A 7 Quantities Summary

S/No Works/Items Unit Quantities Remarks

1 Road Works
2.1 Earth works Cutting/ Filling Plots Area Cft 14,373,362.23
2.2 Earth works Cutting/ Filling Road Area Cft 6,281,997.10
2.3 Sub-Base Course Cft 347,480.76
2.4 Water Bound Cft 199,855.48
2.5 Prime Coat/TST/Wearing Course Sft 475,356.00
2.6 Kerb Stone Fixing Rft 9,000.00
Total
2 Dreinage Works
3.1 Drains Rft 9,800.00
3.2 Culverts No 1.00
3.2 Nullah Rft 2,350.00
Total 12,151.00
3 Footpath
4.1 Drain Cover Rft 9,800.00
4.2 Tuff Paver Sft 37,600.00
Total 47,400.00
4 Sewerage Works
5.1 Excavation/Backfilling Cft 18,019.50
5.2 Manhole Construction Nos 360.39
5.3 Sewerage network Rft 18,019.50
Total 36,399.39
5 Green Belt
6.1 Plants along with road sides Sft 34,000.00
Total 34,000.00
6 Electrical Works
7.1 Street light Poles Nos 136.00
7.2 Street light component Nos 136.00
Total 272.00