Professional Documents
Culture Documents
Name of the work:-" Cleaning & House keeping of main plant area, plant building,aux.building & equipments and cleaning & Housekeeping of
CHP at ITPS" (OPGC-II), (For 02 years).
PART (A)- Labours
2nd
Sl. 1st Year
Location Description of work Unit Year Total Qty Unit Rate Total Amount
No. Qnty
Qnty
(I) T.G.Building :-
(i) 1) Sweeping by broom
2) Mopping mechanically
(i) 0.M.floor with cable gallaries and 3) Removing cub webs manually & using vaccum
Service Bay, Air compressor cleaner. 4)
buildings,Gas rooms. Disposal of debries
(ii) 3.5M &5.0M MCC Room with Cable (ii) 1) Sweeping by broom
galary rooms. 2) Mopping manually
1 Daily 313 313 626
(iii)Elevations 8.5M ,12M & 13.5M 3) Removing cub webs manually & using vaccum
,17.0M ,27M & 32M TG cleaner 4)
Equipment,Pannel Room, Cable Galary Disposal of debries
Floor & cable galaries, PRDS floors, (iii) 1) Sweeping by broom
Battery charger rooms. (Unskilled) 2) Mopping manually
3) Removing cub webs manually
4) Disposal of debries
1) Sweeping by broom
2) Mopping manually
2 Control room 17.0 MTR (Unskilled) Daily 313 313 626
3) Using scrubber for cleaning the floor
4) Disposal of debries
1) Sweeping by broom
HVAC Equipment (24.0M) & Derator
3 2) Mopping manually Daily 313 313 626
floor rooms(25.5M).(Unskilled)
3) Using scrubber for cleaning the floor
1) Cleaning of toilets & urinal pans by hand brush with
Daily
All the toilet from 0.00Mtr to 17.00 detergent.
4 (Thrice 313 313 626
Mtr (Semi skilled) 2) Applying disinfactant and providing deodorant to
/ day)
kep the toilets hygienic.
1)Cleaning by cloth ,
5 Equipment T.G. & Boiler (Unskilled) Daily 313 313 626
2) Cleaning by Air pressure
(II) Boiler area :-
2nd
Sl. 1st Year
Location Description of work Unit Year Total Qty Unit Rate Total Amount
No. Qnty
Qnty
Supply man power of shifting of
Supply man power of shifting of rejected coal using
rejected coal using trolly from mill
8 trolly from mill area to the designated area for Daily 303 303 606
area to the designated area for
dumping as per the direction of EIC.
dumping as per the direction of EIC.
Ash Handling Pump House & Dry
(III)
Ash Silos
Floor cleaning, mopping, removing of 1) Sweeping by broom
cub webs, equipment cleaning , 2) Mopping manually
1 Daily 313 313 626
Cleaning of ash on drains and 3) Removing cub webs manually & using vaccum
peripheral area.(Unskilled) cleaner.
Each
2 Cleaning during Ash spillage(Unskilled) 1)Removing ash manually & washing the floor. 4 4 8
time
(IV) Water Treatment Plant:
1) Sweeping by broom
2) Mopping manually as well using scrubber
1 DM Plant Building (Unskilled) Daily 313 313 626
3) Removing cub webs manually & using vaccum
cleaner.
1) Sweeping by broom
C.W.pump house,BCW pump
2) Mopping manually as well using scrubber
2 house,R.W. pump house, workshop Daily 313 313 626
3) Removing cub webs manually & using vaccum
building. (Unskilled)
cleaner.
1) Cleaning of toilets & urinal pans by hand brush with
All the toilets in DM plant, C.W.pump Daily
detergent.
3 House,Raw Water Pump House and (Thrice 313 313 626
2) Applying disinfactant and providing deodorant to
Workshop Building, (Semi skilled) / day)
keep the toilets hygienic.
Cleaning of neutralisation pit Cleaning of bottom portion of netralization pit and Each
4 2 2 4
(Unskilled) disposal of debries at desiginated place. time
(V) Operation
1) Sweeping by broom
2) Mopping manually as well using scrubber 3)
Pota cabin area,paved area near CST Removing cub webs manually.
2 Daily 313 313 626
and peripheral area (Unskilled) 4) Cleaning of aluminium and glass section with
cleaning liquid . 5)
Cutting of wild garsses inside & out side of fenced area.
2nd
Sl. 1st Year
Location Description of work Unit Year Total Qty Unit Rate Total Amount
No. Qnty
Qnty
Cleaning of storm water drains 1)Cleaning of strom water drains including removal of
including removal of debris, weeds debris,weeds etc from drain and disposal of the same
2 Day 52 52 104
around the plant premises. away from work site including transpotation by tractor
(Unskilled) as per the direction of EIC.
Helper to assist the plumber in Assisting the plumber in day-today maintenance work
Daily 313 313 626
plumbing work(Unskilled) of PH & portable pipe lines inside plant area..
Sweeping all area with broom & mopping all the floors
Floors of CHP Control room, Stair with detergent water,cleaning the cub webs manually &
cases, Cable gallery,Operational staff using vaccum cleaner,disposal of debries, mopping &
1) Days 365 365 730
roomS,MCC room ,Corridor & Periperal cleaning of all furniture,aircondition unit with
area. environment friendly product,cleaning glass &
aluminium section with cleaning liquid
Sweeping all area with broom & mopping all the floors
with detergent water,cleaning the cub webs manually &
Maintenance building,Staff rooms
using vaccum cleaner,disposal of debries, mopping &
2) ,corrider,store rooms,Maintenance Days 313 313 626
cleaning of all furniture,aircondition unit with
building, Lobour Rest shed.
environment friendly product,cleaning glass &
aluminium section with cleaning liquid
Sweeping all area with broom & mopping all the floors
with detergent water,cleaning the cub webs manually &
Track hopper pannel building ,All using vaccum cleaner,disposal of debries, mopping &
4) Days 313 313 626
ventilation rooms,computer room. cleaning of all furniture,aircondition unit with
environment friendly product,cleaning glass &
aluminium section with cleaning liquid.
2nd
Sl. 1st Year
Location Description of work Unit Year Total Qty Unit Rate Total Amount
No. Qnty
Qnty
Cleaning of road by sweeper/ manually and water
6) All roads of CHP sprinkling as per requirement and as per the direction Days 120 120 240
of EIC.
Cleaning of over head tanks at control
Per
7) room / Maintenance Building, TRH 1)Removing of silt , Algae manually 12 12 24
time
area & TH