You are on page 1of 1

BOQ Summary Page 1 of 1

BOQ SUMMARY

Project Name: 1

Element :  Beam

No. Material Unit Quantity Rate $ Cost $


1 Concrete C21 (cum) 3.18 3500.00 11142
Sub Total 3.18 11,142

2 Rebar #10 (Fy420) (kg) 340.12 46.00 15646


3 Rebar #16 (Fy420) (kg) 445.02 46.00 20471
Sub Total 785.14 36,116

4 Shuttering (sq.M) 31.84 350.00 11142


Sub Total 11,142

Grand Total 58,400

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 246.63 kg/cum
2 Consumption : Reinforcement/Planarea = 3.93 kg/sqm
3 Consumption : Concrete/Planarea = 0.02 cum/sqm
4 Concrete % C21 = 100.00 % 
5 Shuttering  = 10.00 sqm/cum

file:///C:/Users/Jeremias%20Marquez%20jr/AppData/Local/Temp/tmp8402.tmp 10/3/2019