BOQ Summary Page 1 of 1

BOQ SUMMARY

Project Name: PP APARTMENT

Element :  Beam

No. Material Unit Quantity Rate $ Cost $


1 Concrete C28 (cum) 15.67 68.00 1066
Sub Total 15.67 1,065

2 Rebar DB8 (Fy390) (kg) 717.25 0.00 0


3 Rebar DB10 (Fy390) (kg) 23.60 0.00 0
4 Rebar DB14 (Fy390) (kg) 1637.25 0.00 0
5 Rebar DB16 (Fy390) (kg) 81.25 0.00 0
Sub Total 2459.35 0

6 Shuttering (sqm) 159.95 12.00 1919


Sub Total 1,919

Grand Total 2,984

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 156.95 kg/cum
2 Concrete % C28 = 100.00 % 
3 Shuttering  = 10.21 sqm/cum