REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE G 2
FACILITY (COVERED COURT)
PERSPECTIVE MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
TABLE OF CONTENTS ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
2 5 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
SAN ISIDRO
N DAMAYOHAN
VILLAFELIPA
TY
KAUSWAGAN
CI
BALINGOAN
AN
SAN ALONZO LAPINIG TULANG
TU
MANTANGALI
BU
PANABOL
BUKO MAGSAYSAY
ESPERANSA BAUK-BAUK MINTABON
TO
KINOGUITAN KAUSWAGAN BABANLAGAN
W
KABULAKAN
E
SAN JOSE
Surigao City KABANTIAN
THIS SITE
VIRAY CALAMCAM
TAGBOCBOC KIBUNGSOD
THIS SITE
SINDANGAN PUTING BALAS
PANABOL KABANGASAN MAGKARILA
SUAREZ BUGDANG
SILAD CAMPO MAPUA PANGPANGON
MANGA SAN VICENTE
STA. CRUZ
SALUBSOB POOK STA. INES
SUGBONGCOGON
SURIGAO KIRAGING
DAHILIG
SIBANTANG PUNTA SANTIAGO
MANDAHILAG
TIBONTIBON
STA. CRUZ MIMBUAHAN CASIBULI ARTADI CABULAWAN
MABINI AMPIANGA PAHINDONG
CAMIGUIN BINUANGAN KITAMBAN
KITAMBIS MACOPA
Tandag
S
TUP-ON
KIDAMPAS
Butuan City MONSANGOT
VALDECONCHA
SAN ROQUE
KANDIIS MINDULAO
MAANAS
SALAY RIVER 11
de Oro ILI-ILIHON
ALIPUATON
KIBUGING
SAN LUIS
TALISAY
MAHAYAHAY
KATIPUNAN
SALAY
TINAGAAN PANGASIHAN
LOOC
Osamiz BUNAL
BANTAAWAN
AGAY-AYAN
ODIONGAN
BUKIDNON DAMPIL
BAYBAY
MALINAO
LANAO GASTON
PIGSALUHAN LUNAO
SAN JUAN DAAN LUNGSOD
ANAKAN
KAMANIKAN KALIPAY
TAGPAKO
ZAMBOANGA CABULAWAN UMAGOS PUNONG MINSAPINIT
MALIBUD
MIMBUNTONG MARIBUCAO
SANTIAGO
LAGONGLONG BAKIDBAKID GINGOOG BAGUBAD SANGALAN
TALON
DAVAO BANGLAY
MURALLON
BRGY.26
MIMBUNGA SAN JOSE
MANAOL
KAUSWAGAN KIANLAGAN
TINULONGAN TINABALAN
NAPALIRAN
MAMBAYAAN KIBANBAN
NORTH QUEZON
SAN MIGUEL
LAWIT MIMBALAGON DINAWEHAN
EUREKA
COTABATO Davao
MANDANGOA KIPUNTOS BINAKALAN
CALAWAG SAMAY LIBERTAD
City SAN FRANCISCO KALAGONOY
CAPITULANGAN
COGON
SAN ISIDRO ALAGATAN LAWAAN
BALINGASAG
Samal LINGANGAO
DANSOLI
BAL-ASON
LUNOTAN
City ROSARIO
KUDARAT BINITINAN
Basilan SOUTH LINABU
SAN JUAN
COTABATO HERMANO
SAMAY
General
Santos
SULU
CELEBES SEA
LOCATION MAP
MAP OF MINDANAO ISLAND
VICINITY MAP
THIS SITE
LOCATION PLAN
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE G 3
FACILITY (COVERED COURT) VICINITY MAP
MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
LOCATION MAP ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, LOCATION PLAN DATE DATE: DATE: DATE: DATE:
3 5 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
TOPOGRAPHIC PLAN
EX
IS
TI
NG
CL
AS
SR
O
O
M
S
2039
85.46
M S
SSROO
CLA
TING
EXIS
2031
85.43
L E G E N D
MAJOR CONTOUR INTERVAL : 5 METERS
MINOR CONTOUR INTERVAL : 1 METERS
2032
85.44
2037
85.45
2030
85.42 TREE
2036
85.46
AFFECTED TREE
ELECTRICAL / UTILITY POST
2026
85.51
EXISTING STAGE
BM1 2033
85.45
2035
2029
85.45
PROPOSED MULTI PURPOSE BLDG.
85.45
EXISTING STRUCTURE
OOMS
ASSR
NG CL
STA
GE
EXISTI FENCE
TING
2038
85.46
EXIS
2034
85.44
PAVED ROAD
2028
85.49
EXISTING BLDG.
2027
85.50
EXISTING STAGE
BM2 BENCHMARKS
OOMS
NG CLASSR
EXISTI
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: PLOTTED AND SURVEYED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE G 4
FACILITY (COVERED COURT)
JELLIAN G. POSERIO JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
4 5 26
24
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
SUMMARY OF QUANTITIES
* ELECTRICAL WORKS
* PLUMBING WORKS
* CANAL
* FASCIA FRAME AND BOARD
* GUTTER
* FLASHING
* DOWNSPOUT
* RUBBERIZED PAINT FOR FLOORING
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE G 5
FACILITY (COVERED COURT)
SITE DEVELOPMENT PLAN MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
SUMMARY OF QUANTITIES ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
5 5 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
A. ARCHITECTURAL PLAN
W E EXISTING CLASSROOMS
5
m
1.20
4 5.00
m
1.20
A
m
m
EXISTING CLASSROOMS 5.00
0m
3 30.0
0m
10.0
2
1 5.00
m
m
5.00
m
1.20
19.4
17.0
0m
0m
1.20
m
1.20
17.0
m
19.4
0m
0m
EXISTING CLASSROOMS
m
1.20
EXISTING STAGE m
5.00
m
5.00
6
10.0
0m 5
0m
30.0
4
m
5.00
1.20
B m
m
5.00
1.20
m 3
1
EXISTING CLASSROOMS
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 6
FACILITY (COVERED COURT)
MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
SITE DEVELOPMENT PLAN ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
1 8 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
B
1 2 3 4 5 6
30.00m
A A
PROPOSED 200mm
17.00m
17.00m
RAISED FLOOR ABOVED
NATURAL GROUND
A A
B B
30.00m
1 2 3 4 5 6
B
1 FLOOR PLAN
2 8 SCALE 1:100MTS
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 7
FACILITY (COVERED COURT)
MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
FLOOR PLAN ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
2 8 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
1 2 3 4 5 6
29.71m
5.00m 5.00m 10.00m 5.00m 5.00m
3.76m
GA. 24 PRE-FORMED
G.I. GUTTER
COLUMN LINE
9.76m
PRE-PAINTED GA. 26 ROOFING
PANEL FASCIA BOARD
175mmØ B.I. PIPE COLUMN IN
QDE PAINT W/ EPOXY PRIMER
6.00m
PROPOSED ELEVATION OF
REINF. CONCRETE FLOOR SLAB
IN RUBBERIZED PAINT FINISH
A B
17.00m
GA. 26 PRE-PAINTED
TRUSS TOP CHORD CORRUGATED G.I. SHEET
3.76m
GA. 24 PRE-FORMED
G.I. GUTTER
COLUMN LINE
PROPOSED ELEVATION OF
REINF. CONCRETE FLOOR SLAB
IN RUBBERIZED PAINT FINISH
FFL
NGL
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 8
FACILITY (COVERED COURT)
TYP. FRONT & REAR ELEVATION MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
TYP. LEFT & RIGHT SIDE ELEVATION ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
3 8 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
1 2 3 4 5 6
30.00m
GA. 26 PRE-PAINTED
TRUSS TOP CHORD CORRUGATED G.I. SHEET
3.76m
GA. 24 PRE-FORMED
G.I. GUTTER
COLUMN LINE
9.76m
PRE-PAINTED GA. 26 ROOFING
PANEL FASCIA BOARD
6.00m
QDE PAINT W/ EPOXY PRIMER
PROPOSED ELEVATION OF
REINF. CONCRETE FLOOR SLAB
IN RUBBERIZED PAINT FINISH
FFL
NGL
GA. 26 PRE-PAINTED
TRUSS TOP CHORD CORRUGATED G.I. SHEET
3.76m
GA. 24 PRE-FORMED
G.I. GUTTER
COLUMN LINE
PROPOSED ELEVATION OF
REINF. CONCRETE FLOOR SLAB
IN RUBBERIZED PAINT FINISH
FFL
NGL
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 9
FACILITY (COVERED COURT)
LONGITUDINAL SECTION THRU A-A' MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
CROSS-SECTION THRU B-B' ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
4 8 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
A
0.50m
0.10m
GA. 24 PRE-FORMED LANDING
G.I. GUTTER(SEE DETAIL
1.20m
RAMP SLOPE=1:12
0.10m
2.50m 1.60m
4.10m
5.80m
6.00m
0.70m 0.20m
Ø50mm PIPE POST
0.90m
REINF. CONCRETE SLAB
IN RUBBERIZED PAINT FINISH
0.20m
1.70m
0.30m
0.10m
1 SPOT DETAIL 1
5 8 SCALE 1:30MTS
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 10
FACILITY (COVERED COURT)
MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
SPOT DETAIL 1 ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
5 8 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
1 2 3 4 5 6
30.00m
NOTE:
1.20m
FOR MULTI-PURPOSE COVERED COURT BUILDING
A SITE LOCATED NEAR SEA BOARDS OR COASTAL
AREAS PRONE TO CORROTION ON STEEL, USE
PAINTS THAT OFFER MUCH GREATER RUST
PROTECTION, PAINTS WHICH CREATE A
PROTECTIVE BARRIER THAT SEAL THE METAL
SURFACE.
19.40m
17.00m
B
1.20m
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 10
FACILITY (COVERED COURT)
SPOT DETAIL 1 MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
REFLECTED CEILING PLAN ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
6 8 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
SCHEDULE OF FLOOR FINISHING
LOCATION DESCRIPTION
1 2 3 4 5 6
30.00m
A A
17.00m
17.00m
B B
30.00m
1 2 3 4 5 6
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 11
FACILITY (COVERED COURT)
MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
FLOOR FINISH LAYOUT ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
7 8 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
1 2 3 4 5 6
30.00m
1.20m
1.20m
A A
GA. 26 PRE-PAINTED
CORRUGATED G.I. SHEET
19.40m
17.00m
17.00m
19.40m
B B
1.20m
1.20m
1.20m 5.00m 5.00m 10.00m 5.00m 5.00m 1.20m
30.00m
1 2 3 4 5 6
1 ROOF PLAN
8 8 SCALE 1:100MTS
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED & DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 12
FACILITY (COVERED COURT)
MABELLE S. DESABILLE-PORTUGALEZA, uap JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
ROOF PLAN ARCHITECT II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
8 8 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
S. STRUCTURAL PLAN
30.00m
A A
F1-C1 F1-C1 F1-C1 F1-C1 F1-C1 F1-C1
17.00m
17.00m
ELEV. +0.20m FROM NGL
W/ 10mmØ REBARS
SPACED @ 400mm BOTHWAYS
B B
5.00m 5.00m 10.00m 5.00m 5.00m
30.00m
1 2 3 4 5 6
1 FOUNDATION PLAN
1 9 SCALE 1:100MTS
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 14
FACILITY (COVERED COURT)
ODILON D. OCLARET, JR. JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
FOUNDATION PLAN ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
1 9 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
GENERAL NOTES:
1.0 STANDARDS AND REFERENCE 1.20m
- THE FOLLOWING SHALL GOVERN THE DESIGN, FABRICATION
AND CONSTRUCTION OF THE PROJECT.
0.35m 0.50m 0.35m
2.0 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES 0.50m
A. DEAD LOAD
0.35m
2.0 DESIGN CRITERIA
15mm THK. BASE PLATE
(N.S.C.P.) VOL. 1, 6TH EDITION. & STIFFENER
2.1 LOADINGS
0.50m
B. LIVE LOAD 8-20mmØ VERTICAL BARS
STEEL -- 76.93kNm³
0.50m
0.35m
ROOF -- 0.75kPa 175mmØ B.I. PIPE SCHED. 40
C. WIND LOAD (NSCP 2010) FILLED W/ CONCRETE 41 OF THE
2.2 DESIGN STRESSES TOTAL PIPE LENGTH
1.20m
BASIC WIND VELOCITY, V = 150KPH
P = qh (GCpf)-(GCpi)(DESIGNWINDPRESSURE)
A. CONCRETE 10-16mmØ TEMP. REBARS 4-20mmØ x 400mm ANCHOR
0.70m
WHERE: qh = VELOCITY PRESSURE, kPa BOLTS W/ STD. NUTS &
GCph = EXTERNAL PRESSURE COEFFICIENT SPACED EQUALLY BOTHWAYS WASHERS
GCpi = INTERNAL PRESSURE COEFFICIENT
4-20mmØ VERTICAL BARS
B. REINFORCING BARS
0.04m W/ 10mmØ TIES @ 0.20m
COMPRESSIVE STRENGTH @ 28 DAYS fc = 20.7 MPa (3,000psi)
C. STRUCTURAL STEEL, ASTM-A36
FOR BARS 16mmØ AND GREATER fy = 275 MPa (40,000psi)
PLAN
FOR TRUSSES, BRACING, & STRUTS fy = 205 MPa (30,000psi)
0.15m
COLD FORMED LIGHT CAGE SHAPES fy = 248 MPa (36,000psi) 15mm THK. GUSSET PLATE
D. PURLINS
E. WELDS - USED E-60xx ELECTRODE F1 PLAN FULL WELD
0.40m
3.1 ASSUMED SOIL BEARING CAPACITY SHALL BE 96 kPa (2,000 PSF)
3.1.1 IN CASE THE ACTUAL SOIL BEARING CAPACITY IS FOUND LESS THE ASSUMED.
96 kPa; NOTIFY THE DESIGNER, BUREAU OF DESIGN FOR PROPER REVISION 4-20mmØ x 400mm ANCHOR
3.1.2 NO FOOTING SHALL REST ON FILL. BOLTS W/ STD. NUTS &
WASHERS
5.80 m.
INDICATED. EXCAVATE TO FIRM LAYER AND REPLACE LOOSE MATERIALS UNDERNEATH
THE FOOTING WITH IN THE FOOTING AREA PLUS 12 DEPTH OF SOFT MATERIAL ON ALL
SIDES WITH SELECT GRANULAR BACKFILL. COMPACT SELECT GRANULAR BACK FILL TO
95 OF MAXIMUM DRY DENSITY.
4.0 MATERIALS
4.1 CONCRETE
4.1.1 CONCRETE COVER OVER REINFORCING BARS SHALL BE AS FOLLOWS:
a. FOOTINGS, FOOTING - TIE BEAMS (CAST AGAINST EARTH) 75mm
b. BEAMS AND COLUMNS (TO STIRRUPS AND TIES) 40mm
4.2 REINFORCING BARS
4.2.1 ALL REINFORCING BARS SHALL BE CLEAN OF RUST, GREASE OR OTHER
MATERIALS THAT WILL IMPAIR BOND.
4.2.2 ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED
BEFORE POURING CONCRETE OR APPLYING MORTAR OR GROUT.
4.2.3 LAPPED SPLICES SHALL BE STAGGERED WHERE POSSIBLE.
4.2.4 UNLESS OTHERWISE INDICATED, SPLICING OF REINFORCEMENT SHALL BE IN
0.10m
0.20m
ACCORDANCE WITH ACI-318M, EXCEPT THAT THE MINIMUM LAP SPLICES SHALL
CONCRETE SLAB
BE 40 BAR DIAMETER BUT NOT LESS THAN 600mm.
4.2.5 DEVELOPMENT LENGTH (Ld) OF REINFORCING BARS SHALL BE AS FOLLOWS: GRAVEL BED 0.10m NGL
SIZE OF REBARS DEVELOPMENT LENGTH
10mm 170mm
12mm 220mm
16mm 270mm
20mm 380mm
0.025m
25mm 600mm
4.3 STRUCTURAL STEEL
1.20m
4.3.1 ALL STRUCTURAL STEEL SHALL HAVE A MINIMUM YIELD STRESS, Fy = 248MPa
(36,000psi)
4.3.2 ALL STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE
WITH THE AISC SPECIFICATIONS AND CODE OF STANDARD PRACTICE AS
AMENDED TO DATE. 0.025m
4.3.3 ALL BOLTS SHALL CONFORM TO ASTMA-307 UNLESS OTHER WISE INDICATED.
4.3.4 SHOP AND FIELD WELDING SHALL BE IN ACCORDANCE WITH A WSD1.1 AND
PERFORMED BY QUALIFIED WELDERS.
4.3.5 UNLESS OTHERWISE INDICATED, WELDING ELECTRODES SHALL BE E60. CHAMFER AREAS
4.3.6 NO STEEL SHALL BE FABRICATED OR ERECTED UNTIL SHOP DRAWING HAVE (ALL CORNERS)
0.30m
- ALL STRUCTURAL PIPE SHALL BE PAINTED WITH 2 COATS EPOXY METAL PRIMER
(1st COATING) AND 2 COATS ALUMINUM PAINT (2nd COATING)
- INCASE THE ACTUAL SOIL BEARING CAPACITY IS FOUND LESS THAN THE ASSUMED
96 KPa; NOTIFY THE PLANNING & DESIGN SECTION FOR PROPER REVISION OF
1 FOOTING & COLUMN DETAILS
FOUNDATION.
2 9 SCALE 1:20MTS
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE GENERAL NOTES
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 15
FACILITY (COVERED COURT) FOOTING & COLUMN DETAILS
ODILON D. OCLARET, JR. JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
PEDESTAL CHAMFER DETAIL ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, PEDESTAL-COLUMN DETAILS DATE DATE: DATE: DATE: DATE:
2 9 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL BRACE PLATE DETAIL
1 2 3 4 5 6
30.00m
T1 FASCIA FRAME T1 FASCIA FRAME T1 FASCIA FRAME T2 FASCIA FRAME T1 FASCIA FRAME T1 FASCIA FRAME T1
1.20m
1.20m
GIRT 1 GIRT 1 GIRT 2 GIRT 1 GIRT 1
A A
FASCIA FRAME
FASCIA FRAME
1.6mm THK. x 20mm x 50mm x 100mm
C-PURLINS
FASCIA FRAME
FASCIA FRAME
12mmØ PLAIN ROUND BAR
SAG ROD W/ 2 NUTS & WASHERS
AT ENDS
19.40m
17.00m
17.00m
19.40m
STRUT 1 STRUT 1 STRUT 1 STRUT 1 STRUT 1
FASCIA FRAME
W/ STANDARD TURN BUCKLE
FASCIA FRAME
GIRT 1 GIRT 1 GIRT 2 GIRT 1 GIRT 1
B B
1.20m
1.20m
T1 FASCIA FRAME T1 FASCIA FRAME T1 FASCIA FRAME T2 FASCIA FRAME T1 FASCIA FRAME T1 FASCIA FRAME T1
1.20m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.67m 1.20m
30.00m
1 2 3 4 5 6
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 16
FACILITY (COVERED COURT)
ODILON D. OCLARET, JR. JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
ROOF FRAMING PLAN ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
3 9 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
0.7083m 0.7083m 0.7083m 0.7083m
GA. 26 PRE-PAINTED
CORRUGATED G.I. SHEET
J-BOLT @ EVERY
1.67m
2 21 SIDE LAP 3RD CORR.
0.10m
PANEL 1 PANEL 2
0.025m 0.025m C-PURLIN
5.00m
1.67m
ROOFING PANEL SIDE LAP
J-BOLT SPACING
DETAIL
0.10m
0.025m
1.67m
C-PURLINS
TRUSS
(SEE DETAIL)
J-SHAPED BOLT
GA. 26 PRE-PAINTED
CORRUGATED G.I. SHEET
2 PURLIN DETAILS
4 9 SCALE 1:15MTS
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE SAG ROD DETAIL A 17
FACILITY (COVERED COURT)
PURLIN DETAILS ODILON D. OCLARET, JR. JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
TRUSS-COLUMN DETAILS ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL,
ROOFING INSTALLATION DETAILS DATE DATE: DATE: DATE: DATE:
4 9 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
CENTER LINE
OF TRUSS
FULL 6mm
WELD
0.300m
0.025m m
40
0.
CENTER LINE 0.025m
OF TRUSS
FULL 6mm
0.050m
6mm WELD
TYP.
0.025m
0.050m
℄
0.40m
ARC TRUSS
0.36m
0.225m
6mm
FULL TYP.
WELD 6mm
0.050m
ARC TRUSS 0.050m
0.082m 0.117m
FULL
10mm THICK STEEL , ⅊
WELD W/ 18mmØ HOLES; TYPICAL
6mm
16mm Ø STEEL CROSS-BRACINGS,
W/ STANDARD TURN-BUCKLE
10mm THICK STEEL , ⅊
W/ 18mmØ HOLES; TYPICAL 16mm Ø CROSS-BRACINGS,
W/ STANDARD TURN-BUCKLE GUTTER BLOW-UP DETAIL
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 18
FACILITY (COVERED COURT) CROSS BRACING CONNECTION DETAIL
ODILON D. OCLARET, JR. JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
TRUSS CONNECTION DETAILS ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, GUTTER DETAILS DATE DATE: DATE: DATE: DATE:
5 9 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
A B
19.40m
0.55m
25MM Ø B.I. PIPE SCHED. 10
TOP CHORD (FULL WELD)
3.25m
0.40m0.40m0.40m0.40m0.40m0.40m0.40m
25MM Ø B.I. PIPE SCHED. 10
4.02m
WEB MEMBER (FULL WELD)
25mmØ B.I PIPE S-10
TOP CHORD (FULL WELD)
0.76m
WEB MEMBER (FULL WELD)
0.76m
ELEVATION SECTION
1 21"
25mmØ B.I PIPE S-10
0.40m 0.40m 0.40m 0.40m TOP (FULL WELD)
2.146" 7.2"
0.76m
0.76m
FASCIA FRAME
2.146"
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 19
FACILITY (COVERED COURT)
ARC FASCIA FRAME DETAIL ODILON D. OCLARET, JR. JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
FASCIA BOARD DETAIL ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL,
FRONT & REAR FASCIA FRAME DETAIL DATE DATE: DATE: DATE: DATE:
6 9 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
A B
19.40m
0.55m
50MM Ø B.I. PIPE SCHED. 40
TOP CHORD (FULL WELD)
STRUT-1
3.50m
STRUT-2 BOTTOM CHORD (FULL WELD) STRUT-2
2.95m
0.7083m 0.7083m 0.7083m 0.7083m 0.7083m 0.7083m 0.7083m
40MM Ø B.I. PIPE SCHED. 40
WEB MEMBER (FULL WELD)
2.45m
FASCIA FASCIA
FRAME FRAME
ELEVATION
2.30m
GIRT-1
1.30m
2 3
40mmØ B.I PIPE S-40 50mmØ B.I PIPE S-40 40mmØ B.I PIPE S-40
0.60m 0.60m 0.60m 0.55m 0.55m 0.55m TOP (FULL WELD) 50mmØ B.I PIPE S-40
WEB MEMBERS (FULL WELD) TOP (FULL WELD)
TOP CHORD (FULL WELD)
0.55m
0.60m
0.76m
40mmØ B.I PIPE S-40
WEB MEMBER (FULL WELD)
25mmØ B.I PIPE S-10 40mmØ B.I PIPE S-40 50mmØ B.I PIPE S-40
50mmØ B.I PIPE S-40 WEB MEMBERS (FULL WELD) BOTTOM (FULL WELD)
BOTTOM CHORD (FULL WELD)
BOTTOM (FULL WELD)
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 20
FACILITY (COVERED COURT) ARC TRUSS 1 DETAIL
ODILON D. OCLARET, JR. JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
GIRT 1 DETAIL ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, STRUT 1 DETAIL DATE DATE: DATE: DATE: DATE:
7 9 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
A B
19.40m
0.55m
50MM Ø B.I. PIPE SCHED. 40
TOP CHORD (FULL WELD)
STRUT-1
3.50m
STRUT-2 BOTTOM CHORD (FULL WELD) STRUT-2
2.95m
0.7083m 0.7083m 0.7083m 0.7083m 0.7083m 0.7083m 0.7083m
40MM Ø B.I. PIPE SCHED. 40
WEB MEMBER (FULL WELD)
FASCIA FASCIA
FRAME ELEVATION FRAME
GIRT-2 GIRT-2
A A
B B
0.76m
40mmØ B.I PIPE S-40
B WEB MEMBER (FULL WELD)
0.55m
A
C
3 4 50mmØ B.I PIPE S-40
BOTTOM CHORD (FULL WELD)
0.55m
C B
0.55m
GIRT 2 DETAIL B C
STRUT 2 DETAIL
ELEVATION-C 25mmØ B.I PIPE S-10 25mmØ B.I PIPE S-10
WEB MEMBERS (FULL WELD) BOTTOM (FULL WELD)
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 21
FACILITY (COVERED COURT) ARC TRUSS 2 DETAIL
ODILON D. OCLARET, JR. JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
GIRT 2 DETAIL ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, STRUT 2 DETAIL DATE DATE: DATE: DATE: DATE:
8 9 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
A B
21.331m
0.550m
3.803m
3.608m
3.253m
3.102m
21m
71m
2.265m
3.7
4.2
R1
R1
1.027m
0.763m
2.000m 2.000m 2.000m 2.500m
77°m
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE A 22
FACILITY (COVERED COURT)
ODILON D. OCLARET, JR. JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
ARC TRUSS DIAGRAM ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
9 9 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
P. PLUMBING
1.20m
A
EXISTING CLASSROOMS 5.00m
2
3 30.00m
5.00m
5.00m
19.40m
17.00m
1.20m
A
ANY RELOCATIONS REQUIRED PROPER EXECUTION OF OTHER
TRADES SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT
B
OR ENGINEER.
1.20
17.00m
m
19.40m
EXISTING STAGE 5.00m
1.20m
EXISTING CLASSROOMS
5. PROPOSED PLUMBING UTILITIES SHALL CONFORM TO THE
5.00
m
5.00
m
30.00m
4 EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE
1.20m
B
1.20m
5.00m
2
3
CONTRACTOR.
1
EXISTING CLASSROOMS 6. PLUMBING INSTALLATION SHALL NOT IMPAIR THE STRENGTH
OF ANY STRUCTURAL MEMBER, COORDINATE WITH STRUCTURAL
PLANS AND DETAILS.PLANS AND DETAILS.
7. MATERIALS USED IN INSTALLATIONS SHALL BE OF
APPROVED BRAND, FREE FROM ANY DEFECTS AND PASSED
THE QUALITY SET FORTH BY THE BUREAU OF PHIL. STANDARDS.
1 SITE DEVELOPMENT PLAN 8. ALL PIPES AND UTILITIES SHALL BE ANCHORED TO A FIXED
1 4 DRAWN NOT TO SCALE
SUPPORT.
9. ALL SLOPE FOR SEWER HORIZONTAL BRANCHES SHALL
MAINTAIN A 2% SLOPE MINIMUM UNLESS OTHERWISE SPECIFIED.
TO BUTUAN CITY
10. SIZE OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN
KINOGUITAN BAY
ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS.
11. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT
SITE AND COORDINATE THE WORKS WITH THE SEWER LINE
EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE.
12. CONNECT ALL SEWER INSTALLATION TO A STANDARD
WAY
SEPTIC TANK IN THE ABSENCE OF SEWER SYSTEM.
13. MINIMUM EARTH COVER OF 300mm SHALL BE OBSERVED
NAT'L HIGH
MANUFACTURERS SPECIFICATIONS.
DE ORO CI
THIS SITE
15. CONDUCT PROPER ROUGHING-INS AND/OR WATER TEST
PRIOR TO POURING TO ENSURE AGAINST LEAKAGE.
CAGAYAN
LOCATION PLAN
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE P 23
FACILITY (COVERED COURT) SITE DEVELOPMENT PLAN
JEAN R. TIOZON JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
LOCATION PLAN ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, PLUMBING NOTES DATE DATE: DATE: DATE: DATE:
1 4 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
1 2 3 4 5 6
30.00m
TO MAIN DRAINAGE
DS CANAL DS DS CANAL DS DS CANAL DS
A A
17.00m
17.00m
B B
DS CANAL DS DS CANAL DS DS CANAL DS
TO MAIN DRAINAGE
5.00m 5.00m 10.00m 5.00m 5.00m
30.00m
1 2 3 4 5 6
1 DRAINAGE LAYOUT
2 4 SCALE 1:100MTS
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE P 24
FACILITY (COVERED COURT)
JEAN R. TIOZON JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
DRAINAGE LAYOUT ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
2 4 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
3"Ø PVC DOWNSPOUT
3"Ø PVC DOWNSPOUT
6 A
6
5.0 L
NA
2
0m 5.0
CA0m
DS
5
5.0
L
1 0m
CA
NA 0m
5.0
DS
DS
3
m
.00 5.0
17 0m
DS
CA
NA
0m
L 5.0 2
DS
GE
A INA
B IN
DR 1
MA
TO
DRAINAGE
1 ISOMETRIC LAYOUT
3 4 SCALE 1:100MTS
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE P 25
FACILITY (COVERED COURT)
JEAN R. TIOZON JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
DRAINAGE ISOMETRIC LAYOUT ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL, DATE DATE: DATE: DATE: DATE:
3 4 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL
KEY TO SYMBOLS: SPECIFICATION:
WC WATER CLOSET 1. WATER LINES
FD FLOOR DRAIN 2. DOWNSPOUT
PEDESTAL
LAV LAVATORY 3. STORM DRAINAGE PIPES
CO CLEANOUT
VTR VENT THRU ROOF 4. VENT PIPES / VENT STACK
SH SHOWER HEAD 5. SOIL AND WASTE PIPES
FAU FAUCET 6. VALVES 3.5mm THK. x 25mm
STEEL CROSS BAR
GV GATE VALVE 7. PIPE SEALANT
CV CHECK VALVE 8. DRAINS & CLEANOUTS
CB CATCH BASIN
0.10m
SV SEPTIC VAULT
WASTE PIPE LINE · Galvanized Iron (GI) Pipes & Fittings.
WATER PIPE LINE · Polyvinyl Chloride (PVC) series 1000.
M WATER METER · Interior - Polyvinyl Chloride (PVC) series 1000.
0.55m
0.35m
AV ANGLE VALVE · Exterior - Polyvinyl Chloride (PVC) series 1000.
· Polyvinyl Chloride (PVC) series 1000.
· Polyvinyl Chloride (PVC) series 1000.
0.10m
· Up to 50mmØ B62, 860 Kpa Class, threaded end.
· Polyvinyl Chloride - PVC Compound, Galvanized Iron - Teflon tape.
· All drains & cleanouts shall be cast iron body w/ bronze / brass top.
1.25m 1.25m
PLAN
0.40m
0.50m
FINISH FLOOR LINE
100mm THK. CONCRETE
CANAL
NATURAL GRADE LINE
0.10m 0.35m 0.10m
0.55m
SEE DETAIL
SECTION
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DESIGNED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION - X
CONSTRUCTION OF MULTI-PURPOSE
MISAMIS ORIENTAL FIRST DISTRICT ENGINEERING OFFICE KEY TO SYMBOLS P 26
FACILITY (COVERED COURT)
SPECIFICATION JEAN R. TIOZON JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN,A.E.R. MARIVEL FRANCES L. ONG, A.E.R.
CANAL SECTION DETAIL ENGINEER II ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC- ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OFFICE OF THE DISTRICT ENGINEER SAN JUAN CENTRAL SCHOOL,
CANAL & STEEL GRATING DETAIL DATE DATE: DATE: DATE: DATE:
4 4 26
Brgy. 26, Gingoog City GINGOOG CITY, MISAMIS ORIENTAL