Professional Documents
Culture Documents
3
6 6 3
2 C D
5 5 5 5
C1
3 (D)D
C1
B
2 2 3
B (D)D
2 2 6
(B)B (B)B 6 F
PANEL
4 3
A B A B F
F F
3
3 3
INSTALASI PENERANGAN
POLITEKNIK NEGERI BANDUNG
Edition Sheet
PRATIKUM
RevNo Revision note Date Signature Checked
3
(P, PE, N) 6 (3P, PE, 2N) 7
(3P, HP, PE, 2N)
(P, N) 2 C D
3 (P, PE, N)
B C C1
3 (P, PE, N) (D)D
3
(P, PE, N) A
2 (P, N) 2 (P, N) 3 (P, PE, N)
B (D)D
6 (3P, N, 2HP)
(B)B (B)B 6 F
(3P, PE, N, HP)
PANEL
4 (2P, 2HP) 3 (2P, HP)
A B A B F
F F
3 (P, PE, N)
3 (P, PE, N) 3
(P, PE, N)
3
(P, PE, N)
KETERANGAN :
P : PHASA
HP : HANTARAN PHASA
N : NETRAL
PE : PROTECTION EARTH
INSTALASI PENERANGAN
POLITEKNIK NEGERI BANDUNG
Edition Sheet
PRATIKUM