BOQ SUMMARY

Project Name: PP APA PP APARTMENT

Element :  Beam

No. Material Unit Quantity Rate $ Cost $


1 Concrete C28 (cum) 13.88 68.00 944
Sub Total 13.88 943

2 Rebar DB8 (Fy390) (kg) 681.25 1.00 681


3 Rebar DB10 (Fy390) (kg) 24.58 1.00 25
4 Rebar DB14 (Fy390) (kg) 1564.38 1.00 1564
5 Rebar DB16 (Fy390) (kg) 51.67 1.00 52
Sub Total 2321.88 2,321

6 Shuttering (sqm) 141.90 12.00 1703


Sub Total 1,702

Grand Total 4,968

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 167.28 kg/cum
2 Concrete % C28 = 100.00 % 
3 Shuttering  = 10.22 sqm/cum