Professional Documents
Culture Documents
Ar-Riffa-01 Site Layout - Scope of Works
Ar-Riffa-01 Site Layout - Scope of Works
AY
W
GH
HI
ER
SK
EXISTING M
UA
AL
R O A D
40
SITE
29
LINE
PIPE
WALL
WATER
X-458769.
BOUNDARY
EXISTING
X-458754.6
Y-2889069
Y-2889050
EXISTING
9515
.8726
406
.4098
GRAVEL
150mm
SINGLE
FINISH
THK.,
SIZE
(TYP.)
20mm
STONE
INCOMING/OUT
03
X-458747.8
No. GOING/FIBER
Y-2889024
CIRCUITS
CH
1
657
FOROPTIC
A
PA
AI
.2647
R
K
400kVCABLES
N
IN
LI
CABLES
G
FOR
BANK
A
B
400kV
N
R
DUCT
EA
K
FE
N
CE
+0.500
C
FRL
BO
OFF
LOADING
U
FUTURE
SPACE FEEDER
N
CABLE
D
PLOTFORM
+1.700
AR
FOR
ROLLER
FFL
REACTOR-1
220kV
HAW
Y
D
DOOR
W
2
AL
E
CABLES
L
UP
3
400kV
FOR OPTIC
FUTURE
SPACE FEEDER
CABLE
F
REACTOR-2
FOR
CIRCUITS
220kV
GOING/FIBER
No.
05
X-458764.4
=C15
Y-2889037
=C15+S1
INCOMING/OUT
X-458803.
H
J
Y-2889026
=C14
500
829
TILES
FUTURE
SPACE FEEDER
x 500
.6054
BASEMENT
MORTAR
CABLE
6226.0683
=C14+S1
PAVIORS
REACTOR-3
x 50mm 40mm
FOR
=C13
K
220kV
EXTENDED
BEDDING
=C13+S1
ON (TYP.)
THK.PRECAST
400kV
X-458702.9
L
Y-2889010.6
=C00+P3
=C12
WALL
6
THK.
GIS
=C12+S1
D8
CONCRETE
O
CEMENT
+1.760
SPACE
ROOM
A
475
FUTURE
=C11
BOUNDARY
D
FFL
CABLE
749
FOR220kV
M
AR-1305
C
REACTOR-4
=C11+S1
=C10
FEEDER
DN
EXISTING
STAIRCASE
TRENCH
UP
7
=C10+S1
CABLE
=C09
D
=C09+S1
+1.700
CONTROL
A
P
O
FFL
=C08 400kV
TRENCH 8 R
=C08+S1
F
UPS
CABLE
48V
DC
BANK
CHGR./DCDB
EXISTING
=C07 +R2
+R1
(400kV,
REACTOR-2
EXISTING
FENCE
DUCT
X-458687.0
=C07
AR-1304
B
9
INCOMING/OUT
=C00+P2 +R1 BANK
Y-2889006.1
=C08
CAB.
=C07
+R2
=C06 =C06
=C09
415V
05
DUCT
100MVAr)
+R1
EXISTING
=C10
F
ESSEN.
No.
+R1 FUTURE CAB.
FUTURE
=C05 +R1
+R1
SITE
=C07+S1 F
CIRCUITS
R
=C04 +R2
=C10
+R2
SER.
SPACE
FUTURE
057
=C11
+R1
GOING/FIBER
SUB
400kV,
AR
=C06 F
OFFICE
=C06+S1
=C04
+R1
=C11
+R2
FUTURE
BD.
F
148
220kV
=C03
+R2
=C12
10
+R1 +R1
FOR
FOR OPTIC
+R2
=D22+R1
=C03
=C13 +R1+R2
BBP
REACTOR
=C05
=D22 =D21
=C02 +R2
=C13
STAIRCASE
PANELS
220kV CABLES
=C02 +R1 +R2
220V
+0250
+R2 F
=D21 +R1
+R1 +R2
=C14
DC
=C05+S1
CHGR./DCDB
MAINTENANCE
=D22+S1
=D20 +R2
=C01+R1
=C14
FRL
=C04
+R1 F
PLATFORM
CRANE
400kV
=C01
=C15
F
=D20
+R1
CONTROL,
=C15
415V
BBP
=D21+S1
WMH
DN
=C04+S1
=D22
=D19
+R2
PANELS
+R2
MAIN
+R1 F
=D19
FUTURE
DIST.
F
=C00+P1
11
BOARD
=D21
=D16
=C03
=C03+S1
=D20+S1
400kV
400kV
400kV
PDM
PROTECTION
F
+R1
=D16+R2
BBF
AVR
PNLS.
F
PROTN.
PNLS.
OFF
ROLLER
=D20
=D15+R1
FUTURE F
=C02
=D19+S1
=D15 =D14
PNLS.
PDM
220kV
DUCT
CABLES
LOADING
CONTROL
TRENCH PANEL
KERB
=C02+S1
(400kV,
REACTOR-
BANK
PNLS.
FUTURE +R2 F
BELOW
X 250 BACK
DOOR
=D14 +R1
+1.760
FOR
EXISTING
CABLE CONTROL
125 ON
ROAD
220kV
+1.700
PLOTFORM
=D19
=D18+S1
N2
BUILDING
&
HVAC
=C01
LAID
FFL
FFL
R
120MVAr)
LV
CYLINDER
=C01+S1
=D13
+R1
12
400kV
1
=D17+S1
O
=D18
=D12
+R1
21kV
FOR
400kV
PANELPNLS.
TRENCH F
REACTOR
+R2
=D11
PROTN.
FIBRE
+1.760
A
COM.
+0.500
=D11
CABLE +R1 F
KERB
PNLS
DIST.
D
=D17
=D09
FFL
UP
ROOM
F
ROOM
X 250 BACK
PNLS.
FRL
BANK
=D16+S1
+R2
=D09
+R1
FUT.
UP 125 ON
DUCT
=D08 +R2
REMOVABLE
ON
LAID
13
D8
=D16
=D15+S1
HOLD
CAB.
=D08
+R1
R
+R1 +R2
=D07
400/220kV
80mm
F
O
BANK
=D15
=D14+S1
=D06
WORKSTATION
OPERATOR
CORRIDOR
PAVING
F
HOUSE
=D06
SCMS
HAND
A
+R1
THK.BRICKS
TRAFO-2
=D05
DUCT
PANELS
D
=D14
+R2
=D05
+1.700
=D13+S1
RAIL
+R1
INTERLOCK
CAB.
BANK
+R2
=D03
FFL
=D13
220kV =D12
+R1
=D03
14
(TYP.)
=D12+S1
FMS
DUCT
=D02 +R2
PNLS.
REACTOR-3
21kV
HIG
400kV
F
HOUSE
CAB.
F
TRENCH
GIS
TRAFO-1
=D02
+R1
FACP
25MVar
IBT
=D01
+R2
FUTURE
CABLE F
=D01
+R1
ROOM
PNLS.
CABLE
220V
=D11+S1
BATTERY-1A
TRENCH
21kV TELECOM
D8
TRENCH
(400MVA,
-2
220V
80mm
=D11
BATTERY
BATTERY-1B
CABLE
PAVING
=D10+S1
SWITCHGEAR
IBT-1
+1.760
REACTOR-2
21kV
21kV
THK.BRICKS
TRENCH
=D10
FFL
X-458816.1
400/220/21kV)
220kV
FUTURE
=D09+S1
25MVar
Y-2888978.5
IBT
INTERLOCK
ROOM
21kV
CABLE
PIT
=D08+S1
FUSE
220V BOX-1
=D09
21kV
(TYP.)
SWITCHGEAR
SWITCHGEAR
960
FUSE
220V BOX-2
=D08
=D07+S1
220V
TRENCH F
336
21kV
+1.760
BATTERY-2A
-3
CABLE
FFL BATTERY-2B
SWITCHGEAR
F
=D07
220V
REACTOR-1
21kV
=D06+S1
CONTROL
ROOM
25MVar
IBT
-1
EXISTING
=D06
STAIRCASE
+0.000
400kV
=D05+S1
O
TRENCH
FRL
D8
A
CABLE
CABLE
=D05
=D04+S1
48V
D
GATE
WORKSHOP
BAT.-
D8 TRENCH
21kV
AR-1304
A
FUSE
1
FUTURE
(400MVA,
=D04
=D03+S1
48V
48V
BOX-1
BAT.-
EX
+1.760
48V FUSE
2
OFFICE
FFL
CAB.
IS
IBT-2
=D03
BOX-2
DUCT
400/220/21kV
220kV
TI
=D02+S1
125 ON
BANK
TRENCH
=D02
PANTRY
DN
UP
LAID
NG
X 250 BACK
=D01+S1
CABLE
KERB
)
R
O
PLOTFORM
=D01
FUTURE
O
TOILET
TRENCH
HW
LOADING
D
CABLE OFF
+0250
FUTURE
FRL
CONTROL
+1.700
+1.760
FFL
400kV
TRENCH
FFL
CABLE
D8
CABLE
TRENCH
21kV DOOR
D8
CRANE ROLLER
SPACE
(400MVA,
MAINTENANCE
PLATFORM PLOTFORM
400kV,
FUTURE
X-458785.2
LOADING
FOR
IBT-3
Y-2888975.6
OFF
REACTOR
400/220/21kV
220kV
BANK TRENCH
DUCT BANK
+0.000
CABLE
665
FRL
CAB. DUCT
)
CAB.
082
AR-1305
D
TRENCH
CABLE
EMERGENCY
DG
CONTROL
UP
CABLES
ROOM
R
KERB 220kV
OPTIC
X 250 BACK
O
FOR
125 ON
A
LAID
D
GOING/FIBER
80mm
D8
TANK
DIESEL
125
No.
PAVING
10
X 250
THK. BRICKS
PUMP
FIRE HOUSE
LAID
ROOM
INCOMING/OUT
KERB
ON
INTERLOCK
WATER
BACK
R
AY
(TYP.)
D
O
EXISTING
A
A
O
D
R
G
N
TI
BOUNDARY
IS
L EX
AL
W
WALL
Y
AR
FIRE
D
WATER
N
U
BO
TANK
CE
+0.000
N
FRL
FE
K
N
LI
N
X-458749.8
AI
Y-2888949
GRAVEL
CH
150mm
GROUND
SINGLE
WATER
FINISH 20mm
TANK
THK., STONE
674
.3062
SIZE
(TYP.)
X-458744.2
RAS LEGRAIN CIRCUIT
Y-2888923
604
.2390
RO
AD
49
07
107800
490
4
BA
X-458765.3118 PC
O BO
UN
D AR
4200
Y
Y-2889075.9086 JOINT BAY X-458819.1136
86089 5 Nos. CIRCUITS FOR 220kV
1970
INCOMING/OUTGOING/FIBER OPTIC CABLES
Y-2889007.9316
15400
X-458816.5430
X-458763.1150 Y-2889006.6670
Y-2889074.1700 PROPO
1:1 SLOPE
SED PRECAST BOUNDARY WALL
STONE PITCHING 257
31 KEY PLAN
2800
968
1A 1B
+0.450 +0.400 3470 -2.920
GENERAL NOTES:
2000
16400
11263
FGL FGL
6000 FRL STONE PITCHING
0
100
SLOPE
110Ø SPOUT SLEEVE TO FREE R1 1: 1 SLOPE
DISCHARGE TO OUTSIDE (TYP)
+0.500 X-458825.9532
R O A D X-458822.7760 Y-2888980.5490 1) ALL DIMENSIONS ARE IN MILLIMETRES AND ALL LEVELS ARE IN METERS, UNLESS NOTED OTHERWISE.
FGL
-1.560
DUCT BANK FOR SPACE FOR
400kV CABLES Y-2888981.7370
FUTURE 220kV
EXT. GROUND LVL.
CABLE FEEDER IBT-4
56627 2) ALL LEVELS ARE FINISHED FLOOR LEVELS AND IN REFERENCE TO FINISHED LEVELS.
REACTOR-2
EXISTING BOUNDARY WALL
15250
2644
Y-2888980.2220
FRL PROPOSED PRECAST BOUNDARY WALL Y-2888934.3970
21500
SPACE FOR SPACE FOR
FUTURE 220kV FUTURE 220kV
CABLE FEEDER CABLE FEEDER 4) ALL LEVELS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL ENGINEERING AND
REACTOR-3 REACTOR-4
DETAILS DRAWINGS.
+0.500
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SLOPE
6000
1500
FGL FGL
16350 61395 CONCRETE HUMPS
CHAINLINK FENCE
FUTURE CABLE TRENCH
3834 8100 400mm WIDTH Septic Tank
425 4375 4800 6600 6600 6740 425 6755 6600 6600 6650 5250 RIFAA - HAWAR #2
X-458754.5187 R2
IMPORTANT NOTES:
3890
Y-2889050.5683 X-458764.4829 RIFAA - HAWAR #1
3700
3000
+0.400
T.O.P Y-2889037.6054
5851
R O A D R O A D 1. THE CONTRACTOR TO TEMPORARILY REMOVED ALL MEP
FGL
42508
A SLOPE SLOPE SLOPE SLOPE
SERVICES AND CCTV FROM THE BOUNDARY WALL AND
8000
RWO +0.375 +0.250
SLOPE 80mm THK. INTERLOCK
FRL FRL REINSTATED UPON COMPLETION.
3800
11530
PAVING TILES (TYP.)
SLOPE
R40
E
OP
00
EXISTING BOUNDARY FENCE TO BE REPLACED BY PRECAST BOUNDARY WALL
T
PI
LE
GROUND LEVELS INSIDE THIS LOWER PLOT AND TRANSPORTED TO EWA SPECIFIED LOCATION ALL AS
AB
SLOPE
R I D G E IN SLOPE
C
AREA OF SUBSTATION SHOULD BE HIGHER
V
0k
DIRECTED.
40
11450
RWO
E
OP
NATURAL SLOPE
E
E
Y-2888975.6082
3105
+14.060
RWO RWO RWO
T.O.P
E SLOPE
RWO +50mm
RWO
STONE PITCHING
SLOPE SLOPE SLOPE SLOPE SLOPE
UP
SLOPE
SLOPE
1:1 SLOPE
SLOPE
PE E
SL
O OP
SL SL
OP
LOWER ROOF
E
93412
E
OP
OP
EY
LEY
E
SL
NEW EARTH CABLE TO BE LAID BESIDE THE NEW
SL
LL
R I D G E 1:100 SLOPE
R I D G E 1:100 SLOPE
F VA
VAL
E
BOUNDARY WALL. TAILS TO BE CONNECTED AT
OP
R I D G E IN SLOPE
SL
2705
PULL PIT
VA
SLOPE
VA
REGULAR INTERVALS TO THE RAZOR WIRE.
LL
LL
000
EXISTING R O A D
G
EXTENDED BASEMENT
R2
EY
EY
3x2-200mmØ PIPE SLEEVES
SLOPE
OP +7.260
+0.275
E
+7.260 TO THE RAZOR WIRE.
SSL
FGL
3x2-200mmØ SSL
H SLOPE
VA
SL
PIPE SLEEVES
8000
OP
LL
65200
E
RWO EY
425
W/ CONCRETE SURROUNDED
(Typ.) SLOPE RWO
J
3765
RWO
OP
SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE
SL
SLOPE
3005
NATURAL SLOPE
E E E E E 2000
SL
SL
SL
SL
SL
OP OP OP OP OP
SL SL SL SL SL
L
OP
OP
OP
OP
OP
E
E
-0.580 R I D G E IN SLOPE
R I D G E IN SLOPE
R I D G E IN SLOPE
R I D G E IN SLOPE
R I D G E IN SLOPE
EXT. GROUND LVL. +0.500 220kV GIS ROOM
NATURAL SLOPE FGL
INTERMEDIATE ROOF
NOTES ON SITE LEVEL:
SLOPE
SLOPE
SLOPE
EY
EY
SLOPE
SLOPE
±0.000 PROJECT LEVEL INDICATES THE +17.240 OF LOCAL DATUM,
7200
VA
VA
VA
EY
LL
LL
+11.360
105762
SL
LL
LL
VAL
OP
+1.780 FOR EXISTING LEVELS THE CONTRACTOR SHOULD REFER FROM
LL
LL
VA
VA
EY
EY
SSL
EY
VA
FFL
+11.360 TOPOGRAPHICAL SURVEY OF EXISTING PLOT
106930
3-250mmØ & 2-150mmØ
PIPE SLEEVES
W/ CONCRETE SURROUNDED
(Typ.) 400kV GIS ROOM SSL (FOR FILLING AND CUTTING QUANTITIES).
M SLOPE RWO
2340
+0.500
OP
SL
FGL
SLOPE
SLOPE
ALUMINUM LOUVERS ROOFING WITH ALL AROUND
CLADDING ON STRUCTURAL STEEL SUPPORT (TYP.)
NEW INTERLOCK ROAD
R I D G E IN SLOPE R O A D
SLOP
+12.860
EMBANKMENT NATURAL SLOPE
CHAINLINK FENCE
E
7200
SSL
REACTOR-1 IBT-1 IBT-2 IBT-3
SLOPE
125 X 150
X-458702.8256 Q SL
OP
E
STANDING KERB
Y-2889010.8335
3840
+14.060
SLOPE
MA
SLOPE
+0.550 T.O.P
RWO RWO
R X-458750.1721
PE
FGL
SLO
+3.800
SSL
SLOPE OFF LOADING PLATFORM +0.600
+0.300 +0.125
Y-2888948.9097
1:5
+1.780
1500
UP
FGL
PROVISION OF 1 x 150 DIA.
0
FFL FGL FGL
00
+4.300
X-458689.4170
DUCT BANK FOR GUARD
R8
T.O.P 8100
Y-2889016.7740
CAB. DUCT BANK
ROOM TO BASEMENT
00
+0.150
FGL
60
+0.553 (+17.793 NSD LVL)
R1
EXT. MANHOLE TOP LVL +0.700 SLOPE +0.600 SLOPE 80mm THK. INTERLOCK SLOPE +0.300 80mm THK. INTERLOCK SLOPE +0.000 +0.000
R O A D PAVING TILES (TYP.) R O A D PAVING TILES (TYP.)
FRL FRL FRL FRL PROPOSED ROAD LVL
307
WMH X-458751.3480 PE
SLO
.5
Y-2888924.0230 X-458756.3890 1:1
PROPOSED PERMANENT
7
Y-2888916.9270
X-458687.9710
+0.300 +0.125 +0.000 +0.000 8704 SECURITY ROOM
000
FGL FGL FGL PROPOSED ROAD LVL
Y-2889014.0550 R8
HOUSE
TRAFO-2
HOUSE
TRAFO-1 EMERGENCY CONCRETE GROUND
FIRE WATER TANK
PAVING TILES INTERNATIONAL
X-458697.6050 DIESEL TANK DG ROOM WT SLAB
500X500mm ALL AROUND
E
6487
X-458744.2604
L
SLOPE
8523
E
EXT. GATE LVL. Tel: (+973) 1770 8118 Fax: (+973) 1770 0115
20
1500X1500X1500(D) X-458744.5040
A
Y-2888918.9440
+0.600 17758 +0.075 PROPOSED ROAD LVL.
IO
E
OP
1:3
FRL
N
6
CHANNEL 300mm DEEP
E
GROUND
5
83
TRANSFER
X-458751.0960
SLOPE
TANK
-
87
1:3 SLOPE
11
Y-2888994.1440 Y-2888986.6280 EXISTING 1000x1000x1000 MANHOLE 00 8
R+0.000 X-458769.1730
BO U600
NCOVER
DARY FENCE TO 0
77
MANHOLE
WITH T
Y-2888871.0680
BE REPLACED BY PR
5
WATER BARRIER/HUMP SHALL BE PROPOSED ROAD LVL
SLOPE
EXISTING R O A D
ECAST BOUNDAR 400 kV TRANSMISSION DEVELOPMENT
A/C IT
UN SE
SOAK PIT
PROVIDED TO PREVENT SPILL WATER
BA
+2.610 SEPTIC TANK