BOQ SUMMARY

Project Name: BGH WH Chavuan_2F-3F ramp beam 2

Element :  Beam

No. Material Unit Quantity Rate $ Cost $


1 Concrete C20 (cum) 1.86 10500.00 19530
Sub Total 1.86 19,530

2 Rebar #10 (Fy420) (kg) 146.48 60.00 8789


3 Rebar #16 (Fy420) (kg) 278.78 60.00 16727
Sub Total 425.26 25,515

4 Shuttering (sqm) 13.99 600.00 8394


Sub Total 8,394

Grand Total 53,439

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 228.63 kg/cum
2 Consumption : Reinforcement/Planarea = 43.57 kg/sqm
3 Consumption : Concrete/Planarea = 0.19 cum/sqm
4 Concrete % C20 = 100.00 % 
5 Shuttering  = 7.52 sqm/cum