Cake Plant Utility Shutdown Guideline

Date : _March 13, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 06:00pm
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 06:00pm
Chilled water return pump no.1 06:00pm
Cooling water pump no.1 06:00pm
Cooling tower fan no.1 06:00pm
Air compressor no.13 Turn OFF Not in use
Air compressor no.16 Turn OFF Not in use
Air compressor no.17 06:00pm
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 06:00pm
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) Do not Turn OFF 24hrs PM in oven area
Air dryer 06:00pm
Air handling unit no.1A (Mixer) 06:00pm
Air handling unit no.3 (Line 1) 06:00pm
Air handling unit no.4 (Line 1 Multipack) 06:00pm
Make-up air unit 1 (Standby) Turn OFF Not in use
Air handling unit no.2A (Standby) Turn OFF Not in use
Air handling unit no.2B (Line 2) 06:00pm
Make-up air unit 2 Turn OFF Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Start-up Guideline
Date : _March 14, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to start-up utilities equipment or adjust start-up schedule. Shift Lead 0500H
Assign EN personnel to start-up all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Start-up the following:
Chiller no. 3 (Midea) 04:00am 4:00 AM
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 04:00am 4:00 AM
Chilled water return pump no.1 04:00am 4:00 AM
Cooling water pump no.1 04:00am 4:00 AM
Cooling tower fan no.1 04:00am 4:00 AM
Air compressor no.13 Turn OFF Not in use
Air compressor no.16 Turn OFF Not in use
Air compressor no.17 05:45am 5:40 AM
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 05:45am 5:45 AM
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) Still ON
Air dryer 05:45am 5:40
Air handling unit no.1A (Mixer) 04:00am 4:10 AM
Air handling unit no.3 (Line 1) 04:00am 4:10 AM
Air handling unit no.4 (Line 1 Multipack) 04:00am 4:10 AM
Make-up air unit 1 (Standby) Turn OFF Not in use
Air handling unit no.2A (Standby) Turn OFF Not in use
Air handling unit no.2B (Line 2) 04:00am 4:10 AM
Make-up air unit 2 Turn OFF Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _March 20, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 06:00am
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 06:00am
Chilled water return pump no.1 06:00am
Cooling water pump no.1 06:00am
Cooling tower fan no.1 06:00am
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 06:00am
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 06:00am
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) Do not Turn OFF 24 hrs PM in line 1 oven area
Air dryer 06:00am
Air handling unit no.1A (Mixer) 06:00am
Air handling unit no.3 (Line 1) 06:00am
Air handling unit no.4 (Line 1 Multipack) 06:00am
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 06:00am
Make-up air unit 2 Not in use Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Start-up Guideline
Date : _March 21, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to start-up utilities equipment or adjust start-up schedule. Shift Lead 0500H
Assign EN personnel to start-up all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Start-up the following:
Chiller no. 3 (Midea) 04:00am
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 04:00am
Chilled water return pump no.1 04:00am
Cooling water pump no.1 04:00am
Cooling tower fan no.1 04:00am
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 05:30am
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 05:30am
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) Still ON
Air dryer 05:30am
Air handling unit no.1A (Mixer) 04:00am
Air handling unit no.3 (Line 1) 04:00am
Air handling unit no.4 (Line 1 Multipack) 04:00am
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 04:00am
Make-up air unit 2 Not in use Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _March 27, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 05:30am
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 05:30am
Chilled water return pump no.1 05:30am
Cooling water pump no.1 05:30am
Cooling tower fan no.1 05:30am
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 05:30am
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 05:30am
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 05:30am Extended production in line 1
Air dryer 05:30am
Air handling unit no.1A (Mixer) 05:30am
Air handling unit no.3 (Line 1) 05:30am
Air handling unit no.4 (Line 1 Multipack) 05:30am
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 05:30am
Make-up air unit 2 Not in use Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Start-up Guideline
Date : _April 18 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to start-up utilities equipment or adjust start-up schedule. Shift Lead 0500H
Assign EN personnel to start-up all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Start-up the following:
Chiller no. 3 (Midea) 04:00am
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 04:00am
Chilled water return pump no.1 04:00am
Cooling water pump no.1 04:00am
Cooling tower fan no.1 04:00am
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 05:30am
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 05:30am
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 05:30am
Air dryer 05:30am
Air handling unit no.1A (Mixer) 04:00am
Air handling unit no.3 (Line 1) 04:00am
Air handling unit no.4 (Line 1 Multipack) 04:00am
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 04:00am
Make-up air unit 2 Not in use Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _April 3, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 02:00pm
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 02:00pm
Chilled water return pump no.1 02:00pm
Cooling water pump no.1 02:00pm
Cooling tower fan no.1 02:00pm
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 02:00pm
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 02:00pm
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) Still ON 24 hours PM both lines
Air dryer 02:00pm
Air handling unit no.1A (Mixer) 02:00pm
Air handling unit no.3 (Line 1) 02:00pm
Air handling unit no.4 (Line 1 Multipack) 02:00pm
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 02:00pm
Make-up air unit 2 02:00pm
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Start-up Guideline
Date : _April 4, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to start-up utilities equipment or adjust start-up schedule. Shift Lead 0500H
Assign EN personnel to start-up all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Start-up the following:
Chiller no. 3 (Midea) 04:00am 4:00 AM
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 04:00am
Chilled water return pump no.1 04:00am 3:55 AM
Cooling water pump no.1 04:00am 3:55 AM
Cooling tower fan no.1 04:00am 3:55 AM
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 (Nitrogen) 05:30am 5:15 AM
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 05:30am 5:15 AM
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) Still ON Still ON
Air dryer 05:30am
Air handling unit no.1A (Mixer) 04:00am 4:15 AM
Air handling unit no.3 (Line 1) 04:00am 4:15 AM
Air handling unit no.4 (Line 1 Multipack) 04:00am 4:15 AM
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 04:00am 4:15 AM
Make-up air unit 2 04:00am 4:15 AM
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _April 14, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 02:00pm
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 02:00pm
Chilled water return pump no.1 02:00pm
Cooling water pump no.1 02:00pm
Cooling tower fan no.1 02:00pm
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 02:00pm
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 02:00pm
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 02:00pm
Air dryer 02:00pm
Air handling unit no.1A (Mixer) 02:00pm
Air handling unit no.3 (Line 1) 02:00pm
Air handling unit no.4 (Line 1 Multipack) 02:00pm
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 02:00pm
Make-up air unit 2 02:00pm
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _April 15, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 02:00pm
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 02:00pm
Chilled water return pump no.1 02:00pm
Cooling water pump no.1 02:00pm
Cooling tower fan no.1 02:00pm
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 02:00pm
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 02:00pm
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 02:00pm
Air dryer 02:00pm
Air handling unit no.1A (Mixer) 02:00pm
Air handling unit no.3 (Line 1) 02:00pm
Air handling unit no.4 (Line 1 Multipack) 02:00pm
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 02:00pm
Make-up air unit 2 02:00pm
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _April 15, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 02:00pm
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 02:00pm
Chilled water return pump no.1 02:00pm
Cooling water pump no.1 02:00pm
Cooling tower fan no.1 02:00pm
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 02:00pm
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 02:00pm
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 02:00pm
Air dryer 02:00pm
Air handling unit no.1A (Mixer) 02:00pm
Air handling unit no.3 (Line 1) 02:00pm
Air handling unit no.4 (Line 1 Multipack) 02:00pm
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 02:00pm
Make-up air unit 2 02:00pm
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _April 17, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 02:00pm
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 02:00pm
Chilled water return pump no.1 02:00pm
Cooling water pump no.1 02:00pm
Cooling tower fan no.1 02:00pm
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 02:00pm
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 02:00pm
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 02:00pm
Air dryer 02:00pm
Air handling unit no.1A (Mixer) 02:00pm
Air handling unit no.3 (Line 1) 02:00pm
Air handling unit no.4 (Line 1 Multipack) 02:00pm
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 02:00pm
Make-up air unit 2 02:00pm
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _May 20, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 09:30pm
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 09:30pm
Chilled water return pump no.1 09:30pm
Cooling water pump no.1 09:30pm
Cooling tower fan no.1 09:30pm
Air compressor no.13 Not in use Not in use
Air compressor no.16 09:30pm
Air compressor no.17 09:30pm
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 10:00pm
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 10:00pm
Air dryer 10:00pm
Air handling unit no.1A (Mixer) 09:30pm
Air handling unit no.3 (Line 1) 09:30pm
Air handling unit no.4 (Line 1 Multipack) 09:30pm
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 09:30pm
Make-up air unit 2 Not in use Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Start-up Guideline
Date : _May 23, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to start-up utilities equipment or adjust start-up schedule. Shift Lead 0500H
Assign EN personnel to start-up all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Start-up the following:
Chiller no. 3 (Midea) 05:00am
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 05:00am
Standby Chilled water return pump no.1 05:00am
Cooling water pump no.1 05:00am
Cooling tower fan no.1 05:00am
Air compressor no.13 (Nitrogen) Not in use Not in use
Air compressor no.16 (Nitrogen) Not in use Not in use
Air compressor no.17 (Nitrogen) 05:30am
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 05:30am
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 05:30am
Air dryer 05:30am
Air handling unit no.1A (Mixer) 05:00am
Air handling unit no.3 (Line 1) 05:00am
Air handling unit no.4 (Line 1 Multipack) 05:00am
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 05:00am
Make-up air unit 2 Not in use Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _May 29, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 02:00pm
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 02:00pm
Chilled water return pump no.1 02:00pm
Cooling water pump no.1 02:00pm
Cooling tower fan no.1 02:00pm
Air compressor no.13 Not in use Not in use
Air compressor no.16 Standby Not in use
Air compressor no.17 02:00pm
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 02:00pm `
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 02:00pm
Air dryer 02:00pm
Air handling unit no.1A (Mixer) 02:00pm
Air handling unit no.3 (Line 1) 02:00pm
Air handling unit no.4 (Line 1 Multipack) 02:00pm
Make-up air unit 1 (Standby) Standby Not in use
Air handling unit no.2A (Standby) Standby Not in use
Air handling unit no.2B (Line 2) 02:00pm
Make-up air unit 2 Standby Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Start-up Guideline
Date : _May 30, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to start-up utilities equipment or adjust start-up schedule. Shift Lead 0500H
Assign EN personnel to start-up all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Start-up the following:
Chiller no. 3 (Midea) 05:00am 5:00 AM
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 05:00am 5:00 AM
Chilled water return pump no.1 05:00am 5:00 AM
Cooling water pump no.1 05:00am 5:00 AM
Cooling tower fan no.1 05:00am 5:00 AM
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 (Nitrogen) 05:30am 5:30 AM
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 05:30am 5:50 AM
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 05:30am 5:50
Air dryer 05:30am 5:50
Air handling unit no.1A (Mixer) 05:00am 5:20 AM
Air handling unit no.3 (Line 1) 05:00am 5:20 AM
Air handling unit no.4 (Line 1 Multipack) 05:00am 5:20 AM
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 05:00am 5:20 AM
Make-up air unit 2 Not in use Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _July 3, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 1400H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 09:00pm 3-Jul
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 09:00pm 3-Jul
Chilled water return pump no.1 09:00pm 3-Jul
Cooling water pump no.1 09:00pm 3-Jul
Cooling tower fan no.1 09:00pm 3-Jul
Air compressor no.13 Not in use Not in use
Air compressor no.16 Standby Not in use
Air compressor no.17 09:00pm 3-Jul
Staff/ Technician 3-Jul
Air compressor no. 32 Food Grade (Biscuit) 09:00pm
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 02:00pm 7/4/2022 due to PM activities
Air dryer 09:00pm 3-Jul
Air handling unit no.1A (Mixer) 09:00pm 3-Jul
Air handling unit no.3 (Line 1) 09:00pm 3-Jul
Air handling unit no.4 (Line 1 Multipack) 02:00pm 3-Jul
Make-up air unit 1 (Standby) Standby Not in use
Air handling unit no.2A (Standby) Standby Not in use
Air handling unit no.2B (Line 2) 09:00pm 3-Jul
Make-up air unit 2 Standby Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Start-up Guideline
Date : _July 5, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to start-up utilities equipment or adjust start-up schedule. Shift Lead 0500H
Assign EN personnel to start-up all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Start-up the following:
Chiller no. 3 (Midea) 05:00am
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 05:00am
Chilled water return pump no.1 05:00am
Cooling water pump no.1 05:00am
Cooling tower fan no.1 05:00am
Air compressor no.13 Not in use Not in use
Air compressor no.16 Not in use Not in use
Air compressor no.17 (Nitrogen) 05:30am
Staff/ Technician
Air compressor no. 32 Food Grade (Biscuit) 05:30am
(3rd shift)
Air compressor no. 12 Industrial (Biscuit) 05:30am
Air dryer 05:30am
Air handling unit no.1A (Mixer) 05:00am
Air handling unit no.3 (Line 1) 05:00am
Air handling unit no.4 (Line 1 Multipack) 05:00am
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 05:00am
Make-up air unit 2 Not in use Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _December 24, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 0600H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) Standby
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 06:00am
Chilled water return pump no.1 06:00am
Cooling water pump no.1 06:00am
Cooling tower fan no.1 06:00am
Air compressor no.13 (Nitrogen Area) 02:00pm due to PM Activities (6-2 only)
Air compressor no.16 (Biscuit area) Food Grade 06:00am
Staff/ Technician
Air compressor no.17 (Nitrogen Area) 06:00am
(3rd shift)
Air dryer 06:00am
Air handling unit no.1A (Mixer) 06:00am
Air handling unit no.3 (Line 1) 06:00am
Air handling unit no.4 (Line 1 Multipack) 06:00am
Make-up air unit 1 (Standby) Standby
Air handling unit no.2A (Standby) Standby
Air handling unit no.2B (Line 2) 06:00am
Make-up air unit 2 Standby
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Start-up Guideline
Date : _December 26, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to start-up utilities equipment or adjust start-up schedule. Shift Lead 0530H
Assign EN personnel to start-up all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Start-up the following:
Chiller no. 3 (Midea) Standby Use 2 York shared by BisCake
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 05:30am
Chilled water return pump no.1 05:30am
Cooling water pump no.1 05:30am
Cooling tower fan no.1 05:30am
Air compressor no.13 (Nitrogen Area) 05:30am
Air compressor no.16 (Biscuit area) Food Grade 05:30am
Staff/ Technician
Air compressor no.17 (Nitrogen Area) 05:30am
(3rd shift)
Air dryer 05:30am
Air handling unit no.1A (Mixer) 05:30am
Air handling unit no.3 (Line 1) 05:30am
Air handling unit no.4 (Line 1 Multipack) 05:30am
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 05:30am
Make-up air unit 2 Not in use Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _December 29, 2022_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 0600H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) Standby
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 09:00pm
Chilled water return pump no.1 09:00pm
Cooling water pump no.1 09:00pm
Cooling tower fan no.1 09:00pm
Air compressor no.13 (Nitrogen Area) Standby We need on Dec. 30 (trial of Keed Machine) 6-2pm only
Air compressor no.16 (Biscuit area) Food Grade 09:00pm
Staff/ Technician
Air compressor no.17 (Nitrogen Area) 09:00pm
(3rd shift)
Air dryer 09:00pm
Air handling unit no.1A (Mixer) 09:00pm
Air handling unit no.3 (Line 1) 09:00pm
Air handling unit no.4 (Line 1 Multipack) 09:00pm
Make-up air unit 1 (Standby) Standby
Air handling unit no.2A (Standby) Standby
Air handling unit no.2B (Line 2) 09:00pm
Make-up air unit 2 Standby
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Start-up Guideline
Date : _January 3, 2023_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to start-up utilities equipment or adjust start-up schedule. Shift Lead 0530H
Assign EN personnel to start-up all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Start-up the following:
Chiller no. 3 (Midea) Standby Use 2 York shared by BisCake
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 05:30am
Chilled water return pump no.1 05:30am
Cooling water pump no.1 05:30am
Cooling tower fan no.1 05:30am
Air compressor no.13 (Nitrogen Area) 05:30am
Air compressor no.16 (Biscuit area) Food Grade 05:30am
Staff/ Technician
Air compressor no.17 (Nitrogen Area) 05:30am
(3rd shift)
Air dryer 05:30am
Air handling unit no.1A (Mixer) 05:30am
Air handling unit no.3 (Line 1) 05:30am
Air handling unit no.4 (Line 1 Multipack) 05:30am
Make-up air unit 1 (Standby) Not in use Not in use
Air handling unit no.2A (Standby) Not in use Not in use
Air handling unit no.2B (Line 2) 05:30am
Make-up air unit 2 Not in use Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _March 19,2023_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 0600H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) Standby Switch to York when biscuit production stops/when their chiller stops
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) Standby Switch to York when biscuit production stops/when their chiller stops
Chilled water return pump no.1 Standby Switch to York when biscuit production stops/when their chiller stops
Cooling water pump no.1 Standby Switch to York when biscuit production stops/when their chiller stops
Cooling tower fan no.1 Standby Switch to York when biscuit production stops/when their chiller stops
Air compressor no.13 (Nitrogen Area) Standby
Air compressor no.16 (Biscuit area) Food Grade Standby
Staff/ Technician
Air compressor no.17 (Nitrogen Area) Standby
(3rd shift)
Air dryer Standby
Air handling unit no.1A (Mixer) Standby
Air handling unit no.3 (Line 1) 02:00pm
Air handling unit no.4 (Line 1 Multipack) 02:00pm
Make-up air unit 1 (Standby) Not in use
Air handling unit no.2A (Standby) Not in use
Air handling unit no.2B (Line 2) Standby
Make-up air unit 2 Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _April_02,2023_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 0600H
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 02:00pm Switch to York when biscuit production stops/when their chiller stops
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 02:00pm Switch to York when biscuit production stops/when their chiller stops
Chilled water return pump no.1 02:00pm Switch to York when biscuit production stops/when their chiller stops
Cooling water pump no.1 02:00pm Switch to York when biscuit production stops/when their chiller stops
Cooling tower fan no.1 02:00pm Switch to York when biscuit production stops/when their chiller stops
Air compressor no.13 (Nitrogen Area) Standby
Air compressor no.16 (Biscuit area) Food Grade Standby
Staff/ Technician
Air compressor no.17 (Nitrogen Area) Standby
(3rd shift)
Air dryer Standby
Air handling unit no.1A (Mixer) Standby
Air handling unit no.3 (Line 1) 02:00pm
Air handling unit no.4 (Line 1 Multipack) 02:00pm
Make-up air unit 1 (Standby) Not in use
Air handling unit no.2A (Standby) Not in use
Air handling unit no.2B (Line 2) Standby
Make-up air unit 2 Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller
Cake Plant Utility Shutdown Guideline
Date : _April_0,2023_.

A. Pre-process Who? Scheduled Time Actual Time Remarks


Call Cake plant supervisor in-charge, ask for any changes on production schedule. Shift Lead
If No, proceed to shutdown utilities equipment or adjust shutdown schedule. Shift Lead 12:00am Please call Cake supervisor prior to scheduled shutdown of equipment.
Assign EN personnel to shutdown all utilities equipment as per schedule (follow sequence). Shift Lead
B. Post-process
Shutdown the following:
Chiller no. 3 (Midea) 02:00am
Chilled water supply pump no (1,2 or 3) of biscuit HVAC system) 02:00am
Chilled water return pump no.1 02:00am
Cooling water pump no.1 02:00am
Cooling tower fan no.1 02:00am
Air compressor no.13 (Nitrogen Area) 02:00am
Air compressor no.16 (Biscuit area) Food Grade 02:00am
Staff/ Technician
Air compressor no.17 (Nitrogen Area) 02:00am
(3rd shift)
Air dryer 02:00am
Air handling unit no.1A (Mixer) 02:00am
Air handling unit no.3 (Line 1) 02:00am
Air handling unit no.4 (Line 1 Multipack) 02:00am
Make-up air unit 1 (Standby) Not in use
Air handling unit no.2A (Standby) Not in use
Air handling unit no.2B (Line 2) 02:00am
Make-up air unit 2 Not in use
C. Verification-process
Record kilowatt reading:
Cake Staff (1st Shift)
Midea Chiller

Target, kw Actual kw
peak peak
Cake
Midea Chiller