O P Q R 21 LOUVER DOOR
AS PER EDD
22 3. DRAWING IS NOT TO BE SCALED, THE CONTRACTOR IS TO WORK TO FIGURED
STANDARD DIMENSIONS ONLY.
4. UNLESS SHOWN OTHERWISE ALL MEMBERS ARE PLACED SYMMETRICALLY ABOUT
4157 4167 X
GRID LINES.
5. ALL DIMENSIONS SHOWN IN THE DRAWINGS ARE TO BE VERIFIED ON SITE BY THE
4080 4090 CONTRACTOR PRIOR TO COMMENCEMENT OF THE WORK.
20
620 300 300 6. CONTRACTOR TO PREPARE SHOP DRAWINGS AND TO BE SUBMITTED FOR
ENGINEER'S REVIEW & APPROVAL.
7. FOUNDATION HAS BEEN DESIGNED FOR SBC 150 kPa
TOP OF CONCRETE TOP OF CONCRETE
+2.70 +2.70
COPING BEAM
2300
AS PER REQUIREMENT
RETAINING WALL T12-200 (V)
FOOTING
X T10-200 (H)
250
AS PER PLAN
2500
2500
BEAM
OUTSIDE
2500
2500
OUTSIDE
2500
ROAD LEVEL
VARY
REQUIREMENTS
-0.290 RETAINING
-0.190 RETAINING WALL - RW1
AS PER
WALL - RW3
WALL - RW4 Revisions Date Description Checked
GROUND BEAM
GROUND BEAM -0.590 EGL EGL CLIENT:
FOOTING -1.000 -1.003 -1.400 VARY (-1.324)
FOOTING EGL
-1.600
250
250
VARY (-1.658)
2300
250
2 COATS BITUMINOUS PAINT
TYP.
500
RETAINING OUTSIDE OUTSIDE -0.40 INTERLOCK/DRIVE WAY LEVEL
WALL - RW1 +0.20
RETAINING ROAD LEVEL
WALL - RW5 800 VARIES
RETAINING
300
RETAINING
WALL - RW1
WALL - RW2
EGL EGL 2 COATS BITUMINOUS PAINT -0.40 DRAWING TITLE:
VARY (-1.540) -0.900 GRADE BEAM INDICATIVE ONLY.
TYP.
1750 1750
2000 - SECTION I-I HM JM
- SECTION G-G
- SECTION D1-D1 SECTION E1-E1
- SECTION F-F -
HM TMS
TMS
DEC
AS SHOWN 1 2021
*
c GC-ST-BW-02 1315