Professional Documents
Culture Documents
SHRI H. H. J. B POLYTECHNIC,
CHANDWAD-423101 (Nashik)
MICRO PROJECT
Academic year: 2022-23
TITLE OF PROJECT
CERTIFICATE
This is to certify that name: 1) Wagh Om Santosh , Roll no: 29, 2) Kunal Govind
Tadge Roll no.26, 3) Samyak Deepak Sancheti Ro llno 21, of 3rd Semester of
Diploma in Civil Engineering of Institute, SHHJB POLYTECHNIC,
CHANDWAD (Code: 0079) has completed the Micro Project satisfactorily in
Subject Advanced Surveying (22301) for the academic year 2022- 2023 as
prescribed in the curriculum.
Place: CHANDWAD
Date:
INDEX
a)
Part A
2. Course Outcomes 4
3. Action Plan 4
6. Skill Developed 5
Part B
9. Practical 10-11
PART A-Plan
➢ PART B-Plan
I)Traversing Method.
1. Alidade
2. Plumbing fork with plumb bob
3. Spirit level
4. Trough compass
5. Drawing sheets and accessories for drawing.
page 8
1. Alidade
It is a straight edge ruler having some form of sighting device. One edge of the
ruler is bevelled and is graduated. Always this edge is used for drawing line of
sight. Depending on the type of line of sight there are two types of alidade:
Plain alidade
Plumbing Fork
page 9
3. Spirit Level
A flat based spirit level is used to level the plane table during surveying. To get
perfect level, spirit level should show central position for bubble tube when
checked with its positions in any two mutually perpendicular directions.
Sprit Level.
4. Trough Compass
It consists of a 80 to 150 mm long and 30 mm wide box carrying a freely
suspended needle at its centre. At the ends of the needle graduations are marked
on the box to indicate zero to five degrees on either side of the centre. The box is
provided with glass top to prevent oscillation of the needle by wind. When needle
is centred (reading 0–0), the line of needle is parallel to the edge of the box. Hence
marking on the edges in this state indicates magnetic north–south direction.
Trough Compass.
page 10
9.0 Practical:
5 sided close traverse survey using plane table surveying by traversing method.
I) Resources required.
II) Procedure.
1. Collect the required instruments as per resources required table.
2. Select the station points A, B, C, D and E in such a way that adjoining stations
are intervisible from the instrument station.
3. Set up the plane table over the station A and perform temporary adjustment i.e.
levelling and centering of the table. Mark north direction with trough compass at
right top corner. Simultaneously Transfer Station A from ground to sheet as ‘a’.
4. With alidade touching station ‘a’, bisect the ranging rod at station B. Measure
distance AB on ground and mark the position ‘b’ on drawing sheet.
5. Shift the instrument at station B and perform temporary adjustment and
orientation by back sighting or magnetic meridian method. And continue the same
procedure at C, D and E.
6. Return the instrument to survey store.
page 11
IV) Observations
Sr.No. Line On sheet (cm) On ground (m) Error
1. PQ 21.60 21.77 +0.17
2. QR 12.00 11.57 -0.43
3. RS 21.60 21.70 +0.10
4. SP 12.00 11.60 -0.40
CUMULATIVE ERROR =-0.56
VII) Conclusion
i. This method of survey is not much accurate.
ii. Man made errors may occur in this type of survey.
iii. This survey is not much very accurate.
page 12
Survey Bungalow
page 13
Comments / Suggestions about team work / leadership / inter – personal communication (if
any)-
___________________________________________________________________________
Signature:-