Year (B.S.

) 2079
Month Aswin 1
No.s of days 31
Specify First day (in AD) 17-Aug-22
Design Generation 15,000.00 MWh
Gen. Target 13,023.83 MWh
No.s of Employees in Month 48
Prepared by (Alok Kumar Karn)
Designation Mech. Engg
Checked by (Youbraj kumar Shrestha)
Designation Ele. Engg
Approved By ( Baburaja Maharjan)
Designation Station Chief

A. Cum. Till This Month Update


Type Unit-1 Unit-2 Unit-3
Running Hrs 321,006.93 294,590.18 339,934.72
Idle Hrs 11,838.16 25,702.57 20,091.14
Planned Outage 3,563.46 11,350.53 1,310.59
Forced Outage 721.34 525.89 284.25
Non dispatch (Hrs) 231.38 338.38 385.04

B.Cum. Till Last Month Update


Type Unit-1 Unit-2 Unit-3
Running Hrs 320,351.74 294,277.74 339,425.65
Idle Hrs 11,749.34 25,279.00 19,856.20
Planned Outage 3,563.46 11,342.53 1,310.59
Forced Outage 721.34 525.89 284.25
Non dispatch (Hrs) 231.38 338.38 385.04

Meter Reading
Unit No. Previous M.R. Present M.R
Unit-1 67,702,013
Unit-2 31,918,495
Unit-3 40,844,166
Unit-4 69,253,510
Unit-5 60,825,213
Unit-6 53,912,132
Unit-7 55,542,484
Total
Station-1 4,470,240.00
Station-2 5,408,800.00
Exp. 48,456,652.00
11KV (KWh)
imp
Exp. 400,542,000.00
Balaju-1 (kWh)
imp 19,267.00
Exp. 1,985,637,226.00
Balaju-2 (kWh)
imp 401,105.00
Exp. 14,976,693.00
Devighat (kWh)
imp 27,148,575.00
Exp. 163,125.00
Chilime (kWh)
imp 244,938,000.00
Index Month Designed Target (MWh)
1 Shrawan 15,000.00 12,899.74
2 Bhadra 15,000.00 12,621.57
3 Aswin 15,000.00 13,023.83
4 Kartik 15,000.00
5 Mangsir 15,000.00
6 Paush 13,000.00
7 Magh 10,800.00
8 Falgun 10,000.00
9 Chaitra 10,000.00
10 Baisakh 15,000.00
11 Jestha 15,000.00
12 Ashad 15,000.00

Update-1
Unit-4 Unit-5 Unit-6 Unit-7
323,742.75 332,235.04 318,751.90 313,906.01
17,827.53 17,807.17 23,020.22 23,028.64
901.75 3,045.93 1,918.16 2,851.80
655.47 402.71 340.98 306.21
282.54 413.86 258.00 310.21

Unit-4 Unit-5 Unit-6 Unit-7


323,031.00 331,623.66 318,075.77 313,312.18
17,798.28 17,680.55 22,957.35 22,881.47
898.75 3,039.93 1,913.16 2,848.80
655.47 402.71 340.98 306.21
282.54 413.86 258.00 310.21

ter Reading
Diff. Total This Month Total Ref.MR
(67,702,013.0) 1,114,997.0 749,257,240
(31,918,495.0) 366,203.0 695,886,190
(40,844,166.0) 967,732.0 834,278,230
(69,253,510.0) 1,348,647.0 759,696,290
(60,825,213.0) 1,133,641.0 785,942,680
(53,912,132.0) 1,314,739.0 794,722,620
(55,542,484.0) 1,136,798.0 716,718,500
(379,998,013.0) 7,382,757.0 (387,380,770.00)
(4,470,240.0) 23,060.0 (4,493,300.00)
(5,408,800.0) - (5,408,800.00)
(48,456,652.0) (48,456,652.0) -
- - -
(400,542,000.0) 13,079,000.0 (413,621,000.00)
(19,267.0) (60,403.0) 41,136.00
(1,985,637,226.0) 13,132,577.0 (1,998,769,803.00)
(401,105.0) 1,819.0 (402,924.00)
(14,976,693.0) 28,950.0 (15,005,643.00)
(27,148,575.0) 101,850.0 (27,250,425.00)
(326,250.0) 1,463.0 (327,713.00)
(489,876,000.0) 18,138,000.0 (508,014,000.00)
12899.74 11590.673
89.851989
MEGA -LOG SHEET OF TRISHULI POWER HOUSE

1 2 3 4 5 6 7
Day Wednesday Thursday Friday Saturday Sunday Monday Tuesday
Date Asw-1 Asw-2 Asw-3 Asw-4 Asw-5 Asw-6 Asw-7
Units running 6 7 7 7 6 7 7
Unit-1 (Kwh) - 33,642 66,168 61,845 1,273 35,113 62,821
Unit-2 (Kwh) 57,862 47,109 43,087 7,880 62,208 38,375 5,015
Unit-3 (Kwh) 44,408 61,950 56,620 58,370 55,013 55,309 51,490
Unit-4 (Kwh) 59,967 69,400 66,505 62,043 61,756 69,380 62,433
Unit-5 (Kwh) 51,486 68,019 46,523 45,329 67,481 66,075 58,169
Unit-6 (Kwh) 61,501 68,159 65,353 64,423 66,315 67,675 65,431
Unit-7 (Kwh) 57,297 48,347 31,758 60,832 61,469 67,545 57,547
Total (Kwh) 332,521.00 396,626.00 376,014.00 360,722.00 375,515.00 399,472.00 362,906.00
Station-1 (Kwh) 830.00 900.00 - 820.00 880.00 880.00 790.00
Station-2 (Kwh) - - - - - - -
32,198.00 38,626.00 37,513.00 39,329.00 39,748.00 39,118.00 36,482.00
11KV (KWh)
- - - - - - -
428.00 460.00 451.00 436.00 449.00 455.00 428.00
Balaju-1 (kWh)
98.00 (61,756.00) - 82.00 - - 184.00
418,378.00 446,582.00 437,910.00 425,982.00 438,274.00 441,730.00 416,929.00
Balaju-2 (kWh)
116.00 - - 96.00 - - 196.00
- - - - - -
Devighat (kWh)
- - - - - - -
- - - 37.00 - - -
Chilime (kWh)
596.00 610.00 610.00 600.00 610.00 606.00 576.00
Max.load (MW) 17.50 17.50 17.50 17.50 17.50 17.50 17.00
Min.Load (MW) - 16.50 15.50 - 13.00 14.00 8.50
Morning Peak Load (MW) 15.00 17.50 17.50 15.50 17.50 17.00 17.00
Evening Peak Load (MW) 17.50 17.50 17.00 17.50 17.50 17.00 16.50
Av.Load 13.86 15.68 15.67 15.03 15.65 16.64 15.12
LF 79.17 89.60 89.53 85.89 89.41 95.11 88.95
Max.Discharge 1,700 1,700 1,700 1,600 1,600 1,600 1,600
Min.Discharge 1,000 - - - 1,600 1,600 800
DT.Level 66.80 66.80 67.00 67.00 67.00 67.00 67.00
8 9 10 11 12 13 14 15 16
Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday
Asw-8 Asw-9 Asw-10 Asw-11 Asw-12 Asw-13 Asw-14 Asw-15 Asw-16
7 7 6 7 7 6 6 6 6
69,055.00 70,440 71,297 62,331 70,966 64,674 65,946 67,358 65,179
16,117.00 11,429 - 30,228 46,893 - - - -
36,991.00 58,625 61,864 26,431 12,974 62,531 61,280 61,555 61,953
65,335.00 63,657 69,014 65,060 72,277 67,070 66,106 65,138 67,514
51,886.00 40,457 61,294 68,799 71,280 58,861 70,356 62,420 67,482
65,854.00 69,894 65,927 66,538 73,101 65,033 67,265 66,988 65,733
67,179.00 57,047 65,475 60,220 68,837 66,877 38,636 63,525 65,914
372,417.00 371,549.00 394,871.00 379,607.00 416,328.00 385,046.00 369,589.00 386,984.00 393,775.00
820.00 860.00 860.00 700.00 610.00 860.00 940.00 900.00 870.00
- - - - - - - - -
36,849.00 39,741.00 38,126.00 40,151.00 40,714.00 38,043.00 40,924.00 36,863.00 36,438.00
- - - - - - - - -
449.00 447.00 453.00 445.00 474.00 441.00 445.00 455.00 460.00
- 41.00 - 79.00 - - - - -
437,451.00 436,394.00 439,721.00 434,392.00 450,660.00 434,757.00 433,866.00 443,172.00 445,120.00
- 40.00 - 90.00 - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
614.00 606.00 600.00 600.00 618.00 586.00 614.00 608.00 610.00
17.50 17.50 17.50 18.00 18.00 18.00 17.50 17.50 17.50
14.00 - 17.50 - 17.00 7.00 11.00 10.50 14.50
17.00 17.50 17.50 17.50 18.00 17.50 15.00 17.50 17.50
17.50 17.50 17.50 18.00 17.50 18.00 17.50 17.50 17.50
15.52 15.48 16.45 15.82 17.35 16.04 15.40 16.12 16.41
88.67 88.46 94.02 87.87 96.37 89.13 88.00 92.14 93.76
1,600 1,600 1,600 1,700 1,700 1,700 1,650 1,700 1,600
- 1,600 1,600 900 1,700 1,650 900 1,000 1,600
67.00 67.20 67.00 67.00 67.20 67.10 67.00 67.00 67.00
Running Hrs
17 18 19 20 21 22 23 24 25
Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Asw-17 Asw-18 Asw-19 Asw-20 Asw-21 Asw-22 Asw-23 Asw-24 Asw-25
6 6 6 6 4 0 0 0 0
68,075 58,267 42,593 51,266 26,688
- - - - -
61,482 53,582 12,678 12,626 -
68,673 73,601 65,519 61,877 26,322
68,994 74,739 16,122 13,274 4,595
68,910 60,271 61,598 58,770 -
60,965 39,435 47,405 46,137 4,351
397,099.00 359,895.00 245,915.00 243,950.00 61,956.00 - - - -
830.00 900.00 550.00 570.00 400.00 890.00 860.00 440.00 670.00
- - - - - - - - -
35,112.00 34,301.00 29,897.00 31,607.00 30,521.00 39,661.00 378,259.00 34,363.00 34,470.00
- - - - - - - - -
466.00 454.00 356.00 383.00 260.00 444.00 461.00 44.00 292.00
- - 135.00 307.00 255.00 - - 45.00 -
452,675.00 444,415.00 351,998.00 - 517,408.00 432,262.00 450,121.00 392,578.00 452,976.00
1.00 - 152.00 - 22.00 - - 835.00 139.00
- - - - - - - 25,913.00 2,831.00
- - - - - - - 18,862.00 48,600.00
- - - - - - - 1,312.00 -
614.00 628.00 530.00 532.00 460.00 592.00 596.00 420.00 532.00
17.50 16.50 14.50 16.50 12.00 17.50 17.50 17.50 17.50
16.50 14.00 10.00 4.00 - 12.00 14.50 3.00 4.00
17.50 16.50 10.00 10.00 4.00 12.00 17.50 3.00 4.00
16.50 14.00 14.50 15.50 - 17.50 17.50 6.00 17.50
16.55 15.00 10.25 10.16 2.58 - - 13.00 -
94.55 90.88 70.67 61.60 21.51 - - 74.29 -
1,600 1,600 1,400 1,500 500 1,800 1,600 1,600 1,600
1,600 - 900 500 - 1,600 1,600 - 500
67.00 67.00 66.60 67.00 65.00 67.10 66.80 66.70 66.80
rs
374277

26 27 28 29 30 31
Sunday Monday Tuesday Wednesday Thursday Thursday
Asw-26 Asw-27 Asw-28 Asw-29 Asw-30 Asw-31
0 0 0 0 0 0

- - - - - -
710.00 690.00 910.00 810.00 630.00 680.00
- - - - - -
36,366.00 35,887.00 35,764.00 37,063.00 38,813.00 37,260.00
- - - - - -
474.00 450.00 466.00 462.00 441.00 450.00
- - - - - 127.00
451,286.00 436,763.00 437,064.00 459,967.00 433,698.00 438,048.00
- - - - 132.00
206.00 - - - - -
34,388.00 - - - - -
- - - - - 114.00
588.00 590.00 604.00 608.00 594.00 586.00
18.00 18.00 17.50 17.50 18.00 18.00
17.50 10.00 15.00 14.50 10.00 10.80
17.50 10.00 17.50 17.50 10.00 18.00
18.00 17.50 17.50 17.00 18.00 18.00
- - - - - 15.00
- - - - - 83.33
1,700 1,700 1,700 1,700 1,600 1,700
1,600 900 1,700 1,700 500 1,700
67.00 66.90 66.70 67.00 66.90 67.00
Total RH of the Month 4069.78 NEPAL ELECTRICITY AUTHORITY
Idle Hours ERROR TRISHULI HYDRO POWER STATION
Planned Outage Hours 25.00 LOAD & RUNNING HOURS
Forced Outage Hours 0.00 Date :2079 Aswin
Total time in Month #VALUE! RUNNING HOURS

Month Unit-1 UNIT-2 UNIT-3 UNIT-4 UNIT-5 UNIT-6 UNIT-7 Total


Date Running Remarks Running Remarks Running Remarks Running Remarks Running Remarks Running Remarks Running Remarks Running
Hours Hours Hours Hours Hours Hours Hours Hours
1 0.00 24.00 18.00 23.00 24.00 24.00 24.00 137.00
2 0.00 22.92 21.17 23.32 22.13 21.87 23.42 134.82
3 24.00 17.00 24.00 24.00 17.00 24.00 12.00 142.00
4 22.00 3.00 23.00 23.00 16.00 23.00 23.00 133.00
5 23.00 24.00 24.00 24.00 24.00 24.00 24.00 167.00
6 13.00 12.00 24.00 24.00 22.00 24.00 24.00 143.00
7 21.00 2.00 20.00 22.00 20.00 21.00 22.00 128.00
8 23.60 7.00 16.65 23.77 19.72 23.70 23.68 138.12
9 23.00 4.00 23.00 23.00 13.00 23.00 22.00 131.00
10 23.78 -0.20 23.75 23.92 23.87 23.83 24.00 142.95
11 23.00 13.00 10.00 23.00 23.00 23.00 23.00 138.00
12 24.00 19.00 5.00 24.00 24.00 24.00 24.00 144.00
13 24.00 0.00 24.00 24.00 21.00 23.00 24.00 140.00
14 24.00 0.00 24.00 24.00 24.00 24.00 15.00 135.00
15 24.00 0.00 24.00 24.00 22.00 24.00 24.00 142.00
16 24.00 0.00 24.00 24.00 24.00 24.00 24.00 144.00
17 23.83 0.00 23.67 23.92 23.78 23.88 23.73 142.82
18 24.00 0.00 24.00 24.00 24.00 24.00 20.00 140.00
19 23.00 0.00 5.00 24.00 8.00 24.00 24.00 108.00
20 23.00 0.00 5.00 23.00 5.00 21.00 22.00 99.00
21 11.00 0.00 0.00 11.00 3.00 0.00 1.00 26.00
22 24.00 24.00 24.00 24.00 24.00 24.00 0.00 144.00
23 24.00 11.00 24.00 24.00 24.00 24.00 12.00 143.00
24 18.18 -0.28 0.83 13.12 0.88 1.85 2.00 36.58
25 23.78 0.00 15.00 23.72 15.00 15.00 15.00 107.50
26 24.00 14.00 10.00 24.00 24.00 24.00 24.00 144.00
27 24.00 20.00 12.00 24.00 24.00 24.00 11.00 139.00
28 24.00 24.00 24.00 24.00 24.00 24.00 24.00 168.00
29 24.00 24.00 13.00 24.00 24.00 24.00 11.00 144.00
30 24.00 24.00 0.00 24.00 24.00 24.00 24.00 144.00
31 24.00 24.00 0.00 24.00 24.00 24.00 24.00 144.00
Total RH of the Month 655.18 312.43 509.07 711.75 611.38 676.13 593.83 4,069.78
Cum.RH Till Last Month 320,351.74 294,277.74 339,425.65 323,031.00 331,623.66 318,075.77 313,312.18 2,240,097.74
Cum.RH Till this Month 321,006.93 294,590.18 339,934.72 323,742.75 332,235.04 318,751.90 313,906.01 2,244,167.52
Unit No.1 Trip Record
Total Trip Total Run Act Run Common
Date times (Hrs) (Hrs) (Hrs) Remarks
1 0 0.00 - 0.00 -
2 0 0.00 - 0.00 -
3 0 0.00 24.00 24.00 -
4 0 0.00 22.00 22.00 -
5 0 0.00 23.00 23.00 -
6 0 0.00 13.00 13.00 -
7 0 0.00 21.00 21.00 -
8 1 0.40 24.00 23.60
9 0 0.00 23.00 23.00
10 1 0.22 24.00 23.78
11 0 0.00 23.00 23.00
12 0 0.00 24.00 24.00
13 0 0.00 24.00 24.00
14 0 0.00 24.00 24.00
15 0 0.00 24.00 24.00
16 0 0.00 24.00 24.00
17 1 0.17 24.00 23.83
18 0 0.00 24.00 24.00
19 0 0.00 23.00 23.00
20 0 0.00 23.00 23.00
21 0 0.00 11.00 11.00
22 0 0.00 24.00 24.00
23 0 0.00 24.00 24.00 -
24 5 2.82 21.00 18.18 System trip due to
25 1 0.22 24.00 23.78
26 0 0.00 24.00 24.00 -
27 0 0.00 24.00 24.00
28 0 0.00 24.00 24.00
29 0 0.00 24.00 24.00
30 0 0.00 24.00 24.00
31 0 0.00 24.00 24.00
Unit 1 Trip1
Trip Sync Hour Back Station
Time Time Duration feed Control Rel. Ind Remarks

0:01 0:25 0.400 0:13 System trip due to

13:20 13:33 0.217 Unit trip due to chilime line trip

9:20 9:30 0.167 Unit trip due to lo

0:23 0:33 0.167 0:26 System trip due to


2:01 2:14 0.217 Unit trip due to lo
Unit 1 Trip2
Trip Sync Hour Back Station Trip
Time Time Duration feed Control Rel. Ind Remarks Time

2:30 3:30 1.000 2:25 trip due to Balaju 14:02


Unit 1 Trip3 Unit 1 Trip4
Sync Hour Back Station Trip Sync Hour Back Station
Time Duration feed Control Rel. Ind Remarks Time Time Duration feed Control

14:12 0.167 Unit trip 14:52 14:56 0.067


Trip4 Unit 1 Trip5 Unit 1
Trip Sync Hour Back Station Trip Sync
Rel. Ind Remarks Time Time Duration feed Control Rel. Ind Remarks Time Time

Unit trip 15:15 16:40 1.417 Unit trip due to chilime


Unit 1 Trip6 Unit 1 Trip7
Hour Back Station Trip Sync Hour Back Station
Duration feed Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind
Remarks
Unit No.2 Trip Record
Total Trip Total Run Act Run Common
Date times (Hrs) (Hrs) (Hrs) Remarks
1 0 0.00 24.00 24.00 -
2 4 1.08 24.00 22.92 System out
3 0 0.00 17.00 17.00 -
4 0 0.00 3.00 3.00 -
5 0 0.00 24.00 24.00 -
6 0 0.00 12.00 12.00 -
7 0 0.00 2.00 2.00 -
8 0 0.00 7.00 7.00 -
9 0 0.00 4.00 4.00 -
10 1 0.20 - -0.20 Unit trip due to chi
11 0 0.00 13.00 13.00 -
12 0 0.00 19.00 19.00 -
13 0 0.00 - 0.00 -
14 0 0.00 - 0.00 -
15 0 0.00 - 0.00 -
16 0 0.00 - 0.00 -
17 0 0.00 - 0.00 -
18 0 0.00 - 0.00 -
19 0 0.00 - 0.00 -
20 0 0.00 - 0.00 -
21 0 0.00 - 0.00 -
22 0 0.00 24.00 24.00 -
23 0 0.00 11.00 11.00 -
24 1 0.28 - -0.28 Unit trip due to chi
25 0 0.00 - 0.00 -
26 0 0.00 14.00 14.00 -
27 0 0.00 20.00 20.00 -
28 0 0.00 24.00 24.00 -
29 0 0.00 24.00 24.00 -
30 0 0.00 24.00 24.00 -
31 0 0.00 24.00 24.00 -
Unit 2 Trip1
Trip Sync Hour Back Station Trip
Time Time Duration feed Control Rel. Ind Remarks Time

2:01 2:13 0.200 2:06 System out 9:35

13:20 13:32 0.200 Unit trip due to chi

0:23 0:40 0.283 0:26 Unit trip due to chi


Unit 2 Trip2 Unit 2 Tr
Sync Hour Back Station Trip Sync
Time Duration feed Control Rel. Ind Remarks Time Time

9:56 0.350 9:45 System trip 14:36 14:51


Unit 2 Trip3 Unit 2 Trip4
Hour Back Station Trip Sync Hour Back Station
Duration feed Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind

System
0.250 0.62 21:25 21:42 0.283
trip
Unit 2 Trip5 Unit 2 Trip6
Trip Sync Hour Back Station Trip Sync Hour
Remarks Time Time Duration feed Control Rel. Ind Remarks Time Time Duration
unit trip
due to
chilime
trip
Unit 2 Trip6 Unit 2 Trip7
Back Station Trip Sync Hour Back Station
feed Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind Remarks
Unit No.3 Trip Record
Total Trip Total Run Act Run Common
Date times (Hrs) (Hrs) (Hrs) Remarks
1 0 0.00 18.00 18.00 -
2 4 1.83 23.00 21.17 system out
3 0 0.00 24.00 24.00 -
4 0 0.00 23.00 23.00 -
5 0 0.00 24.00 24.00 -
6 0 0.00 24.00 24.00 -
7 0 0.00 20.00 20.00 -
8 1 0.35 17.00 16.65 -
9 0 0.00 23.00 23.00 -
10 1 0.25 24.00 23.75 Unit trip due to chi
11 0 0.00 10.00 10.00 -
12 0 0.00 5.00 5.00 -
13 0 0.00 24.00 24.00 -
14 0 0.00 24.00 24.00 -
15 0 0.00 24.00 24.00 -
16 0 0.00 24.00 24.00 -
17 1 0.33 24.00 23.67 Unit trip due to lo
18 0 0.00 24.00 24.00 -
19 0 0.00 5.00 5.00 -
20 0 0.00 5.00 5.00 -
21 0 0.00 - 0.00 -
22 0 0.00 24.00 24.00 -
23 0 0.00 24.00 24.00 -
24 2 1.17 2.00 0.83 Unit trip due to chi
25 0 0.00 15.00 15.00 -
26 0 0.00 10.00 10.00 -
27 0 0.00 12.00 12.00 -
28 0 0.00 24.00 24.00 -
29 0 0.00 13.00 13.00 -
30 0 0.00 - 0.00 -
31 0 0.00 - 0.00 -
### - -
Unit 3 Trip1
Trip Sync Hour Back Station Trip
Time Time Duration feed Control Rel. Ind Remarks Time

2:01 2:25 0.400 2:06 system out 9:35

0:01 0:22 0.350 0:13 system trip due to low voltage

13:20 13:35 0.250 Unit trip due to chi

9:20 9:40 0.333 Unit trip due to lo

0:23 0:28 0.083 0:26 Unit trip due to chi2:25


Unit 3 Trip2 Unit 3 Tr
Sync Hour Back Station Trip Sync
Time Duration feed Control Rel. Ind Remarks Time Time

10:25 0.833 9:45 System trip 14:36 14:47

3:30 1.083 2:30 trip due to Balaju i fault


Unit 3 Trip3 Unit 3 Trip4
Hour Back Station Trip Sync Hour Back Station
Duration feed Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind

0.183 14:46 unit trip 21:25 21:50 0.417


Unit 3 Trip5 Unit 3 Trip6
Trip Sync Hour Back Station Trip Sync Hour Back
Remarks Time Time Duration feed Control Rel. Ind Remarks Time Time Duration feed
unit trip
due to
chilime
trip
Unit 3 Trip6 Unit 3 Trip7
Station Trip Sync Hour Back Station
Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind Remarks
Unit No.4 Trip Record
Total Trip Total Run Act Run Common
Date times (Hrs) (Hrs) (Hrs) Remarks
1 0 0.00 23.00 23.00 -
2 4 0.68 24.00 23.32 System out
3 0 0.00 24.00 24.00 -
4 0 0.00 23.00 23.00 -
5 0 0.00 24.00 24.00 -
6 0 0.00 24.00 24.00 -
7 0 0.00 22.00 22.00 -
8 1 0.23 24.00 23.77 -
9 0 0.00 23.00 23.00 -
10 1 0.08 24.00 23.92 Unit trip due to chi
11 0 0.00 23.00 23.00 -
12 0 0.00 24.00 24.00 -
13 0 0.00 24.00 24.00 -
14 0 0.00 24.00 24.00 -
15 0 0.00 24.00 24.00 -
16 0 0.00 24.00 24.00 -
17 1 0.08 24.00 23.92 Unit trip due to lo
18 0 0.00 24.00 24.00 -
19 0 0.00 24.00 24.00 -
20 0 0.00 23.00 23.00 -
21 0 0.00 11.00 11.00 -
22 0 0.00 24.00 24.00 -
23 0 0.00 24.00 24.00 -
24 5 2.88 16.00 13.12 Unit trip due to chi
25 1 0.28 24.00 23.72 Unit trip due to chi
26 0 0.00 24.00 24.00 -
27 0 0.00 24.00 24.00 -
28 0 0.00 24.00 24.00 -
29 0 0.00 24.00 24.00 -
30 0 0.00 24.00 24.00 -
31 0 0.00 24.00 24.00 -
Unit 4 Trip1
Trip Sync Hour Back Station
Time Time Duration feed Control Rel. Ind Remarks

2:01 2:11 0.167 2:06 System out

0:01 0:15 0.233 0:13 system trip due to low voltage

13:20 13:25 0.083 Unit trip due to chi

9:20 9:25 0.083 Unit trip due to lo

0:23 0:30 0.117 0:26 Unit trip due to chi


2:01 2:18 0.283 Unit trip due to chi
Unit 4 Trip2
Trip Sync Hour Back Station Trip
Time Time Duration feed Control Rel. Ind Remarks Time

9:35 9:50 0.250 9:45 System trip 14:36

2:25 3:31 1.100 2:30 System trip due tio Balaju I trip 14:02
Unit 4 Trip3 Unit 4 Trip4
Sync Hour Back Station Trip Sync Hour Back Station
Time Duration feed Control Rel. Ind Remarks Time Time Duration feed Control

14:47 0.183 14:46 System trip 21:25 21:30 0.083

14:10 0.133 Unit trip du14:52 14:57 0.083


Trip4 Unit 4 Trip5 Unit
Trip Sync Hour Back Station Trip Sync
Rel. Ind Remarks Time Time Duration feed Control Rel. Ind Remarks Time Time
unit trip
due to
chilime
trip

Unit trip du15:15 16:42 1.450 Unit trip due to chilime tr


Unit 4 Trip6 Unit 4 Trip7
Hour Back Station Trip Sync Hour Back Station
Duration feed Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind
Remarks
Unit No.5 Trip Record
Total Trip Total Run Act Run Common
Date times (Hrs) (Hrs) (Hrs) Remarks
1 0 0.00 24.00 24.00 -
2 4 0.87 23.00 22.13 System out
3 0 0.00 17.00 17.00 -
4 0 0.00 16.00 16.00 -
5 0 0.00 24.00 24.00 -
6 0 0.00 22.00 22.00 -
7 0 0.00 20.00 20.00 -
8 1 0.28 20.00 19.72 -
9 0 0.00 13.00 13.00 -
10 1 0.13 24.00 23.87 Unit trip due to chi
11 0 0.00 23.00 23.00 -
12 0 0.00 24.00 24.00 -
13 0 0.00 21.00 21.00 -
14 0 0.00 24.00 24.00 -
15 0 0.00 22.00 22.00 -
16 0 0.00 24.00 24.00 -
17 1 0.22 24.00 23.78 Unit trip due to lo
18 0 0.00 24.00 24.00 -
19 0 0.00 8.00 8.00 -
20 0 0.00 5.00 5.00 -
21 0 0.00 3.00 3.00 -
22 0 0.00 24.00 24.00 -
23 0 0.00 24.00 24.00 -
24 2 1.12 2.00 0.88 Unit trip due to chi
25 0 0.00 15.00 15.00 -
26 0 0.00 24.00 24.00 -
27 0 0.00 24.00 24.00 -
28 0 0.00 24.00 24.00 -
29 0 0.00 24.00 24.00 -
30 0 0.00 24.00 24.00 -
31 0 0.00 24.00 24.00 -
Unit 5 Trip1
Trip Sync Hour Back Station Trip
Time Time Duration feed Control Rel. Ind Remarks Time

2:01 2:14 0.217 2:06 System out 9:35

0:01 0:18 0.283 0:13 system trip due to low voltage

13:20 13:28 0.133 Unit trip due to chi

9:20 9:33 0.217 Unit trip due to lo

0:23 0:30 0.117 0:26 Unit trip due to chi2:25


Unit 5 Trip2 Unit 5 T
Sync Hour Back Station Trip Sync
Time Duration feed Control Rel. Ind Remarks Time Time

9:52 0.283 9:45 System trip 14:36 14:48

3:25 1.000 2:30 System trip due tio Balaju I trip


Unit 5 Trip3 Unit 5 Trip4
Hour Back Station Trip Sync Hour Back Station
Duration feed Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind

0.200 14:46 System tri21:25 21:35 0.167


Unit 5 Trip5 Unit 5 Trip6
Trip Sync Hour Back Station Trip Sync Hour Back
Remarks Time Time Duration feed Control Rel. Ind Remarks Time Time Duration feed
Unit trip
due to
chilime
trip
Unit 5 Trip6 Unit 5 Trip7
Station Trip Sync Hour Back Station
Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind Remarks
Unit No.6 Trip Record
Total Trip Total Run Act Run Common
Date times (Hrs) (Hrs) (Hrs) Remarks
1 0 0.00 24.00 24.00 -
2 4 1.13 23.00 21.87 System out
3 0 0.00 24.00 24.00 -
4 0 0.00 23.00 23.00 -
5 0 0.00 24.00 24.00 -
6 0 0.00 24.00 24.00 -
7 0 0.00 21.00 21.00 -
8 1 0.30 24.00 23.70 System trip due to
9 0 0.00 23.00 23.00 -
10 1 0.17 24.00 23.83 Unit trip due to chi
11 0 0.00 23.00 23.00 -
12 0 0.00 24.00 24.00 -
13 0 0.00 23.00 23.00 -
14 0 0.00 24.00 24.00 -
15 0 0.00 24.00 24.00 -
16 0 0.00 24.00 24.00 -
17 1 0.12 24.00 23.88 Unit trip due to lo
18 0 0.00 24.00 24.00 -
19 0 0.00 24.00 24.00 -
20 0 0.00 21.00 21.00 -
21 0 0.00 - 0.00 -
22 0 0.00 24.00 24.00 -
23 0 0.00 24.00 24.00 -
24 2 1.15 3.00 1.85 Unit trip due to chi
25 0 0.00 15.00 15.00 -
26 0 0.00 24.00 24.00 -
27 0 0.00 24.00 24.00 -
28 0 0.00 24.00 24.00 -
29 0 0.00 24.00 24.00 -
30 0 0.00 24.00 24.00 -
31 0 0.00 24.00 24.00 -
Unit 6 Trip1
Trip Sync Hour Back Station
Time Time Duration feed Control Rel. Ind Remarks

2:01 2:20 0.317 2:06 System out

0:01 0:19 0.300 0:13 System trip due to

13:20 13:30 0.167 Unit trip due to chi

9:20 9:27 0.117 Unit trip due to lo

0:23 0:27 0.067 0:26 Unit trip due to chi


Unit 6 Trip2
Trip Sync Hour Back Station Trip
Time Time Duration feed Control Rel. Ind Remarks Time

9:35 9:59 0.400 9:45 System trip 14:36

2:25 3:30 1.083 2:30 System trip due tio Balaju I trip
Unit 6 Trip3 Unit 6 Trip4
Sync Hour Back Station Trip Sync Hour Back Station
Time Duration feed Control Rel. Ind Remarks Time Time Duration feed Control

14:48 0.200 14:46 System tri21:25 21:38 0.217


Trip4 Unit 6 Trip5 Unit 6
Trip Sync Hour Back Station Trip Sync
Rel. Ind Remarks Time Time Duration feed Control Rel. Ind Remarks Time Time
Unit trip
due to
chilime
trip
Unit 6 Trip6 Unit 6 Trip7
Hour Back Station Trip Sync Hour Back Station
Duration feed Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind
Remarks
Unit No.7 Trip Record
Total Trip Total Run Act Run Common
Date times (Hrs) (Hrs) (Hrs) Remarks
1 0 0.00 24.00 24.00 -
2 2 0.58 24.00 23.42 System trip
3 0 0.00 12.00 12.00 -
4 0 0.00 23.00 23.00 -
5 0 0.00 24.00 24.00 -
6 0 0.00 24.00 24.00 -
7 0 0.00 22.00 22.00 -
8 1 0.32 24.00 23.68 System trip due to
9 0 0.00 22.00 22.00 -
10 0 0.00 24.00 24.00 -
11 0 0.00 23.00 23.00 -
12 0 0.00 24.00 24.00 -
13 0 0.00 24.00 24.00 -
14 0 0.00 15.00 15.00 -
15 0 0.00 24.00 24.00 -
16 0 0.00 24.00 24.00 -
17 1 0.27 24.00 23.73 Unit trip due to lo
18 0 0.00 20.00 20.00 -
19 0 0.00 24.00 24.00 -
20 0 0.00 22.00 22.00 -
21 0 0.00 1.00 1.00 -
22 0 0.00 - 0.00 -
23 0 0.00 12.00 12.00 -
24 1 1.00 3.00 2.00 -
25 0 0.00 15.00 15.00 -
26 0 0.00 24.00 24.00 -
27 0 0.00 11.00 11.00 -
28 0 0.00 24.00 24.00 -
29 0 0.00 11.00 11.00 -
30 0 0.00 24.00 24.00 -
31 0 0.00 24.00 24.00 -
Unit 7 Trip1
Trip Sync Hour Back Station Trip
Time Time Duration feed Control Rel. Ind Remarks Time

9:35 9:56 0.350 9:45 System trip 14:36

0:01 0:20 0.317 0:13 System trip due to

9:20 9:36 0.267 Unit trip due to lo

2:25 3:25 1.000 2:30 System trip due tio Balaju I trip
Unit 7 Trip2 Unit 7 Tr
Sync Hour Back Station Trip Sync
Time Duration feed Control Rel. Ind Remarks Time Time

14:50 0.233 14:46 System trip


Unit 7 Trip3 Unit 7 Trip4
Hour Back Station Trip Sync Hour Back Station
Duration feed Control Rel. Ind Remarks Time Time Duration feed Control
Trip4 Unit 7 Trip5 Unit
Trip Sync Hour Back Station Trip Sync
Rel. Ind Remarks Time Time Duration feed Control Rel. Ind Remarks Time Time
Unit 7 Trip6 Unit 7 Trip7
Hour Back Station Trip Sync Hour Back Station
Duration feed Control Rel. Ind Remarks Time Time Duration feed Control Rel. Ind
Remarks
NEPAL ELECTRICITY AUTHORITY
Generation Directorate
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
Monthly Generation Data

Increase/
Energy Forecast Generated Energy
S.N Month Decrease Percentage
(MWh) (MWh)

Total 38,545.14 22,450.29 -12%

1 Shrawan 12,899.74 10,859.62 Decrease -15.8%


2 Bhadra 12,621.57 11,590.67 Decrease -8.2%
3 Aswin 13,023.83
4 Kartik - N/A
5 Mangsir - N/A
6 Paush - N/A
7 Magh - N/A
8 Falgun - N/A
9 Chaitra - N/A
10 Baisakh - N/A
11 Jestha - N/A
12 Ashad - N/A
NEPAL ELECTRICITY AUTHORITY
Generation Directorate
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
Monthly Generation and Other Related Data
Year/Month :2079 Aswin Table 1
S. N Particulars Unit Data Remarks
1 Designed Energy Generation MWh 15,000.00
2 Energy Forecast MWh 13,023.83
3 ENERGY GENERATION
A.Till last month MWh 5,716,499.76
B.Of this month MWh 7,382.76
C. Total upto date of same month MWh 22,450.29
D. last years generation of same month MWh 12,052.88
E. Increase / Decrease WRT last year (3B-3D)/3D*100 % (38.75) Decrease
F. Last years generation upto date MWh 12,052.88
G. Increase / Decrease WRT last year (3C-3F)/3F*100 % 86.27 Increase
H. Total generation upto date (3A+3B) Cummulative MWh 5,723,882.52
4 SUMMARY OF UNIT HISTORY
A.Running Hours of Units Hrs. 4,069.78
B.Idle Hours of Units Hrs. #VALUE!
C.Planned Outage of Unit Hrs. 25.00
D.Forced Outage Hours of Units Hrs. -
E.Total hours of the month(no.of days in the month*no.of units*24) Hrs. 5,208.00
5 ENERGY IMPORT
A.Import from INPS (Chileme+MailungH.P.+Balaju+Devighat) MWh (517,444.95)
B.Import from IPPS MWh
C.Import from Diesel Generator (if any) MWh
D.Total Import MWh (517,444.95)
6 POWER GENERATION
A.Max.Load MW 18.00
B.Average Load (3B/total hours in the month) MW 9.92
7 ENERGY UTILIZATION
A.Station consumption MWh (9,879.04)
B.Internal consumption MWh from Dcs
C.Local distribution MWh 2,742.06
D.Transmission to grid MWh (2,401,482.17)
E.Total utiilization (A+B+C+D) MWh (2,408,619.15)
8 PEAK DEMAND
A.Morning MW 18.00
B.Evening MW 18.00
C.Demand ratio (6A/24*100) % 75.00
9 PLANT AVAILBILITY (Table 4) % 59.39
10 STATION LOSS (3B+5D-7E)/(3B+5D)*100 % (168.39)
11 LOAD FACTOR (6B/6A)*100 % 55.13
12 CAPACITY FACTOR(3B/1)*100 % 49.22
13 PERFORMANCE FACTOR (3B/2)*100 % 56.69
14 PLANT FACTOR [3B/(Unit capacity*4E)]*100 Days 41.35
15 No of Employees in the month Nos 48.00
16 Actual O&M expenditure of the month Rs.
17 Energy per Emplovees (3B/15) MWH/EMP 153.81
18 Generation Cost: (16/3B) of last month Rs/KWH

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief
Table 2
Nepal Electricity Authority
Generation Directorate
Medium GenerationOperation & Maintenance Department
Trishuli Hydro Power Station
Daily/Monthly Generation Report
Installed Capacity : 24 MW
Installed Units : 7
Peaking Capacity : 21MW Design 15000 Target 13,023.83 MWh 2079 Aswin
Generated Available Availability
Energy D-selting Units in
Date Day in Discharge Tank Running Under (MW) Availability Remarks
in (KWH) Cusecs Level(Ft) (MW) Day Peak (%)
1 Wednesday 332,521 1700 66.80 6 17.50 13.86 17.50 74.42
2 Thursday 396,626 1700 66.80 7 17.50 16.53 17.50 83.24
3 Friday 376,014 1700 67.00 7 17.50 15.67 17.00 79.59
4 Saturday 360,722 1600 67.00 7 17.50 15.03 17.50 78.30
5 Sunday 375,515 1600 67.00 6 17.50 15.65 17.50 80.34
6 Monday 399,472 1600 67.00 7 17.50 16.64 17.00 82.81
7 Tuesday 362,906 1600 67.00 7 17.00 15.12 16.50 76.96
8 Wednesday 372,417 1600 67.00 7 17.50 15.52 17.50 79.91
9 Thursday 371,549 1600 67.20 7 17.50 15.48 17.50 79.79
10 Friday 394,871 1600 67.00 6 17.50 16.45 17.50 83.00
11 Saturday 379,607 1700 67.00 7 18.00 15.82 18.00 81.72
12 Sunday 416,328 1700 67.20 7 18.00 17.35 17.50 85.95
13 Monday 385,046 1700 67.10 6 18.00 16.04 18.00 82.47
14 Tuesday 369,589 1650 67.00 6 17.50 15.40 17.50 79.52
15 Wednesday 386,984 1700 67.00 6 17.50 16.12 17.50 81.91
16 Thursday 393,775 1600 67.00 6 17.50 16.41 17.50 82.85
17 Friday 397,099 1600 67.00 6 17.50 16.55 16.50 81.67
18 Saturday 359,895 1600 67.00 6 16.50 15.00 14.00 72.46
19 Sunday 245,915 1400 66.60 6 14.50 10.25 14.50 57.59
20 Monday 243,950 1500 67.00 6 16.50 10.16 15.50 58.95
21 Tuesday 61,956 500 65.00 4 12.00 2.58 0.00 8.53
22 Wednesday - 1800 67.10 0 17.50 0.00 17.50 28.65
23 Thursday - 1600 66.80 0 17.50 0.00 17.50 28.65
24 Friday - 1600 66.70 0 17.50 0.00 6.00 9.82
25 Saturday - 1600 66.80 0 17.50 0.00 17.50 28.65
26 Sunday - 1700 67.00 0 18.00 0.00 18.00 29.46
27 Monday - 1700 66.90 0 18.00 0.00 17.50 28.65
28 Tuesday - 1700 66.70 0 17.50 0.00 17.50 28.65
29 Wednesday - 1700 67.00 0 17.50 0.00 17.00 27.83
30 Thursday - 1600 66.90 0 18.00 0.00 18.00 29.46
31 Thursday - 1700 67.00 0 18.00 0.00 18.00 29.46
Total 7,382,757 1601.61 66.89 17.26 9.92 16.26 59.39
Note:
Availability during day = Time Except Peak
Availability During Peak = 5:30 A.M. to 8 A.M. (Morning) & 5:00 P.M. to 8:10 P.M. (Evening)
Day Availability & Peak availability = Total MW in Week / No of Days
# Availability % (Give average of the week in total )

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief
NEPAL ELECTRICITY AUTHORITY Table 4
Generation Directorate
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
Energy Balance
2079 Aswin
Energy Balance at 6.6 KV Voltage Level:-

S. Meter Energy Meter Reading M. F. Kwh Consumed


Source Difference
No Symbol Previous Present (X) Export import
1 Gen. 1 M1 67,702,013 - (67,702,013) 1 (67,702,013)
2 Gen. 2 M2 31,918,495 - (31,918,495) 1 (31,918,495)
3 Gen. 3 M3 40,844,166 - (40,844,166) 1 (40,844,166)
4 Gen. 4 M4 69,253,510 - (69,253,510) 1 (69,253,510)
5 Gen. 5 M5 60,825,213 - (60,825,213) 1 (60,825,213)
6 Gen. 6 M6 53,912,132 - (53,912,132) 1 (53,912,132)
7 Gen. 7 M7 55,542,484 - (55,542,484) 1 (55,542,484)
8 St.1 M8 4,470,240 - (4,470,240) 1 (4,470,240)
9 St.2 M9 5,408,800 - (5,408,800) 1 (5,408,800)
10 10 MVA Tr.out M10 (11kv) 80,558,053 83,300,114 2,742,061 1 2,742,061
11 10 MVA Tr.in M10 ' - - - 1 -
Energy Difference 6.6 KV Bus:- Total Export (387,134,992)
Total import -

1 Total Generation -379998.01 MWH


2 Station Consumption -9879.04 MWH
3 Local Distribution 2742.06 MWH From DCS
4 Internal Consumption From DCS MWH

Energy balance at 66 KV Voltage Level:


S. Meter Energy Meter Reading M. F. Kwh .Consumed
Source Difference
No Symbol Previous Present (X) Export import
1 Balaju 1 Out M18 400,542,000.00 - (400,542,000.00) 1.00 (400,542,000.00)
2 Balaju 1 In M18 ' 19,267.00 - (19,267.00) 1.00 (19,267.00)
3 Balaju 2 Out M19 1,985,637,226.00 - ### 1.00 (1,985,637,226.00)
4 Balaju 2 In M19 401,105.00 - (401,105.00) 1.00 (401,105.00)
5 Chilime Out M 20 163,125.00 - (163,125.00) 2.00 (326,250.00)
6 Chilime In M20 ' 244,938,000.00 - (244,938,000.00) 2.00 (489,876,000.00)
7 Devighat Out M 21 14,976,693.00 - (14,976,693.00) 1.00 (14,976,693.00)
8 Devighat In M21 ' 27,148,575.00 - (27,148,575.00) 1.00 (27,148,575.00)
Energy Difference in 66 KV Bus:- Total Export (2,401,482,169.00)
Total import (517,444,947.00)
1 Available Energy (897,442.96) MWh Net Sent out (MWH) (1,884,037.22)
2 Total Utilization (2,408,619.15) MWh
3 Station Loss 1,511,176.19 MWh
4 % Station Loss: -168.39 %

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief
326.66
Table 3-1
NEPAL ELECTRICITY AUTHORITY
Generation Directorate
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
UNIT OPERATIONS DETAILS
Unit No.1 Year /Month : 2079 Aswin
Tripping Outage Type Total Remarks
Running Tripping Recharging
Date Outage Planned / Non Time
Hours Time Time Hour Idle Forced Dispatch (Hours) (Reason of Outage)
Scheduled
1 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
2 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,

3 24.00 0.00 0.00 0.00 0.00 0.00 0.00


4 22.00 0.00 0.00 2.00 0.00 0.00 2.00 plant shutdown,
5 23.00 0.00 0.00 1.00 0.00 0.00 1.00 low discharge,
6 13.00 0.00 0.00 11.00 0.00 0.00 11.00
7 21.00 0.00 0.00 3.00 0.00 0.00 3.00
8 23.60 0:01 0:25 0.40 0.00 0.40 0.00 0.00 0.40 Tripped 1 time: ()
9 23.00 0.00 0.00 1.00 0.00 0.00 1.00
10 23.78 13:20 13:33 0.22 0.00 0.22 0.00 0.00 0.22 Tripped 1 time: ()

11 23.00 0.00 0.00 1.00 0.00 0.00 1.00


12 24.00 0.00 0.00 0.00 0.00 0.00 0.00
13 24.00 0.00 0.00 0.00 0.00 0.00 0.00
14 24.00 0.00 0.00 0.00 0.00 0.00 0.00
15 24.00 0.00 0.00 0.00 0.00 0.00 0.00
16 24.00 0.00 0.00 0.00 0.00 0.00 0.00
17 23.83 9:20 9:30 0.17 0.00 0.17 0.00 0.00 0.17 Tripped 1 time: ()
18 24.00 0.00 0.00 0.00 0.00 0.00 0.00
19 23.00 0.00 0.00 1.00 0.00 0.00 1.00
20 23.00 0.00 0.00 1.00 0.00 0.00 1.00
21 11.00 0.00 0.00 13.00 0.00 0.00 13.00
22 24.00 0.00 0.00 0.00 0.00 0.00 0.00
23 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Tripped 5 times: (System trip
24 18.18 2.82 0.00 5.82 0.00 0.00 5.82 due to low voltage) Fault in balaju line i,

25 23.78 2:01 2:14 0.22 0.00 0.22 0.00 0.00 0.22 Tripped 1 time: ()

26 24.00 0.00 0.00 0.00 0.00 0.00 0.00

27 24.00 0.00 0.00 0.00 0.00 0.00 0.00


28 24.00 0.00 0.00 0.00 0.00 0.00 0.00
29 24.00 0.00 0.00 0.00 0.00 0.00 0.00
30 24.00 0.00 0.00 0.00 0.00 0.00 0.00
31 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 655.18 3.82 0.00 88.82 0.00 0.00 88.82

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief
Table 3-2
NEPAL ELECTRICITY AUTHORITY
Generation Directorate
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
UNIT OPERATIONS DETAILS
Unit No.2 Year /Month : 2079 Aswin
Outage Type Total Remarks
Running Tripping Recharging Outage
Date Planned / Non Time
Hours Time Time Hour Idle Forced (Reason of Outage)
Scheduled Dispatch (Hours)
1 24.00 0.00 0.00 0.00 0.00 0.00 0.00
2 22.92 1.08 0.00 1.08 0.00 0.00 1.08 Tripped 4 times: (System out)

3 17.00 0.00 0.00 7.00 0.00 0.00 7.00 low discharge,

4 3.00 0.00 0.00 21.00 0.00 0.00 21.00 plant shutdown,


Desander and
5 24.00 0.00 4.00 -4.00 0.00 0.00 0.00 headgate flushing,
6 12.00 0.00 0.00 12.00 0.00 0.00 12.00 low discharge,
7 2.00 0.00 0.00 22.00 0.00 0.00 22.00 low discharge,
8 7.00 0.00 0.00 17.00 0.00 0.00 17.00 low discharge,
9 4.00 0.00 0.00 20.00 0.00 0.00 20.00 low discharge,
Tripped 1 time: (Unit trip due
10 -0.20 13:20 13:32 0.20 0.00 24.20 0.00 0.00 24.20 to chilime line trip)
11 13.00 0.00 0.00 11.00 0.00 0.00 11.00
12 19.00 0.00 0.00 5.00 0.00 0.00 5.00 low discharge,
13 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
14 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
15 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
16 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
17 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
18 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
19 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
20 0.00 0.00 0.00 24.00 0.00 0.00 24.00
21 0.00 0.00 0.00 24.00 0.00 0.00 24.00
22 24.00 0.00 0.00 0.00 0.00 0.00 0.00
23 11.00 0.00 0.00 13.00 0.00 0.00 13.00 low discharge,
Tripped 1 time: (Unit trip due
24 -0.28 0:23 0:40 0.28 0.00 24.28 0.00 0.00 24.28 to chilime line trip) Fault in balaju line i,

25 0.00 0.00 0.00 24.00 0.00 0.00 24.00 Fault in balaju line i,
26 14.00 0.00 0.00 10.00 0.00 0.00 10.00 low discharge,
Desander and
27 20.00 0.00 4.00 0.00 0.00 0.00 4.00 headgate flushing,
28 24.00 0.00 0.00 0.00 0.00 0.00 0.00
29 24.00 0.00 0.00 0.00 0.00 0.00 0.00
30 24.00 0.00 0.00 0.00 0.00 0.00 0.00
31 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 312.43 1.57 8.00 423.57 0.00 0.00 431.57

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief
Table 3-3
NEPAL ELECTRICITY AUTHORITY
Generation Directorate
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
UNIT OPERATIONS DETAILS
Unit No.3 Year /Month : 2079 Aswin
Outage Type Total Remarks
Running Tripping Recharging Outage
Date Planned / Non Time
Hours Time Time Hour Idle Forced (Reason of Outage)
Scheduled Dispatch (Hours)
1 18.00 0.00 0.00 6.00 0.00 0.00 6.00
2 21.17 1.83 0.00 2.83 0.00 0.00 2.83 Tripped 4 times: (system out)

3 24.00 0.00 0.00 0.00 0.00 0.00 0.00


4 23.00 0.00 0.00 1.00 0.00 0.00 1.00 plant shutdown,
5 24.00 0.00 0.00 0.00 0.00 0.00 0.00
6 24.00 0.00 0.00 0.00 0.00 0.00 0.00
7 20.00 0.00 0.00 4.00 0.00 0.00 4.00
8 16.65 0:01 0:22 0.35 0.00 7.35 0.00 0.00 7.35 Tripped 1 time: (0)
9 23.00 0.00 0.00 1.00 0.00 0.00 1.00
Tripped 1 time: (Unit trip due
10 23.75 13:20 13:35 0.25 0.00 0.25 0.00 0.00 0.25 to chilime line trip)
11 10.00 0.00 0.00 14.00 0.00 0.00 14.00
12 5.00 0.00 0.00 19.00 0.00 0.00 19.00
13 24.00 0.00 0.00 0.00 0.00 0.00 0.00
14 24.00 0.00 0.00 0.00 0.00 0.00 0.00
15 24.00 0.00 0.00 0.00 0.00 0.00 0.00
16 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Tripped 1 time: (Unit trip due
17 23.67 9:20 9:40 0.33 0.00 0.33 0.00 0.00 0.33 to low voltage)
18 24.00 0.00 0.00 0.00 0.00 0.00 0.00
19 5.00 0.00 0.00 19.00 0.00 0.00 19.00
20 5.00 0.00 0.00 19.00 0.00 0.00 19.00
21 0.00 0.00 0.00 24.00 0.00 0.00 24.00
22 24.00 0.00 0.00 0.00 0.00 0.00 0.00
23 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Tripped 2 times: (Unit trip
24 0.83 1.17 0.00 23.17 0.00 0.00 23.17 due to chilime line trip) Fault in balaju line i,

25 15.00 0.00 0.00 9.00 0.00 0.00 9.00 Fault in balaju line i,
26 10.00 0.00 0.00 14.00 0.00 0.00 14.00 low discharge,
27 12.00 0.00 0.00 12.00 0.00 0.00 12.00 low discharge,
28 24.00 0.00 0.00 0.00 0.00 0.00 0.00
29 13.00 0.00 0.00 11.00 0.00 0.00 11.00 low discharge,
30 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
31 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,
Total 509.07 3.93 0.00 234.93 0.00 0.00 234.93

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief
Table 3-4
NEPAL ELECTRICITY AUTHORITY
Generation Directorate
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
UNIT OPERATIONS DETAILS
Unit No.4 Year /Month : 2079 Aswin
Outage Type Total Remarks
Running Tripping Recharging Outage
Date Planned / Non Time
Hours Time Time Hour Idle Forced (Reason of Outage)
Scheduled Dispatch (Hours)
1 23.00 0.00 0.00 1.00 0.00 0.00 1.00
2 23.32 0.68 0.00 0.68 0.00 0.00 0.68 Tripped 4 times: (System out)

3 24.00 0.00 0.00 0.00 0.00 0.00 0.00


4 23.00 0.00 0.00 1.00 0.00 0.00 1.00 plant shutdown,
5 24.00 0.00 0.00 0.00 0.00 0.00 0.00
6 24.00 0.00 0.00 0.00 0.00 0.00 0.00
7 22.00 0.00 0.00 2.00 0.00 0.00 2.00
8 23.77 0:01 0:15 0.23 0.00 0.23 0.00 0.00 0.23 Tripped 1 time: (0)
9 23.00 0.00 0.00 1.00 0.00 0.00 1.00
Tripped 1 time: (Unit trip due Oil cooler and radiator
10 23.92 13:20 13:25 0.08 3.00 -2.92 0.00 0.00 0.08 to chilime line trip) cleaning,
11 23.00 0.00 0.00 1.00 0.00 0.00 1.00
12 24.00 0.00 0.00 0.00 0.00 0.00 0.00
13 24.00 0.00 0.00 0.00 0.00 0.00 0.00
14 24.00 0.00 0.00 0.00 0.00 0.00 0.00
15 24.00 0.00 0.00 0.00 0.00 0.00 0.00
16 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Tripped 1 time: (Unit trip due
17 23.92 9:20 9:25 0.08 0.00 0.08 0.00 0.00 0.08 to low voltage)
18 24.00 0.00 0.00 0.00 0.00 0.00 0.00
19 24.00 0.00 0.00 0.00 0.00 0.00 0.00
20 23.00 0.00 0.00 1.00 0.00 0.00 1.00
21 11.00 0.00 0.00 13.00 0.00 0.00 13.00
22 24.00 0.00 0.00 0.00 0.00 0.00 0.00
23 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Tripped 5 times: (Unit trip
24 13.12 2.88 0.00 10.88 0.00 0.00 10.88 due to chilime line trip) Fault in balaju line i,

Tripped 1 time: (Unit trip due


25 23.72 2:01 2:18 0.28 0.00 0.28 0.00 0.00 0.28 to chilime line trip)
26 24.00 0.00 0.00 0.00 0.00 0.00 0.00
27 24.00 0.00 0.00 0.00 0.00 0.00 0.00
28 24.00 0.00 0.00 0.00 0.00 0.00 0.00
29 24.00 0.00 0.00 0.00 0.00 0.00 0.00
30 24.00 0.00 0.00 0.00 0.00 0.00 0.00
31 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 711.75 4.25 3.00 29.25 0.00 0.00 32.25

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief
Table 3-5
NEPAL ELECTRICITY AUTHORITY
Generation Directorate
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
UNIT OPERATIONS DETAILS
Unit No.5 Year /Month : 2079 Aswin
Outage Type Total Remarks
Running Tripping Recharging Outage
Date Planned / Non Time
Hours Time Time Hour Idle Forced (Reason of Outage)
Scheduled Dispatch (Hours)
1 24.00 0.00 0.00 0.00 0.00 0.00 0.00
2 22.13 0.87 0.00 1.87 0.00 0.00 1.87 Tripped 4 times: (System out)

3 17.00 0.00 0.00 7.00 0.00 0.00 7.00


4 16.00 0.00 0.00 8.00 0.00 0.00 8.00 plant shutdown,
5 24.00 0.00 0.00 0.00 0.00 0.00 0.00
oil cooler and radiator
6 22.00 0.00 2.00 0.00 0.00 0.00 2.00 cleaning,
plant shutdown for B-0
7 20.00 0.00 0.00 4.00 0.00 0.00 4.00 cleaning works,
8 19.72 0:01 0:18 0.28 0.00 4.28 0.00 0.00 4.28 Tripped 1 time: (0)
9 13.00 0.00 0.00 11.00 0.00 0.00 11.00
Tripped 1 time: (Unit trip due Desander and
10 23.87 13:20 13:28 0.13 4.00 -3.87 0.00 0.00 0.13 to chilime line trip) headgate flushing,
11 23.00 0.00 0.00 1.00 0.00 0.00 1.00
12 24.00 0.00 0.00 0.00 0.00 0.00 0.00
13 21.00 0.00 0.00 3.00 0.00 0.00 3.00
14 24.00 0.00 0.00 0.00 0.00 0.00 0.00
15 22.00 0.00 0.00 2.00 0.00 0.00 2.00
16 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Tripped 1 time: (Unit trip due
17 23.78 9:20 9:33 0.22 0.00 0.22 0.00 0.00 0.22 to low voltage)
18 24.00 0.00 0.00 0.00 0.00 0.00 0.00
19 8.00 0.00 0.00 16.00 0.00 0.00 16.00
20 5.00 0.00 0.00 19.00 0.00 0.00 19.00
21 3.00 0.00 0.00 21.00 0.00 0.00 21.00
22 24.00 0.00 0.00 0.00 0.00 0.00 0.00
23 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Tripped 2 times: (Unit trip
24 0.88 1.12 0.00 23.12 0.00 0.00 23.12 due to chilime line trip) Fault in balaju line i,

25 15.00 0.00 0.00 9.00 0.00 0.00 9.00 Fault in balaju line i,
26 24.00 0.00 0.00 0.00 0.00 0.00 0.00
27 24.00 0.00 0.00 0.00 0.00 0.00 0.00
28 24.00 0.00 0.00 0.00 0.00 0.00 0.00
29 24.00 0.00 0.00 0.00 0.00 0.00 0.00
30 24.00 0.00 0.00 0.00 0.00 0.00 0.00
31 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 611.38 2.62 6.00 126.62 0.00 0.00 132.62

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief
Table 3-6
NEPAL ELECTRICITY AUTHORITY
Generation Directorate
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
UNIT OPERATIONS DETAILS
Unit No.6 Year /Month : 2079 Aswin
Outage Type Total Remarks
Running Tripping Recharging Outage
Date Planned / Non Time
Hours Time Time Hour Idle Forced (Reason of Outage)
Scheduled Dispatch (Hours)
1 24.00 0.00 0.00 0.00 0.00 0.00 0.00
2 21.87 1.13 0.00 2.13 0.00 0.00 2.13 Tripped 4 times: (System out)

3 24.00 0.00 0.00 0.00 0.00 0.00 0.00


4 23.00 0.00 0.00 1.00 0.00 0.00 1.00 plant shutdown,
5 24.00 0.00 0.00 0.00 0.00 0.00 0.00
6 24.00 0.00 0.00 0.00 0.00 0.00 0.00
plant shutdown for B-0
7 21.00 0.00 0.00 3.00 0.00 0.00 3.00 cleaning works,
Tripped 1 time: (System trip
8 23.70 0:01 0:19 0.30 0.00 0.30 0.00 0.00 0.30 due to low voltage)

Desander headgate
9 23.00 0.00 5.00 -4.00 0.00 0.00 1.00 flushing ,heavy flood,

Tripped 1 time: (Unit trip due


10 23.83 13:20 13:30 0.17 0.00 0.17 0.00 0.00 0.17 to chilime line trip)
11 23.00 0.00 0.00 1.00 0.00 0.00 1.00
12 24.00 0.00 0.00 0.00 0.00 0.00 0.00
13 23.00 0.00 0.00 1.00 0.00 0.00 1.00
14 24.00 0.00 0.00 0.00 0.00 0.00 0.00
15 24.00 0.00 0.00 0.00 0.00 0.00 0.00
16 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Tripped 1 time: (Unit trip due
17 23.88 9:20 9:27 0.12 0.00 0.12 0.00 0.00 0.12 to low voltage)
18 24.00 0.00 0.00 0.00 0.00 0.00 0.00
19 24.00 0.00 0.00 0.00 0.00 0.00 0.00
20 21.00 0.00 0.00 3.00 0.00 0.00 3.00
21 0.00 0.00 0.00 24.00 0.00 0.00 24.00
22 24.00 0.00 0.00 0.00 0.00 0.00 0.00
23 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Tripped 2 times: (Unit trip
24 1.85 1.15 0.00 22.15 0.00 0.00 22.15 due to chilime line trip) Fault in balaju line i,

25 15.00 0.00 0.00 9.00 0.00 0.00 9.00 Fault in balaju line i,

26 24.00 0.00 0.00 0.00 0.00 0.00 0.00

27 24.00 0.00 0.00 0.00 0.00 0.00 0.00


28 24.00 0.00 0.00 0.00 0.00 0.00 0.00
29 24.00 0.00 0.00 0.00 0.00 0.00 0.00
30 24.00 0.00 0.00 0.00 0.00 0.00 0.00
31 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 676.13 2.87 5.00 62.87 0.00 0.00 67.87

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief
Table 3-7
NEPAL ELECTRICITY AUTHORITY
Generation Directorate
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
UNIT OPERATIONS DETAILS
Unit No.7 Year /Month : 2079 Aswin
Outage Type Total Remarks
Running Tripping Recharging Outage
Date Planned / Non Time
Hours Time Time Hour Idle Forced (Reason of Outage)
Scheduled Dispatch (Hours)
1 24.00 0.00 0.00 0.00 0.00 0.00 0.00
2 23.42 0.58 0.00 0.58 0.00 0.00 0.58 Tripped 2 times: (System trip)

3 12.00 0.00 0.00 12.00 0.00 0.00 12.00


4 23.00 0.00 0.00 1.00 0.00 0.00 1.00 plant shutdown,
5 24.00 0.00 0.00 0.00 0.00 0.00 0.00
6 24.00 0.00 0.00 0.00 0.00 0.00 0.00
plant shutdown for Miv
7 22.00 0.00 0.00 2.00 0.00 0.00 2.00 unit 3 works,
Tripped 1 time: (System trip
8 23.68 0:01 0:20 0.32 0.00 0.32 0.00 0.00 0.32 due to low voltage)
9 22.00 0.00 0.00 2.00 0.00 0.00 2.00 low discharge,

10 24.00 0.00 0.00 0.00 0.00 0.00 0.00


11 23.00 0.00 0.00 1.00 0.00 0.00 1.00 low discharge,
12 24.00 0.00 0.00 0.00 0.00 0.00 0.00
oil cooler and radiator
13 24.00 0.00 3.00 -3.00 0.00 0.00 0.00 cleaning,
14 15.00 0.00 0.00 9.00 0.00 0.00 9.00
15 24.00 0.00 0.00 0.00 0.00 0.00 0.00
16 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Tripped 1 time: (Unit trip due
17 23.73 9:20 9:36 0.27 0.00 0.27 0.00 0.00 0.27 to low voltage)
18 20.00 0.00 0.00 4.00 0.00 0.00 4.00
19 24.00 0.00 0.00 0.00 0.00 0.00 0.00
20 22.00 0.00 0.00 2.00 0.00 0.00 2.00 low discharge,

21 1.00 0.00 0.00 23.00 0.00 0.00 23.00 low discharge,

22 0.00 0.00 0.00 24.00 0.00 0.00 24.00 low discharge,


23 12.00 0.00 0.00 12.00 0.00 0.00 12.00 low discharge,
24 2.00 2:25 3:25 1.00 0.00 22.00 0.00 0.00 22.00 Tripped 1 time: (0) Fault in balaju line i,
25 15.00 0.00 0.00 9.00 0.00 0.00 9.00 Fault in balaju line i,
26 24.00 0.00 0.00 0.00 0.00 0.00 0.00
27 11.00 0.00 0.00 13.00 0.00 0.00 13.00 low discharge,

28 24.00 0.00 0.00 0.00 0.00 0.00 0.00


29 11.00 0.00 0.00 13.00 0.00 0.00 13.00 low discharge,
30 24.00 0.00 0.00 0.00 0.00 0.00 0.00
31 24.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 593.83 2.17 3.00 147.17 0.00 0.00 150.17

Summary
Total Outage
Total R.H. Month diff.
Planned Idle Forced Non-Dispatch
4069.78 #VALUE! 25.00 1113.22 0.00 0.00 1138.22

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief
NEPAL ELECTRICITY AUTHORITY
Generation Directorate Table 5
Medium Generation Operation and Maintenance Department
Trishuli Hydro Power Station
UNIT HISTORY REPORT
2079 Aswin
Generation Energy Running Hours Idle Hours Planned Outage Hours Forced Outage Hours Non - Dispatch Hrs Unit
S.N. Unit Of this Of this Till Last Of this Till Last Of this Till Last Of this Till Last Of this Availability
No.
Till Last Month month Till Last Month month Month month Month month Month month Month month Factor
(MWh) (MWh) (Hrs) (Hrs) (Hrs) (Hrs) (Hrs) (Hrs) (Hrs) (Hrs) (Hrs) (Hrs) %
A B C D E F G H I J K L M N O
1 1 816,959.25 1,115.00 320,351.74 655.18 11,749.34 88.82 3,563.46 - 721.34 - 231.38 231.38 67.17%
2 2 727,804.69 366.20 294,277.74 312.43 25,279.00 423.57 11,342.53 8.00 525.89 - 338.38 338.38 29.60%
3 3 875,122.40 967.73 339,425.65 509.07 19,856.20 234.93 1,310.59 - 284.25 - 385.04 385.04 45.09%
4 4 828,949.80 1,348.65 323,031.00 711.75 17,798.28 29.25 898.75 3.00 655.47 - 282.54 282.54 69.63%
5 5 846,767.89 1,133.64 331,623.66 611.38 17,680.55 126.62 3,039.93 6.00 402.71 - 413.86 413.86 53.32%
6 6 848,634.75 1,314.74 318,075.77 676.13 22,957.35 62.87 1,913.16 5.00 340.98 - 258.00 258.00 67.98%
7 7 772,260.98 1,136.80 313,312.18 593.83 22,881.47 147.17 2,848.80 3.00 306.21 - 310.21 310.21 56.61%
Total 5,716,499.76 7,382.76 2,240,097.74 4,069.78 138,202.20 1,113.22 24,917.22 25.00 3,236.85 - 2,219.41 2,219.41 55.13%
Unit Availability factor = (F+J+L)/(F+H+J+L+N)

Prepared by Checked by Approved By

(Alok Kumar Karn) (Youbraj kumar Shrestha) ( Baburaja Maharjan)


Mech. Engg Ele. Engg Station Chief