You are on page 1of 1

GENERAL NOTES:

1. DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTS,


SERVICES ENGINEERS AND APPROVED SUB-CONTRACTORS DRAWINGS AND THE
SPECIFICATION. ANY DESCRIPANCY SHALL BE BROUGHT TO CLIENT'S NOTICE.

2. ALL DIMENSIONS ARE IN mm UNLESS NOTED OTHERWISE.


3. DRAWING IS NOT TO BE SCALED, THE CONTRACTOR IS TO WORK TO FIGURED
DIMENSIONS ONLY.
WALL PANEL WALL PANEL
4. UNLESS SHOWN OTHERWISE ALL MEMBERS ARE PLACED SYMMETRICALLY ABOUT
(REFER ARCHITECTURE DWG.) (REFER ARCHITECTURE DWG.)
GRID LINES.
5. ALL DIMENSIONS SHOWN IN THE DRAWINGS ARE TO BE VERIFIED ON SITE BY THE
CONTRACTOR PRIOR TO COMMENCEMENT OF THE WORK.
6. CONTRACTOR TO PREPARE SHOP DRAWINGS AND TO BE SUBMITTED FOR
ENGINEER'S REVIEW & APPROVAL.

COPING BEAM ROOF BEAM


(REFER TO SCHEDULE) (REFER TO SCHEDULE)
STEEL COLUMN
(AS PER PEB SUPPLIER)
STEEL COLUMN 200 THK BLOCK WALL STEEL COLUMN C1 REINFORCEMENT
(AS PER PEB SUPPLIER) (AS PER PEB SUPPLIER) (REFER TO SCHEDULE) GB1 (REFER TO SCHEDULE)

SSL
INTERLOCK LVL +0.40
+0.20

BRC MESH A393


(TOP & BOTTOM)
INTERLOCK PAVERS EGL
12mm ISOLATION JOINT 12mm ISOLATION JOINT
PEDESTAL REINF'T
GB1 (REFER TO SCHEDULE) (REFER TO SCHEDULE)
BRC MESH A393 SSL SSL
+0.40 INTERLOCK LVL +0.40 INTERLOCK LVL LVL FOOTING
(TOP & BOTTOM) -1.40
+0.20 +0.20 (REFER TO SCHEDULE)

BRC MESH A393 - REINFORCEMENT SECTION C-C


12mm ISOLATION JOINT (TOP & BOTTOM)
EGL EGL

LVL FOOTING LVL


-1.40 FOOTING REINF'T TYP. -1.40
(REFER TO SCHEDULE)
(REFER TO SCHEDULE)

- REINFORCEMNT SECTION A-A - REINFORCEMENT SECTION B-B

200 THK BLOCK WALL/


STIFFENER COLUMN COLUMN
(AS SHOWN IN LAYOUT) STEEL COLUMN
G.I TIE AT (AS PER PEB SUPPLIER)
ALTERNATING LAYER 200 THK BLOCK WALL
CONSTRUCTION DRAWINGS
PEDESTAL REINF'T
(REFER TO SCHEDULE)
BRC MESH A393 SSL BRC MESH A393
SSL INTERLOCK LVL +0.40
(TOP & BOTTOM)
+0.40 +0.20

G.I STRIP WELDED


STEEL COLUMN AT 1m C/C INTERLOCK PAVERS 12mm ISOLATION JOINT
EGL
(AS PER PEB SUPPLIER)
PEDESTAL- P1 2 17-05-2023 FOUNDATION HAS BEEN REVISED AS PER PEB HM
REACTIONS

3T12 T10-200 COLUMN-BLOCK WORKS LVL FOOTING REINF'T TYP. 1 07-05-2023 REVISED AS PER PEB REACTIONS AND SITE LEVEL HM
-1.40 (REFER TO SCHEDULE)

0 09-04-2023 ISSUED FOR CONSTRUCTION HM


- CONNECTION DETAIL (TYP.)
- REINFORCEMENT SECTION D-D Revisions Date Description Checked
- REINFORCEMENT SECTION E-E CLIENT:

SCHEDULE OF PEDESTAL
CONSULTANT:

450 450 450 550 500 450 600


ISMAIL KHONJI ASSOCIATES
CONSULTING ENGINEERS Telephone:
+973 17714463 - Fax: +973 17712292 Email:
ikabah@batelco.com.bh PO Box 72, Bahrain
650

650

650

650

650

650

650
MEP CONSULTANT:

12T16 12T16 12T16 12T16 12T16 12T16 12T16


T10-200 SHEAR LINKS T10-200 SHEAR LINKS T10-200 SHEAR LINKS T10-200 SHEAR LINKS T10-200 SHEAR LINKS T10-200 SHEAR LINKS T10-200 SHEAR LINKS

GRADE "A" MEP CONSULTANT


DESIGN & SUPERVISION
License No. EP.BN/177
Tel. 17382264 : Fax. 17382267
P1 P1A P2 P2A P3 P3A P4 PO Box 18236, Kingdom of Bahrain
www.sjmmep.com

PROJECT:

SCHEDULE OF COLUMN PROPOSED FILLING STATION


at RAS ZUWAYED

200
200
200
200
200 400 250 DRAWING TITLE:
200
200
600
550

500

REINFORCEMENT SECTIONS AND


400
350

350

350

300
SCHEDULES

200
6T16 8T16 6T16 6T16 8T16 8T16 10T16 4T16 4T12 HM JM
T8-200 LINKS T8-200 LINKS T8-200 LINKS T8-200 LINKS T8-200 LINKS T8-200 LINKS T8-200 LINKS T8-200 LINKS T8-200 LINKS

HM TMS
C1 C1A C1B C2 C3 C3A C3B C4 C5
TMS

DEC
AS SHOWN 2 2021
*
c GC-ST-04 1315

You might also like