Table of Content
Monitoring Readyness QAQC Construction Dossier
/WML-40-SNBP-PTG-PGAS-VIII-2022 08/Aug/22 5 A4 PL
/WML-40-SNBP-PTG-PGAS-VIII-2022 08/Aug/22 4 A4 PL
/WML-40-SNBP-PTG-PGAS-VIII-2022 09/Aug/22 6 A4 PL
/WML-40-SNBP-PTG-PGAS-VIII-2022 09/Aug/22 1 A4 PL
/WML-40-SNBP-PTG-PGAS-VIII-2022 10/Aug/22 6 A4 PL
/WML-40-SNBP-PTG-PGAS-VIII-2022 10/Aug/22 4 A4 PL
/WML-40-SNBP-PTG-PGAS-VIII-2022 11/Aug/22 6 A4 PL
/WML-40-SNBP-PTG-PGAS-VIII-2022 11/Aug/22 2 A4 PL
Doc. Type Monitoring Review
Hard
Weight E-File Date Finding Page
File
1 1 1 21-Sep-22 NA NA
1 1 1 21-Sep-22 NA NA
1 1 1 21-Sep-22 NA NA
1 1 1 21-Sep-22 NA NA
1 1 1 21-Sep-22 NA NA
1 1 1 21-Sep-22 NA NA
1 0 1 21-Sep-22 Dokumen Belum Lengkap 1 of 2
1 1 1 21-Sep-22 NA NA
Monitoring Review
Status
Comments
QTY
VOL IV
4.1 TQ (TECHNICAL QUERY)
4.2 FCN (FIELD CHANGE NOTICE)
4.3 CAR (CORRECTIVE ACTION REQUEST)
4.4 NCR (NON CONFORMANCE REPORT)
4.5 QAQC CONSTRUCTION REPORT
4.5.1 PIPELINE CONSTRUCTION
4.5.1.1 PIPELINE 20"
4.5.1.2 PIPELINE 16"
4.5.1.3 PIPELINE LBCV
4.5.1.4 PIPELINE CIVIL
4.5.1.5 PIPELINE ELECTRICAL
4.5.2 METERING SENIPAH
4.5.2.1 PIPING
4.5.2.2 CIVIL
4.5.2.3 MECHANICAL
4.5.2.4 ELECTRICAL
4.5.2.5 INSTRUMENT
4.5.3 METERING BALIKPAPAN
4.5.3.1 PIPING
4.5.3.2 CIVIL
4.5.3.3 MECHANICAL
4.5.3.4 ELECTRICAL
4.5.3.5 INSTRUMENT
4.5.4 TIE-IN PHM
Permintaan Dokumen Native
Penamaan File ToC
Reviewed by PTG
Kategori
Dokumen Lengkap Dokumen Belum Lengkap
Hard File E-File
Hard File E-File Kurang / Penamaan Kurang /
Tidak Sesuai Tidak Sesuai
Tidak Ada File ToC Tidak Ada
Approved by PTG
Kategori
Dokumen
E-File Dokumen
Belum Remaining
Penamaan Lengkap
Lengkap
File ToC
Dokumen Administrasi Proyek
Dossier Proyek
Volume Sub-Volume Konten
Volume 1 Kontrak
Volume 2 Engineeering Doc.
V.2.1 Detail Engineering Design (DED)
V.2.2 As-Built Doc.
Volume 3 Procurement Doc.
V.3.1 Vendor Doc.
V.3.2 Berita Acara MOS
Volume 4 Construction Doc.
V.4.1 TQ (Technical Query)
V.4.2 FCN (Field Change Notice)
V.4.3 CAR (Corrective Action Request)
V.4.4 NCR (Non Conformance Report)
V.4.5 QAQC Construction Report
V.4.5.1 Pipeline Construction
V.4.5.1.1 Pipeline 16"
V.4.5.1.1.1 KP 00 - KP 14
V.4.5.1.2 Pipeline 20"
V.4.5.1.2.1 KP 15 - KP 75
V.4.5.1.3 Pipeline LBCV
V.4.5.1.3.1 Electrical LBCV Pipeline
V.4.5.1.3.2 Instrument LBCV Pipeline
V.4.5.1.3.3 Civil LBCV Pipeline
V.4.5.1.4 Civil Pipeline
V.4.5.2 Metering Senipah Construction
V.4.5.2.1 Piping
V.4.5.2.2 Civil
V.4.5.2.3 Mechanical
V.4.5.2.4 Electrical
V.4.5.2.5 Instrument
V.4.5.3 Metering Balikpapan Construction
V.4.5.3.1 Piping
V.4.5.3.2 Civil
V.4.5.3.3 Mechanical
V.4.5.3.4 Electrical
V.4.5.3.5 Instrument
Volume 5 QAQC Doc.
V.5.1 Certificate of Registration
V.5.2 Welder Certificate
V.5.3 Personel Certificate
V.5.4 Tools Calibration
V.5.5 Field Test Report (Report Hasil Pengujian Lapangan)
V.5.6 Material Verification Report
V.5.7 Berita Acara QAQC
V.5.8 Company Profile
V.5.8.1 NDT Compro
V.5.8.2 HDD Compro
V.5.8.3 N2 Purging Compro
Volume 6 Installation System & Tools
V.6.1 Pre-Commissioning Pipeline
V.6.2 Pre-Commissioning Non Pipeline
V.6.3 Certificate of Inspection (COI)
V.6.4 Commissioning & Start-Up
V.6.5 Operating & Maintanance Manual & Training
Volume 7 Project Report
Volume 8 Warranty Tools
MOCKUP SYSTEM & SUB-SYSTEM FOR MECHANICAL COMPLETION
1.A.1 PIPING
1.A.2 CIVIL
1.A FUEL PACKAGE 1.A.3 MECHANICAL
1.A.4 ELECTRICAL
1.A.5 INSTRUMENT
1.B.1 PIPING
1.B.2 CIVIL
1.B AIR PACKAGE 1.B.3 MECHANICAL
1.B.4 ELECTRICAL
1.B.5 INSTRUMENT
1.C.1 PIPING
1.C.2 CIVIL
1.C WATER PACKAGE 1.C.3 MECHANICAL
1.C.4 ELECTRICAL
1.C.5 INSTRUMENT
1.D.1 PIPING
1 SYSTEM STASIUN SENIPAH
1.D.2 CIVIL
1.D MAIN PROCESS 1.D.3 MECHANICAL
1.D.4 ELECTRICAL
1.D.5 INSTRUMENT
1.E.1 UPS
1.E.2 LV SWITCGEAR
1.E ELECTRICAL PACKAGE 1.E.3 TRANSFORMER & ICCP
1.E.4 CABLE POWER, GROUNDING & LIGHTNING SYSTEM
1.E.5 EDG
1.F.1 CCTV
1.F.2 FIRE & GAS
1.F INSTRUMENT PACKAGE
1.F.3 SCADA
1.F.4 MOTOR CONTROL CENTER
1.G.1 BUILDING & SHELTER
1.G BUILDING PACKAGE 1.G.2 SANITARY
1.G.3 SAFETY GUARD
2.A.1 PIPING
2.A.2 CIVIL
2.A FUEL PACKAGE 2.A.3 MECHANICAL
2.A.4 ELECTRICAL
2.A.5 INSTRUMENT
2.B.1 PIPING
2.B.2 CIVIL
2.B AIR PACKAGE 2.B.3 MECHANICAL
2.B.4 ELECTRICAL
2.B.5 INSTRUMENT
2.C.1 PIPING
2.C.2 CIVIL
2.C WATER PACKAGE 2.C.3 MECHANICAL
2.C.4 ELECTRICAL
2.C.5 INSTRUMENT
2.D.1 PIPING
2 SYSTEM STASIUN BALIKPAPAN
2.D.2 CIVIL
2.D MAIN PROCESS 2.D.3 MECHANICAL
2.D.4 ELECTRICAL
2.D.5 INSTRUMENT
2.E.1 UPS
2.E.2 LV SWITCGEAR
2.E ELECTRICAL PACKAGE 2.E.3 TRANSFORMER & ICCP
2.E.4 CABLE POWER, GROUNDING & LIGHTNING SYSTEM
2.E.5 EDG
2.F.1 CCTV
2.F.2 FIRE & GAS
2.F INSTRUMENT PACKAGE
2.F.3 SCADA
2.F.4 MOTOR CONTROL CENTER
2.G.1 BUILDING & SHELTER
2.G BUILDING PACKAGE 2.G.2 SANITARY
2.G.3 SAFETY GUARD
3.A.1 PIPELINE
3.A.2 CIVIL
3.A PIPELINE 20"
3.A.3 MECHANICAL
3.A.4 ELECTRICAL
3.B.1 PIPELINE
3.B.2 CIVIL
3 SYSTEM PIPELINE 3.B PIPELINE 16"
3.B.3 MECHANICAL
3.B.4 ELECTRICAL
3.C.1 PIPING
3.C.2 CIVIL
3.C LBCV
3.C.3 MECHANICAL
3.C.4 INSTRUMENT
4.B.1 PIPING
4.B.1.1 PIPING SENIPAH TIE-IN GAS
PAINTING
4.B.1.2 PIPE SUPPORT
16"-PG-SNP-0001-A03A
4.B.1.2.1 SNBP-EPC-10-PIP-ISO-001 Sheet 18-22
4.B.2 CIVIL
4 TIE-IN PHM AREA 4.B TIE-IN GAS
4 TIE-IN PHM AREA 4.B TIE-IN GAS RETAINING WALL FOR TIE-IN BOX
SHELTER FOR TIE IN PLAN & SECTION
FENCE AND GATE FOR TIE-IN
PIPE SUPPORT FOUNDATION
PIPE SLEEPER FOUNDATION
4.B.3 MECHANICAL
FLANGE, GASKET AND BOLTS/NUTS
1 - 20" Pipeline 75,7 Km (Include Pig Launcher & Pig Receiver) Pipa Penyalur Senipah - Balikpapan COI
4 PSV-102 PSV for Sales Gas Filter Katup Pengaman Senipah COI
10 PSV-601 PSV for Instrument Air Receiver Katup Pengaman Senipah COI
11 SNP-MBF-101 Instrument Air Receiver Bejana Tekan (Pressure Vessel) 1370/PV.PTM.12.2022 Senipah COI A4 1 PT Medina Eng PJ TEK Mandiri FAT Done Completed Completed
13 SNP-ABD-101 Closed Drain Drum Bejana Tekan (Pressure Vessel) 1372/PV.PTM.12.2022 Senipah COI A4 1 PT Medina Eng PJ TEK Mandiri FAT Done Completed Completed
14 SNP-ABD-102 Vent KO Pot Bejana Tekan (Pressure Vessel) 1374/PV.PTM.12.2022 Senipah COI A4 1 PT Medina Eng PJ TEK Mandiri FAT Done Completed Completed
19 PSV-203 PSV for Sales Gas Filter Katup Pengaman Balikpapan COI
24 PSV-604 PSV for Instrument Air Receiver Katup Pengaman Balikpapan COI
25 BLP-MBF-201 Instrument Air Receiver Bejana Tekan (Pressure Vessel) 1371/PV.PTM.12.2022 Balikpapan COI A4 1 PT Medina Eng PJ TEK Mandiri FAT Done Completed Completed
27 SNP-ABD-201 Closed Drain Drum Bejana Tekan (Pressure Vessel) 1373/PV.PTM.12.2022 Balikpapan COI A4 1 PT Medina Eng PJ TEK Mandiri FAT Done Completed Completed
28 BLP-ABD-202 Vent KO Pot Bejana Tekan (Pressure Vessel) 1375/PV.PTM.12.2022 Balikpapan COI A4 1 PT Medina Eng PJ TEK Mandiri FAT Done Completed Completed
29 SNP-ZAU-101A/B Sales Gas Metering Package Alat Ukur Serah Terima Senipah COI
30 SNP-ZAU-201A/B Sales Gas Metering Package Alat Ukur Serah Terima Senipah COI