Design Generation 15,000.00 MWh
Gen. Target 13,023.83 MWh
No.s of Employees in Month 48
Prepared by (Alok Kumar Karn)
Designation Mech. Engg
Checked by (Youbraj kumar Shrestha)
Designation Ele. Engg
Approved By ( Baburaja Maharjan)
Designation Station Chief
Meter Reading
Unit No. Previous M.R. Present M.R
Unit-1 67,702,013
Unit-2 31,918,495
Unit-3 40,844,166
Unit-4 69,253,510
Unit-5 60,825,213
Unit-6 53,912,132
Unit-7 55,542,484
Total
Station-1 4,470,240.00
Station-2 5,408,800.00
Exp. 48,456,652.00
11KV (KWh)
imp
Exp. 400,542,000.00
Balaju-1 (kWh)
imp 19,267.00
Exp. 1,985,637,226.00
Balaju-2 (kWh)
imp 401,105.00
Exp. 14,976,693.00
Devighat (kWh)
imp 27,148,575.00
Exp. 163,125.00
Chilime (kWh)
imp 244,938,000.00
Index Month Designed Target (MWh)
1 Shrawan 15,000.00 12,899.74
2 Bhadra 15,000.00 12,621.57
3 Aswin 15,000.00 13,023.83
4 Kartik 15,000.00
5 Mangsir 15,000.00
6 Paush 13,000.00
7 Magh 10,800.00
8 Falgun 10,000.00
9 Chaitra 10,000.00
10 Baisakh 15,000.00
11 Jestha 15,000.00
12 Ashad 15,000.00
Update-1
Unit-4 Unit-5 Unit-6 Unit-7
323,742.75 332,235.04 318,751.90 313,906.01
17,827.53 17,807.17 23,020.22 23,028.64
901.75 3,045.93 1,918.16 2,851.80
655.47 402.71 340.98 306.21
282.54 413.86 258.00 310.21
ter Reading
Diff. Total This Month Total Ref.MR
(67,702,013.0) 1,114,997.0 749,257,240
(31,918,495.0) 366,203.0 695,886,190
(40,844,166.0) 967,732.0 834,278,230
(69,253,510.0) 1,348,647.0 759,696,290
(60,825,213.0) 1,133,641.0 785,942,680
(53,912,132.0) 1,314,739.0 794,722,620
(55,542,484.0) 1,136,798.0 716,718,500
(379,998,013.0) 7,382,757.0 (387,380,770.00)
(4,470,240.0) 23,060.0 (4,493,300.00)
(5,408,800.0) - (5,408,800.00)
(48,456,652.0) (48,456,652.0) -
- - -
(400,542,000.0) 13,079,000.0 (413,621,000.00)
(19,267.0) (60,403.0) 41,136.00
(1,985,637,226.0) 13,132,577.0 (1,998,769,803.00)
(401,105.0) 1,819.0 (402,924.00)
(14,976,693.0) 28,950.0 (15,005,643.00)
(27,148,575.0) 101,850.0 (27,250,425.00)
(326,250.0) 1,463.0 (327,713.00)
(489,876,000.0) 18,138,000.0 (508,014,000.00)
12899.74 11590.673
89.851989
MEGA -LOG SHEET OF TRISHULI POWER HOUSE
1 2 3 4 5 6 7
Day Wednesday Thursday Friday Saturday Sunday Monday Tuesday
Date Asw-1 Asw-2 Asw-3 Asw-4 Asw-5 Asw-6 Asw-7
Units running 6 7 7 7 6 7 7
Unit-1 (Kwh) - 33,642 66,168 61,845 1,273 35,113 62,821
Unit-2 (Kwh) 57,862 47,109 43,087 7,880 62,208 38,375 5,015
Unit-3 (Kwh) 44,408 61,950 56,620 58,370 55,013 55,309 51,490
Unit-4 (Kwh) 59,967 69,400 66,505 62,043 61,756 69,380 62,433
Unit-5 (Kwh) 51,486 68,019 46,523 45,329 67,481 66,075 58,169
Unit-6 (Kwh) 61,501 68,159 65,353 64,423 66,315 67,675 65,431
Unit-7 (Kwh) 57,297 48,347 31,758 60,832 61,469 67,545 57,547
Total (Kwh) 332,521.00 396,626.00 376,014.00 360,722.00 375,515.00 399,472.00 362,906.00
Station-1 (Kwh) 830.00 900.00 - 820.00 880.00 880.00 790.00
Station-2 (Kwh) - - - - - - -
32,198.00 38,626.00 37,513.00 39,329.00 39,748.00 39,118.00 36,482.00
11KV (KWh)
- - - - - - -
428.00 460.00 451.00 436.00 449.00 455.00 428.00
Balaju-1 (kWh)
98.00 (61,756.00) - 82.00 - - 184.00
418,378.00 446,582.00 437,910.00 425,982.00 438,274.00 441,730.00 416,929.00
Balaju-2 (kWh)
116.00 - - 96.00 - - 196.00
- - - - - -
Devighat (kWh)
- - - - - - -
- - - 37.00 - - -
Chilime (kWh)
596.00 610.00 610.00 600.00 610.00 606.00 576.00
Max.load (MW) 17.50 17.50 17.50 17.50 17.50 17.50 17.00
Min.Load (MW) - 16.50 15.50 - 13.00 14.00 8.50
Morning Peak Load (MW) 15.00 17.50 17.50 15.50 17.50 17.00 17.00
Evening Peak Load (MW) 17.50 17.50 17.00 17.50 17.50 17.00 16.50
Av.Load 13.86 15.68 15.67 15.03 15.65 16.64 15.12
LF 79.17 89.60 89.53 85.89 89.41 95.11 88.95
Max.Discharge 1,700 1,700 1,700 1,600 1,600 1,600 1,600
Min.Discharge 1,000 - - - 1,600 1,600 800
DT.Level 66.80 66.80 67.00 67.00 67.00 67.00 67.00
8 9 10 11 12 13 14 15 16
Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday
Asw-8 Asw-9 Asw-10 Asw-11 Asw-12 Asw-13 Asw-14 Asw-15 Asw-16
7 7 6 7 7 6 6 6 6
69,055.00 70,440 71,297 62,331 70,966 64,674 65,946 67,358 65,179
16,117.00 11,429 - 30,228 46,893 - - - -
36,991.00 58,625 61,864 26,431 12,974 62,531 61,280 61,555 61,953
65,335.00 63,657 69,014 65,060 72,277 67,070 66,106 65,138 67,514
51,886.00 40,457 61,294 68,799 71,280 58,861 70,356 62,420 67,482
65,854.00 69,894 65,927 66,538 73,101 65,033 67,265 66,988 65,733
67,179.00 57,047 65,475 60,220 68,837 66,877 38,636 63,525 65,914
372,417.00 371,549.00 394,871.00 379,607.00 416,328.00 385,046.00 369,589.00 386,984.00 393,775.00
820.00 860.00 860.00 700.00 610.00 860.00 940.00 900.00 870.00
- - - - - - - - -
36,849.00 39,741.00 38,126.00 40,151.00 40,714.00 38,043.00 40,924.00 36,863.00 36,438.00
- - - - - - - - -
449.00 447.00 453.00 445.00 474.00 441.00 445.00 455.00 460.00
- 41.00 - 79.00 - - - - -
437,451.00 436,394.00 439,721.00 434,392.00 450,660.00 434,757.00 433,866.00 443,172.00 445,120.00
- 40.00 - 90.00 - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
614.00 606.00 600.00 600.00 618.00 586.00 614.00 608.00 610.00
17.50 17.50 17.50 18.00 18.00 18.00 17.50 17.50 17.50
14.00 - 17.50 - 17.00 7.00 11.00 10.50 14.50
17.00 17.50 17.50 17.50 18.00 17.50 15.00 17.50 17.50
17.50 17.50 17.50 18.00 17.50 18.00 17.50 17.50 17.50
15.52 15.48 16.45 15.82 17.35 16.04 15.40 16.12 16.41
88.67 88.46 94.02 87.87 96.37 89.13 88.00 92.14 93.76
1,600 1,600 1,600 1,700 1,700 1,700 1,650 1,700 1,600
- 1,600 1,600 900 1,700 1,650 900 1,000 1,600
67.00 67.20 67.00 67.00 67.20 67.10 67.00 67.00 67.00
Running Hrs
17 18 19 20 21 22 23 24 25
Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Asw-17 Asw-18 Asw-19 Asw-20 Asw-21 Asw-22 Asw-23 Asw-24 Asw-25
6 6 6 6 4 0 0 0 0
68,075 58,267 42,593 51,266 26,688
- - - - -
61,482 53,582 12,678 12,626 -
68,673 73,601 65,519 61,877 26,322
68,994 74,739 16,122 13,274 4,595
68,910 60,271 61,598 58,770 -
60,965 39,435 47,405 46,137 4,351
397,099.00 359,895.00 245,915.00 243,950.00 61,956.00 - - - -
830.00 900.00 550.00 570.00 400.00 890.00 860.00 440.00 670.00
- - - - - - - - -
35,112.00 34,301.00 29,897.00 31,607.00 30,521.00 39,661.00 378,259.00 34,363.00 34,470.00
- - - - - - - - -
466.00 454.00 356.00 383.00 260.00 444.00 461.00 44.00 292.00
- - 135.00 307.00 255.00 - - 45.00 -
452,675.00 444,415.00 351,998.00 - 517,408.00 432,262.00 450,121.00 392,578.00 452,976.00
1.00 - 152.00 - 22.00 - - 835.00 139.00
- - - - - - - 25,913.00 2,831.00
- - - - - - - 18,862.00 48,600.00
- - - - - - - 1,312.00 -
614.00 628.00 530.00 532.00 460.00 592.00 596.00 420.00 532.00
17.50 16.50 14.50 16.50 12.00 17.50 17.50 17.50 17.50
16.50 14.00 10.00 4.00 - 12.00 14.50 3.00 4.00
17.50 16.50 10.00 10.00 4.00 12.00 17.50 3.00 4.00
16.50 14.00 14.50 15.50 - 17.50 17.50 6.00 17.50
16.55 15.00 10.25 10.16 2.58 - - 13.00 -
94.55 90.88 70.67 61.60 21.51 - - 74.29 -
1,600 1,600 1,400 1,500 500 1,800 1,600 1,600 1,600
1,600 - 900 500 - 1,600 1,600 - 500
67.00 67.00 66.60 67.00 65.00 67.10 66.80 66.70 66.80
rs
374277
26 27 28 29 30 31
Sunday Monday Tuesday Wednesday Thursday Thursday
Asw-26 Asw-27 Asw-28 Asw-29 Asw-30 Asw-31
0 0 0 0 0 0
- - - - - -
710.00 690.00 910.00 810.00 630.00 680.00
- - - - - -
36,366.00 35,887.00 35,764.00 37,063.00 38,813.00 37,260.00
- - - - - -
474.00 450.00 466.00 462.00 441.00 450.00
- - - - - 127.00
451,286.00 436,763.00 437,064.00 459,967.00 433,698.00 438,048.00
- - - - 132.00
206.00 - - - - -
34,388.00 - - - - -
- - - - - 114.00
588.00 590.00 604.00 608.00 594.00 586.00
18.00 18.00 17.50 17.50 18.00 18.00
17.50 10.00 15.00 14.50 10.00 10.80
17.50 10.00 17.50 17.50 10.00 18.00
18.00 17.50 17.50 17.00 18.00 18.00
- - - - - 15.00
- - - - - 83.33
1,700 1,700 1,700 1,700 1,600 1,700
1,600 900 1,700 1,700 500 1,700
67.00 66.90 66.70 67.00 66.90 67.00
Total RH of the Month 4069.78 NEPAL ELECTRICITY AUTHORITY
Idle Hours ERROR TRISHULI HYDRO POWER STATION
Planned Outage Hours 25.00 LOAD & RUNNING HOURS
Forced Outage Hours 0.00 Date :2079 Aswin
Total time in Month #VALUE! RUNNING HOURS
System
0.250 0.62 21:25 21:42 0.283
trip
Unit 2 Trip5 Unit 2 Trip6
Trip Sync Hour Back Station Trip Sync Hour
Remarks Time Time Duration feed Control Rel. Ind Remarks Time Time Duration
unit trip
due to
chilime
trip
Unit 2 Trip6 Unit 2 Trip7
Back Station Trip Sync Hour Back Station
feed Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind Remarks
Unit No.3 Trip Record
Total Trip Total Run Act Run Common
Date times (Hrs) (Hrs) (Hrs) Remarks
1 0 0.00 18.00 18.00 -
2 4 1.83 23.00 21.17 system out
3 0 0.00 24.00 24.00 -
4 0 0.00 23.00 23.00 -
5 0 0.00 24.00 24.00 -
6 0 0.00 24.00 24.00 -
7 0 0.00 20.00 20.00 -
8 1 0.35 17.00 16.65 -
9 0 0.00 23.00 23.00 -
10 1 0.25 24.00 23.75 Unit trip due to chi
11 0 0.00 10.00 10.00 -
12 0 0.00 5.00 5.00 -
13 0 0.00 24.00 24.00 -
14 0 0.00 24.00 24.00 -
15 0 0.00 24.00 24.00 -
16 0 0.00 24.00 24.00 -
17 1 0.33 24.00 23.67 Unit trip due to lo
18 0 0.00 24.00 24.00 -
19 0 0.00 5.00 5.00 -
20 0 0.00 5.00 5.00 -
21 0 0.00 - 0.00 -
22 0 0.00 24.00 24.00 -
23 0 0.00 24.00 24.00 -
24 2 1.17 2.00 0.83 Unit trip due to chi
25 0 0.00 15.00 15.00 -
26 0 0.00 10.00 10.00 -
27 0 0.00 12.00 12.00 -
28 0 0.00 24.00 24.00 -
29 0 0.00 13.00 13.00 -
30 0 0.00 - 0.00 -
31 0 0.00 - 0.00 -
### - -
Unit 3 Trip1
Trip Sync Hour Back Station Trip
Time Time Duration feed Control Rel. Ind Remarks Time
2:25 3:31 1.100 2:30 System trip due tio Balaju I trip 14:02
Unit 4 Trip3 Unit 4 Trip4
Sync Hour Back Station Trip Sync Hour Back Station
Time Duration feed Control Rel. Ind Remarks Time Time Duration feed Control
2:25 3:30 1.083 2:30 System trip due tio Balaju I trip
Unit 6 Trip3 Unit 6 Trip4
Sync Hour Back Station Trip Sync Hour Back Station
Time Duration feed Control Rel. Ind Remarks Time Time Duration feed Control
2:25 3:25 1.000 2:30 System trip due tio Balaju I trip
Unit 7 Trip2 Unit 7 Tr
Sync Hour Back Station Trip Sync
Time Duration feed Control Rel. Ind Remarks Time Time
Increase/
Energy Forecast Generated Energy
S.N Month Decrease Percentage
(MWh) (MWh)
25 23.78 2:01 2:14 0.22 0.00 0.22 0.00 0.00 0.22 Tripped 1 time: ()
25 0.00 0.00 0.00 24.00 0.00 0.00 24.00 Fault in balaju line i,
26 14.00 0.00 0.00 10.00 0.00 0.00 10.00 low discharge,
Desander and
27 20.00 0.00 4.00 0.00 0.00 0.00 4.00 headgate flushing,
28 24.00 0.00 0.00 0.00 0.00 0.00 0.00
29 24.00 0.00 0.00 0.00 0.00 0.00 0.00
30 24.00 0.00 0.00 0.00 0.00 0.00 0.00
31 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 312.43 1.57 8.00 423.57 0.00 0.00 431.57
25 15.00 0.00 0.00 9.00 0.00 0.00 9.00 Fault in balaju line i,
26 10.00 0.00 0.00 14.00 0.00 0.00 14.00 low discharge,
27 12.00 0.00 0.00 12.00 0.00 0.00 12.00 low discharge,
28 24.00 0.00 0.00 0.00 0.00 0.00 0.00
29 13.00 0.00 0.00 11.00 0.00 0.00 11.00 low discharge,
30 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
31 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
Total 509.07 3.93 0.00 234.93 0.00 0.00 234.93
25 15.00 0.00 0.00 9.00 0.00 0.00 9.00 Fault in balaju line i,
26 24.00 0.00 0.00 0.00 0.00 0.00 0.00
27 24.00 0.00 0.00 0.00 0.00 0.00 0.00
28 24.00 0.00 0.00 0.00 0.00 0.00 0.00
29 24.00 0.00 0.00 0.00 0.00 0.00 0.00
30 24.00 0.00 0.00 0.00 0.00 0.00 0.00
31 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 611.38 2.62 6.00 126.62 0.00 0.00 132.62
Desander headgate
9 23.00 0.00 5.00 -4.00 0.00 0.00 1.00 flushing ,heavy flood,
25 15.00 0.00 0.00 9.00 0.00 0.00 9.00 Fault in balaju line i,
Summary
Total Outage
Total R.H. Month diff.
Planned Idle Forced Non-Dispatch
4069.78 #VALUE! 25.00 1113.22 0.00 0.00 1138.22