You are on page 1of 1

BOQ Summary Page 1 of 1

Academic license user


CONNECTED USER:

BOQ SUMMARY

Project Name: CEZA_SLABS

Element :  Slab

No. Material Unit Quantity Rate $ Cost $


1 Concrete C21 (cum) 111.18 6500.00 722670
Sub Total 111.18 7,22,670

2 Rebar 12 (Fy414) (kg) 15907.18 53.00 843081


Sub Total 15907.18 8,43,080

3 Shuttering (sqm) 794.14 600.00 476484


Sub Total 4,76,484

Grand Total 20,42,234

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 143.08 kg/cum
2 Consumption : Reinforcement/Planarea = 15.47 kg/sqm
3 Consumption : Concrete/Planarea = 0.11 cum/sqm
4 Concrete % C21 = 100.00 % 
5 Shuttering  = 7.14 sqm/cum