18/09/23 x 2023-10-08 1798 - 08/10/23 x
GtoG01/HBED/B01S/R03 R0 Main Control Room Layout & Local Control House 2023-01-30 3276 - 30/01/23 x 2023-02-13 291 - 13/02/23 x
GtoG01/HBED/B01S/R03-2 R1 Main Control Room Layout & Local Control Room 2023-04-17 3767 - 17/04/23 x 2023-05-10 703 - 10/05/23 x
R0 400kV & 132kV Local Control Room 2023-08-01 4463 - 01/08/23 x 2023-08-16 1396 - 16/08/23 x
IDM-T600 R0 DFDR Panel Drawing 2023-11-02 5212 - 02/11/23 x

1.12.08 Birulia 132/33 kV GIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
78 GtoG01/HBED/B64S/R01 R0 PSLD 1 2023-10-17 5065 - 17/10/23 x 2023-11-02 1979 - 02/11/23 x

1.12.08 Kumargaon 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
79 GtoG01/HBED/B63S/

1.12.08 Aminbazar 230/132 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
80 GtoG01/HBED/B55S/R01-01 R0 PSLD 1 2022-08-29 2337 - 29/08/22 x 2022-09-13 1599 - 13/09/22 x 15
GtoG01/HBED/B55S/R03 R0 132kV Control Room Layout 1 2022-10-17 2681 - 17/10/22 x 2022-11-09 1967 - 09/11/22 x
GtoG01/HBED/B55S/R03 R0 132kV Line CRP 105 2023-03-30 3640 - 30/03/23 x 2023-04-24 664 - 24/04/23 x
GtoG01/HBED/B55S/R04 R0 EM Panel 20 2023-03-30 3639 - 30/03/23 x 2023-04-24 663 - 24/04/23 x

1.12.08 Naogaon 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
81 GtoG01/HBED/B61S/R01 R0 PSLD 1 2023-10-18 5078 - 18/10/23 x 2023-11-01 1974 - 01/11/23 x 14
RA1_450_34 R0 DFDR Panel Drawing 2023-10-29 5154 - 29/10/23 x

1.12.08 Daudkandi 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
82 GtoG01/HBED/B63S/

1.12.08 Manikganj 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
83 GtoG01/HBED/B54S/R01-01 R0 PSLD 1 2022-08-10 2251 - 10/08/22 x 2022-08-25 1478 - 25/08/22 x 15
GtoG01/HBED/B54S/R02 R0 132kV Control Room Layout 1 2022-10-17 2678 - 17/10/22 x 2022-10-30 1915 - 30/10/22 x
GtoG01/HBED/B54S/R03 R0 132kV Line CRP 2023-03-15 3539 - 15/03/23 x 2023-04-06 586 - 06/04/23 x

Page 18 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
R0 132kV Line CRP 2023-10-26 5138 - 26/10/23 x
GtoG01/HBED/B54S/R04 R0 EM Panel 2023-03-15 3538 - 15/03/23 x 2023-04-06 587 - 06/04/23 x

1.12.08 Bogra (Old) 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
98 GtoG01/HBED/B96S/R01-01 R0 PSLD 1 2023-01-10 3146 - 10/01/23 x 2023-01-26 189 - 26/01/23 x
GtoG01/HBED/B96S/R02 R0 132kV Control Room Layout 1 2023-01-18 3207 - 18/01/23 x 2023-02-05 236 - 05/02/23 x 18
GtoG01/HBED/B96S/R03 R0 132kV TX Protection (T1 & T2) 2023-03-15 3537 - 15/03/23 x 2023-04-02 546 - 02/04/23 x
GtoG01/HBED/B96S/R05 R0 33kV Incomer (T1A & T2A) 2023-03-15 3536 - 15/03/23 x 2023-04-02 545 - 02/04/23 x
GtoG01/HBED/B96S/R07 R0 EM Panel 2023-03-15 3532 - 15/03/23 x 2023-04-02 547 - 02/04/23 x

1.12.08 Purbasadipur 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
85 GtoG01/HBED/B93S/R01-01 R0 PSLD 1 2023-10-18 5077 - 18/10/23 x 2023-11-01 1975 - 01/11/23 x

1.12.08 Netrokona 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
86 GtoG01/HBED/B90S/R01-01 R0 PSLD 1 2023-08-23 4615 - 23/08/23 x 2022-09-07 1588 - 07/09/23 x
GtoG01/HBED/B90S/R02 R0 Layout of Control Room 1 2023-08-23 4616 - 23/08/23 x 2022-09-07 1587 - 07/09/23 x
GtoG01/HBED/B90S/R03 R0 132kV TR1/2 CRP 86 2023-10-16 5044-16/10/2023 x
GtoG01/HBED/B90S/R05 R0 33KV Incoming TR1/2A CRP 65 2023-10-16 5047-16/10/2023 x
GtoG01/HBED/B90S/R07 R0 BusCoupler (BT) Protection 76 2023-10-16 5046-16/10/2023 x
GtoG01/HBED/B90S/R08 R0 EM Panel 22 2023-10-16 5045-16/10/2023 x

1.12.08 Savar 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
87 GtoG01/HBED/B74S/R01-01 R0 PSLD 1 2022-09-07 2413 - 07/09/22 x 2022-09-22 1668 - 22/09/22 x 15
GtoG01/HBED/B74S/R02 R0 132kV Control Room Layout 1 2022-09-07 2412 - 07/09/22 x 2022-09-22 1669 - 22/09/22 x 15
GtoG01/HBED/B74S/R03 R0 Detail Protection Scheme 132kV Tx (T4) 91 2022-12-18 2992 - 18/12/22 x 2023-01-05 21 - 05/01/23 x 18
R1 Detail Protection Scheme 132kV Tx (T4) 91 2023-01-18 3209 - 18/01/23 x 2023-02-05 245 - 05/02/23 x 18
GtoG01/HBED/B74S/R04 R0 Detail Protection Scheme (33kV incoming =T4A) 62 2022-12-18 2993 - 18/12/22 x 2023-01-05 22 - 05/01/23 x 18
R1 Detail Protection Scheme (33kV incoming =T4A) 62 2023-01-18 3208 - 18/01/23 x 2023-02-05 244 - 05/02/23 x 18
GtoG01/HBED/B74S/R05 R0 EM Panel Scheme 19 2022-12-18 2991 - 18/12/22 x 2023-01-05 23 - 05/01/23 x 18

1.12.08 Mongla 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
88 GtoG01/HBED/B98S/R01-01 R0 PSLD 1 2022-09-07 2414 - 07/09/22 x 2022-09-22 1666 - 22/09/22 x 15
GtoG01/HBED/B98S/R02 R0 132kV Control Room Layout 1 2022-11-13 2816 - 13/11/22 x 2022-11-24 2048 - 24/11/22 x
GtoG01/HBED/B98S/R03 R0 Detail Protection Scheme (T1 & T2) 65 2022-11-16 2842 - 16/11/22 x 2022-12-01 2088 - 01/12/22 x 15
GtoG01/HBED/B98S/R05 R0 Detail Protection Scheme (T1A & T2A) 62 2022-11-16 2842 - 16/11/22 x 2022-12-01 2088 - 01/12/22 x 15
GtoG01/HBED/B98S/R07 R0 EM Panel Scheme 22 2022-11-16 2843 - 16/11/22 x 2022-12-01 2087 - 01/12/22 x 15

1.12.08 Bhandaria 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
89 GtoG01/HBED/B77S/R01-01 R0 PSLD 1 2022-07-17 2084 - 17/07/22 x 2022-08-08 1377 - 04/08/22 x 22
GtoG01/HBED/B77S/R02 R0 132kV Conntrol Room Layout 1 2022-09-12 2455 - 12/09/22 x 2022-09-22 1667 - 22/09/22 x
GtoG01/HBED/B77S/R03 R0 Detail Protection Scheme (T1 & T2) 66 2022-09-12 2454 - 12/09/22 x 2022-09-29 1716 - 29/09/22 x
GtoG01/HBED/B77S/R05 R0 Detail Protection Scheme (T1A & T2A) 62 2022-09-12 2454 - 12/09/22 x 2022-09-29 1716 - 29/09/22 x
GtoG01/HBED/B77S/R07 R0 EM Panel Scheme 22 2022-09-12 2456 - 12/09/22 x 2022-09-29 1715 - 29/09/22 x 17

1.12.08 Jhenaidah 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
90 N/A

1.12.08 Rajshahi 132/33 kV AIS Substation

Page 19 (25)
SUBMISSION RETURN
Category Current Status Previous Status

For Re-approval

For information

Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.

As Built
Date Ref. No. Date Ref. No.

RR

RR
AC

AC
FA

FA
A

A
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
91 N/A

1.12.08 Gulshan 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
92 Canceled scope

1.12.08 Baraulia 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
93 Canceled scope

1.12.08 Shamirpur 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
94 Canceled scope

1.12.08 Goalpara 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
95 Canceled scope

1.12.08 Gopalganj 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
96 GtoG01/HBED/B84S/R01-01 R0 PSLD 1 2023-02-05 3311 - 05/02/23 x 2023-02-20 314 - 20/02/23 x
GtoG01/HBED/B84S/R02 R0 Layout of Control Room 1 2023-03-22 3586 - 22/03/23 x 2023-04-13 617 - 13/04/23 x
GtoG01/HBED/B84S/R03 R0 Detail Protection Scheme(132kV Tx Protection =T3) 2023-08-22 4609 - 22/08/23 x 2023-09-07 1524 - 07/09/23 x
R0 Detail Protection Scheme(132kV Tx Protection =T3) 2023-10-26 5132 - 26/10/23 x
GtoG01/HBED/B84S/R04 R0 Detail Protection Scheme(33kV Incoming =T3A) 2023-08-22 4610 - 22/08/23 x 2023-09-07 1523 - 07/09/23 x
R0 Detail Protection Scheme(33kV Incoming =T3A) 66 2023-10-26 5131 - 26/10/23 x
GtoG01/HBED/B84S/R05 R0 EM Panel Scheme 21 2023-08-22 4608 - 22/08/23 x 2023-09-07 1585 - 07/09/23 x

1.12.08 Chapai Nawabganj 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
97 Canceled scope

1.12.08 Bhulta 400/230/132 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
84 GtoG01/HBED/B56S/R01-01 R0 PSLD 1 2023-10-31 5179 - 31/10/23 x

1.12.08 Baghabari 132/33 kV AIS Substation


1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
99 Canceled scope

Page 20 (25)
SUBMISSION RETURN

Category Current Status Previous Status

For Re-approval

For information
Item Drawings/Document Number Rev. Drawings/Document Title Sheet No.

For Approval
Date Ref. No. Date Ref. No.

As Built

RR

RR
AC

AC
FA

FA
A

A
1 ACDB
1.1 230 GIS SS
G2G-ACDB-A R0 415/240V AC Distribution Panel Drawing 2022-07-06 2059 - 06/07/22 x 2022-07-21 1283 - 21/07/22 x
G2G-ACDB-A R0 415/240V AC Distribution Panel Drawing 2023-11-05 5221 - 05/11/23 x

1.2 132kV GIS (New)


G2G-ACDB-B R0 415/240V AC Distribution Panel Drawing 2022-07-06 2058 - 06/07/22 2022-07-21 1283 - 21/07/22 x

1.3 132kV AIS (New)


GTP - GTP 2022-10-12 2638 - 12/10/22 x 2022-10-23 1864 - 23/10/22 x
- GTP 2022-12-04 2911 - 04/12/22 x 2022-12-19 2165 - 19/12/22 x
G2G-ACDB-C R0 415/240V AC Distribution Panel Drawing 11 2022-07-06 2057 - 06/07/22 2022-07-21 1283 - 21/07/22 x
R1 415/240V AC Distribution Panel Drawing 11 2022-10-12 2638 - 12/10/22 x 2022-10-23 1864 - 23/10/22 x
R2 415/240V AC Distribution Panel Drawing 11 2022-12-04 2911 - 04/12/22 x 2022-12-19 2165 - 19/12/22 x

1.4 230kV AIS(New Barapukuria)


GTP - GTP 2022-10-12 2637 - 12/10/22 x 2022-10-26 1884 - 26/10/22 x
- GTP 2022-12-04 2912 - 04/12/22 x 2023-01-15 70 - 15/01/23 x
G2G-ACDB-D R0 415/240V AC Distribution Panel Drawing 8 2022-07-06 2056 - 06/07/22 2022-07-21 1283 - 21/07/22
R1 415/240V AC Distribution Panel Drawing 8 2022-10-12 2637 - 12/10/22 x 2022-10-26 1884 - 26/10/22 x
R2 415/240V AC Distribution Panel Drawing 8 2022-12-04 2912 - 04/12/22 x 2023-01-15 70 - 15/01/23 x

1.5 33kV Control Room


GTP - GTP 2022-10-12 2636 - 12/10/22 x 2022-10-30 1908 - 30/10/22 x
- GTP 2022-12-04 2910 - 04/12/22 x 2022-12-19 2166 - 19/12/22 x
G2G-ACDB-E-1, E2 R0 415/240V AC Distribution Panel Drawing 10 2022-07-06 2055 - 06/07/22 x 2022-07-21 1283 - 21/07/22 x
G2G-ACDB-E-1 R1 415/240V AC Distribution Panel Drawing 10 2022-10-12 2636 - 12/10/22 x 2022-10-30 1908 - 30/10/22 x
R2 415/240V AC Distribution Panel Drawing 10 2022-12-04 2910 - 04/12/22 x 2022-12-19 2166 - 19/12/22 x
G2G-ACDB-E-2 R0 415/240V ACDB for 400kV AIS & 230kV GIS 2023-11-05 5220- 05/11/23 x

2 DCDB
2.1 230/132kV GIS
Calculation - Calculation 2022-02-02 1256 - 02/02/22 x 2022-03-03 416 - 03/03/22
- Calculation 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22
- Calculation 2022-05-31 1855 - 31/05/22 x 2022-06-12 1028 - 12/06/22 x

G2G-DCDB-110/A R0 110V DC Distribution Panel 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22 x
R2 110V DC Distribution Panel 2022-06-09 1900 - 09/06/22 x 2022-06-27 1140 - 27/06/22 x
R3 110V DC Distribution Panel 2022-06-09 2032 - 04/07/22 x 2022-07-19 1207 - 19/07/22 x
R4 110V DC Distribution Panel 2022-08-02 2209 - 02/08/22 x 2022-08-11 1416 - 11/08/22 x
G2G-DCDB-110/A R0 110V DC Distribution Panel 2023-11-05 5219- 05/11/23 x

2.2 132/33kV AIS


The Main Contractor: ROHAS-EUCO INDUSTRIES BHD. Page 21 (25)
The Subcontractor: ETERN-CCC JOINT VENTURE
SUBMISSION RETURN

Category Current Status Previous Status

For Re-approval

For information
Item Drawings/Document Number Rev. Drawings/Document Title Sheet No.

For Approval
Date Ref. No. Date Ref. No.

As Built

RR

RR
AC

AC
FA

FA
A

A
Calculation - Calculation 2022-02-02 1258 - 02/02/22 x 2022-03-03 416 - 03/03/22 x
- Calculation 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22 x
- Calculation 2022-06-13 1916 - 13/06/22 x 2022-06-22 1108 - 22/06/22 x

G2G-DCDB-110/B R0 110V DC Distribution Panel 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22
R2 110V DC Distribution Panel 2022-06-09 1900 - 09/06/22 x 2022-06-27 1140 - 27/06/22 x
R3 110V DC Distribution Panel 2022-06-09 2032 - 04/07/22 x 2022-07-19 1207 - 19/07/22 x
G2G-DCDB-110/B1 R4 110V DC Distribution Panel 12 2022-08-02 2209 - 02/08/22 x 2022-08-11 1416 - 11/08/22 x

2.3 132/33kV GIS


Calculation - Calculation 2022-02-02 1257 - 02/02/22 x 2022-03-03 416 - 03/03/22
- Calculation 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22
- Calculation 2022-06-13 1915 - 13/06/22 x 2022-06-20 1091 - 20/06/22 x

G2G-DCDB-110/C R0 110V DC Distribution Panel 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22
R2 110V DC Distribution Panel 2022-06-09 1900 - 09/06/22 x 2022-06-27 1140 - 27/06/22 x
R3 110V DC Distribution Panel 2022-06-09 2032 - 04/07/22 x 2022-07-19 1207 - 19/07/22 x
R4 110V DC Distribution Panel 2022-08-02 2209 - 02/08/22 x 2022-08-11 1416 - 11/08/22 x

2.4 33kV Control Room


Calculation - Calculation 2022-02-02 1255 - 02/02/22 x 2022-03-03 416 - 03/03/22
- Calculation 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22
- Calculation 2022-05-31 1855 - 31/05/22 x 2022-06-19 1084 - 19/06/22 x

G2G-DCDB-110/D R0 110V DC Distribution Panel 8 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22
R1 110V DC Distribution Panel 8 2022-06-09 1900 - 09/06/22 x 2022-06-27 1140 - 27/06/22 x
R2 110V DC Distribution Panel 8 2022-06-09 2032 - 04/07/22 x 2022-07-19 1207 - 19/07/22 x
R3 110V DC Distribution Panel 8 2022-08-02 2209 - 02/08/22 x 2022-08-11 1416 - 11/08/22 x
R4 110V DC Distribution Panel 8 2022-08-29 2348 - 29/08/22 x 2022-09-11 1583 - 11/09/22 x
2.5 230kV AIS (Barapukuria)
Calculation - Calculation 2022-04-12 1609 - 12/04/22 x 2022-11-01 1925 - 01/11/22
- Calculation 2022-08-28 2331 - 28/08/22 x 2022-09-01 1535 - 01/09/22 x

G2G-DCDB-110/E R0 110V DC Distribution Panel 13 2022-04-12 1609 - 12/04/22 x 2022-04-26 751 - 26/04/22 x
R1 110V DC Distribution Panel 13 2022-06-09 1900 - 09/06/22 x 2022-06-27 1140 - 27/06/22 x
R2 110V DC Distribution Panel 13 2022-06-09 2032 - 04/07/22 x 2022-07-19 1207 - 19/07/22 x
R3 110V DC Distribution Panel 13 2022-08-02 2209 - 02/08/22 x 2022-08-11 1416 - 11/08/22 x
R3 110V DC Distribution Panel 13 2022-08-29 2349 - 29/08/22 x 2022-09-11 1584 - 11/09/22 x
R4 110V DC Distribution Panel 13 2022-10-02 2595 - 02/10/22 x Missing by PGCB
R4 110V DC Distribution Panel 13 2023-01-18 3210 - 18/01/23 x 2023-01-29 208 - 29/01/23 x
3 110V Battery
3.1 440, 500, 550, 820AH (Henan new Taihang Power Source Co., Ltd)
GTP - GTP 2022-10-10 2624 - 10/10/22 x 2022-10-16 1808 - 16/10/22 x
LS416.141 (GN440) / (G500) / (GN550) / (GN820) - Rack Drawing & Connection Diagram 2022-10-19 2692 - 19/10/22 2022-11-01 1924 - 01/11/22 x
The Main Contractor: ROHAS-EUCO INDUSTRIES BHD. Page 22 (25)
The Subcontractor: ETERN-CCC JOINT VENTURE
SUBMISSION RETURN

Category Current Status Previous Status

For Re-approval

For information
Item Drawings/Document Number Rev. Drawings/Document Title Sheet No.

For Approval
Date Ref. No. Date Ref. No.

As Built

RR

RR
AC

AC
FA

FA
A

A
3.2 150, 400, 460 AH (Sichuan Changhong Battery Co., Ltd)
KPL 150, KPL 400, KPL 460AH - GTP 2022-09-01 2367 - 01/09/22 x 2022-09-11 1585 - 11/09/22 x
92KPL150, 92KPL400, 92KPL460 - Rack Drawing & Connection Diagram 2022-10-19 2691 - 19/10/22 2022-11-01 1925 - 01/11/22 x

4 110V Charger
4.1 50A, 155A, 185A, 260A [Sichuan Changhong Battery Co. Ltd]
DC Charger 50A,155A,185A, 260A Type: GXPDY - GTP 2022-07-19 2115 - 19/07/22 x 2022-07-31 1342 - 31/07/22 x
DC Charger 50A, 185A - GTP 2022-09-04 2385 - 04/09/22 x 2022-09-18 1639/1 - 18/09/22 x
- GTP 2022-10-23 2721 - 23/10/22 x 2022-11-11 1974 - 09/11/22 x
GtoG01/Charger/SCCH/A, B, C, D R0 DC Charger Drawing 19, 19, 19, 20 2022-07-19 2115 - 19/07/22 x 2022-07-31 1342 - 31/07/22 x
GtoG01/Charger/SCCH/A, C R2, R3 DC Charger Drawing 21, 21 2022-09-04 2385 - 04/09/22 x 2022-09-18 1639/1 - 18/09/22 x
GtoG01/Charger/SCCH/C R2 DC Charger Drawing 21 2022-09-19 2492 - 19/09/22 2022-09-18 1580 - 08/09/22
R2, R3 DC Charger Drawing 21, 21 2022-10-23 2721 - 23/10/22 x 2022-11-11 1974 - 09/11/22 x

4.2 50A, 155A, 185A, 260A [Shanghai Chengyi Electric Co. Ltd]
DC Charger 50A,155A,185A, 260A Type: GZD(W)-1 - GTP 2022-07-19 2114 - 19/07/22 x 2022-07-31 1343 - 31/07/22 x
DC Charger 155A, 260A - GTP 2022-09-04 2386 - 04/09/22 x 2022-09-18 1631 - 18/09/22 x
- GTP 2022-10-23 2720 - 23/10/22 2022-11-11 1975 - 09/11/22 x
GtoG01/Charger/SCCH/A_B_C_D R0 DC Charger Drawing 7, 7, 7, 9 2022-07-19 2114 - 19/07/22 2022-07-31 1343 - 31/07/22 x
GtoG01/Charger/SCCH/B, D R1, R1 DC Charger Drawing 7, 9 2022-09-04 2386 - 04/09/22 2022-09-18 1639 - 18/09/22 x
R3, R3 DC Charger Drawing 7, 10 2022-10-23 2720 - 23/10/22 2022-11-11 1975 - 09/11/22 x

5 48V System
GTP - GTP 2022-09-27 2561 - 27/09/22 2022-10-12 1783 - 12/10/22
- GTP 2022-10-19 2758 - 30/10/22 2022-11-13 1984 - 13/11/22

G2G -DC-48V R0 48V DC System Diagram 9 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22 x
R1 48V DC System Diagram 9 2022-06-16 1937 - 16/06/22 2022-06-29 1154 - 29/06/22 x
R2 48V DC System Diagram 9 2022-07-06 2054 - 06/07/22 2022-07-19 1207 - 19/07/22 x
R3 48V DC System Diagram 9 2022-08-02 2208 - 02/08/22 x 2022-08-11 1420 - 11/08/22 x
R4 48V DC System Diagram 9 2022-09-27 2561 - 27/09/22 2022-10-12 1783 - 12/10/22 x
R5 48V DC System Diagram 9 2022-10-19 2758 - 30/10/22 2022-11-13 1984 - 13/11/22 x

6 UPS System
G2G-UPS R0 UPS System Diagram 8 2022-02-02 1255 - 02/02/22 x 2022-03-03 416 - 03/03/22 x
R0 UPS System Diagram 8 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22 x
R1 UPS System Diagram 8 2022-06-16 1936 - 16/06/22 x 2022-06-28 1147 - 28/06/22 x
R2 UPS System Diagram 8 2022-12-15 2983 - 15/12/22 x 2022-12-27 2200 - 27/12/22 x
R3 GTP & UPS System Diagram 8 2023-01-10 3165 - 10/01/23 x 2023-01-26 199 - 26/01/23 x
R4 GTP & UPS System Diagram 8 2023-02-05 3313 - 05/02/23 x 2023-02-20 316 - 20/02/23 x
7 NIFPS
7.1 230kV (300MVA, 350MVA, 400MVA)
The Main Contractor: ROHAS-EUCO INDUSTRIES BHD. Page 23 (25)
The Subcontractor: ETERN-CCC JOINT VENTURE
SUBMISSION RETURN

Category Current Status Previous Status

For Re-approval

For information
Item Drawings/Document Number Rev. Drawings/Document Title Sheet No.

For Approval
Date Ref. No. Date Ref. No.

As Built

RR

RR
AC

AC
FA

FA
A

A
GTP R0 GTP 2022-04-25 1676 - 25/04/22 x 2022-06-06 990 - 06/06/22 x

ZP150-003-1
ZP150-001 R0 GA Drawing (225/300MVA) 2022-04-25 1675 - 25/04/22 x 2022-05-25 904 - 25/05/22 x
ZP150-009

ZP150-003-1
R0 GA Drawing (250/350MVA) 2022-03-30 1539 - 30/03/22 x 2022-04-21 725 - 21/04/22 x
ZP150-009

ZP150-003-1
R0 GA Drawing (300/450MVA) 2022-03-30 1538 - 30/03/22 x 2022-04-21 726 - 21/04/22 x
ZP150-009

ZP150-001
ZP150-011 ~ 017
R0 Schemactic Drawing 2022-06-19 1949 - 19/06/22 x 2022-07-20 1330 - 28/07/22 x
ZP150-005/5-1
ZP150-010/010-1

7.2 132KV (50/75MVA, 80/120MVA)


GTP R0 GTP 2022-06-05 1877 - 05/06/22 x 2022-06-26 1134 - 26/06/22 x

ZP125-001-1
ZP125-008 R0 GA Drawing 2022-07-18 2105 - 18/07/22 x 2022-07-20 1276 - 20/07/22 x
ZP125-009

ZP125-001
ZP125-011 ~ 017
R0 Schemactic Drawing 2022-06-19 1948 - 19/06/22 x 2022-07-20 1329 - 28/07/22 x
ZP125-005/5-1
ZP125-010/010-1

ZP125-003-1 R0 System Installaion Diagram 2022-02-16 1322 - 16/02/22 x 2022-02-24 352 - 24/02/22 x

8 Relay list
8.1 Relay List & Catalog R01 Relay List & Catalog for RTU Based 132kVSS 1 2021-08-21 605 - 31/08/21 x 2021-09-06 1245 - 06/09/21 x
8.2 Relay List & Catalog - Relay List & Catalog for RTU Based 230kV SS 4 2021-10-11 825 - 10/11/21 x 2021-11-15 1706 - 15/11/21 x
8.3 Relay List & Catalog R05 Relay List & Catalog for RTU & SAS Based 230kV SS 10 2021-12-15 980 - 15/12/21 x 2022-04-24 769 - 24/04/22 x

9 DFDR
9.1 DFDR - GTP 2023-01-10 3157 - 10/01/23 x 2023-01-26 188 - 26/01/23 x
- GTP 2023-04-09 3697 - 09/04/23 x
- GTP (IDM+, BEN6000) 2023-07-11 4259 - 11/07/23 x 2023-07-31 1237 - 31/07/23 x
- GTP (IDM+) 2023-08-29 4659 - 29/08/23 x 2023-10-08 1799 - 08/10/23 x
- Reply Regarding GTP (IDM+) 2023-10-15 5029-15/10/2023 x 2023-10-19 1886 - 19/10/23 x
Signal List - Signal input list 2023-10-15 5021-15/10/2023 x 2023-10-19 1898 - 19/10/23 x

10 Others
10.1 Energy Meter GTP 2022-04-10 1597 - 10/04/22 x 2022-06-28 770 - 28/04/22 x
Energy Meter GTP (Revised County Origin) 2022-04-10 4190 - 25/06/23 x 2023-07-06 1066 - 06/07/23 x
The Main Contractor: ROHAS-EUCO INDUSTRIES BHD. Page 24 (25)
The Subcontractor: ETERN-CCC JOINT VENTURE
SUBMISSION RETURN

Category Current Status Previous Status

For Re-approval

For information
Item Drawings/Document Number Rev. Drawings/Document Title Sheet No.

For Approval
Date Ref. No. Date Ref. No.

As Built

RR

RR
AC

AC
FA

FA
A

A
10.2 Protocol converter (CSD1321) 2022-11-03 2786 - 03/11/22 x 2022-11-20 2011 - 20/11/22 x

The Main Contractor: ROHAS-EUCO INDUSTRIES BHD. Page 25 (25)


The Subcontractor: ETERN-CCC JOINT VENTURE