You are on page 1of 1

ALBA R/A

AY
W
GH
HI
ER
SK
EXISTING M
UA
AL
R O A D
40

SITE
29
LINE
PIPE
WALL
WATER

X-458769.
BOUNDARY
EXISTING

X-458754.6

Y-2889069
Y-2889050
EXISTING

9515
.8726
406
.4098

GRAVEL
150mm
SINGLE

FINISH
THK.,
SIZE

(TYP.)
20mm
STONE
INCOMING/OUT

03
X-458747.8

No. GOING/FIBER
Y-2889024

CIRCUITS

CH
1
657

FOROPTIC
A

PA

AI
.2647

R
K

400kVCABLES

N
IN

LI
CABLES

G
FOR
BANK

A
B

400kV

N
R
DUCT

EA

K
FE
N
CE
+0.500
C

FRL

BO
OFF
LOADING

U
FUTURE
SPACE FEEDER

N
CABLE

D
PLOTFORM
+1.700

AR
FOR
ROLLER

FFL

REACTOR-1

220kV

HAW
Y
D

DOOR

W
2

AL
E
CABLES

L
UP

3
400kV
FOR OPTIC

FUTURE
SPACE FEEDER
CABLE
F

REACTOR-2

FOR
CIRCUITS

220kV
GOING/FIBER
No.
05

X-458764.4
=C15

Y-2889037
=C15+S1
INCOMING/OUT

X-458803.
H
J

Y-2889026
=C14

500

829
TILES

FUTURE
SPACE FEEDER
x 500

.6054
BASEMENT

MORTAR

CABLE

6226.0683
=C14+S1

PAVIORS

REACTOR-3
x 50mm 40mm

FOR
=C13
K

220kV
EXTENDED

BEDDING
=C13+S1

ON (TYP.)

THK.PRECAST
400kV
X-458702.9

L
Y-2889010.6

=C00+P3
=C12
WALL

6
THK.
GIS

=C12+S1

D8

CONCRETE

O
CEMENT
+1.760

SPACE
ROOM

A
475

FUTURE
=C11
BOUNDARY

D
FFL

CABLE
749

FOR220kV
M

AR-1305
C

REACTOR-4
=C11+S1

=C10

FEEDER
DN
EXISTING

STAIRCASE
TRENCH

UP

7
=C10+S1
CABLE

=C09
D

=C09+S1

+1.700
CONTROL
A

P
O

FFL
=C08 400kV
TRENCH 8 R

=C08+S1

F
UPS
CABLE

48V
DC
BANK

CHGR./DCDB
EXISTING

=C07 +R2
+R1

(400kV,
REACTOR-2

EXISTING
FENCE
DUCT

X-458687.0

=C07

AR-1304
B

9
INCOMING/OUT
=C00+P2 +R1 BANK

Y-2889006.1

=C08
CAB.

=C07

+R2
=C06 =C06

=C09

415V

05
DUCT

100MVAr)
+R1

EXISTING
=C10

F
ESSEN.

No.
+R1 FUTURE CAB.

FUTURE

=C05 +R1

+R1

SITE
=C07+S1 F

CIRCUITS
R

=C04 +R2

=C10
+R2

SER.

SPACE
FUTURE

057

=C11
+R1

GOING/FIBER
SUB

400kV,

AR
=C06 F

OFFICE
=C06+S1

=C04
+R1

=C11
+R2

FUTURE
BD.
F

148

220kV

=C03
+R2

=C12

10
+R1 +R1

FOR

FOR OPTIC
+R2
=D22+R1

=C03

=C13 +R1+R2
BBP

REACTOR
=C05

=D22 =D21

=C02 +R2

=C13
STAIRCASE

PANELS

220kV CABLES
=C02 +R1 +R2

220V

+0250
+R2 F

=D21 +R1

+R1 +R2
=C14

DC
=C05+S1

CHGR./DCDB
MAINTENANCE

=D22+S1

=D20 +R2

=C01+R1

=C14

FRL
=C04
+R1 F

PLATFORM
CRANE

400kV

=C01

=C15
F

=D20
+R1

CONTROL,

=C15

415V
BBP
=D21+S1

WMH

DN

=C04+S1

=D22

=D19
+R2

PANELS

+R2

MAIN
+R1 F

=D19

FUTURE

DIST.
F

=C00+P1

=D18 +R1 +R2

11
BOARD
=D21

=D16
=C03

=C03+S1

=D20+S1

400kV

400kV

400kV
PDM
PROTECTION
F

+R1
=D16+R2

BBF

AVR

PNLS.
F

PROTN.

PNLS.
OFF

ROLLER

=D20

=D15+R1
FUTURE F

=C02

=D19+S1

=D15 =D14

PNLS.

PDM
220kV

DUCT
CABLES
LOADING
CONTROL
TRENCH PANEL
KERB

=C02+S1

(400kV,
REACTOR-

BANK
PNLS.
FUTURE +R2 F

BELOW
X 250 BACK

DOOR

=D14 +R1

+1.760

FOR

EXISTING
CABLE CONTROL
125 ON

ROAD
220kV
+1.700
PLOTFORM

=D19

=D18+S1

N2

BUILDING
&
HVAC

=C01
LAID

FFL

FFL

R
120MVAr)

LV

CYLINDER
=C01+S1

=D13
+R1

12
400kV

1
=D17+S1

O
=D18

=D12
+R1

21kV
FOR

400kV

PANELPNLS.
TRENCH F

REACTOR
+R2
=D11

PROTN.

FIBRE

+1.760

A
COM.
+0.500

=D11
CABLE +R1 F
KERB

PNLS

DIST.

D
=D17

=D09

FFL

UP
ROOM
F

ROOM
X 250 BACK

PNLS.
FRL

BANK

=D16+S1

+R2

=D09
+R1

FUT.
UP 125 ON

DUCT

=D08 +R2

REMOVABLE

ON
LAID
13

D8

=D16

=D15+S1

HOLD
CAB.

=D08
+R1

R
+R1 +R2
=D07

400/220kV

80mm
F

O
BANK

=D15

=D14+S1

=D06

WORKSTATION
OPERATOR

CORRIDOR

PAVING
F

HOUSE

=D06

SCMS

HAND

A
+R1

THK.BRICKS
TRAFO-2

=D05
DUCT

PANELS

D
=D14

+R2

=D05

+1.700
=D13+S1

RAIL
+R1

INTERLOCK
CAB.

BANK

+R2
=D03

FFL
=D13

220kV =D12

+R1
=D03

14
(TYP.)
=D12+S1

FMS
DUCT

=D02 +R2

PNLS.

REACTOR-3
21kV

HIG
400kV
F

HOUSE

CAB.
F
TRENCH

GIS
TRAFO-1

=D02
+R1

FACP

25MVar

IBT
=D01
+R2
FUTURE
CABLE F

=D01
+R1
ROOM
PNLS.
CABLE

220V
=D11+S1

BATTERY-1A
TRENCH
21kV TELECOM

D8
TRENCH

(400MVA,
-2

220V
80mm

=D11

BATTERY
BATTERY-1B
CABLE

PAVING

=D10+S1
SWITCHGEAR

IBT-1

+1.760

REACTOR-2
21kV
21kV

THK.BRICKS

TRENCH

=D10

FFL

X-458816.1
400/220/21kV)

220kV
FUTURE

=D09+S1

25MVar

Y-2888978.5
IBT
INTERLOCK

ROOM
21kV
CABLE
PIT

=D08+S1

FUSE
220V BOX-1
=D09

21kV
(TYP.)

SWITCHGEAR

SWITCHGEAR

960
FUSE
220V BOX-2
=D08

=D07+S1

220V
TRENCH F

336
21kV

+1.760

BATTERY-2A
-3
CABLE

FFL BATTERY-2B
SWITCHGEAR
F

=D07

220V

REACTOR-1
21kV
=D06+S1
CONTROL

ROOM

25MVar

IBT
-1
EXISTING

=D06

STAIRCASE

+0.000
400kV

=D05+S1
O
TRENCH

FRL
D8

A
CABLE
CABLE

=D05

=D04+S1

48V
D
GATE

WORKSHOP

BAT.-
D8 TRENCH
21kV

AR-1304
A

FUSE

1
FUTURE

(400MVA,

=D04

=D03+S1

48V

48V
BOX-1

BAT.-
EX

+1.760

48V FUSE

2
OFFICE

FFL
CAB.
IS

IBT-2

=D03

BOX-2
DUCT

400/220/21kV

220kV
TI

=D02+S1

125 ON
BANK
TRENCH

=D02

PANTRY

DN

UP

LAID
NG

X 250 BACK
=D01+S1
CABLE

KERB
)
R

O
PLOTFORM

=D01
FUTURE
O

TOILET
TRENCH

HW
LOADING

D
CABLE OFF

+0250
FUTURE

FRL
CONTROL

+1.700
+1.760

FFL
400kV
TRENCH

FFL
CABLE

D8
CABLE

TRENCH
21kV DOOR

D8
CRANE ROLLER

SPACE

(400MVA,
MAINTENANCE
PLATFORM PLOTFORM

400kV,

FUTURE

X-458785.2
LOADING

FOR

IBT-3

Y-2888975.6
OFF

REACTOR

400/220/21kV

220kV
BANK TRENCH
DUCT BANK

+0.000
CABLE

665
FRL
CAB. DUCT

)
CAB.

082
AR-1305
D
TRENCH
CABLE

EMERGENCY
DG
CONTROL
UP
CABLES

ROOM
R
KERB 220kV
OPTIC
X 250 BACK

O
FOR
125 ON

A
LAID

D
GOING/FIBER

NEW PALISADE 6 MTRS WIDE GATE


CIRCUITS

80mm

D8

TANK
DIESEL

125
No.

PAVING
10

X 250
THK. BRICKS
PUMP
FIRE HOUSE

LAID
ROOM
INCOMING/OUT

KERB
ON
INTERLOCK
WATER

BACK
R

AY
(TYP.)
D

O
EXISTING
A

A
O

D
R
G
N
TI

BOUNDARY
IS
L EX
AL
W

WALL
Y
AR

FIRE
D

WATER
N
U
BO

TANK
CE

+0.000
N

FRL
FE
K
N
LI
N

X-458749.8
AI

Y-2888949
GRAVEL
CH

150mm

GROUND
SINGLE

WATER
FINISH 20mm

TANK
THK., STONE

674
.3062
SIZE

(TYP.)

X-458744.2
RAS LEGRAIN CIRCUIT

Y-2888923

604
.2390
RO
AD
49
07
107800

490
4
BA
X-458765.3118 PC
O BO
UN
D AR

4200
Y
Y-2889075.9086 JOINT BAY X-458819.1136
86089 5 Nos. CIRCUITS FOR 220kV

1970
INCOMING/OUTGOING/FIBER OPTIC CABLES
Y-2889007.9316
15400
X-458816.5430
X-458763.1150 Y-2889006.6670
Y-2889074.1700 PROPO
1:1 SLOPE
SED PRECAST BOUNDARY WALL
STONE PITCHING 257
31 KEY PLAN
2800

968

1A 1B
+0.450 +0.400 3470 -2.920
GENERAL NOTES:

2000
16400

11263
FGL FGL
6000 FRL STONE PITCHING

0
100
SLOPE
110Ø SPOUT SLEEVE TO FREE R1 1: 1 SLOPE
DISCHARGE TO OUTSIDE (TYP)
+0.500 X-458825.9532
R O A D X-458822.7760 Y-2888980.5490 1) ALL DIMENSIONS ARE IN MILLIMETRES AND ALL LEVELS ARE IN METERS, UNLESS NOTED OTHERWISE.
FGL
-1.560
DUCT BANK FOR SPACE FOR
400kV CABLES Y-2888981.7370
FUTURE 220kV
EXT. GROUND LVL.
CABLE FEEDER IBT-4
56627 2) ALL LEVELS ARE FINISHED FLOOR LEVELS AND IN REFERENCE TO FINISHED LEVELS.
REACTOR-2
EXISTING BOUNDARY WALL

+0.500 (400MVA, 400/200/21kV)

DUCT BANK FOR 220kV


CABLES BELOW ROAD
FGL -1.285 X-458820.6110 X-458853.8770
3) DO NOT SCALE DRAWINGS, FOLLOW FIGURED DIMENSIONS ONLY.

15250

2644
Y-2888980.2220
FRL PROPOSED PRECAST BOUNDARY WALL Y-2888934.3970
21500
SPACE FOR SPACE FOR
FUTURE 220kV FUTURE 220kV
CABLE FEEDER CABLE FEEDER 4) ALL LEVELS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL ENGINEERING AND
REACTOR-3 REACTOR-4
DETAILS DRAWINGS.
+0.500
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SLOPE
6000

FRL +0.375 +0.400


NATURAL SLOPE SLOPE
5) CONTRACTOR TO PROVIDE SHOP DRAWINGS.

1500
FGL FGL
16350 61395 CONCRETE HUMPS

CHAINLINK FENCE
FUTURE CABLE TRENCH
3834 8100 400mm WIDTH Septic Tank
425 4375 4800 6600 6600 6740 425 6755 6600 6600 6650 5250 RIFAA - HAWAR #2
X-458754.5187 R2
IMPORTANT NOTES:

3890
Y-2889050.5683 X-458764.4829 RIFAA - HAWAR #1
3700

3000

+14.060 UP FUTURE CABLE TRENCH

+0.400
T.O.P Y-2889037.6054

5851
R O A D R O A D 1. THE CONTRACTOR TO TEMPORARILY REMOVED ALL MEP

FGL
42508
A SLOPE SLOPE SLOPE SLOPE
SERVICES AND CCTV FROM THE BOUNDARY WALL AND

8000
RWO +0.375 +0.250
SLOPE 80mm THK. INTERLOCK
FRL FRL REINSTATED UPON COMPLETION.
3800

11530
PAVING TILES (TYP.)
SLOPE

R40
E
OP

B 2. THE CONTRACTOR TO REMOVED THE EXISTING PORTA CABIN


SL

00
EXISTING BOUNDARY FENCE TO BE REPLACED BY PRECAST BOUNDARY WALL

T
PI
LE
GROUND LEVELS INSIDE THIS LOWER PLOT AND TRANSPORTED TO EWA SPECIFIED LOCATION ALL AS

AB

SLOPE
R I D G E IN SLOPE

C
AREA OF SUBSTATION SHOULD BE HIGHER

V
0k
DIRECTED.

40

FUTURE CAB. DUCT BANK


FROM OUTSIDE PLOT TO DISCHARGE RAIN
7200

WATER TO THROUGH SPOUT SLEEVES SL


OP
E CAB. PIT
3. THE EXISTING CHAIN-LINK FENCE AND GATES SHALL BE
SLOPE

REACTOR-3 REACTOR-2 REACTOR-1


400kV GIS ROOM (21kV, 25MVAr) (21kV, 25MVAr) (21kV, 25MVAr)
REMOVED BY THE CONTRACTOR AND TRANSPORTED TO EWA
C UPPER ROOF +50mm SPECIFIED LOCATION ALL AS DIRECTED.
SLOPE RWO
+12.860 R O A D
4. THE CONTRACTOR TO COLLECT THE PROCURED ACCESS
1500

SSL SPACE FOR 13000


SLOPE

FUTURE CONTROL SYSTEMS FROM ISSD AND ARRANGED FOR


7200

1000 REACTOR-2 400kV, REACTOR

11450
RWO
E
OP

INSTALLATION AS PER ISSD GUIDELINES.


SL

(400kV, 100MVAr) 21kV IBT 21kV IBT 21kV IBT


R I D G E IN SLOPE
SL

REACTOR-3 REACTOR-2 REACTOR-1


OP

NATURAL SLOPE
E

+0.500 25MVar 25MVar 25MVar R O A D


FGL +10.260 REMOVABLE HAND RAIL X-458785.2665 1500 5. THE CONTRACTOR TO DISMANTLED AND RELOCATED THE
D SL
OP SSL UP
EXISTING PTZ CAMERA AND TEMPORARY GATE EMERGENCY
SLOPE

E
Y-2888975.6082
3105

ALARM SYSTEM TO THE NEW GATE.


SLOPE

+14.060
RWO RWO RWO
T.O.P
E SLOPE
RWO +50mm
RWO

STONE PITCHING
SLOPE SLOPE SLOPE SLOPE SLOPE
UP

CONTROL ROOM & 21kV SWITCHGEAR ROOM LEGEND:


4095

SLOPE

SLOPE

1:1 SLOPE
SLOPE

PE E

SL
O OP
SL SL

OP
LOWER ROOF
E
93412

E
OP

OP
EY
LEY

E
SL
NEW EARTH CABLE TO BE LAID BESIDE THE NEW
SL

LL

R I D G E 1:100 SLOPE

R I D G E 1:100 SLOPE
F VA
VAL

E
BOUNDARY WALL. TAILS TO BE CONNECTED AT

OP
R I D G E IN SLOPE

SL
2705

PULL PIT

VA

SLOPE

VA
REGULAR INTERVALS TO THE RAZOR WIRE.

LL

LL
000

EXISTING R O A D
G
EXTENDED BASEMENT

R2

EY

EY
3x2-200mmØ PIPE SLEEVES
SLOPE

TAILS TO BE CONNECTED AT REGULAR INTERVALS

OFF LOADING PLOTFORM


W/ CONCRETE SURROUNDED SL
4460

OP +7.260

+0.275
E
+7.260 TO THE RAZOR WIRE.
SSL

FGL
3x2-200mmØ SSL
H SLOPE
VA

SL
PIPE SLEEVES
8000

OP
LL
65200

E
RWO EY
425

W/ CONCRETE SURROUNDED
(Typ.) SLOPE RWO
J
3765

+12.560 SLOPE +1.780 +0.125


+200mm
RWO RWO
+200mm +200mm
RWO
+200mm +200mm T.O.P +200mm FFL FRL
SCOPE OF WORKS
K
E

RWO
OP

SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE
SL

SLOPE
3005

NATURAL SLOPE
E E E E E 2000
SL

SL

SL

SL

SL
OP OP OP OP OP
SL SL SL SL SL
L
OP

OP

OP

OP

OP
E

E
-0.580 R I D G E IN SLOPE
R I D G E IN SLOPE

R I D G E IN SLOPE

R I D G E IN SLOPE

R I D G E IN SLOPE
EXT. GROUND LVL. +0.500 220kV GIS ROOM
NATURAL SLOPE FGL
INTERMEDIATE ROOF
NOTES ON SITE LEVEL:
SLOPE

SLOPE

SLOPE

PROPOSED PRECAST BOUNDARY WALL


LEY

EY

EY
SLOPE

SLOPE
±0.000 PROJECT LEVEL INDICATES THE +17.240 OF LOCAL DATUM,
7200

VA
VA

VA
EY

LL

LL
+11.360

105762
SL

LL
LL
VAL

OP
+1.780 FOR EXISTING LEVELS THE CONTRACTOR SHOULD REFER FROM
LL
LL

VA

VA
EY

EY
SSL
EY
VA

FFL
+11.360 TOPOGRAPHICAL SURVEY OF EXISTING PLOT

106930
3-250mmØ & 2-150mmØ
PIPE SLEEVES
W/ CONCRETE SURROUNDED
(Typ.) 400kV GIS ROOM SSL (FOR FILLING AND CUTTING QUANTITIES).
M SLOPE RWO
2340

+12.560 AD DUR - NEW RIFAA FEEDER


UPPER ROOF T.O.P
#1 (MADINAT HAMAD 1)
N +12.860 UP
EXISTING LIGHT POLE TO BE CAREFULLY REMOVED
SSL
E

+0.500
OP
SL

& RELOCATE AFTER NEW ROAD COMPLETED


4860

FGL
SLOPE

SLOPE
ALUMINUM LOUVERS ROOFING WITH ALL AROUND
CLADDING ON STRUCTURAL STEEL SUPPORT (TYP.)
NEW INTERLOCK ROAD
R I D G E IN SLOPE R O A D
SLOP

+12.860
EMBANKMENT NATURAL SLOPE

CHAINLINK FENCE
E

7200

SSL
REACTOR-1 IBT-1 IBT-2 IBT-3
SLOPE

(400kV, 120MVAr) (400MVA, 400/220/21kV) (400MVA, 400/220/21kV) (400MVA, 400/220/21kV)

125 X 150
X-458702.8256 Q SL
OP
E
STANDING KERB
Y-2889010.8335
3840

A 06.01.2021 ISSUED FOR TENDER


SLOPE

+14.060
SLOPE
MA

SLOPE
+0.550 T.O.P
RWO RWO
R X-458750.1721

PE
FGL

SLO
+3.800
SSL
SLOPE OFF LOADING PLATFORM +0.600
+0.300 +0.125
Y-2888948.9097

1:5
+1.780

1500
UP
FGL
PROVISION OF 1 x 150 DIA.

0
FFL FGL FGL

00
+4.300
X-458689.4170
DUCT BANK FOR GUARD

R8
T.O.P 8100
Y-2889016.7740
CAB. DUCT BANK

CAB. DUCT BANK

CAB. DUCT BANK

CAB. DUCT BANK

CAB. DUCT BANK

CAB. DUCT BANK

ROOM TO BASEMENT

00
+0.150
FGL

60
+0.553 (+17.793 NSD LVL)

R1
EXT. MANHOLE TOP LVL +0.700 SLOPE +0.600 SLOPE 80mm THK. INTERLOCK SLOPE +0.300 80mm THK. INTERLOCK SLOPE +0.000 +0.000
R O A D PAVING TILES (TYP.) R O A D PAVING TILES (TYP.)
FRL FRL FRL FRL PROPOSED ROAD LVL
307

WMH X-458751.3480 PE
SLO
.5
Y-2888924.0230 X-458756.3890 1:1
PROPOSED PERMANENT
7

Y-2888916.9270
X-458687.9710
+0.300 +0.125 +0.000 +0.000 8704 SECURITY ROOM
000
FGL FGL FGL PROPOSED ROAD LVL
Y-2889014.0550 R8
HOUSE
TRAFO-2
HOUSE
TRAFO-1 EMERGENCY CONCRETE GROUND
FIRE WATER TANK
PAVING TILES INTERNATIONAL
X-458697.6050 DIESEL TANK DG ROOM WT SLAB
500X500mm ALL AROUND
E

Y-2888984.7430 X-458708.1900 X-458759.8870 Consulting Engineers to the Energy Sector

6487
X-458744.2604
L

SLOPE

FIRE WATER P.O. Box 5922, Manama, Kingdom of Bahrain


EXISTING 11 KV S/S Y-2888900.8730

8523
E

+0.460 Y-2888970.4850 PUMP HOUSE Y-2888923.2390


20
V

EXT. GATE LVL. Tel: (+973) 1770 8118 Fax: (+973) 1770 0115
20

1500X1500X1500(D) X-458744.5040
A

EXISTING GATE SOAKAWAY WITH 600 COVER +0.000


T

Y-2888918.9440
+0.600 17758 +0.075 PROPOSED ROAD LVL.
IO

E
OP
1:3

FGL +0.400 +0.000 SL


PROPOSED DRAIN FGL .5
ISMAIL KHONJI ASSOCIATES
SL

15116 PROPOSED ROAD LVL 1:1


OP

FRL
N

6
CHANNEL 300mm DEEP
E

GROUND
5
83
TRANSFER
X-458751.0960

SLOPE
TANK
-

87

Ø110 RAINWATER PIPE +0.250


Y-2888913.1700
74
B

1:3 SLOPE

+0.770 FROM CHANNEL GRATING FGL NATURAL SLOPE MANHOLE MANHOLE

X-458684.5170 EXT. ROAD LVL. TO MANHOLE & SOAKWAY EXISTING BOUNDARY WA


8998 X-458689.4640 LL 00 R8
000
97

11
Y-2888994.1440 Y-2888986.6280 EXISTING 1000x1000x1000 MANHOLE 00 8
R+0.000 X-458769.1730
BO U600
NCOVER
DARY FENCE TO 0

77
MANHOLE
WITH T

Y-2888871.0680
BE REPLACED BY PR

5
WATER BARRIER/HUMP SHALL BE PROPOSED ROAD LVL

SLOPE
EXISTING R O A D
ECAST BOUNDAR 400 kV TRANSMISSION DEVELOPMENT

A/C IT
UN SE
SOAK PIT
PROVIDED TO PREVENT SPILL WATER

BA
+2.610 SEPTIC TANK

EXT. ROAD LVL.


+1.900
EXT. ROAD LVL. FROM EXISTING ROAD TO SUBSTATION
+1.120 Y WALL X-458734.9590
49656
GATE.
EXT. ROAD LVL.
EXISTING WATER PIPE LIN
E +0.120 110Ø SPOUT SLEEVE TO FREE
Y-2888920.7130
DISCHARGE TO OUTSIDE (TYP)
2009 - 2013
NEW PALISADE 6 MTRS WIDE GATE EXT. ROAD LVL.
-0.590
STUB OUT TO
EXT. ROAD LVL.
-1.010 CONNECT TO PUBLIC SUBSTATION CIVIL WORK
EXT. ROAD LVL. EXISTING WATER PIPE LIN SEWER LINE 22640
E

400 kV & 220 kV SUBSTATION AT RIFFA


CONSTRUCTION OF PERMANENT
1 SITE LAYOUT - SCOPE OF WORKS RETAINING WALL NEW PALISADE 8 MTRS WIDE
BOUNDARY WALL & SECURITY ROOM
GATE & WICKET GATE
SITE LAYOUT - SCOPE OF WORKS