MAHARASHTRA STATE BOARD

OF TECHNICAL EDUCATION
(MSBTE)

GOVERNMENT POLYTECHNIC YAVATMAL


Dhamangaon Road, Yavatmal-445001

DEPARTMENT OF
CIVIL ENGINEERING

ADVANCED SURVEYING (ASU-22301)

Branch: CIVIL ENGINEERING Scheme: ‘I’ Scheme

Year: SECOND YEAR Sem:3nd (CE-3I)

Micro Project Title


"COLLECT INFORMATION ABOUT THEODOLITE AAND AND HOW TO
PERFORM AND MEASURE HORIZONTAL ANGLE CORRECTLY DIRECT
METHOD ’’

GUIDED BY
MISS.P.K.ANASANE
GROUP MEMBERS
Roll No.: Name of Student Sign
20CE07 SAURABH BHURE
20CE08 SAMEER BOBDE
20CE09 PRASAD BURKULE
20CE10 HARSHAL CHAVHAN
20CE11 PRASAD CHAVHAN
20CE12 PRIYANSHU
DAMBHARE
GOVERNMENT POLYTECHNIC, YAVATMAL

Certificate
This is certified that the Micro-project report entitle ‘‘PREPARE A REPORT ON
Collect information about theodolite and how to perform and measure
horizontal angle correctly by direct method. of the subject
Advanced Surveying of Diploma in Civil Engineering.
In the partial fulfillment for the award of Micro project work as prescribed by
Board of Technical Education, Mumbai for the academic year 2021 - 2022

Submitted by

Roll No.: Name of Student Enrollment


No.
20CE07 SAURABH BHURE 2001350097
20CE08 SAMEER BOBADE 2001350342
20CE09 PRASAD BURKULE 2001350175
20CE10 HARSHAL CHAVHAN 2001350233
20CE11 PRASAD CHAVAHAN 2001350183
20CE42 PRIYANSHU DAMBHARE 2001350008

Miss P.K.Anasane Dr.S.J.Patil


Guide Head of Department
Lecturer Department of Civil
of Civil Engineering Engineering

. Dr.R.P.Mogre sir
Principal
G. P. Yavatmal
GOVERNMENT POLYTECHNIC
YAVATMAL

Certificate
This is to certify that Mr./ PRASAD ARUN BURKULE.

Roll No.20CE09 , of Second Semester of Diploma in Civil Engineering of Institute,

Government Polytechnic Yavatmal has completed the Micro-Project in course

AdvancedSurveying (22301) for the academic year 2021 to 2022 as prescribed in the

curriculum. 

Place: UMARKHED Enrollment No.:2001350175


Date: __________

Miss. P.K.Anasane Dr.S.J.Patil Dr.R.P.Mogre Sir


Course Teacher Head of Department Principal
ACKNOWLEDGEMENT

It is an incident of great pleasure for us submitting this micro project I take this
opportunity to express our deep sense of gratitude & great thanks to my guide Miss
P.K.Anasane and head of department. Dr.R.P.Mogre sir , who has been a constant
source of guidance and inspiration of thoughts.
I will always be grateful to them for the encouragement & suggestion given by
them from time to time. I would like to thank all the teaching members of civil
engineering department & sincere thanks to our principal Dr.R.P.Mogre sir who always
inspire us.
I also thankful to our friends & library staff members who’s encouragement
Suggestion helped us to complete our micro project. Last but not least I thankful to
my parents whose best wishes are always with me.
Annexure-1
PART-A Micro-project Proposal

TITLE: -
 Collect information about theodolite and how to perform and measure horizontal angle
correctly by direct method.

1.0 Aims/benefits of the micro project :-

 The Aim of this project is to the study about the theodolite surveying.

2.0 Course Outcomes : -


 Prepare a plans using theodolite surveying.

3.0 Proposed Methodology:-


To create a micro project on guidelines required for good presentation firstly
micro project after collecting all required materials we started our work. We
visited so many Website for collection extra information about the given micro
project. Firstly we visited on Google and started searching information after
sometime we got one pdf based on road and road components we take this pdf
and started creating our micro project. Each group member divides the work
and on specific date we collect data from each group member. From all
members we got some useful information for creating our micro project. We
collect all information and merge into one ppt to get our micro project ready.
Then we all of we referred some books and also searched on internet related to
our micro project, we used this information for creation of our micro project.
Then we started writing a report of project

We also referred some websites and books:

http://textbook.in
http://niraliprakashan
http://classroom
4.0 ACTION PLAN-

SR.
NO. WEEK ACTIVITY PERFORMED SIGN OF GUIDE DATE
1 1st Discussion and finalization of topic 04/10/2021
Preparation and submission of
2 2nd 16/10/2021
Abstract
3 3rd Literature Review 24/10/2021

4 4th Collection of Data 30/10/2021

5 6th Discussion and outline of Content 14/11/2021

6 7th Formulation of Content 20/12/2021

7 8th Editing and proof Reading of Content 28/12/2021

8 9th Compilation of Report And Presentation 12/12/2021

9 11th Viva voce 26/12/2021

10 12th Final submission of Micro Project 30/12/2021

5.0 Resource Required


Sr. No Name of Resources Specification Quantity
1 Computer System i3 -i5 preferable ram 4 GB 1
2 Pages A4 Size Page 28
Annexure-ll
PART-B Micro-project Report

TITLE: -
 Collect information about theodolite and how to perform and measure horizontal angle
correctly by direct method.

2.0 Aims/Benefits in the Micro Project:


 The Aim of this project is to the study about the theodolite surveying.

3.0 Course Outcomes


 Prepare a plans using theodolite surveying.

4.0 Literature Review:-


Sr.N
Title Of Book Author Publication
o
NIRALI
PRAKSHAN
ADVANCED abhyudaya pragati,
1 S. V. GOSAVI
SURVEYING
1312 shivaji nagar.
Pune. 411005
SAINATH
VITHOBA.K.KOMAWA
2 SURVEYING PUBLICATION
T
PUNE 411005
THEODOLITE NIRALI
3 SANJAY MAHAJAN
SURVEYING PRAKASHAN.
TECHMAX
4 BASIC SURVEYING V. K. KUMAWAT
PUBLICATION
5.0 Actual Methodology Followed:-
To complete this Micro project we all together as a group started
searching for topics and content, then we decided the topic which was
followed by distribution of work to each group member we confirmed are
Micro project from are responsible Miss. P.K.Anasane and completed the
task containing Annexure1,2, Certificates, methodology .
INTRODUCTION

The theodolite is instrument designed for measurement of horizontal angle and vertical angles upto
10" or 20" least count depending upon the instrument. It is most precise instrument in
surveying.Because of its various uses the theodolite is sometime also known as universal instrument. It
is consist of movable telescope that can rotate and pivot on the horizontal and vertical axes the
angular measurement can be used to take distance and other measurement indirectly using
trigonometry.

DEFINITION

the system of surveying in which the angles are measured with the help of a theodolite is called
theodolite surveying.

1.1 TYPES OF THEODOLITE

The theodolites may be primarily of two types :

1) Transit theodolite
2) Non-transit

 Transit theodolite : A theodolite in which the telescope can be revolve through complete
revolution about it's horizontal axis in vertical plane is known as transit theodolite.

 Non-transit :In this type of theodolite the telescope can not be revolved in the vertical plane.
 COMPONENT PART OF TRANSIT THEODOLITE SURVEYING
1. Tribrach and Trivet.
2. Footsscrews
3. Clamping screws for centering
4. Lower plate.
5. Graduated arc
6. Upper plate
7. Standards
8. Telescope

9. Horizontal axis

10.Verniers

11.Vertical circle

12.Tripod top

13.Vernier frame

14.Arm of circle clamp

15.Plate levels

16.Vernier circle clamping screws

17.Level on vernier arm.

18.Hook of plumb bob

19.Axis of bubble

20.Lower plate clamp

21.Upper plate clamp


 TEMPORARY ADJUSTMENTS

The temporary adjustment have to be carried out at every setup is the instrument before
taking observations with the theodolite.

i) Setting up the theodolite over a station


ii) Levelling up
iii) Focussing of eyepiece and
iv) Focussing of object glass to remove the parallax

i. Setting up :

ii. setting up of theodolite include :


a) Centering it over a station point, and
b) Levelling it approximately by the tripod legs only.

II. Levelling up :

Accurate leveling is done with reference to the plate level (S) by


Means of foots screws. The object levelling is to make the vertical axis truly vertical.

III. Focusing the eye piece :


the object of focusing the eye piece is to make the cross - hair on diaphragm distinct and clear. To do
this, direct this telescope towards the sky or hold a sheet of white paper on front of the object glass,
and move the eye piece circumferentially or in or out until the cross -hair are seen sharp and black.

IV. focussing of object glass :

The object of focusing the object glass is to bring it the image of the object formed by the object glass
exactly in the plane of cross -hair. If not done accurately, there will be an apparent moment of the
image relatively to the cross hairs when the observer moves his eye up and down. This effect is known
as parallax. The parallax can be removed by sharp focusing until the image appears sharp and clear.

1.2 USES OF THEODOLITE

The Theodolite is use for various purpose such as :


1. Measuring horizontal angle.
2. Measuring vertical angle.
3. Measuring deflection angle.
4. Measuring magnetic bearing of line.
5. Ranging the Line.
6. Prolonging the survey line.
7. Setting out curves.
8. Establishing grades.
9. Determination of difference in elevation.

PROCEDURE

1. Collect the required instrument as per table from the store.


2. Set up the tripod over the given station O and fix the theodolite over it.Perform Approximate
levelling by tripod stand.
3. Perform centering by using plumbing.
4. Perform accurate levelling by using foot screws.
5. Focus the eye piece and make cross hairs clear and distinct.
6. For removal of parallax, do focusing the object glass.
7. Set the horizontal circle vernier A to 00° 00' 00''and at 180° 00' 00'' accurately using upper
tangent screws. I
8. Unclamp the lower clamp and bisect A approximately, clamp lower clamp. Using lower
tangent screws bisect the object With face left precisely.
9. Unclamp upper clamp, Swing the telescope in clockwise direction and bisect the object on
forward direction . B approximately. Clamp upper clamp. Using upper tangent screws bisect B
precisely. Take reading at the vernier A and B
10. Repeat Average of face left and face right is the required horizontal and AOB.
11. Return the instrument to the survey store .

PRECAUTIONS

1. Temporary adjustment are done precisely.


2. Bisect A and B precisely.
3. Read the verniers accurately.
4. Enter the reading in the approximate columns.
6.0 Actual Resource Required:

Sr.No Title Of Book Author Publication

1 THEODOLITE SURVEY SANJAY MAHAJAN nirali prakashan

2 ADVANCED SURVEY S. V. GOSAVI nirali prakashan

VITTHOBA K.
SURVEYING techmax publication
KOMAWAT

BASIC SURVEYING V. K. KOMAWAT techtmax publication

7.0 Output of Micro-project

To complete this Micro project we all together as a group started searching for
topics and content, then we decided the topic which was followed by distribution of
work to each group member we confirmed are Micro project from are responsible
Miss P.K Anasane Mam and completed the task containing Annexure1,2,
Certificates, Acknowledgement, Rationale, And Course Outcomes.

8.0 Skill developed:

 We are able to learned about theodolite surveying.