Professional Documents
Culture Documents
5m Culvert
2.1 Handle, pitch and drive initial pile nr 154 10.00 1,540.00
2.2 Handle, pitch and drive extension pile nr 154 10.00 1,540.00
Total 15,092.00
Total 7,422.00