Professional Documents
Culture Documents
GC ST 03
GC ST 03
4200
+3.80
A B
RB2
RB2
RB2
150 THK. SLAB RS1
COPING BEAM ROOF SLAB-RS1
WITH T12-200 T&B
220
RB3 RB3 RB3 RB3 RB3 RB3 WALL PANEL
(REFER ARCHITECTURE DWG.)
RB1 RB1 RB1
A
RB3
+3.80 200 THK. 600 HEIGHT INFILL
RB3 RB1 CONC. BLOCK WALL (TYP.)
RS1 A B B1
RB3
COPING BEAM
6520
RB3 RB3 RB3 RB3
STEEL COLUMN 200 THK BLOCK WALL
(AS PER PEB SUPPLIER)
COPING BEAM
(EL. +3.950 TOC) COPING BEAM
(EL. +3.950 TOC)
3050
B
12mm ISOLATION JOINT
I I
BEAM - GB1
SSL
+0.40 INTERLOCK LVL
+0.20
200
250
250 THK GRADE SLAB COMPACTED
ENGINEERING
- LOWER ROOF FLOOR STRUCTURAL G.A PART PLAN EGL FILL (TYP.)
300
FOOTING LVL
-1.40
PEDESTAL TYP.
WALL PANEL 2 17-05-2023 FOUNDATION HAS BEEN REVISED AS PER PEB HM
WALL PANEL (REFER ARCHITECTURE DWG.) BASE PLATE REACTIONS
(REFER ARCHITECTURE DWG.) BASE PLATE
TOP OF PARAPET 1 07-05-2023 REVISED AS PER PEB REACTIONS AND SITE LEVEL HM
+4.40 ANCHOR BOLT
ANCHOR BOLT
(AS PER PEB DETAIL)
(AS PER PEB DETAIL) 0 09-04-2023 ISSUED FOR CONSTRUCTION HM
SSL 150 THK. ROOF INFILL CONC. 200 THK.
+3.80 SLAB-RS1 BLOCK WALL WITH STEEL COLUMN STEEL COLUMN
(AS PER PEB SUPPLIER) (AS PER PEB SUPPLIER) Revisions Date Description Checked
T12-400 (TYP.)
ROOF BEAM RB1
CLIENT:
STEEL COLUMN
(AS PER PEB SUPPLIER)
250
250
250
+973 17714463 - Fax: +973 17712292 Email:
ikabah@batelco.com.bh PO Box 72, Bahrain
250 THK GRADE SLAB COMPACTED 250 THK GRADE SLAB COMPACTED 250 THK GRADE SLAB COMPACTED 250 THK GRADE SLAB
ENGINEERING COMPACTED ENGINEERING ENGINEERING
EGL FILL (TYP.) EGL ENGINEERING EGL FILL (TYP.) EGL FILL (TYP.) EGL
FILL (TYP.)
300
300
300
300
MEP CONSULTANT:
FOOTING LVL LVL LVL LVL FOOTING
-1.40 -1.40 -1.40 FOOTING -1.40
- SECTION B-B - SECTION B1-B1 - SECTION C-C 2 COATS BITUMINOUS PAINT GRADE "A" MEP CONSULTANT
- SECTION D-D
TYP.
1000 GAUGE POLYTHENE SHEET DESIGN & SUPERVISION
50mm CONCRETE BLINDING License No. EP.BN/177
COMPACTED SUBGRADE UP TO 95% M.D.D Tel. 17382264 : Fax. 17382267
(OR) ON ROCK PO Box 18236, Kingdom of Bahrain
www.sjmmep.com
PROJECT:
200 THK BLOCK WALL/
STIFFENER COLUMN (C1A)
SCHEDULE OF ROOF BEAMS PROPOSED FILLING STATION
BOTTOM TOP at RAS ZUWAYED
SIZE REINFORCEMENT REINFORCEMENT STIRRUPS
BEAM
TYPE REMARKS
WIDTH DEPTH MID CONT END
SPAN SUPPORT SPAN SUPPORT
( mm ) ( mm ) SPAN SUPPORT SUPPORT 250 THK GRADE SLAB TOC
SSL +3.95
RB1 200 400 2T16+2T16 2T16+2T16 2T16+2T16 2T16+2T16 2T16+2T16 T8-200 T8-200 - +0.400
COPING BEAM DRAWING TITLE:
RB2 200 400 2T16 2T16 2T16 2T16 2T16 T8-200 T8-200 - (*NOTE: DEPTH SHALL FIT TO
DEPTH
THE DOOR OPENING)
250
RB3 200 400 2T12 2T12 2T12 2T12 2T12 T8-200 T8-200 -
200 THK BLOCK WALL STRUCTURAL G.A SECTIONS
200
COPING BEAM 200 300 2T12 2T12 2T12 2T12 2T12 T8-200 T8-200 -
200
TIE BEAM 200 2T12 2T12 2T12 2T12 2T12 T8-200 T8-200 - THICKENING - SECTION I-I HM JM
400 150
HM TMS
- SECTION E-E
TMS
DEC
AS SHOWN 2 2021
*
c GC-ST-03 1315