Document Title: Method Statement for EARTH FILLING Page : 08 Revision : 0 Date : 8/11/2010

INSPECTION & TEST PLAN (ITP) : EARTH FILLING


Sr. Inspection / Test Parameter Acceptance Criteria Timing Method Frequency Reference Involved Parties Remarks
No Activity Doc. / Format

1 Earthfilling material approval Excavated earth as per specification Before filling Visual Each shift Checklist I W W

2 Foreign materials/ Lumps Quality of filling material as per specification Before filling Visual While spreading I W W
Checklist

3 Layer of filling 300mm layer as per specification During filling Visual While filling I W W
Checklist
as per specification/
4 Compaction Plate compactor/Roller well compaction After each layer filling Sand replacement test instruction from IS2720:1983 Part 7 I W W
engineer in charge

as per specification/
as per IS2720:1983
5 Test Results 95% compaction, MDD After each layer/test Sampling instruction from Test Result QR R R
Part 7
engineer in charge

Inspection Legend Description

I Inspection

T Test

R Review & Approval

W Witness (Optional)

H Hold (Mandatory Witness Inspection)

QR Quality Record (Report Required)