BOQ SUMMARY

Project Name: BGH WH Chavuan_2F Beam

Element :  Beam

No. Material Unit Quantity Rate $ Cost $


1 Concrete C20 (cum) 40.59 10500.00 426195
Sub Total 40.59 4,26,195

2 Rebar #10 (Fy420) (kg) 2334.10 60.00 140046


3 Rebar #16 (Fy420) (kg) 4852.51 60.00 291151
4 Rebar #19 (Fy420) (kg) 28.25 60.00 1695
Sub Total 7214.86 4,32,891

5 Shuttering (sqm) 294.27 600.00 176562


Sub Total 1,76,562

Grand Total 10,35,648

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 177.75 kg/cum
2 Consumption : Reinforcement/Planarea = 12.58 kg/sqm
3 Consumption : Concrete/Planarea = 0.07 cum/sqm
4 Concrete % C20 = 100.00 % 
5 Shuttering  = 7.25 sqm/cum