You are on page 1of 1

BOQ Summary Page 1 of 1

COLUMN VILLA BOQ SUMMARY

Project Name: VILLA

Element :  ALL Column

No. Material Unit Quantity Rate $ Cost $


1 Concrete C25 (cum) 7.57 80.00 606
Sub Total 7.57 606

2 Rebar Ø6 (Fe250) (kg) 155.12 1.00 155.12


3 Rebar DB8 (Fe250) (kg) 14.55 1.00 15
4 Rebar DB16 (Fe390) (kg) 974.00 1.00 974
Sub Total 1143.68 1,144.12

5 Shuttering (sq.M) 109.80 10.00 1098


Sub Total 1,098

Grand Total 2,848.12 $

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 151.03 kg/cum
2 Concrete % C25 = 100.00 % 
3 Shuttering  = 14.50 sqm/cum

file:///C:/Users/NASA%20Computer/AppData/Local/Temp/tmpB972.tmp 8/29/2019