You are on page 1of 2

NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY

Engineering – Architecture Department


ARCHITECTURAL DESIGN 4

MAJOR PLATE

TITLE: A Proposed Level II Hospital (65 BED CAPACITY)

DATE GIVEN: March 16, 2023

DUE DATE: April 13, 2023

MODE:

SITE DESCRIPTION

Parcel Land allotted for this project has a total area of 10,071 sqm or 1.071 hectares bounded by roads on two sides
– 8.00m RROW on North side and 3.00m RROW on East side. Vacant land on its South side and Commercial on
Left.

Point Bearing Distance (Meters)


1-2 N 86°57’ E 95.77
2-3 S 9°13’ E 64.57
3-4 S 2°42’ E 26.48
4-5 S 5°36’ E 3.79
5-6 S 78°28’ E 100.3
6-1 N 4°53’ W 109.32
DRAWING REQUIREMENTS:

1. Space Programming
2. Floor Plan/s 1:200
3. 4 Elevations 1:200

RESEARCH REQUIRMENTS:

1. Concept Schemes
2. Site Analysis
3. Zoning
4. Bubble Diagrams/Matrix Diagram
5. Planning Schemes

RESEARCH PAPER ON:

 DOH Guidelines for Level II Hospital Planning and Design


 Ordinances and Laws relevant to Hospital Design
 Ideal Architectural Approach and Materials to use for Hospital Designs both for Indoor and Outdoor Spaces

TIMELINE OF SUBMISSIONS:

1. Mar. 21 – Lot Bearing and Description


2. Mar. 23 – Research Paper
3. Mar. 24 – 1st Progress Submission (At least with draft concept and initial information from researches, and
Draft Layout)
4. Mar. 30 – Consultation (Should have Building Plan already including Space Programming)
5. Mar. 31 – 2nd Progress Submission (Should have Elevation intent)
6. April 7 – Final Consultation, and most of the Drawings are translated to 20x30 already
7. April 13 – PLATE # 1 SUBMISSION DATE at 5:00PM

Notes:

 The students will formulate their own Design Objectives and Design Considerations based on the project
objectives.
 Use cartolina size linen for the final drawings
 Studies and schemes relating to the project will be done as class activities and considered as esquisses and
seat works.
 Other details in the space requirements will be provided by the students.
 TECHNICAL DRAFTING and COLORED PRESENTATION
 The design Critique will be conducted after the submission of this plate and will serve as recitation grade.
 NO LATE PLATES WILL BE SUBMITTED