TCL Project Pluto West Virginia STANDARD ITP FOR CIVIL WORKS
ACCEPTANCE RESPONSIBILITY
Sl. No. ACTIVITY DESCRIPTION CHECK/ INSPECTION VERIFYING RECORDS
CRITERIA Cont. Consl.
1 MATERIAL
Material Inspection for each lot P W RAN
Compressive Strength
Fineness
1.1 Cement JD&E's ready-mix supplier
submittals
Chemical composition
ACI 301, Technical Spec
Visual storage inspection 19011-U-000- S W RAN
CVL-SPN-001-A4
ACI 301, Technical Spec
Standard consistency 19011-U-000- S R R
CVL-SPN-001-A4
1 of 8
CONTRACT NO
TCL Project Pluto West Virginia STANDARD ITP FOR CIVIL WORKS
ACCEPTANCE RESPONSIBILITY
Sl. No. ACTIVITY DESCRIPTION CHECK/ INSPECTION VERIFYING RECORDS
CRITERIA Cont. Consl.
Calibration of Total Station, As per accuracy
Level Machine, mentioned in "Product By JD&E S R R
2.1 Survey Theodolite Data Sheet"
2 of 8
CONTRACT NO
TCL Project Pluto West Virginia STANDARD ITP FOR CIVIL WORKS
ACCEPTANCE RESPONSIBILITY
Sl. No. ACTIVITY DESCRIPTION CHECK/ INSPECTION VERIFYING RECORDS
CRITERIA Cont. Consl.
Calibration of Weigh batchers / As per manufacturers
Ready-Mix Supplier QC S W R
batching Plant spec.
RMC Batch Checking As per mix design Ready-Mix Supplier QC S R R
ACI 301, Technical Spec
Batching of materials 19011-U-000-CVL-SPN- Ready-Mix Supplier QC S W R
001-A4
Slump cone test ASTM C143 By HCEA P W RAN
ACI 301, Technical Spec
5.2 Before / During Concreting
Compaction 19011-U-000-CVL-SPN- By JD&E P W RAN
001-A4
Compressive Strength Test
ASTM C39 By HCEA P W RAN
Sample
Dimensional Alignment Check ( As per drawing /tech
By JD&E P W RAN
before concreting Spec)
Pre Determined location /
Construction joints By JD&E P W RAN
Tech Spec
ACI 301, Technical Spec
Curing 19011-U-000-CVL-SPN- P W RAN
001-A4
Smooth Surface , free of By JD&E
Visual Inspection after de honeycombing , ACI 301,
P W RAN
5.3 Post Concreting shuttering Technical Spec 19011-U-
000-CVL-SPN-001-A4
Calibration of compression
testing machine (Pressure ASTM C39 P W R
gauge) By HCEA
Compressive strength ASTM C39 P W R
As per drg. /
spec/Handing Over
6 Handing over Check for Handing Over By TCL, JD&E S A A
protocol and final
punchlist
3 of 8
CONTRACT NO
TCL Project Pluto West Virginia STANDARD ITP FOR CIVIL WORKS
ACCEPTANCE RESPONSIBILITY
Sl. No. ACTIVITY DESCRIPTION CHECK/ INSPECTION VERIFYING RECORDS
CRITERIA Cont. Consl.
Legend:
H Hold point (further steps shell commence only after clearance from – as applicable)
R Review & approve
RAN Random
P Perform
W Witness and approval
S Submission
Company name
Name
Signature
Date
4 of 8
DOCUMENT NO