You are on page 1of 1

BOQ SUMMARY

Project Name: 11 Atienza

Element :  Slab

No. Material Unit Quantity Rate $ Cost $


1 Concrete C28 (cum) 4.77 4350.00 20760
Sub Total 4.77 20,760

2 Rebar #10 (Fy276) (kg) 937.86 22.00 20633


Sub Total 937.86 20,632

3 Shuttering (sq.M) 47.73 100.00 4773


Sub Total 4,772

Grand Total 46,165

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 196.51 kg/cum
2 Consumption : Reinforcement/Planarea = 11.72 kg/sqm
3 Consumption : Concrete/Planarea = 0.06 cum/sqm
4 Concrete % C28 = 100.00 % 
5 Shuttering  = 10.00 sqm/cum