WEEK 17
Summary of progress made since last review meeting

 Supervisor review our Mid-Evaluation documents and had a discussion related future
development stage.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 After Mid-evaluation discussion. The supervisor discusses about application work and other
module of the project.

Result of discussion with supervisor Proposed tasks for the next meeting

 The Project Development Plan was


reviewed, and it was advised to  Report the implementation as a rough work.
move forward with the Project
keeping updated Timeline in mind.

Supervisor Signature: ______________________________ Date: __________________


Week 18
Summary of progress made since last review meeting

 A thorough study was done. And the learning process has started.
 Listed down all the new hardware components to be used further in the project.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 Discussion about literature viewed, & looking up for more improvement in concepts.

Result of discussion with supervisor Proposed tasks for the next meeting

 To study more about the scope of  Discussion on other libraries and workings for
the project. betterment.
 Clear all the advance concepts for
implementation within this week.

Supervisor Signature: ______________________________ Date: __________________


Week 19
Summary of progress made since last review meeting

 Working on the improvement of the basic structure defined till Mid evaluation.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 Redesigning and working on further better concepts for more accurate workings and new
work.

Result of discussion with supervisor Proposed tasks for the next meeting

 The Supervisor instructed to go  More suggestions and related task should be


through this phase as soon as completed.
possible and let us know regarding
multiple new learning’s related to
the project and market.

Supervisor Signature: ______________________________ Date: __________________


Week 20
Summary of progress made since last review meeting

 As per Instructions, start working for suggestions and related task.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 Furthermore suggestions were discussed, sir suggested more regarding admin module.

Result of discussion with supervisor Proposed tasks for the next meeting

 The Supervisor instructed to  Study for admin module.


complete this phase and study on
modules that were suggested.

Supervisor Signature: ______________________________ Date: __________________


Week 21
Summary of progress made since last review meeting

 Supervisor discussed regarding modules and especially about admin module as it was
supposed to be completed from now onwards.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 Working on modules of admin and other designing process.

Result of discussion with supervisor Proposed tasks for the next meeting

 Learn about some coding  Finalizing the designing phase and modules
methodologies and processes. research.

Supervisor Signature: ______________________________ Date: __________________


Week 22
Summary of progress made since last review meeting

 The supervisor instructed to complete the admin and also reviewed the modules designs.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 Development of phases were started and login methodologies were being reviewed.

Result of discussion with supervisor Proposed tasks for the next meeting

 The supervisor reviewed the  Development of modules should be completed.


project and guided us for some
features.

 He also followed up for login and


other functionalities.

Supervisor Signature: ______________________________ Date: __________________


Week 23
Summary of progress made since last review meeting

 Development was almost completed but still there were some issues.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 Development was in process and finalizing the access to all different modules.

Result of discussion with supervisor Proposed tasks for the next meeting

 Access for modules were finalized  Finalization of modules.


and learn regarding some new
additions.

Supervisor Signature: ______________________________ Date: __________________


Week 24
Summary of progress made since last review meeting

 Finalizing all modules and their functionalities.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 Addition of customer names and other status were discussed and further processed.

Result of discussion with supervisor Proposed tasks for the next meeting

 Additions were discussed and  To complete all development.


finalizing was started.

Supervisor Signature: ______________________________ Date: __________________


Week 25
Summary of progress made since last review meeting

 Development was process to be completed and finalize the deployment.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 Testing of modules were discussed.

Result of discussion with supervisor Proposed tasks for the next meeting

 The supervisor reviewed the  Report process was discussed.


progress we made and instructed
us to test it.

Supervisor Signature: ______________________________ Date: __________________


Week 26
Summary of progress made since last review meeting

 Report was discussed and other related documents were started to process.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 Testing and report was the main focus for the finalization

 process.

Result of discussion with supervisor Proposed tasks for the next meeting

 The supervisor reviewed the  Report was the main task assigned.
progress we made and instructed
us to test it.
Supervisor Signature: ______________________________ Date: __________________

Week 27
Summary of progress made since last review meeting

 Finalizing all modules for submission process and supervisor told to wrap up everything
smoothly and accurately.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

 The deployed module was reviewed by the supervisor and tested that it is working properly.
 Report is shown to supervisor.
 Checking and manual testing of the display, and other hardware components integrated.
 Finalization and completion of project.

Result of discussion with supervisor Proposed tasks for the next meeting

 The supervisor reviewed the  Documentation and finalization


project and instructed to complete
the documentation of the project
before final evaluation.
Supervisor Signature: ______________________________ Date: __________________

Week 28
Summary of progress made since last review meeting

 The documentation is completed.

Activity/Data/Literature Reviews/Figure/Sample Analysis (Achievement based on Gantt chart)

Achievement Based on Gantt Chart:

• Finalizing & Documentation.

Activity:

• Final checking of project and documentation.

Result of discussion with supervisor Proposed tasks for the next meeting

 The supervisor reviewed the  Deliver Project


documentation before final
evaluation.

Supervisor Signature: ______________________________ Date: __________________