Contract Name
R 3,248,584.22
P&G Value = 357,344.26 Gross
11%
PAGE / ITEM CLAUSE DETAILS FIXED VALUE TIME TOTAL
3/1/1/6 A6 Contractors Site Representative - - 48.75% 48.75%
3/1/1/7 A7 Compliance with Laws 1.02% - - 1.02%
3/1/1/8 A8 Works Risk - 1.03% - 1.03%
4/1/1/11 A11 Special Insurances - 0.06% - 0.06%
4/1/1/14 A14 Security - 0.27% - 0.27%
5/1/1/19 A19 Temporary Works and Plant 4.67% - 21.49% 26.16%
9/1/1/55 B6.1 Water 1.95% - 1.78% 3.73%
9/1/1/56 B6.2 Electricity 2.56% - 2.63% 5.19%
9/1/1/57 B6.3 Telecommunications 0.97% - 1.73% 2.70%
9/1/1/58 B6.4 Ablution Facilities 0.73% - 1.23% 1.96%
9/1/1/63 B9.3 Security of the Works 0.33% - 2.03% 2.36%
11/1/1/67 B9.7 Works Cleaning and Clearing 2.27% 4.50% 6.77%
C HIV/AIDS Awearness
TOTAL 0 0 84.14% 100.00%
100.00%
Check 357,344.26
SSZNAYO
MNQ/SCM/15/21-22
CONSTRUCTIO OF EXT 5 GRAVEL INTERNAL STREETS IN CENTANE
ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT
(c) In inlet and outlet structure, skewed ends, catchpits, manhole,thrustand anchor block,
excluding formwok, but including class U2surface:
To suite 600mm diameter outlet pipe complete (1,5m x 2m x 100mmslab and 5m2
brickwokeach) 20Mpa for concrete slab No. 8 R 1,800.00 R 14,400.00
(a) Cast in situ concrete lining (20Mpa V-drain) m³ 44.65 R 2,300.00 R 102,695.00
23.09 Formwork to cast in situ concrete linning for open drains (class F2 surface finish)
(a) To sides with formwork on the internal face only m² 65 R 85.00 R 5,525.00
23.10 Sealed joints in concrete linings of open drains (10mm soft-board) m 77 R 185.00 R 14,245.00
56.01 Road sign boards complete with supports with Class 1 retro-refelective background.
Symbols and lettering in semi-matt black . Borders in Class 1 retro-reflective material,
where the sign board is constructed from;
MNQ/SCM/15/21-22
CONSTRUCTIO OF EXT 5 GRAVEL INTERNAL STREETS IN CENTANE
SUMMARY PAGE
SUB-TOTAL R 362,433.51
TOTAL R 416,798.54