You are on page 1of 2

QUALITY ASSURANCE PLAN - MANUFACTURING & TESTING OF CONVEYOR

BELT
Power for Progress

OPGC - ITPS,
Banharpali

Sl. Component Charecterstics Class Type of Quantum of Reference Acceptance Format of Inspection Remarks
No / Check check document Norms Record Agency
Operation M C/ M C A
O
1 2 3 4 5 6 7 8 9 D 10 11

1.1 Finished Width Critical Physical as per BIS Tech. Tech. Spec Inspection Y P -- W
Conveyor 1891 Spec Report -
Belt Length Critical Measure Y P -- W
-
Total Critical Measure Y P -- W
Thickness -
Rubber Cover Critical Measure Y P -- W
(Top & -
Bottom)
Min. Tensile Critical Measure Y P -- W
strength -
Abrassion Critical Measure DIN 53516 DIN DIN 53516 Y P -- W
Loss 53516 / / -
Tech. Tech. Spec.
Spec.
Breaking Critical Measure as per BIS BIS 1891 Y P -- W
Strength 1891 -
Adhesion Critical Measure Y P -- W
Tests -
(in wrap &
weft)
Troughability Critical Measure Y P -- W
-
Elongation Critical Measure Y P -- W
(%) at -
Break & at
Ref. Load
No. Of Plies Critical Visual 100% 10% Tech. Tech. Spec Y P -- W
Spec -

Legends : DOCUMENT NO : QAP / CHP / CONVEYOR


M : Manufacturer sub supplier, C : Supplier , O : OPGC BELT - 01.00
PR No. : P : Perform, W : Witness, V : Verify as appropriate
Y : Yes for documentation / Records
Note :
All standards are to be considered as their latest version
Any specific property check not covered in this QAP shall
be as per PREPARED REVIEWED APPROVED
relevent BIS standard.

You might also like