MPT JO Phase 5.

3 Project-DLD

M3.6-Pure Solar-Add 3xZXD3000+3techDG+DCPD7


LTE-M3.6-Pure Solar Add 3xZXD3000+3techDG+2xMCB

G142, B211

R154,G202, B60

R68,G200, B245
M3.6-Pure Solar-Add 3*ZXD3000+DG+DCPD7
LTE-M3.6-Pure Solar-Add 3*ZXD3000+DG+2*MCB
ØPure solar Site.
Existing Solar + Battery (off-grid) Scenario ØAdd DG and ACDB(with ATS) and DCPD, reuse existing power
cabinet, battery and solar panels.
M3.6-Pure Solar-Add 3*ZXD3000+DG+DCPD7
-48Vdc Description Qty
Existing Solar Panel
-48Vdc Rectifier Module 3*3KW
ACDB(with ATS) 1
Genset[1] 1*20KVA(Low Noise Type)
Rectifier & Equipment 2V Battery Cabinet
Cabinet(SF01) DCPD for DC distribution 1*DCPD7A

2V Battery Cabinet LTE-M3.6-Pure Solar-Add 3*ZXD3000+DG+2*MCB


Description Qty
New configured Power solutions for upgrade Rectifier Module 3*3KW
3*25
+1*16 mm2 2*16mm2(+) ACDB(with ATS) 1
Plug in 2*16mm2(-)
Genset[1] 1*20KVA(Low Noise Type)
3*25
+1*16 mm2 DCPD DCPD for DC distribution[1] 1*DCPD7
Genset
ACDB(with ATS) 3*ZXD3000 Remark:
[1] For “M3.6-Pure Solar-Add 3*ZXD3000+DG+DCPD7 ”, scenario use DCPD for DC
AC Energy DC Energy distribution comes from RAN scope, the DCPD7 to be connected to LVD1.

© ZTE Corporation. All rights reserved


2
1.1 New 3*ZXD3000 SMR Installation

1.Lift the handle and 2.Push inward


loose slowly

3.Secure and tighten


the bolts

Note: After dummy cover of the SMR was take out, need to put dismantle list and give to customer.

© ZTE Corporation. All rights reserved


3
1.2 New 3*ZXD3000 Parameter Settings

Press and hold query key of SMR for


5 second
Change number
value( #04,#05,#06)
according to actual
SMR installed slots

© ZTE Corporation. All rights reserved


4
2.1 Installation DCPD7

Change 2 LLVD1 breakers for DCPD7 with 2*63A

LLVD1 LLVD2

Blue-2*16mm2 or
2*25mm2 power cable (+)Ve busbaar

Black- 2*16mm2
power cable
Install new DCPD7

DCPD7
Yellow-green
Equipment cabinet 16mm2cable
Grounding bar
© ZTE Corporation. All rights reserved
5
2.2 Replace Breaker for DCPD7

§ If existing free breaker capacity for new DCDP7 is less than 63A, must replace with new 2*63A capacity
breakers at LLVD1 for 2 sources as following steps,
i. Power Off existing power cabinet’s battery breakers and AC breaker for safety in PEW time
window.
ii. Take out the cover of existing DC distribution rack.
iii. Loose the screw of each breakers and a little bit take out breakers connection copper bar.
iv. Dismantle existing breaker and replace with new 63A breaker systematically one by one.
v. Tighten the screws of all breakers.
vi. Check internal power cable to breakers and breakers connection copper bar are loose or not.
vii. Power On AC breaker, battery breakers, DC distribution breakers, one by one carefully.

Remark:
Situation 1: If existing breaker is free enough for new DCPD7, replace with new 2*63A capacity breakers at
LLVD 1 for 2 sources.

Situation 2: If existing breaker is no free or only one breaker for new DCPD7, shift existing load cable
(which must be small load current and regional customer agreed) to new DCPD7.
© ZTE Corporation. All rights reserved
6
2.3 Replace Breaker for DCPD7

(ii) Take out cover


(i) Power OFF (iii) Loose the screw and
breaker connection bar

LLVD1
(vii) Power ON
one by one

(vi) Check internal power cable (v) Tighten breaker screw


(iv) Replace with new 63A
and breakers connecting bar
breaker for 2 sources at LLVD 1
is loose or not

© ZTE Corporation. All rights reserved


7
3.1 Installation DCPD7A

Change 1 LLVD1 breaker and 1 LLVD2 breaker for DCPD7A with 2*63A

LLVD1 LLVD2

Blue-2*16mm2 or
2*25mm2 power cable (+)Ve busbaar

Black- 2*16mm2
Install new DCPD7A power cable

DCPD7A
Yellow-green
Equipment cabinet 16mm2cable
Grounding bar
© ZTE Corporation. All rights reserved
8
3.2 Replace Breaker for DCPD7A

§ If existing free breaker capacity for new DCDP7A is less than 63A, must replace with new 2*63A
capacity breakers at LLVD1 and LLVD2 for 2 sources as following steps,
i. Power Off existing power cabinet’s battery breakers and AC breaker for safety in PEW time
window.
ii. Take out the cover of existing DC distribution rack
iii. Loose the screw of each breakers and a little bit take out breakers connection copper bar.
iv. Dismantle existing breaker and replace with new 63A breaker systematically one by one.
v. Tighten the screws of all breakers.
vi. Check internal power cable to breakers and breakers connection copper bar are loose or not.
vii. Power On AC breaker, battery breakers, DC distribution breakers, one by one carefully.

Remark:
Situation 1: If existing breaker is free enough for new DCPD7A, replace with new 2*63A capacity breakers
at LLVD 1 and LLVD2 for 2 sources.

Situation 2: If existing breaker is no free or only one breaker for new DCPD7A, shift existing load
cable( which must be small load current and regional customer agreed) to LLVD1 and LLVD2 of new
DCPD7A.
© ZTE Corporation. All rights reserved
9
3.3 Replace Breaker for DCPD7A

(ii) Take out cover


(i) Power OFF (iii) Loose the screw and
breaker connection bar

LLVD1 LLVD2
(vii) Power ON
one by one

(vi) Check internal power cable (v) Tighten breaker screw


(iv) Replace with new 63A
and breakers connecting bar
breaker for 2 sources at LLVD1
is loose or not
and LLVD2

© ZTE Corporation. All rights reserved


10
4.1 Cabling Requirement

For cables between cabinets must through wave pipe, for cables along
outside cabinet or under ground must through PVC pipe and wave pipe.

For the PVC pipe or wave


pipe port must be seal
with insulated tapes

© ZTE Corporation. All rights reserved


11
4.2 Cabling Requirement

For the Cabinet of


(DG/ATS/ACDB/SF01/B
attery) cabling holes,
must be sealed with
muds or other object
perfect to prevent the
mouse. And make sure
no cable exposed
outside the cabinet.

© ZTE Corporation. All rights reserved


12
Internal use only▲
5.1 Connect AC power cable
Connect the AC input cable from mains PDB to ACDB cabinet, then connect ACDB output AC to power
Cabinet.

Cable Name End A End B Cable type

AC power cable ACDB: LOAD OUTPUT TERMINAL SF01 POWER CABINET AC INPUT MCB (3+1) 25mm2 AC cable

AC power cable DG: LOAD OUTPUT TERMINAL ACDB: DG INPUT TERMINAL (3+1) 25mm2 AC cable

1. Inside cabinet all breakers are OFF;


2. Utility mains PDF MCB is OFF;
3. Remove SF01 power cabinet AC input cover.

© ZTE All rights reserved


13
5.2 Making Terminal Cable
SF01 UIB/GMU terminal cable

DG/ ATS(ACDB) terminal cable

© ZTE Corporation. All rights reserved


14
6. Gisel generator and ACDB with ATS installation Internal use only▲

6.1 Install DG and ACDB with ATS at designed position, connect PE cable to ground bar from DG.
6.2 Connect related signal cable of DG and ATS

Cable Name End A End B Cable Type

Genset – SF01 GMU RS485 DG terminal RS485 XT1-A/B- GMU RS485-1 A/B 1 pair of 8-core 100Ω
(SF01-DG) 18/20 unshielded net cable
Genset Start/Stop Control Cable SF01 UIB X7-NO7/COM7 ATS Terminal Bar X1-A37/B- 1 pair of 8-core 100Ω
(SF01-ATS) (Must Remove Default unshielded net cable
connector)
Genset Start/Stop Control Cable ATS Terminal Bar X1-5A/24A Genset Terminal Bar XT1- 1 pair of 4 core 1sqmm
(ATS-Genset) 5/24
Mains Failure ATS Terminal BarX1-D1/D2 SF01 UIB-X9 S1/48VP 1 pair of 8-core 100Ω
(SF01-ATS) [M failure] unshielded net cable
Water Fuel water alarm DG terminal-XT1 94/95 SF01 UIB-X10 E1/48Vp 1 pair of 8-core 100Ω
(SF01-DG) [FUEL_W_ALM] unshielded net cable
Water level Alarm DG terminal-XT1 98/99 SF01 UIB-X10 E2/48V 1 pair of 8-core 100Ω
(SF01-DG) [WATERLOG_ALM] unshielded net cable
© ZTE All rights reserved
15
6. Gisel generator and ACDB with ATS installation Internal use only▲

6.3 Connect related power cable of DG and ATS


Connection as below:

Cable Name End A End B Cable Type


Charger DC power SF01 LVD2 breaker(>10A)/ DG termainal XT1 DC48-/DC48+ 2 core of 1.5sqmm cable
cable-48V SF01 positive bar
(SF01-DG)
ATS controller DC ATS terminal bar X1-(1+/1-) DG terminal XT1 DC12V-(2/5) 1 pair of 4 core 1sqmm
power cable
(ATS-DG)

© ZTE All rights reserved


16
6. Gisel generator and ACDB with ATS installation Internal use only▲

6.4 All related power cable, signal cable connection


Must Remove connector 8-core unshielded SF01 UIB X7-NO7/COM7
cable
SF01 UIB-X9 S1/48VP

8-core unshielded
SF01 UIB-X10 E2/48VP
ATS

cable
SF01 UIB-X10 E1/48VP

GMU RS485-1 A/B


2 5 5 24
C 4-core 1sqmm cable
TO 48V breaker(2-core 1.5sq mm cable) 24A 5A 1- 1+

DG
© ZTE All rights reserved
17
7. Operation and Testing

DG and ATS controller para setting


Remember to use the enter to save para setting, and double check after modification.

© ZTE Corporation. All rights reserved


18
7. Operation and Testing

DG test
Step 1: Step 2:

Step 3:

© ZTE Corporation. All rights reserved


19
8. Implementation

Parameter Setting
Battery type 2:Deep Cycling Batt
Tank Shape-1# 1:Cube (1) After power on the SF01 system, need to
Length:1800mm configure the parameters in the CSU as shown
Tank Feature-1# Width:0900mm
Height:0620mm
M3.6-Pure Solar-Add 3ZXD3000+DG+DCPD7 and
Battery Cap.-1#-2# 1000AH LTE-M3.6-Pure Solar Add 3ZXD3000+DG+2MCB
Date/Time According to actual sites.
Chg. Curr. Coeff 0.1
DG.Start.Voltage 48
(2). Need to call PGD power engineers to cross
DG.Start.SOC 50% check.
Gen.St.Dis.Dura 2880
AC.LT.Chg.Intv. 30
AC.LT.Chg.Dur. 600
Gen.Power-1# 20KVA
AC.Start.SOC.En. 0:Disable
AC.Stop.Cur.En. 1:Enable
AC.Stop.Volt. 56.4
Min.DG.Run.Dura. 60
AC.In.Scenario.Mains and DG 2: DG
Max.AC.Run.Dura. 180
MODEM Exist No
Net Source ETHO
Local IP Mode 0:Static
Local IP refer to IP planning
Mask refer to IP planning
Gateway refer to IP planning
© ZTE Corporation. All rights reserved
20
9. Power cabinet Signal interface introduction Internal use only▲

© ZTE All rights reserved


21
Internal use only▲
9. Power cabinet Signal interface introduction

© ZTE All rights reserved


22
9. Power cabinet Signal interface introduction Internal use only▲

© ZTE All rights reserved


23
9. Power cabinet Signal interface introduction Internal use only▲

Environmental detection, temp, door magnetic are in UIB and CSU board.

© ZTE All rights reserved


24
10. Site Cleaning

Ø Make related labels.

Ø Checking the all equipments are working in normal as per the check list.

Ø After finish all work, clean the site.

Ø Inform MOC, and then leave the site.

© ZTE Corporation. All rights reserved


25
Thank you