For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
1.12.08 Ashuganj 132/33kV AIS Substation
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
1 GtoG01/HBED/B97S/R01-01 R1 PSLD 1 2021-05-23 380 - 23/05/21 x 2021-09-21 1364 - 21/09/21 x 121
GtoG01/HBED/B97S/R02 R0 132kV Control Room Layout 2 2021-07-29 539 - 29/07/21 x 2021-11-17 1727 - 17/11/21 x 111
GtoG01/HBED/B97S/R03 R0 Detail Protection Scheme (T3A Incomer) 62 2021-10-24 737 - 24/10/21 x 2021-11-08 1658 - 08/11/21 x 15
GtoG01/HBED/B97S/R04 R0 Detail Protection Scheme (T4A Incomer) 59 2021-10-24 737 - 24/10/21 x 2021-11-08 1658 - 08/11/21 x 15
GtoG01/HBED/B97S/R05 R1 EM Panel Scheme 19 2022-05-16 1753 - 16/05/21 x 2022-06-02 973 - 02/06/22 x 17
Page 1 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
8 GtoG01/HBED/B91S/R01-01 R1 PSLD 1 2021-10-24 749 - 24/10/21 x 2021-11-01 1613 - 01/11/21 x 8
GtoG01/HBED/B91S/R02 R0 132kV Control Room Layout 1 2021-10-24 748 - 24/10/21 x 2021-11-01 1612 - 01/11/21 x 8
GtoG01/HBED/B91S/R03 R1 Detail Protection Scheme (T2&T3) 91 2022-01-02 1083 - 02/01/22 x 2022-01-16 094 - 16/01//22 x 14
GtoG01/HBED/B91S/R05 R1 Detail Protection Scheme (T2A&T3A) 62 2022-01-02 1083 - 02/01/22 x 2022-01-16 094 - 16/01//22 x 14
GtoG01/HBED/B91S/R07 R1 Detail Protection Scheme (Rahanpur 1&2) 96 2022-01-02 1083 - 02/01/22 x 2022-01-16 094 - 16/01//22 x 14
GtoG01/HBED/B91S/R09 R1 EM Panel Scheme 39 2022-05-16 1755 - 16/05/22 x 2022-06-02 972 - 02/06/22 x 17
Page 2 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
R2 Station Common Control panel (Common BCU) 31 2023-07-26 4414 - 26/07/23 x 2023-08-16 1398 - 16/08/23 x
Page 3 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
GtoG01/HBED/B29S/R03-01 R2 132kV Control Room Layout 1 2021-02-10 1302 - 10/02/22 x 2021-02-23 342 - 23/02/22 x 13
GtoG01/HBED/B26S/R03-02/A R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
SYSAT-01 R0 Detail Protection Scheme (System Archeitecture) 2 2023-06-15 4131 - 15/06/23 x 2023-07-04 1038 - 04/07/23 x
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (Line Dist) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Line Dist) 93 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07//22 x 46
GtoG01/HBED/B29S/R041 R0 Detail Protection Scheme (Line Diff) (Matarbari) 93 2023-01-10 3153 - 10/01/23 x 2023-01-24 23.147 - 24/01/23 x
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (Txr Prot) 93 2022-01-27 1219 - 27/01/22 x 2022-03-22 425 - 03/03//22 x 54
R3 Detail Protection Scheme (Txr Prot) 97 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B29S/R05(1) R0 Detail Protection Scheme (TR1/2 Prot) 2023-05-07 3815 - 07/05/23 x 2023-05-28 809 - 28/05/23 x
GtoG01/HBED/B29S/R05(2) R0 Detail Protection Scheme (TR3/4 Prot) 2023-05-07 3814 - 07/05/23 x 2023-05-28 810 - 28/05/23 x
R0 Detail Protection Scheme (TR3/4 Prot) 2023-07-13 4288 - 13/07/23 x 2023-07-31 1239 - 31/07/23 x
GtoG01/HBED/B17S/R06 R0 Detail Protection Scheme (Patnitola BBP-NA) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (Chakaria BBP) 109 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B17S/R07 R0 Detail Protection Scheme (BC) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (BC) 86A 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R08 R0 Detail Protection Scheme (Txr Incomer) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R4 Detail Protection Scheme (Txr Incomer) 135 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B29S/R08(1) R0 Detail Protection Scheme (33kV Incomer TR1A/TR2A) 2023-05-07 3812 - 07/05/23 x 2023-05-28 812 - 28/05/23 x
GtoG01/HBED/B29S/R08(2) R0 Detail Protection Scheme (33kV Incomer TR3A/TR4A) 2023-05-07 3813 - 07/05/23 x 2023-05-28 810 - 28/05/23 x
R0 Detail Protection Scheme (33kV Incomer TR3/TR4) ) 2023-07-13 4287 - 13/07/23 x 2023-07-31 1241 - 31/07/23 x
GtoG01/HBED/B17S/R09 R0 Detail Protection Scheme (33kV Feeder) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (33kV Feeder) 58 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B29S/R10 R0 EM Panel Scheme 109 2022-09-14 2467 - 14/09/22 x 2022-10-04 1744 - 04/10/22 x 20
R0 EM Panel Scheme 2023-03-06 3461 - 06/03/23 x 2023-03-27 498 - 27/03/23 x 21
GtoG01/HBED/B29S/R17 R0 Station Common Control panel
Page 4 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
GtoG01/HBED/B21S/R08(2) R0 Detail Protection Scheme (33kV Incomer TR3A) 110 2023-05-14 3868 - 14/05/23 x 2023-05-28 807 - 28/05/23 x
GtoG01/HBED/B21S/R08(3) R0 Detail Protection Scheme (33kV Incomer TR4A) 107 2023-05-14 3867 - 14/05/23 x 2023-05-28 806 - 28/05/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B21S/R10 R0 EM Panel 2023-03-06 3463 - 06/03/23 x 2023-03-27 496 - 27/03/23 x
GtoG01/HBED/B21S/R17 R0 Station Common Control panel
Page 5 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (Line Dist) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Line Dist) 93 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07//22 x 46
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (Txr Prot) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (Txr Prot) 97 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R07 R0 Detail Protection Scheme (BC) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R3 Detail Protection Scheme (BC) 86A 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R08 R0 Detail Protection Scheme (Txr Incomer) 93 2022-01-27 1219 - 27/01/22 x 2022-03-03 425 - 03/03//22 x 35
R4 Detail Protection Scheme (Txr Incomer) 135 2022-05-18 1771 - 18/05/22 x 2022-07-03 1169 - 03/07/22 x 46
GtoG01/HBED/B17S/R09 R0 Detail Protection Scheme (33kV Feeder) 50 2022-02-15 1320(A) - 15/02/22 x 2022-03-03 407 - 03/03/22 x 16
R1 Detail Protection Scheme (33kV Feeder) 58 2022-05-18 1774 - 18/05/22 x 2022-07-03 1170 - 03/07/22 x 46
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B26S/R10 R0 EM Panel Scheme 84 2022-09-14 2467 - 14/09/22 x 2022-10-04 1744 - 04/10/22 x 20
GtoG01/HBED/B30S/R10 R0 EM Panel Scheme 2023-04-16 3759 - 16/04/23 x 2023-05-10 707 - 10/05/23 x
GtoG01/HBED/B30S/R17 R0 Station Common Control panel
Page 6 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
1.12.08 Taraganj 132/33kV AIS Substation
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
23 GtoG01/HBED/B24S/R01 R0 PSLD 1 2022-01-02 1082 - 02/01/22 x 2022-10-13 1799 - 13/10/22 x
R1 PSLD 1 2022-11-16 2844 - 16/11/22 x 2022-12-01 2091 - 01/12/22 x 15
GtoG01/HBED/B24S/R02 R0 Detail Protection Scheme (System Archeitecture) 1 2023-05-07 3818 - 07/05/23 x 2023-05-28 802 - 28/05/23 x
GtoG01/HBED/B24S/R03-01 R0 132kV Control Room Layout 1 2022-03-06 1403 - 06/03/22 x 2022-03-21 507 - 21/03/22 x 15
GtoG01/HBED/B26S/R03-02/B R0 33kV Control Room Layout 1 2022-05-12 1734 - 12/05/22 x 2022-06-02 978 - 02/06/22 x 21
GtoG01/HBED/B20S/R04 R0 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-01 3069 - 01/01/23 x 2023-01-12 61 - 12/01/23 x
R1 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-22 3235 - 22/01/23 x 2023-02-05 240 - 05/02/23 x
GtoG01/HBED/B24S/R05 R0 Detail Protection Scheme (Txr Prot) 126 2023-05-18 3922 - 18/05/23 x 2023-06-04 861 - 04/06/23 x
GtoG01/HBED/B24S/R06 R0 Detail Protection Scheme (BBP) 106 2022-09-22 2526 - 22/09/22 x 2022-10-13 1799 - 13/10/22 x 21
R1 Detail Protection Scheme (BBP) 106 2023-01-08 3132 - 08/01/23 x 2023-01-25 165 - 25/01/23 x
GtoG01/HBED/B24S/R07 R0 Detail Protection Scheme (BC) 151 2023-01-04 3097 - 04/01/23 x 2023-01-25 161 - 25/01/23 x 21
GtoG01/HBED/B24S/R08 R0 Detail Protection Scheme (33kV Incomer TR1) 155 2023-05-18 3921 - 18/05/23 x 2023-06-04 865 - 04/06/23 x
GtoG01/HBED/B24S/R08 R0 Detail Protection Scheme (33kV Incomer TR2) 155 2023-05-18 3918 - 18/05/23 x 2023-06-04 865 - 04/06/23 x
GtoG01/HBED/B24S/R08 R0 Detail Protection Scheme (33kV Incomer TR3) 155 2023-05-18 3917 - 18/05/23 x 2023-06-04 865 - 04/06/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 155 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B24S/R10 R0 EM Panel 2023-03-06 3462 - 06/03/23 x 2023-03-27 500 - 27/03/23 x 21
GtoG01/HBED/B24S/R17 R0 Station Common Control panel
Page 7 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
GtoG01/HBED/B25S/R08(2) R0 Detail Protection Scheme (33kV Incomer TR3A/TR4A) 2023-05-15 3889 - 15/05/23 x 2023-06-04 871 - 04/06/23 x
R0 Detail Protection Scheme (33kV Incomer TR3A/TR4A) 2023-07-16 4291 - 16/07/23 x 2023-07-31 1236 - 31/07/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B25S/R10 R0 EM Panel 2023-03-06 3468 - 06/03/23 x 2023-03-28 525 - 28/03/23 x
GtoG01/HBED/B25S/R17 R0 Station Common Control panel
Page 8 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
GtoG01/HBED/B20S/R04 R0 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-01 3069 - 01/01/23 x 2023-01-12 61 - 12/01/23 x
R1 Detail Protection Scheme (Line Dist) (Type B) 130 2023-01-22 3235 - 22/01/23 x 2023-02-05 240 - 05/02/23 x
GtoG01/HBED/B14S/R05 R0 Detail Protection Scheme (Txr Prot) 2023-07-23 4348 - 23/07/23 x 2023-08-13 1368 - 13/08/23 x
GtoG01/HBED/B14S/R07 R0 Detail Protection Scheme (BC) 2023-01-04 3100 - 04/01/23 x 2023-01-25 160 - 25/01/23 x
GtoG01/HBED/B14S/R08 R0 Detail Protection Scheme (33kV Incomer) 2023-07-23 4347 - 23/07/23 x 2023-08-13 1369 - 13/08/23 x
GtoG01/HBED/B20S/R09 R0 Detail Protection Scheme (33kV Line Feeder) (Type B) 2023-01-01 3070 - 01/01/23 x 2023-01-12 62 - 12/01/23 x
R1 Detail Protection Scheme (33kV Line Feeder) (Type B) 108 2023-03-14 3526 - 14/03/23 x 2023-03-28 526 - 28/03/23 x
GtoG01/HBED/B14S/R10 R0 EM Panel Scheme 2023-04-16 3756 - 16/04/23 x 2023-05-10 709 - 10/05/23 x
GtoG01/HBED/B17S/R17 R0 Station Common Control panel
Page 9 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
GtoG01/HBED/B17S/R03 R0 Detail Protection Scheme (T1) 74 2022-01-30 1220 - 30/01/22 x 2022-05-11 801 - 11/05/22 x 101
GtoG01/HBED/B17S/R04 R0 Detail Protection Scheme (T2) 62 2022-01-30 1220 - 30/01/22 x 2022-05-11 801 - 11/05/22 x 101
GtoG01/HBED/B17S/R05 R0 Detail Protection Scheme (TA) 62 2022-01-30 1220 - 30/01/22 x 2022-05-11 801 - 11/05/22 x 101
GtoG01/HBED/B17S/R07 R1 EM Panel Scheme 22 2022-05-16 1756 - 16/05/22 x 2022-06-02 970 - 02/06/22 x 17
Page 10 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
GtoG01/HBED/B86S/R03 R0 132kV Control Room Layout 1 2022-08-11 2260 - 11/08/22 x 2022-08-25 1479 - 25/08/22 x 14
R1 132kV Control Room Layout 1 2022-09-14 2476 - 14/09/22 x 2022-10-04 1784 - 04/10/22 x 20
R2 132kV Rev. Control Room Layout 1 2023-08-20 4583 - 20/08/23 x 2023-09-07 1582 - 07/09/23 x x
GtoG01/HBED/B86S/R04 R0 Detail Protection Scheme (132kV Line E01/E02) 2023-07-13 4282 - 13/07/23 x 2023-07-31 1247 - 31/07/23 x
R1 Detail Protection Scheme (132kV Line) 97 2023-08-30 4669 - 30/08/23 x 2022-09-17 1649 - 17/09/23
GtoG01/HBED/B86S/R06 R0 Detail Protection Scheme (132kV BBP) 2023-07-13 4284 - 13/07/23 x 2023-07-31 1252 - 31/07/23 x
GtoG01/HBED/B86S/R07 R0 Detail Protection Scheme (132kV BC) 2023-07-13 4283 - 13/07/23 x 2023-07-31 1245 - 31/07/23 x
R0 Detail Protection Scheme (132kV BC) 83 2023-08-30 4671 - 30/08/23 x 2022-09-17 1650 - 17/09/23 x
GtoG01/HBED/B86S/R10 R0 EM Panel 2023-07-13 4281 - 13/07/23 x 2023-07-31 1255 - 31/07/23 x
GtoG01/HBED/B72S/R08(3) R0 Detail Protection Scheme (33kV Trafo Incomer TR2) 80 2023-03-27 3609 - 27/03/23 x 2023-04-13 621 - 13/04/23 x
Page 11 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
R0 Detail Protection Scheme (BC) 82 2023-08-30 4673 - 30/08/23 x 2023-09-17 1651 - 17/09/23 x
GtoG01/HBED/B89S/R08(1) R0 Detail Protection Scheme (33kv Incoming TR1/3) 2023-07-12 4272 - 12/07/23 x 2023-07-31 1248 - 31/07/23 x
GtoG01/HBED/B89S/R08(2) R0 Detail Protection Scheme (33kv Incoming TR2) 2023-07-12 4271 - 12/07/23 x 2023-07-31 1248 - 31/07/23 x
GtoG01/HBED/B89S/R08 R0 Detail Protection Scheme (33kV Incoming TR1/2/3) 2023-10-01 4905 - 01/10/23 x
GtoG01/HBED/B89S/R10 R0 EM Panel 2023-07-23 4345 - 23/07/23 x 2023-08-13 1364 - 13/08/23 x
Page 12 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
46 GtoG01/HBED/B10S/R01 R1 PSLD 1 2022-05-09 1714 - 09/05/22 x 2022-05-25 886 - 25/05/22 x 16
132kV(50kA) GIS LCC drawing of Kabirpur 230/132kV GIS Substation for
132kV GIS LCC R0 392 2022-07-25 2166 - 25/07/22 x 2022-09-06 1556 - 06/09/22 x 43
ZF16-252)
230kV GIS LCC - 230kV 50kA 1 2023-03-14 3528 - 14/03/23 x 2023-04-05 575 - 05/04/23 x
GtoG01/HBED/B10S/R02 R0 Panel Arrangement of Control Room 1 2023-01-16 3185 - 16/01/23 x 2023-02-02 223 - 02/02/23 x
GtoG01/HBED/B10S/R02 R2 Panel Arrangement of Control Room (Rev.) 1 2023-08-28 4637 - 28/08/23 x 2023-09-03 1557 - 03/09/23 x x
Page 13 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
50 GtoG01/HBED/B09S/R01 R2 PSLD 1 2022-05-09 1717 - 09/05/22 x 2022-05-25 884 - 25/05/22 x 16
GtoG01/HBED/B09S/R02 R0 Panel Arrangement of Control Room 1 2023-03-27 3612 - 27/03/23 x 2023-04-13 616 - 13/04/23 x
R1 Panel Arrangement of Control Room (Rev.) 1 2023-08-28 4636 - 28/08/23 x 2023-09-10 1610 - 10/09/23 x x
GIS LCC - 230kV 50kA & 132kV 40kA GIS LCC 2023-03-14 3530 - 14/03/23 x 2023-04-14 626 - 14/04/23 x
Page 14 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
132kV GIS LCC R0 132kV GIS LCC drawing of Shabgram 230/132kV GIS Substation 2022-07-27 2178 - 27/07/22 x 2022-08-23 1458 - 23/08/22 x
Page 15 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
R1 Detail Protection Scheme (230kV ATR-4 Control & Protection) 216 2023-08-22 4600 - 22/08/23 x 2023-09-07 1580 - 07/09/23 x
GtoG01/HBED/B52S/R06 R0 Detail Protection Scheme (132kV Incoming CRP) 59 2023-07-04 4212 - 04/07/23 x 2023-07-19 1142 - 19/07/23 x
R1 Detail Protection Scheme (132kV Incoming CRP) 166 2023-08-22 4599 - 22/08/23 x 2023-09-04 1563 - 04/09/23 x
GtoG01/HBED/B52S/R07 R0 230kV EM Panel 21 2023-07-04 4211 - 04/07/23 x 2023-07-23 1173 - 23/07/23 x
GtoG01/HBED/B52S/R08 R0 132kV EM Panel 21 2023-07-04 4210 - 04/07/23 x 2023-07-23 1172 - 23/07/23 x
GtoG01/HBED/B52S/R09 R0 Detail Protection Scheme (230kV ATR-4 AVR CRP) 2023-09-12 4787 - 12/09/23 x 2023-09-25 1728 - 25/09/23 x
GtoG01/HBED/B52S/R10 R0 Detail Protection Scheme (230kV ATR-3 AVR CRP) 2023-09-12 4786 - 12/09/23 x 2023-09-25 1729 - 25/09/23 x
GtoG01/HBED/B52S/R11 R0 Detail Protection Scheme (230kV ATR-1 AVR CRP) 2023-09-12 4788 - 12/09/23 x 2023-09-25 1730 - 25/09/23 x
Page 16 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
GtoG01/HBED/B43S/R05 R0 Detail Protection Scheme (230kV Line Protection) [Sylhet S-2] 106 2023-01-12 3171 - 12/01/23 x 2023-01-26 190 - 26/01/23 x
- Reply Regarding Comment 2023-04-06 3646 - 06/04/23 x
GtoG01/HBED/B43S/R06 R0 EM Panel Scheme 21 2023-01-12 3170 - 12/01/23 x 2023-01-26 190 - 26/01/23 x
- Reply Regarding Comment 2023-04-06 3646 - 06/04/23 x
Page 17 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
GtoG01/HBED/B55S/R03 R0 132kV Control Room Layout 1 2022-10-17 2681 - 17/10/22 x 2022-11-09 1967 - 09/11/22 x
GtoG01/HBED/B55S/R03 R0 132kV Line CRP 105 2023-03-30 3640 - 30/03/23 x 2023-04-24 664 - 24/04/23 x
GtoG01/HBED/B55S/R04 R0 EM Panel 20 2023-03-30 3639 - 30/03/23 x 2023-04-24 663 - 24/04/23 x
Page 18 (23)
SUBMISSION RETURN
Category Current Status Previous Status
For Re-approval
For information
Days
For Approval
Item Drawings/Document No. Rev. Drawings/Document Title Sheet No.
As Built
Date Ref. No. Date Ref. No.
RR
RR
AC
AC
FA
FA
A
A
1.12.08 Bhandaria 132/33 kV AIS Substation
1.12.08-02 ELECTRICAL SECONDARY DRAWINGS
89 GtoG01/HBED/B77S/R01-01 R0 PSLD 1 2022-07-17 2084 - 17/07/22 x 2022-08-08 1377 - 04/08/22 x 22
GtoG01/HBED/B77S/R02 R0 132kV Conntrol Room Layout 1 2022-09-12 2455 - 12/09/22 x 2022-09-22 1667 - 22/09/22 x
GtoG01/HBED/B77S/R03 R0 Detail Protection Scheme (T1 & T2) 66 2022-09-12 2454 - 12/09/22 x 2022-09-29 1716 - 29/09/22 x
GtoG01/HBED/B77S/R05 R0 Detail Protection Scheme (T1A & T2A) 62 2022-09-12 2454 - 12/09/22 x 2022-09-29 1716 - 29/09/22 x
GtoG01/HBED/B77S/R07 R0 EM Panel Scheme 22 2022-09-12 2456 - 12/09/22 x 2022-09-29 1715 - 29/09/22 x 17
Page 19 (23)
SUBMISSION RETURN
For Re-approval
For information
Item Drawings/Document Number Rev. Drawings/Document Title Sheet No.
For Approval
Date Ref. No. Date Ref. No.
As Built
RR
RR
AC
AC
FA
FA
A
A
1 ACDB
1.1 230 GIS SS
G2G-ACDB-A R0 415/240V AC Distribution Panel Drawing 2022-07-06 2059 - 06/07/22 2022-07-21 1283 - 21/07/22 x
2 DCDB
2.1 230/132kV GIS
Calculation - Calculation 2022-02-02 1256 - 02/02/22 x 2022-03-03 416 - 03/03/22
- Calculation 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22
- Calculation 2022-05-31 1855 - 31/05/22 x 2022-06-12 1028 - 12/06/22 x
G2G-DCDB-110/A R0 110V DC Distribution Panel 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22 x
R2 110V DC Distribution Panel 2022-06-09 1900 - 09/06/22 x 2022-06-27 1140 - 27/06/22 x
R3 110V DC Distribution Panel 2022-06-09 2032 - 04/07/22 x 2022-07-19 1207 - 19/07/22 x
R4 110V DC Distribution Panel 2022-08-02 2209 - 02/08/22 x 2022-08-11 1416 - 11/08/22 x
For Re-approval
For information
Item Drawings/Document Number Rev. Drawings/Document Title Sheet No.
For Approval
Date Ref. No. Date Ref. No.
As Built
RR
RR
AC
AC
FA
FA
A
A
G2G-DCDB-110/B R0 110V DC Distribution Panel 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22
R2 110V DC Distribution Panel 2022-06-09 1900 - 09/06/22 x 2022-06-27 1140 - 27/06/22 x
R3 110V DC Distribution Panel 2022-06-09 2032 - 04/07/22 x 2022-07-19 1207 - 19/07/22 x
G2G-DCDB-110/B1 R4 110V DC Distribution Panel 12 2022-08-02 2209 - 02/08/22 x 2022-08-11 1416 - 11/08/22 x
G2G-DCDB-110/C R0 110V DC Distribution Panel 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22
R2 110V DC Distribution Panel 2022-06-09 1900 - 09/06/22 x 2022-06-27 1140 - 27/06/22 x
R3 110V DC Distribution Panel 2022-06-09 2032 - 04/07/22 x 2022-07-19 1207 - 19/07/22 x
R4 110V DC Distribution Panel 2022-08-02 2209 - 02/08/22 x 2022-08-11 1416 - 11/08/22 x
G2G-DCDB-110/D R0 110V DC Distribution Panel 8 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22
R1 110V DC Distribution Panel 8 2022-06-09 1900 - 09/06/22 x 2022-06-27 1140 - 27/06/22 x
R2 110V DC Distribution Panel 8 2022-06-09 2032 - 04/07/22 x 2022-07-19 1207 - 19/07/22 x
R3 110V DC Distribution Panel 8 2022-08-02 2209 - 02/08/22 x 2022-08-11 1416 - 11/08/22 x
R4 110V DC Distribution Panel 8 2022-08-29 2348 - 29/08/22 x 2022-09-11 1583 - 11/09/22 x
2.5 230kV AIS (Barapukuria)
Calculation - Calculation 2022-04-12 1609 - 12/04/22 x 2022-11-01 1925 - 01/11/22
- Calculation 2022-08-28 2331 - 28/08/22 x 2022-09-01 1535 - 01/09/22 x
G2G-DCDB-110/E R0 110V DC Distribution Panel 13 2022-04-12 1609 - 12/04/22 x 2022-04-26 751 - 26/04/22 x
R1 110V DC Distribution Panel 13 2022-06-09 1900 - 09/06/22 x 2022-06-27 1140 - 27/06/22 x
R2 110V DC Distribution Panel 13 2022-06-09 2032 - 04/07/22 x 2022-07-19 1207 - 19/07/22 x
R3 110V DC Distribution Panel 13 2022-08-02 2209 - 02/08/22 x 2022-08-11 1416 - 11/08/22 x
R3 110V DC Distribution Panel 13 2022-08-29 2349 - 29/08/22 x 2022-09-11 1584 - 11/09/22 x
R4 110V DC Distribution Panel 13 2022-10-02 2595 - 02/10/22 x Missing by PGCB
R4 110V DC Distribution Panel 13 2023-01-18 3210 - 18/01/23 x 2023-01-29 208 - 29/01/23 x
3 110V Battery
3.1 440, 500, 550, 820AH (Henan new Taihang Power Source Co., Ltd)
GTP - GTP 2022-10-10 2624 - 10/10/22 x 2022-10-16 1808 - 16/10/22 x
LS416.141 (GN440) / (G500) / (GN550) / (GN820) - Rack Drawing & Connection Diagram 2022-10-19 2692 - 19/10/22 2022-11-01 1924 - 01/11/22 x
3.2 150, 400, 460 AH (Sichuan Changhong Battery Co., Ltd)
KPL 150, KPL 400, KPL 460AH - GTP 2022-09-01 2367 - 01/09/22 x 2022-09-11 1585 - 11/09/22 x
92KPL150, 92KPL400, 92KPL460 - Rack Drawing & Connection Diagram 2022-10-19 2691 - 19/10/22 2022-11-01 1925 - 01/11/22 x
The Main Contractor: ROHAS-EUCO INDUSTRIES BHD. Page 21 (23)
The Subcontractor: ETERN-CCC JOINT VENTURE
SUBMISSION RETURN
For Re-approval
For information
Item Drawings/Document Number Rev. Drawings/Document Title Sheet No.
For Approval
Date Ref. No. Date Ref. No.
As Built
RR
RR
AC
AC
FA
FA
A
A
4 110V Charger
4.1 50A, 155A, 185A, 260A [Sichuan Changhong Battery Co. Ltd]
DC Charger 50A,155A,185A, 260A Type: GXPDY - GTP 2022-07-19 2115 - 19/07/22 x 2022-07-31 1342 - 31/07/22 x
DC Charger 50A, 185A - GTP 2022-09-04 2385 - 04/09/22 x 2022-09-18 1639/1 - 18/09/22 x
- GTP 2022-10-23 2721 - 23/10/22 x 2022-11-11 1974 - 09/11/22 x
GtoG01/Charger/SCCH/A, B, C, D R0 DC Charger Drawing 19, 19, 19, 20 2022-07-19 2115 - 19/07/22 x 2022-07-31 1342 - 31/07/22 x
GtoG01/Charger/SCCH/A, C R2, R3 DC Charger Drawing 21, 21 2022-09-04 2385 - 04/09/22 x 2022-09-18 1639/1 - 18/09/22 x
GtoG01/Charger/SCCH/C R2 DC Charger Drawing 21 2022-09-19 2492 - 19/09/22 2022-09-18 1580 - 08/09/22
R2, R3 DC Charger Drawing 21, 21 2022-10-23 2721 - 23/10/22 x 2022-11-11 1974 - 09/11/22 x
4.2 50A, 155A, 185A, 260A [Shanghai Chengyi Electric Co. Ltd]
DC Charger 50A,155A,185A, 260A Type: GZD(W)-1 - GTP 2022-07-19 2114 - 19/07/22 x 2022-07-31 1343 - 31/07/22 x
DC Charger 155A, 260A - GTP 2022-09-04 2386 - 04/09/22 x 2022-09-18 1631 - 18/09/22 x
- GTP 2022-10-23 2720 - 23/10/22 2022-11-11 1975 - 09/11/22 x
GtoG01/Charger/SCCH/A_B_C_D R0 DC Charger Drawing 7, 7, 7, 9 2022-07-19 2114 - 19/07/22 2022-07-31 1343 - 31/07/22 x
GtoG01/Charger/SCCH/B, D R1, R1 DC Charger Drawing 7, 9 2022-09-04 2386 - 04/09/22 2022-09-18 1639 - 18/09/22 x
R3, R3 DC Charger Drawing 7, 10 2022-10-23 2720 - 23/10/22 2022-11-11 1975 - 09/11/22 x
5 48V System
GTP - GTP 2022-09-27 2561 - 27/09/22 2022-10-12 1783 - 12/10/22
- GTP 2022-10-19 2758 - 30/10/22 2022-11-13 1984 - 13/11/22
G2G -DC-48V R0 48V DC System Diagram 9 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22 x
R1 48V DC System Diagram 9 2022-06-16 1937 - 16/06/22 2022-06-29 1154 - 29/06/22 x
R2 48V DC System Diagram 9 2022-07-06 2054 - 06/07/22 2022-07-19 1207 - 19/07/22 x
R3 48V DC System Diagram 9 2022-08-02 2208 - 02/08/22 x 2022-08-11 1420 - 11/08/22 x
R4 48V DC System Diagram 9 2022-09-27 2561 - 27/09/22 2022-10-12 1783 - 12/10/22 x
R5 48V DC System Diagram 9 2022-10-19 2758 - 30/10/22 2022-11-13 1984 - 13/11/22 x
6 UPS System
G2G-UPS R0 UPS System Diagram 8 2022-02-02 1255 - 02/02/22 x 2022-03-03 416 - 03/03/22 x
R0 UPS System Diagram 8 2022-04-04 1562 - 04/04/22 x 2022-04-26 751 - 26/04/22 x
R1 UPS System Diagram 8 2022-06-16 1936 - 16/06/22 x 2022-06-28 1147 - 28/06/22 x
R2 UPS System Diagram 8 2022-12-15 2983 - 15/12/22 x 2022-12-27 2200 - 27/12/22 x
R3 GTP & UPS System Diagram 8 2023-01-10 3165 - 10/01/23 x 2023-01-26 199 - 26/01/23 x
R4 GTP & UPS System Diagram 8 2023-02-05 3313 - 05/02/23 x 2023-02-20 316 - 20/02/23 x
7 NIFPS
7.1 230kV (300MVA, 350MVA, 400MVA)
GTP R0 GTP 2022-04-25 1676 - 25/04/22 x 2022-06-06 990 - 06/06/22 x
For Re-approval
For information
Item Drawings/Document Number Rev. Drawings/Document Title Sheet No.
For Approval
Date Ref. No. Date Ref. No.
As Built
RR
RR
AC
AC
FA
FA
A
A
ZP150-003-1
ZP150-001 R0 GA Drawing (225/300MVA) 2022-04-25 1675 - 25/04/22 x 2022-05-25 904 - 25/05/22 x
ZP150-009
ZP150-003-1
R0 GA Drawing (250/350MVA) 2022-03-30 1539 - 30/03/22 x 2022-04-21 725 - 21/04/22 x
ZP150-009
ZP150-003-1
R0 GA Drawing (300/450MVA) 2022-03-30 1538 - 30/03/22 x 2022-04-21 726 - 21/04/22 x
ZP150-009
ZP150-001
ZP150-011 ~ 017
R0 Schemactic Drawing 2022-06-19 1949 - 19/06/22 x 2022-07-20 1330 - 28/07/22 x
ZP150-005/5-1
ZP150-010/010-1
ZP125-001-1
ZP125-008 R0 GA Drawing 2022-07-18 2105 - 18/07/22 x 2022-07-20 1276 - 20/07/22 x
ZP125-009
ZP125-001
ZP125-011 ~ 017
R0 Schemactic Drawing 2022-06-19 1948 - 19/06/22 x 2022-07-20 1329 - 28/07/22 x
ZP125-005/5-1
ZP125-010/010-1
ZP125-003-1 R0 System Installaion Diagram 2022-02-16 1322 - 16/02/22 x 2022-02-24 352 - 24/02/22 x
8 Relay list
8.1 Relay List & Catalog R01 Relay List & Catalog for RTU Based 132kVSS 1 2021-08-21 605 - 31/08/21 x 2021-09-06 1245 - 06/09/21 x
8.2 Relay List & Catalog - Relay List & Catalog for RTU Based 230kV SS 4 2021-10-11 825 - 10/11/21 x 2021-11-15 1706 - 15/11/21 x
8.3 Relay List & Catalog R05 Relay List & Catalog for RTU & SAS Based 230kV SS 10 2021-12-15 980 - 15/12/21 x 2022-04-24 769 - 24/04/22 x
9 DFDR
9.1 DFDR - GTP 2023-01-10 3157 - 10/01/23 x 2023-01-26 188 - 26/01/23 x
- GTP 2023-04-09 3697 - 09/04/23 x
- GTP (IDM+, BEN6000) 2023-07-11 4259 - 11/07/23 x 2023-07-31 1237 - 31/07/23 x
- GTP (IDM+) 2023-08-29 4659 - 29/08/23 x 2023-10-08 1799 - 08/10/23 x
10 Others
10.1 Energy Meter GTP 2022-04-10 1597 - 10/04/22 x 2022-06-28 770 - 28/04/22 x
Energy Meter GTP (Revised County Origin) 2022-04-10 4190 - 25/06/23 x 2023-07-06 1066 - 06/07/23 x
10.2 Protocol converter (CSD1321) 2022-11-03 2786 - 03/11/22 x 2022-11-20 2011 - 20/11/22 x