You are on page 1of 2

COLOURBOARD SELECTION

External – TAN Scheme

Brick Roof Tiles Timber Cladding (if applicable)


Austral Bricks Bristle – Designer Haymes UVEX Stain

Render #1 Render #2 (if applicable) Gutter/Fascia/Capping


Haymes Haymes Meterbox/Downpipes
Colorbond

Aluminium Frames Front Entry Door Garage Door


Colorbond Haymes Colorbond

Mouldings/Timber Posts/Cladding dependent on Façade.

Disclaimer:

The colours and finishes for the images and product swatches in this brochure may vary due to paper, printing processes and photographic
lighting. Please allow for variation in colour, shade and effect for natural products specified. This will not be deemed as faulty.

- Refer to Upgrade Specifications for Contract Inclusions. Upgrade Inclusions/Contract overrides any Colourboard items.
- Refer to plan for relevance of colour items.

Should any item(s) or materials(s) used in Construction of the works not be available for use after a period, the builder reserves the right to
substitute any item(s) and/or material(s) should it become discontinued, faulty and or supplier changed; no variation will be provided for
substitutions. The Builder will select item(s) and/or material(s) of similar quality and/or colour but cannot guarantee exact match of previous
selected.

Customer Signature
UPGRADE OPTIONS
External – TAN Scheme

Colorbond Roof Driveway Driveway


Coloured Concrete Exposed Aggregate

Timber Look Garage Door Front Entry Timber Stain Door


Decowood Haymes UVEX

Mouldings/Timber Posts/Cladding dependent on Façade.

Disclaimer:

The colours and finishes for the images and product swatches in this brochure may vary due to paper, printing processes and photographic
lighting. Please allow for variation in colour, shade and effect for natural products specified. This will not be deemed as faulty.

- Refer to Upgrade Specifications for Contract Inclusions. Upgrade Inclusions/Contract overrides any Colourboard items.
- Refer to plan for relevance of colour items.

Should any item(s) or materials(s) used in Construction of the works not be available for use after a period, the builder reserves the right to
substitute any item(s) and/or material(s) should it become discontinued, faulty and or supplier changed; no variation will be provided for
substitutions. The Builder will select item(s) and/or material(s) of similar quality and/or colour but cannot guarantee exact match of previous
selected.

Customer Signature

You might also like