SKID- Outlet line shall route below the skid access platform with a
2 IVC/Skid updated
gap of 50mm from top of pipe to cross over platform
Skid east and west side to be maintained 125mm from flange edge updated
to skid beam edge
Skid north side to be maintained 700mm from edge of pipe to skid
updated
beam edge
2 Tranchess , JBs ,
Remark
Skid east and west side maintained with 125mm from flange edge to skid beam edge , considering 2500# flange.
Skid north side maintained with 700mm from edge of pipe to skid beam edge, considering instrument stand pipe
Skid model updated based on provide 3D PDS model by ADNOC. if the skid inlet and outlet to be modeled as per Gas lift we
model required to be reoriented and IVC to be mirrored, refer attached PDF for orientation based on the skid