Performance of the Relays in MRT Sub-division Ananthapuramu for the month of APRIL 2023

Return on Healthiness and Operation of AUFLS and f+df/dt Load Shedding Schemes

Exact time of Approved Load Actual Load


Frequency at operation of Relief from Relief obtained Affected area
Name of the Sub- Model & Make of Status of feeders from feeders
Sl. No. Name of the Feeders Setting adopted the time of relay whether Remarks
Station relay the relay
tripping ( as per power flow
relay)
MW MW

1) 33 kV Kanaganapalli
2) 33 kV Kanumukkala
3) 33 kV D.C.Palli
132/33 kV SS AUFLS Stage-I
1 4) 33 kV Bathalapalli SIFANG/CSC211 Healthy - -NIL- 26 MW -NIL- -NIL- --
Dharmavaram setting of 49.4 Hz
5) 33 kV Tadimarri
6) 33 kV N.S.Gate
7) 33 kV Hampapuram
1) 33 kV K.P.Doddi
2) 33 kV Rayadurgam
3) 33 kV Chadam ALSTOM /
132/33 kV SS AUFLS Stage-III
2 MFVUM Healthy - -NIL- 26 MW -NIL- -NIL- --
Rayadurgam 4) 33 kV Bhupasamudram setting of 49.0 Hz
12D1AA0014A
5) 33 kV Pallepalli
6) 33 kV Avuladatla
1) 33 kV Settur
2) 33 kV Beluguppa
3) 33 kV HR Palli
220/132/33 kV SS 4) 33 kV Thimmapuram AUFLS Stage-IV
3 ALSTOM/P442 Healthy - -NIL- 55 MW -NIL- -NIL- --
Kalyandurgam setting of 48.8 Hz
5) 33 kV Gangavaram
6) 33 kV Kundurpi
7) 33 kV Nuthimadugu

EXECUTIVE ENGINEER DEPUTY EXECUTIVE ENGINEER ASSISTANT EXECUTIVE ENGINEER


MRT & TRE DIVISION MRT SUB-DIVISION MRT SUB-DIVISION
ANANTHAPURAMU ANANTHAPURAMU ANANTHAPURAMU
Performance of the Relays in MRT Sub-division Ananthapuramu for the month of APRIL 2023
220 kV and 132 kV Lines Relays

Make of C.T.Ratio Make of the Relay Type of the relay Due date
Sl. Date of last Condition
Name of the feeder the Main 2 / Main 2 / Date of last testing for next
No. Available Adopted Main 1 Main 1 Operated of Relay
Breaker Back up Back up testing
220/132/33 kV SS ANANTHAPURAMU
Main 1 10.01.23 21.08.2022 09.01.24 OK
1 220 kV Gooty SWS ABB (SF6) 800-600-400/1-1-1-1-1 A 800/1-1-1---1 GE ABB P444 REL670
Main 2 10.01.23 21.08.2022 09.01.24 OK
Main 1 10.01.2023 20.04.2022 09.01.2024 OK
2 220 kV Thimmapuram-I ABB (SF6) 800-600-400/1-1-1-1-1 A 800/1-1-1---1 GE ABB P444 REL670
Main 2 10.01.2023 20.04.2022 09.01.2024 OK
800-600-400/1-1-1,0.5- Main 1 19.04.23 19.02.2023 18.04.24 OK
3 220 kV Thimmapuram-II ABB (SF6) 800/1-1-1---1 GE ABB P444 REL670
1,0.5-1 A Main 2 19.04.23 19.02.2023 18.04.24 OK
Main 1 10.01.2023 03.03.23 09.01.2024 OK
4 220 kV Ramagiri ABB (SF6) 800-600-400/1-1-1-1-1 A 800/1-1-1---1 GE ABB P444 REL670
Main 2 10.01.2023 22.02.2022 09.01.2024 OK
Main 1 10.01.2023 22.02.2022 09.01.2024 OK
5 220 kV Kalyanadurgam-I ABB (SF6) 1600-800/1-1-1,2-1,2-1 800/1-1-1---1 GE ABB P444 REL670
Main 2 10.01.2023 22.02.2022 09.01.2024 OK
Main 1 22.10.2022 09.05.2022 21.10.2023 OK
6 220 kV Kalyanadurgam-II ABB (SF6) 1600-800/1-1-1,2-1,2-1 800/1-1-1---1 SIFANG Schneider CSC101 P444
Main 2 22.10.2022 09.05.2022 21.10.2023 OK
7 220 kV Bus Coupler ABB (SF6) 1600-800/1-2-2-1 1600/1-2-2-1 GE ~ C264 ~ Main ~ 26.01.2020 ~ OK

8 220 kV Bus Bar ~ ~ ~ GE ~ B90 ~ Main 08.06.2019 04.05.2019 08.06.2020 OK


Main 21.04.23 16.03.23 20.04.24 OK
9 132 kV Nagalapuram ABB (SF6) 600-300-150/1-1-1 600/1-1-1 ALSTOM ALSTOM P442 P14DB
Back up 21.04.23 23.05.18 20.04.24 OK
Main 10.01.2023 05.04.23 09.01.2024 OK
10 132 kV Dharmavaram ABB (SF6) 600-300-150/1-1-1 600/1-1-1 ER ER SEL-311C ARGUS-2
Back up 10.01.2023 22.04.18 09.01.2024 OK
Main 18.01.2023 07.01.2023 17.01.2024 OK
11 132 kV Ankampalli CGL (SF6) 600-300-150/1-1-1 600/1-1-1 ALSTOM ALSTOM P442 P14DB
Back up 18.01.2023 22.04.18 17.01.2024 OK
Main 07.04.2022 29.03.2022 06.04.2023 OK
12 132 kV Taticherla feeder CGL (SF6) 600-300/1-1-1 600/1-1-1 ALSTOM ALSTOM P442 P14DB
Back up 07.04.2022 19.08.18 06.04.2023 OK
220/132/33 kV SS KALYANDURGAM
800-600-400/1-1-1,0.5- Main 1 20.06.2022 24.08.21 19.06.2023 OK
13 220 kV Ananthapuramu-I CGL (SF6) 800/1-1-1---1 GE ALSTOM D60 P444
1,0.5-1. Main 2 20.06.2022 24.08.21 19.06.2023 OK
800-600-400/1-1-1,0.5- Main 1 06.01.2023 01.08.2022 05.01.2024 OK
14 220 kV Ananthapuramu-II CGL (SF6) 800/1-1-1---1 Schneider SIEMENS P545 7SA522
1,0.5-1. Main 2 06.01.2023 01.08.2022 05.01.2024 OK
800-600-400/1-1-1,0.5- Main 1 30.11.2022 ~ 29.11.2023 OK
15 220 kV Borampalli -I ABB (SF6) 800/1-1-1---1 GE ALSTOM D60 P444
1,0.5-1. Main 2 30.11.2022 ~ 29.11.2023 OK
800-600-400/1-1-1,0.5- Main 1 13.10.2022 09.05.2022 12.10.23 OK
16 220 kV Borampalli-II CGL (SF6) 800/1-1-1---1 GE ALSTOM D60 P442
1,0.5-1. Main 2 13.10.2022 09.05.2022 12.10.23 OK

17 220 kV Bus Bar ~ ~ ~ GE ~ B90 ~ Main 1 29.07.2019 ~ 29.07.20 OK

Page 2
Main 11.11.2022 12.05.21 10.11.2023 OK
18 132 kV Ankampalli CGL (SF6) 600-300-150/1-1-1 600/1-1-1 ALSTOM ALSTOM P442 P14DB
Back up 11.11.2022 13.09.09 10.11.2023 OK
Main 11.11.2022 05.02.2023 10.11.2023 OK
19 132 kV Rayadurgam - I CGL (SF6) 600-300-150/1-1-1 300/1-1-1 GE GE P442 P14DB
Back up 11.11.2022 06.12.21 10.11.2023 OK
Main 11.11.2022 27.01.2023 10.11.2023 OK
20 132 kV Rayadurgam - II SIEMENS 600-300/1-1-1 300/1-1-1 GE GE D60 F650
Back up 11.11.2022 24.11.2022 10.11.2023 OK
Micom Main 06.01.2023 06.09.22 05.01.2024 OK
21 132 kV Tagguparthy - I SIEMENS 600-300/1-1-1 600/1-1-1 Schneider Schneider Micom P141
P442 Back up 06.01.2023 ~ 05.01.2024 OK
Micom Main 06.01.2023 06.09.22 05.01.2024 OK
22 132 kV Tagguparthy - II SIEMENS 600-300/1-1-1 600/1-1-1 Schneider Schneider Micom P141
P442 Back up 06.01.2023 ~ 05.01.2024 OK
Main 23.04.2022 21.02.2023 22.04.2023 OK
23 132 kV Taticherla CGL (SF6) 600-300-150/1-1-1 300/1-1-1 ALSTOM ALSTOM P442 P14DB
Back up 23.04.2022 ~ 22.04.2023 OK
132 kV Poly solar wind Main 29.12.2022 16.03.20 28.12.2023 OK
24 ABB (SF6) 600-300/1-1-1 300/1-1-1 ABB ABB REL650 REF 615
farm Back up 29.12.2022 ~ 28.12.2023 OK
220/33 kV SS RAMAGIRI
Main 1 13.10.2022 31.01.2022 12.10.2023 OK
25 220 kV Ananthapuramu ABB (SF6) 800-600-400/1-1-1-1-1 800/1-1-1 A GE Alstom D-60 P-444
Main 2 13.10.2022 31.01.2022 12.10.2023 OK
Main 1 13.10.2022 12.06.2022 12.10.2023 OK
26 220 kV Shyapuram ABB (SF6) 800-600-400/1-1-1-1-1 800/1-1-1 A GE ABB P444 REL670
Main 2 13.10.2022 12.06.2022 12.10.2023 OK
ALSTOM Main 1 13.10.2022 14.04.21 12.10.2023 OK
27 220 kV Muttala-1 800-400-200/1-1-1-1-1 800/1-1-1 A ABB ALSTOM REL-670 P-444
(SF6) Main 2 13.10.2022 14.04.21 12.10.2023 OK
ALSTOM Main 1 13.10.2022 28.07.22 12.10.2023 OK
28 220 kV Muttala-2 800-400-200/1-1-1-1-1 800/1-1-1 A ABB ALSTOM REL-670 P-444
(SF6) Main 2 13.10.2022 28.07.22 12.10.2023 OK
29 220 kV Bus Bar ALSTOM Alstom Alstom P741 P743 18.09.2018 ~ 18.09.2019 OK
220/132 kV SS BORAMPALLI
220 kV Uravakonda Twin Main 1 11.05.2022 ~ 11.05.2023 OK
30 CGL (SF6) 1600-1200-800/1-1-1-1-1 1200/1-1-1---1 A GE ALSTOM D60 P 444
Moose-I Main2 11.05.2022 ~ 11.05.2023 OK
220 kV Uravakonda Twin Main 1 26.05.2022 05.05.22 26.05.2023 OK
31 CGL (SF6) 1600-1200-800/1-1-1-1-1 1200/1-1-1---1 A GE ALSTOM D60 P 444
Moose-II Main2 26.05.2022 05.05.22 26.05.2023 OK
220 kV Uravakonda Single 800-600-400/1-1-0.5,1- Main 1 25.08.2022 19.02.2023 25.08.2023 OK
32 CGL (SF6) 800/1-1-1---1 A GE ALSTOM D60 P 444
Moose-I 0.5,1-1 Main2 25.08.2022 19.02.2023 25.08.2023 OK
220 kV Uravakonda Single 800-600-400/1-1-0.5,1- Main 1 12.05.2022 22.04.21 12.05.2023 OK
33 CGL (SF6) 800/1-1-1---1 A GE ALSTOM D60 P 444
Moose-II 0.5,1-1 Main2 12.05.2022 22.04.21 12.05.2023 OK
800-600-400/1-1-0.5,1- Main 1 28.05.2022 ~ 28.05.2023 OK
34 220 kV Kalyanadurgam-I CGL (SF6) 800/1-1-1---1 A GE ALSTOM D60 P 444
0.5,1-1 Main2 28.05.2022 ~ 28.05.2023 OK
800-600-400/1-1-0.5,1- Main 1 10.10.2022 30.04.22 09.10.2023 OK
35 220 kV Kalyanadurgam-II CGL (SF6) 800/1-1-1---1 A GE ALSTOM D60 P 444
0.5,1-1 Main2 10.10.2022 30.04.22 09.10.2023 OK
2400-1600-2000/1,2-1,2-
36 220 kV Bus Coupler CGL (SF6) 1600/1-1 ABB REC670 ~ ~ ~ OK
1-1-1

37 220 kV Bus Bar Protection CGL (SF6) ~ ~ GE B90 06.01.2017 ~ 05.01.2018 OK

Page 3
220 kV Ecoren-I Main 1 12.01.2023 ~ 11.04.2024 OK
800-600-400/1-1-0.5,1-
38 (220 kV ABB (SF6) 800/1-1-1-1-1 A GE ALSTOM D60 P 444
0.5,1-1
Maddalacheruvu-I) Main2 12.01.2023 ~ 11.04.2024 OK
220 kV Ecoren-II Main 1 12.01.2023 09.05.22 11.04.2024 OK
800-600-400/1-1-0.5,1-
39 (220 kV ABB (SF6) 800/1-1-1-1-1 A GE ALSTOM D60 P 444
0.5,1-1 Main2 12.01.2023 09.05.22 11.04.2024 OK
Maddalacheruvu-II)
220 kV Hero- I Main 1 05.01.2023 18.12.21 04.01.2024 OK
800-600-400/1-1-0.5,1-
40 (220 kV Guruvepalli- ABB (SF6) 800/1-1-1-1-1 A GE ALSTOM D60 P 444
0.5,1-1 Main2 05.01.2023 18.12.21 04.01.2024 OK
I)
220 kV Hero-II Main 1 05.01.2023 ~ 04.01.2024 OK
800-600-400/1-1-0.5,1-
41 (220 kV Guruvepalli- ABB (SF6) 800/1-1-1-1-1 A GE ALSTOM D60 P 444
0.5,1-1 Main2 05.01.2023 ~ 04.01.2024 OK
II)
Main 1 05.01.2023 ~ 04.01.2024 OK
220 kV Greenko-I 800-600-400/1-1-0.5,1-
42 SIEMENS 800/1-1-1-1-1 A ALSTOM GE P 444 D60
(220 kV Saipuram-I) 0.5,1-1 Main2 05.01.2023 ~ 04.01.2024 OK

220 kV Greenko-II 800-600-400/1-1-0.5,1- Main 1 05.01.2023 04.01.2024 OK


43 SIEMENS 800/1-1-1-1-1 A ALSTOM GE P 444 D60
(220 kV Saipuram-II) 0.5,1-1 Main2 05.01.2023 04.01.2024 OK
220 kV Theta windfarms-I 800-600-400/1-1-0.5,1- Main 1 12.01.2023 ~ 11.04.2024 OK
44 CGL (SF6) 800/1-1-1-1-1 A ALSTOM GE P 444 D60
(220 kV Borampalli-I) 0.5,1-1 Main2 12.01.2023 ~ 11.04.2024 OK
132/33 kV SS URAVAKONDA
Main 21.01.2023 21.06.2022 20.01.2024 OK
45 132 kV Guntakal SIEMENS 600-300/1-1-1 600/1-1-1 GE GE D60 F650
Back up 21.01.2023 30.05.14 20.01.2024 OK
132/66 kV SS HAMPI
Main 01.06.2022 ~ 31.05.2023 OK
46 132 kV Guntakal CGL (SF6) 600-300/1-1-1 600/1-1-1 SIFANG SIFANG CSC162 CSC211
Back up 01.06.2022 ~ 31.05.2023 OK
132/33 kV SS RAYADURGAM
Main 01.09.2022 05.02.2023 31.08.2023 OK
47 132 kV Kalyandurgam-I CGL (SF6) 600-300-150/1-1-1 600/1-1-1 ER ER CSC162 CSC211
Back up 01.09.2022 05.05.20 31.08.2023 OK
SIEMENS Main 02.08.2022 27.01.2023 01.08.2023 OK
48 132 kV Kalyandurgam-II 600-300/1-1-1 600/1-1-1 GE GE D60 F650
(SF6) Back up 02.08.2022 24.06.13 01.08.2023 OK
SIEMENS Micom Main 17.12.2022 09.02.2023 18.12.2023 OK
49 132 kV Obulapuram 600-300/1-1-1 600/1-1-1 Schneider Schneider Micom P141
(SF6) P442 Back up 17.12.2022 ~ 18.12.2023 OK
Main 01.09.2022 ~ 31.08.2023 OK
50 132 kV Rayadurgam RTSS ABB( SF6) 600-300/1-1-1 300/1-1-1 ABB ABB REL650 REC650
Back up 01.09.2022 ~ 31.08.2023 OK
132/11 kV ( HNSS ) SS ANKAMPALLI
Main 20.10.2022 07.01.2023 19.10.2023 OK
51 132 kV Ananthapuramu CGL (SF6) 600-300-150/1-1-1 600/1-1-1 ER ER CSC162 CSC211
Back up 20.10.2022 30.04.11 19.10.2023 OK
Main 20.10.2022 12.05.21 19.10.2023 OK
52 132 kV Kalyandurgam CGL (SF6) 600-300-150/1-1-1 600/1-1-1 ER ER CSC162 CSC211
Back up 20.10.2022 06.04.12 19.10.2023 OK
132 kV Duddekunta Micom Main 20.10.2022 ~ 19.10.2023 OK
53 Siemens 600-300/1-1-1 600/1-1-1 Schneider Schneider P141
( Gamesa ) -I P442 Back up 20.10.2022 ~ 19.10.2023 OK
132 kV Duddekunta Micom Main 20.10.2022 21.11.21 19.10.2023 OK
54 Siemens 600-300/1-1-1 600/1-1-1 Schneider Schneider P141
( Gamesa ) -II P442 Back up 20.10.2022 ~ 19.10.2023 OK

Page 4
132/33 kV SS NAGALAPURAM
132 kV Ananthapuramu Micom Main 28.07.2022 16.03.2023 27.07.2023 OK
55 CGL (SF6) 600-400/1-1-1 600/1-1-1 Schneider Schneider C264P
Feeder P442 Back up 28.07.2022 ~ 27.07.2023 OK
Micom Main 28.07.2022 29.03.2022 27.07.2023 OK
56 132 kV Gooty Feeder CGL (SF6) 600-400/1-1-1 600/1-1-1 Schneider Schneider C264P
P442 Back up 28.07.2022 ~ 27.07.2023 OK
57 132 kV MEIL Feeder CGL (SF6) 600-400/1-1-1 400/1-1-1 Schneider ~ ~ C264P Main 11.07.2022 26.09.2014 10.07.2023 OK
132/33 kV SS OBULAPURAM
Micom Main 17.12.2022 09.02.2023 18.12.2023 OK
58 132 kV Rayadurgam SIEMENS 600-300-150/1-1-1A 600/1-1-1 Schneider Schneider C264P
P442 Back up 17.12.2022 28.07.19 18.12.2023 OK
132/33 kV SS TATICHERLA
132 kV Ananthapuramu Main 24.08.22 26.01.2023 23.08.23 OK
59 CGL (SF6) 600-300/1-1-1 600/1-1-1 NR NR PCS902 PCS9705
feeder Back up 24.08.22 ~ 23.08.23 OK
132 kV Kalyandurgam Main 23.04.22 21.02.2023 22.04.2023 OK
60 CGL (SF6) 600-300-150/1-1-1 300/1-1-1 NR NR PCS902 PCS9705
feeder Back up 23.04.22 ~ 22.04.2023 OK
Main 13.01.2023 13.01.2023 12.01.2024 OK
61 132 kV RTSS feeder-I SIEMENS 600-300/1-1-1 300/1-1-1 NR NR PCS9311 PCS9705
Back up 13.01.2023 ~ 12.01.2024 OK
Main 13.01.2023 13.01.2023 12.01.2024 OK
62 132 kV RTSS feeder-II SIEMENS 600-300/1-1-1 300/1-1-1 NR NR PCS9311 PCS9705
Back up 13.01.2023 ~ 12.01.2024 OK
132 kV RTSS TATICHERLA
Main 13.01.2023 ~ 12.01.2024 OK
63 132 kV Taticherla feeder-I ~ 600-300/1-1-1 300/1-1-1 NR NR PCS9311 PCS9705
Back up 13.01.2023 ~ 12.01.2024 OK
Main 13.01.2023 ~ 12.01.2024 OK
64 132 kV Taticherla feeder-II ~ 600-300/1-1-1 300/1-1-1 NR NR PCS9311 PCS9705
Back up 13.01.2023 ~ 12.01.2024 OK
132/33 kV SS DHARMAVARAM
Main 03.01.2023 13.04.23 02.01.2024 OK
65 132 kV Beechuganipalli CGL (SF6) 600-300-150/1-1-1 600/1-1-1 ER ER SEL-311C ARGUS-2
Back up 03.01.2023 ~ 02.01.2024 OK
Main 03.01.2023 16.12.21 02.01.2024 OK
66 132 kV Ananthapuramu CGL (SF6) 600-300-150/1-1-1 600/1-1-1 ER ER CSC162 CSC-211
Back up 03.01.2023 ~ 02.01.2024 OK
132/33 kV SS TADIMARRI
Main 19.10.22 15.11.21 18.10.23 OK
67 132 kV Pulivendula CGL (SF6) 600-300-150/1-1-1 600/1-1-1 ABB ABB REL650 REF615
Back up 19.10.22 ~ 18.10.23 OK

EXECUTIVE ENGINEER DEPUTY EXECUTIVE ENGINEER ASSISTANT EXECUTIVE ENGINEER


MRT & TRE DIVISION MRT SUB-DIVISION MRT SUB-DIVISION
ANANTHAPURAMU ANANTHAPURAMU ANANTHAPURAMU

Page 5
Performance of the Relays in MRT Sub-division Ananthapuramu for the month of APRIL 2023
Power Transformer Relays
Transformer Details Make of the Breaker C.T.Ratio(HV) C.T.Ratio(LV) Make of the Relay Type of the relay
Due Date
Sl. Date of last Conditi
Date of Last Testing for Next
No. Capacity in Voltage Differential/ Differential/ operated on
Make HV LV Available Adopted Available Adopted HV LV HV LV Testing
MVA Ratio in kV Overflux Overflux

220/132/33 kV SS ANANTAPURAMU
Differential
& HV 19.04.23 18.04.24 OK
Overflux
300/1-1,0.66-
GEC 300/1-0.666- 500/1-1,0.66-1 LV Overflux 19.04.23 17.11.2020 18.04.24 OK
1 100 220/ 132 ABB (SF6) CGL (SF6) 1,0.5,0.375- 500/1-0.660-1 GE GE GE P643 C264 P643
(PTR-I) 0.375-1 A
1,0.5,0.375-1 A
HV Relay 19.04.23 17.11.2020 18.04.24 OK

LV relay 19.04.23 17.11.2020 18.04.24 OK

Differential
& HV 18.01.23 10.12.19 17.01.24 OK
Overflux
300/1-1,0.66-
BBL ALSTOM 300/1-1- 500/1-1,0.66-1
2 100 220/ 132 ABB (SF6) 1,0.5,0.375- 500/1-1-1 A GE GE GE P643 P643 C264 LV Overflux 18.01.23 10.12.19 17.01.24 OK
(PTR-II) (SF6) 0.375-1 A
1,0.5,0.375-1 A
HV Relay 18.01.23 10.12.19 17.01.24 OK
LV Relay 18.01.23 10.12.19 17.01.24 OK
Differential
& HV 21.04.23 24.10.19 20.04.24 OK
300/1-1,0.66- Overflux
TELK ALSTOM 300/1-0.666- 500/1-1,0.66-1
3 100 220/ 132 ABB (SF6) 1,0.5,0.375- 500/1-0.660-1 GE GE GE P643 C264 C264 LV Overflux 21.04.23 04.02.2022 20.04.24 OK
(PTR-III) (SF6) 0.375-1 A
1,0.5,0.375-1 A
HV Relay 21.04.23 04.02.2022 20.04.24 OK
LV Relay 21.04.23 - 20.04.24 OK
Differential 01.04.23 22.09.19 01.04.24 OK

Bharat Bijili 300-200-100/1- 1200-800- SIFANG/ CSC 326/ Overflux 01.04.23 ~ 01.04.24 OK
4 50 132/ 33 ABB (SF6) CGL (VCB) 300/1-1-1 1200/1-0.5775-1 SIFANG SIFANG CSC 211 CSC 211
(PTR-I) 1,0.5775-1 400/1-0.5775-1 SIFANG CSC211 HV Relay 01.04.23 24.09.2021 01.04.24 OK
LV Relay 01.04.23 18.04.23 01.04.24 OK

Differential
& Overflux
13.04.23 - 12.04.24 OK
ABB 300-200-100/1- 1200-800-
5 50 132/ 33 CGL (SF6) ABB (VCB) 300/1-1-1 1200/1-1-1 ABB ABB ABB RET 650 REF615 REF615
(PTR-II) 1,0.5775-1 400/1-0.5775-1 HV Relay 13.04.23 24.09.2021 12.04.24 OK
LV Relay 13.04.23 18.04.23 12.04.24 OK
Differential 18.01.2023 ~ 17.01.2024 OK

INDOTECH ALSTOM/ KBCH Overflux 18.01.2023 ~ 17.01.2024 OK


6 80 132/ 33 CGL (SF6) ABB (VCB) 500/1-1-1 1400/1-1-1 SIEMENS SIEMENS 7SR2202 7SR2201
(PTR-III) SIEMENS 120/7RW8010 HV Relay 18.01.2023 24.09.2021 17.01.2024 OK
LV Relay 18.01.2023 18.04.23 17.01.2024 OK
Differential 18.01.2023 - 17.01.2024 OK
Aditya
SIEMENS Megawin 300-200-100/1- 1200-800-
7 (PTR- 31.5 132/ 33
(SF6) (VCB) 0.5775,1-1
200/1-1-1
400/1-0.5775-1
800/1-1-1 ER ER ER CSC 326 CSC 211 CSC 211 HV Relay 18.01.2023 21.03.14 17.01.2024 OK
IV)
LV Relay 18.01.2023 28.03.23 17.01.2024 OK

Page 6
220/132/33 kV SS KALYANADURGAM
Differential
& HV 28.11.22 24.12.19 27.12.23 OK
Overflux
300/1-1-
300/1-1, 0.66-1, 0.5, 800-500/1-
8 EMCO 100 220/ 132 ABB (SF6) SIEMENS 0.375-0.375- 500/1-1-1 GE GE GE P643 C264 C264 LV Overflux 28.11.22 ~ 27.12.23 OK
0.37-1, 0.5, 0.375-1 1,0.5775, 0.66-1
1
HV Relay 28.11.22 03.06.2022 27.12.23 OK

LV Relay 28.11.22 03.06.2022 27.12.23 OK

Differential 06.01.2023 08.01.2020 05.01.2024 OK


500-300/1-1, 0.66-1,
0.37,0.5,0.625,0.83- 300/1-1-
800-500/1-
9 BBL 100 220/ 132 AREVA (SF6) CGL (SF6) 1, 0.375-0.375- 500/1-1-1 ER ER ER CSC 326 CSC 211 CSC 211 HV Relay 06.01.2023 08.01.2020 05.01.2024 OK
1,0.5775, 0.66-1
0.375,0.5,0.625,0.83 1
-1
LV Relay 06.01.2023 08.01.2020 05.01.2024 OK

Differential
500-300/1-1, 0.66-1, & O/F
29.12.22 08.01.2020 28.12.23 OK
0.37,0.5,0.625,0.83- 300/1-1-
SIEMENS 800-500/1-
10 BBL 100 220/ 132
(SF6)
CGL (SF6) 1, 0.375-0.375-
1,0.5775, 0.66-1
500/1-1-1 ABB ABB ABB RET 670 REF 615 REF 615 HV Relay 29.12.22 08.01.2020 28.12.23 OK
0.375,0.5,0.625,0.83 1
-1
LV Relay 29.12.22 03.06.2022 28.12.23 OK

Differential 20.05.22 30.08.22 19.05.23 OK


Megawin 300-200-100/1- 1200-800-
11 BBL 50 132/ 33 CGL (SF6)
(VCB) 1,0.5775-1
300/1-1-1
400/1-1-0.5775
1200/1-1-1 ER ER ER DUOBIAS-M ARGUS - 2 ARGUS - 1 HV Relay 20.05.22 19.04.23 19.05.23 OK

LV relay 20.05.22 19.04.23 19.05.23 OK

Differential 29.08.22 18.03.22 28.08.23 OK


1200-800-
Venkateswar 300-200-100/1-
12
a Electricals
30/50 132/ 33 CGL (SF6) ABB(VCB)
1,0.5775-1
300/1-1-1 400/1-1,0.5775- 1200/1-1-1 ER ER ER CSC 326 CSC 211 CSC 211 HV Relay 29.08.22 19.04.23 28.08.23 OK
1
LV Relay 29.08.22 19.04.23 28.08.23 OK

Differential 29.08.22 01.06.2020 28.08.23 OK

500-300/1-1,0.5775-
2000-1200-
7SR24/
Overflux 29.08.22 ~ 28.08.23
13 BBL 30/50 132/ 33 CGL (SF6) ABB (VCB) 300/1-1-1 800/1-1,0.5775- 1200/1-1-1 SIEMENS SIEMENS SIEMENS 7SR2202 7SR2201
1 7RW8010
1 HV Relay 29.08.22 19.04.23 28.08.23 OK

LV Relay 29.08.22 19.04.23 28.08.23 OK

220/33kV SS RAMAGIRI

Differential
& HV 22.04.23 21.09.20 21.04.24 OK
NGEF 300-500/1-1- 1200-900- Overflux
JYOTHI
14 ( PTR- 31.5 220/33 ABB (SF6) 1,0.83,0.615,0.375 300/1-1-1 600/1-0.5775- 600/1-1-1 GE GE GE P643 C264 C264
(VCB)
I) -1-1 1 HV Relay 22.04.23 12.09.22 21.04.24 OK

LV Relay 22.04.23 31.03.23 21.04.24 OK

Differential
& HV 13.10.22 31.03.23 12.10.23 OK
150/1-1/0.48- 1200-900- Overflux
BHEL 150/1-0.48- 1200/1-1-
15 50 220/33 ABB (SF6) CGL (VCB) 1/0.25/0.817- 600/1-0.5775- GE GE GE P643 C264 C264
(PTR-II) 1 0.5775 HV Relay 13.10.22 12.09.22 12.10.23 OK
1/0.25/0.187-1 1

LV Relay 13.10.22 31.03.23 12.10.23 OK

Page 7
220/132 kV SS BORAMPALLI

Differential 30.11.22 29.11.23 OK


500-300/1-1,0.66-
1,0.83,0.625,0.5,0.37 HV Relay 30.11.22 ~ 29.11.23 OK
300/1-1-
16 TBEA 100 220/ 132 CGL (SF6) CGL (SF6) 5- 500-300/1-1-1 A 500/1-1-1 A GE GE GE T60 F650 F650
0.375-1
1,0.83,0.625,0.5,0.37
5-1 A LV Relay 30.11.22 ~ 29.11.23 OK

132/33 kV SS RAYADURGAM
Differential 01.09.22 23.08.2022 31.08.23 OK
1200-800- O/C-
NGEF 300-200-100/1- O/C-CDG
17
(PTR-I)
50 132/ 33 CGL (SF6) S&S
0.5775-1 A
300/1-1-1 400/1-0.5775,1- 1200/1-1-1 Alstom Alstom Alstom DUOBIAS-M CDG(HS)
E/F CDG
HV Relay 01.09.22 30.03.23 31.08.23 OK
1 E/F CDD
LV Relay 01.09.22 05.09.22 31.08.23 OK
Differential 01.09.22 31.08.23 OK
1200-800- O/C- 30.03.23
EMCO JYOTHI 300-200-100/1- O/C-CDG HV Relay 01.09.22 31.08.23 OK
18 50 132/ 33 CGL (SF6) 300/1-1-1 A 400/1-0.5775,1- 1200/1-1-1 A ERL Alstom Alstom DUOBIAS-M CDG21(HS)
(PTR-II) (VCB) 0.5775,1-1 A E/F CDG
1A E/F CDD21
LV Relay 01.09.22 30.03.23 31.08.23 OK

132/33 kV SS URAVAKONDA

Differential
& HV 21.01.23 28.05.14 20.01.24 OK
1200-800- Overflux
SIEMENS BHEL 300-200-100/1-
19 TOSHIBA 31.5 132/ 33 200/1-1-1 400/1-1,0.5775- 800/1-1-1 ER ER ER DUOBIAS-M ARGUS - 2 ARGUS - 1
(SF6) (VCB) 1,0.5775-1
1 HV Relay 21.01.23 12.09.2022 20.01.24 OK
LV Relay 21.01.23 12.09.2022 20.01.24 OK

Differential
& HV 21.04.23 13.03.21 20.01.24 OK
1200-800- Overflux
SIEMENS BHEL 300-225-150/1-
20 HHE 31.5 132/ 33 225/1-1-1 400/1-1,0.5775- 800/1-1-1 ER ER ER DUOBIAS-M ARGUS - 2 ARGUS - 1
(SF6) (VCB) 1,0.5775-1
1
HV Relay 21.04.23 12.09.2022 20.01.24 OK
LV Relay 21.04.23 12.09.2022 20.01.24 OK
132/66 kV SS HAMPI
Differential 01.06.2022 ~ 31.05.2023 OK
TRANSFOR
MERS & HV Relay 01.06.2022 ~ 31.05.2023 OK
SIEMENS 300-200-100/1- MIT114 &
21 RECTIFIER 30/40 MVA 132/66 kV CGL(SF6) 200/1-1-1A 600-300/1-1-1 A 600/1-1-1A ER ER ER MIB202 MIT114
(SF6) 0.5775,1-1 A MIT131
S LIMITED
(PTR-I) LV Relay 01.06.2022 ~ 31.05.2023 OK

TRANSFOR Differential 01.06.2022 ~ 31.05.2023 OK


MERS &
300-200-100/1- HV Relay 01.06.2022 ~ 31.05.2023 OK
22 RECTIFIER 30/40 MVA 132/66 kV CGL(SF6) CGL(SF6) 200/1-1-1A 600-300/1-1-1 A 600/1-1-1A SIFANG SIFANG SIFANG CSC 326 CSC211 CSC211
0.5775,1-1 A
S LIMITED
(PTR-II) LV Relay 01.06.2022 ~ 31.05.2023 OK

Page 8
132/11 kV ( HNSS ) SS ANKAMPALLI
Differential 20.10.22 17.05.21 19.10.23 OK
ECE PCES 300-200-100/1- 2000-1000/1-1-
23
(PTR-I)
10/16 132/ 11 CGL (SF6)
(Kiosk type) 1,0.5775-1
100/1-1-1
1
1000/1-1-1 ER ER ER CSC 326 CSC211 CSC211 HV Relay 20.10.22 29.09.22 19.10.23 OK
LV Relay 20.10.22 29.09.22 19.10.23 OK
Differential 20.10.22 17.12.21 19.10.23 OK
ECE PCES 300-200-100/1- 2000-1000/1-1-
24
(PTR-II)
10/16 132/ 11 CGL (SF6)
(Kiosk type) 1,0.5775-1
100/1-1-1
1
1000/1-1-1 ER ER ER CSC 326 CSC211 CSC211 HV Relay 20.10.22 17.12.21 19.10.23 OK
LV Relay 20.10.22 17.12.21 19.10.23 OK
Differential 20.10.22 10.08.22 19.10.23 OK
ECE PCES 300-200-100/1- 2000-1000/1-1-
25
(PTR-III)
10/16 132/ 11 CGL (SF6)
(Kiosk type) 1,0.5775-1
100/1-1-1
1
1000/1-1-1 ER ER ER CSC 326 CSC211 CSC211 HV Relay 20.10.22 29.09.22 19.10.23 OK
LV Relay 20.10.22 29.09.22 19.10.23 OK
132/33 kV SS NAGALAPURAM
Differential 28.07.2022 ~ 27.07.2023 OK
1200-800-
SIEMENS Schneider 300-200-100/1-
26 Indo- Tech 31.5 132/33 kV
(SF6) (VCB) 0.5775,1-1A
200/1-1-1 A 400/1-0.5775,1- 800/1-1-1--A NR NR NR PCS978 PCS9705 PCS9705 HV Relay 28.07.2022 ~ 27.07.2023 OK
1-1A
LV Relay 28.07.2022 23.11.21 27.07.2023 OK
132/33 kV SS OBULAPURAMU
Differential 03.11.2022 ~ 02.11.2023 OK
1200-800-
SIEMENS Schneider 300-200-100/1- Micom
27 TOSHIBA 31.5 132/ 33
(SF6) (VCB) 1,0.5775-1
200/1-1-1 400/1-1,0.5775- 800/1-1-1 Schneider Schneider Schneider Micom P642
C264
Micom C264 HV Relay 03.11.2022 06.07.19 02.11.2023 OK
1
LV Relay 03.11.2022 16.05.21 02.11.2023 OK
Differential 03.11.2022 ~ 02.11.2023 OK
1200-800-
SIEMENS Schneider 300-200-100/1- Micom
28 NGEF 10/16 132/ 33
(SF6) (VCB) 1,0.5775-1
100/1-1-1 400/1-1,0.5775- 400/1-1-1 Schneider Schneider Schneider Micom P642
C264
Micom C264 HV Relay 03.11.2022 06.07.19 02.11.2023 OK
1
LV Relay 03.11.2022 16.05.21 02.11.2023 OK
132/33kV SS DHARMAVARAM
Differential 04.08.22 08.07.14 03.08.23 OK
ADITYA ALSTOM 150-100-50/1- 400-200/1-
29 31.5 132/ 33 ABB(VCB) 100/1-1-1 400/1-1-1 ER ER ER CSC 326 CSC211 CSC211 HV Relay 04.08.22 29.12.22 03.08.23 OK
(PTR-I) (SF6) 0.5775,1-1 0.5775,1-1
LV Relay 04.08.22 29.12.22 03.08.23 OK
Differential 04.08.22 ~ 03.08.23 OK
T&R Ltd ALSTOM 200-100-50/1- 800-400/1-
30 31.5 132/ 33 ABB (VCB) 200/1-1-1 800/1-1-1 ER ER ER CSC 326 CSC211 CSC211 HV Relay 04.08.22 29.12.22 03.08.23 OK
(PTR-II) (SF6) 0.5775,1-1 0.5775,1-1
LV Relay 04.08.22 29.12.22 03.08.23 OK

1200-800- Differential 04.08.22 ~ 03.08.23 OK


KANOHAR 300-200-100/1- 200/1-
31 31.5 132/ 33 CGL (SF6) ABB (VCB) 400/1- 800/1-0.577-1 ER ER ER DUOBIAS ARGUS - 2 ARGUS - 1 HV Relay 04.08.22 29.12.22 03.08.23 OK
(PTR-III) 0.5775,1-1 0.577-1
0.5775,1-1 LV Relay 04.08.22 29.12.22 03.08.23 OK
Differential 06.04.23 05.04.23 05.04.24 OK
NGEF SIEMENS 150-100-50/1- 100/1- 400-200/1-1- HV Relay 06.04.23 05.04.23 05.04.24 OK
32 16 132/ 33 CGL (SF6) 400/1-0.577-1 ER ER ER DUOBIAS ARGUS - 2 ARGUS - 1
(PTR-IV) (VCB) 0.5775,1-1 0.577-1 0.5775,1
LV Relay 06.04.23 05.04.23 05.04.24 OK
132/33kV SS TATICHERLA
Differential 25.04.22 ~ 24.04.23 OK
Aditya Schneider 300-200-100/1- 800-400-
33 31.5 132/33 CGL (SF6) 200/1-1-1 800/1-1-1 NR NR NR PCS 978 PCS9705 PCS9705 HV Relay 25.04.22 05.11.22 24.04.23 OK
(PTR-I) (VCB) 0.5775-1 200/1-05775-1
LV Relay 25.04.22 05.11.22 24.04.23 OK
Differential 24.08.22 ~ 23.08.23 OK
Toshiba
Schneider 300-200-100/1- 800-400-
34 (PTR- 50 132/33 CGL (SF6) 300/1-1-1 1200/1-1-1 NR NR NR PCS 978 PCS9705 PCS9705 HV Relay 24.08.22 05.11.22 23.08.23 OK
(VCB) 0.5775-1 200/1-05775-1
II)
LV Relay 24.08.22 05.11.22 23.08.23 OK

Page 9
132/33kV SS TADIMARRI
Differential 19.10.22 07.04.20 18.10.23 OK
Toshibha 300-200-100/1- 800-400-
35 31.5 132/33 CGL (SF6) ABB (VCB) 200/1-1-1 800/1-1-1 ABB ABB ABB RET650 REC650 REF615 HV Relay 19.10.22 11.08.20 18.10.23 OK
(PTR-I) 0.5775-1 200/1-05775-1
LV Relay 19.10.22 25.06.20 18.10.23 OK
Differential 19.10.22 ~ 18.10.23 OK
APEX 300-200-100/1- 800-400-
36 16 132/33 CGL (SF6) ABB (VCB) 100/1-1-1 400/1-1-1 ABB ABB ABB RET650 REC650 REF615 HV Relay 19.10.22 11.08.20 18.10.23 OK
(PTR-II) 0.5775-1 200/1-05775-1
LV Relay 19.10.22 ~ 18.10.23 OK

EXECUTIVE ENGINEER DEPUTY EXECUTIVE ENGINEER ASSISTANT EXECUTIVE ENGINEER


MRT & TRE DIVISION MRT SUB-DIVISION MRT SUB-DIVISION
ANANTHAPURAMU ANANTHAPURAMU ANANTHAPURAMU

Page 10
Performance of the Relays in MRT Sub-division Ananthapuramu for the month of APRIL 2023
33kV Feeders, Capacitor banks & 11 kV Feeder Relays
C.T.Ratio Date of Due date
Make of the Make of the Date of last
Sl.No Name of the feeder Type of the relay last for next Condition
Breaker Available Adopted Relay Operated
testing testing
220/132/33 kV SS ANANTHAPURAMU
1 33kV Kuderu BHEL(VCB) 400-200-100/1-1 400/1-1 ER CSC 211 31.12.2022 18.04.23 30.12.2023 OK
2 33kV Taticherla ABB (VCB) 400-200-100/1-1 400/1-1 ER CSC 211 01.04.2022 21.04.23 01.04.2024 OK
Siemens 21.04.23
3 33kV Narpala-I CGL(VCB) 400-200-100/1-1 400/1-1 7SR1102 01.04.2022 01.04.2024 OK
Reyrolle
Siemens 21.04.23
4 33kV Narpala-II BHEL (VCB) 400-200-100/1-1 400/1-1 7SR1102 01.04.2022 01.04.2024 OK
Reyrolle
Siemens 25.04.23
5 33kV Singanamala SIEMENS (VCB) 400-200-100/1-1 400/1-1 7SR1102 01.04.2022 01.04.2024 OK
Reyrolle
Siemens 31.03.23
6 33kV Garladinna BHEL(VCB) 400-200-100/1-1 400/1-1 7SR1102 01.04.2022 01.04.2024 OK
Reyrolle
Siemens 24.04.23
7 33kV Rotarypuram CGL(VCB) 400-200-100/1-1 400/1-1 7SR1102 01.04.2022 01.04.2024 OK
Reyrolle
8 33kV Gooty Road CGL(VCB) 400-200-100/1-1 400/1-1 ER CSC 211 01.04.2022 20.04.23 01.04.2024 OK

9 33kV Ananthapuramu ABB (VCB) 400-200-100/1-1 400/1-1 ER CSC 211 31.12.2022 21.04.23 30.12.2023 OK

10 33kV Hospital ABB (VCB) 400-200-100/1-1 400/1-1 ER MJT 314 (3O/L+E/L) 31.12.2022 24.04.23 30.12.2023 OK
33kV 24.04.23
11 ABB (VCB) 400-200-100/1-1 400/1-1 JVS JNC066 ( 2O/L+ E/L) 31.12.2022 30.12.2023 OK
Bukkarayasamudram
12 33kV Medical College BHEL(VCB) 400-200-100/1-1 400/1-1 ASHIDA ADR241A 31.12.2022 24.04.23 30.12.2023 OK
13 33kV Power House SIEMENS (VCB) 400/1-1 ASHIDA ADR241A 31.12.2022 13.04.23 30.12.2023 OK
P14D (3O/L+E/L),
MEGAWIN P241(Lead PF Trip) & 28.08.2022
14 7.2 MVAR Cap.Bank 240-120/1-1 240/1-1 ALSTOM 23.11.2022 22.11.2023 OK
(VCB) P14N(Neutral
Unbalance)
P14D (3O/L+E/L),
15 2X6 MVAR Cap.Bank BHEL(VCB) 240-120/1-1 240/1-1 ALSTOM P241(Lead PF Trip & 23.11.2022 12.10.2020 22.11.2023 OK
Neutral Unbalance)
220/132/33 kV SS KALYANDURGAM
16 33kV Kalyandurgam CGL(VCB) 400-200-100/1-1 400/1-1 ASHIDA ADR141A(2O/L+E/L) 22.11.2022 19.11.22 21.11.2023 OK
17 33kV Settur SIEMENS 400-200-100/1-1 400/1-1 ASHIDA ADR141A(2O/L+E/L) 02.06.2022 25.04.23 01.06.2023 OK
18 33kV Nuthimadugu CGL(VCB) 400-200-100/1-1 400/1-1 AVANA NPA 422 (3O/L+E/L) 02.06.2022 14.04.23 01.06.2023 OK

Page 11
19 33kV Thimmapuram ABB 400-200/1-1 400/1-1 ASHIDA ADR141A(2O/L+E/L) 02.06.2022 24.04.23 01.06.2023 OK
20 33kV H.R.Palli SIEMENS 400-200/1-1 400/1-1 ASHIDA MJT314 02.06.2022 12.04.23 01.06.2023 OK
21 33kV Gangavaram ABB 400-200-100/1-1 400/1-1 ASHIDA ADR141A(2O/L+E/L) 02.06.2022 24.04.23 01.06.2023 OK
22 33kV Beluguppa ABB 400-200/1-1 400/1-1 Schneider P127(3O/L+E/L) 02.06.2022 24.04.23 01.06.2023 OK
23 33kV Kundurpi STELMECH 400-200/1-1 400/1-1 AVANA NPA 422 (3O/L+E/L) 02.06.2022 25.04.23 01.06.2023 OK
24 33kV Sai Sudhir Solar I ABB 400-200-100/1-1 200/1-1 ER MJT 314 (3O/L+E/L) 17.12.22 19.04.23 17.12.23 OK
25 33kV Sai Sudhir Solar II ABB 400-200-100/1-1 200/1-1 ER MJT 314 (3O/L+E/L) 17.12.22 19.04.23 17.12.23 OK
26 33kV Blyth-I WF Feeder ABB 800-400/1-1 800/1-1 Schneider Micom P127(3O/L+E/L) 16.02.23 21.04.23 16.02.24 OK
27 33kV Blyth-II WF Feeder ABB 500-250/1-1 250/1-1 Schneider Micom P127(3O/L+E/L) 13.02.23 19.04.23 13.02.24 OK
28 33kV KCT WF Feeder ABB 500-600/1-1A 500/1-1 Schneider Micom P127(3O/L+E/L) 16.02.23 15.03.23 16.02.24 OK

29 7.2 MVAR Cap.Bank - I BHEL(VCB) 200-100/1-1 200/1-1 EE CDG ( 3O/L+ E/L) 02.06.2022 23.05.22 01.06.2023 OK

30 7.2 MVAR Cap.Bank - II JYOTHI(VCB) 240-120/1-1 120/1-1 JVS JRC-054 (3 O/L + E/L) 02.06.2022 07.02.21 01.06.2023 OK

220/33 kV SS RAMAGIRI
31 33kV ASL Feeder BHEL (VCB) 240-120/1-1 240/1-1 ER CSC-211 13.10.22 16.10.22 12.10.23 OK
SIEMENS
32 33kV IDL Feeder 400-200-100-50/1-1 400/1-1 ER CSC-211 13.10.22 18.04.23 12.10.23 OK
(VCB)
33 33kV RMG Feeder BHEL (VCB) 400-200-100-50/1-1 400/1-1 ASHIDA ADR241A 13.10.22 24.04.23 12.10.23 OK
34 33kV RTC Feeder BHEL (VCB) 400-200-100-50/1-1 400/1-1 ER CSC-211 13.10.22 16.10.22 12.10.23 OK
35 33kV IL&FS Feeder CGL (VCB) 400-200-100-50/1-1 400/1-1 ER CSC-211 13.10.22 03.04.23 12.10.23 OK
36 33kV Suzlon CGL (VCB) 600-300/1-1 600/1-1 Micom P14D 13.10.22 23.03.23 12.10.23 OK
37 33 kV C.K.Palli BHEL (VCB) 400-200-100/1-1A 400/1-1 ASHIDA ADR241A 13.10.22 22.04.23 12.10.23 OK
132/33 kV SS RAYADURGAM
38 33kV K.P.Doddi S&S(VCB) 400-200-100/1-1 400/1-1 ER MJT314 17.12.22 25.04.23 16.12.23 OK
39 33kV Rayadurgam S&S(VCB) 400-200-100/1-1 400/1-1 ER TJM10 ( 3O/L+ E/L) 17.12.22 21.04.23 16.12.23 OK
40 33kV Chadam S&S(VCB) 400-200-100/1-1 400/1-1 ER MIT114(3O/L+E/L) 17.12.22 21.04.23 16.12.23 OK
41 33kV Bhupasamudram Megawin (VCB) 400-200-100/1-1 400/1-1 ER MJT314 17.12.22 21.04.23 16.12.23 OK
42 33kV Pallepalli CGL(VCB) 400-200/1-1 200/1 ASHIDA ADR141A(2O/L+E/L) 17.12.22 25.04.23 16.12.23 OK
43 33kV Sai Sudhir solarPP Megawin (VCB) 400-200-100/1-1 200/1-1 JVS JNC066 ( 2O/L+ E/L) 31.05.21 21.04.23 16.12.23 OK
44 33kV Avuladatla Feeder ABB (VCB) 400-200-100/1-1 200/1-1 JVS JNC066 (2O/L+ E/L) 01.09.22 09.03.23 31.08.23 OK
45 7.2 MVAR Cap.Bank-I S&S(VCB) 240-120/1-1 120/1-1 ER TJM10 ( 3O/L+ E/L) 17.12.22 22.09.21 16.12.23 OK
46 7.2 MVAR Cap.Bank-II ABB (VCB) 240-120/1-1 120/1-1 ER TJM10 ( 3O/L+ E/L) 17.12.22 22.09.21 16.12.23 OK

Page 12
132/33 kV SS URAVAKONDA
47 33 kV Uravakonda SIEMENS 400-200/1-1 400/1-1 ER CSC 211 21.01.23 25.04.2023 20.01.24 OK
48 33 kV Kanekal SIEMENS 400-200/1-1 400/1-1 ER CSC 211 21.01.23 25.04.2023 20.01.24 OK
49 33 kV Amidyala SIEMENS 400-200-100/1-1 400/1-1 ER CSC 211 21.01.23 22.04.2023 20.01.24 OK
33 kV Fdr for 400 kV SS
50 SIEMENS 200-100/1-1 100/1-1 ER CSC 211 21.01.23 01.11.2023 20.01.24 OK
supply
51 33 kV Suzlon CGL(VCB) 600-300/1-1 600/1-1 Alstom P14DB 21.01.23 08.04.2023 20.01.24 OK

52 33 kV Pennahobilam BHEL(VCB) 400-200/1-1 400/1-1 ASHIDA ADR241A 21.01.2321.04.2023 20.01.24 OK


53 33 kV Kanekal-2 ABB (VCB) 400/1-1 400/1-1 GE P14D 25.03.23 15.04.2023 24.03.24 OK
132/33 kV SS OBULAPURAMU
54 33kV Obulapuramu Schneider (VCB) 400-200/1-1 400/1-1 Schneider Micom C264 03.11.2022 22.04.23 02.11.2023 OK
55 33kV Gudiselapalli Schneider (VCB) 400-200/1-1 400/1-1 Schneider Micom C264 03.11.2022 25.04.23 02.11.2023 OK
56 33kV Apple Industries Schneider (VCB) 400-200/1-1 400/1-1 Schneider Micom C264 03.11.2022 25.04.23 02.11.2023 OK
Micom C264 &
57 33kV D.Hirehal Schneider (VCB) 400-200/1-1 400/1-1 Schneider 03.11.2022 03.04.23 02.11.2023 OK
MJT314
58 33kV Bommanahall Schneider (VCB) 400-200/1-1 400/1-1 Schneider Micom C264 03.11.2022 25.04.23 02.11.2023 OK
132/33 kV SS DHARMAVARAM
08.09.202
59 33kV Kanaganipalli BHEL (VCB) 400-200-100/1-1 400/1-1 ER CSC211 23.04.23 07.09.2023 OK
2
19.11.202
60 33kV Tadimarri BHEL (VCB) 400-200-/1-1 400/1-1 ER CSC211 17.03.23 18.11.2023 OK
2
19.11.202
61 33kV Bathalapalli ABB(VCB) 400-200/1-1 400/1-1 ER CSC211 16.03.23 18.11.2023 OK
2
19.11.202
62 33kV D. Cherlopalli ABB(VCB) 400-200/1-1 400/1-1 ER CSC211 21/Jul/2022 18.11.2023 OK
2
19.11.202
63 33kV Kannamukkala BHEL(VCB) 400-200-100/1-1 400/1-1 ER CSC211 25.03.23 18.11.2023 OK
2
19.11.202
64 33kV N.S. Gate ABB(VCB) 400-200/1-1 400/1-1 ER CSC211 29.03.23 18.11.2023 OK
2
19.11.202
65 33kV Hampapuram CGL(VCB) 400-200/1-1 400/1-1 ER CSC211 22.04.23 18.11.2023 OK
2
19.11.202
66 33kV Sathya sai WW ABB(VCB) 200-100/1-1A 100/1-1A AVANA AVANA 25.04.23 18.11.2023 OK
2
33kV SARAYU wind 19.11.202
67 ABB (VCB) 600-400/1-1A 400/1-1A GE F-650 03.04.23 18.11.2023 OK
farm 2
19.11.202
68 33kV Rain coke-1 (solar) ABB (VCB) 500-250/1-1 500/1-1 ABB REF-615 08.03.23 18.11.2023 OK
2
19.11.202
69 33kV Rain coke-2 (solar) ABB (VCB) 500-250/1-1 500/1-1 ABB REF-615 17.03.23 18.11.2023 OK
2
5+6 MVAR Cap.Bank- 19.11.202
70 Megawin 240-120/1-1 240/1-1 ER CDG(3 O/L+E/L) 12/8/2021 18.11.2023 OK
I&II 2
19.11.202
71 7.2 MVAR Cap.Bank-III ABB (VCB) 400-200/1-1 200/1-1 JVS JRC068(3O/L+E/L) 12/8/2021 18.11.2023 OK
2

Page 13
132/33 kV SS TATICHERLA
Schneider 22.04.23
72 33kV Taticherla 400-200-100/1-1A 400/1-1A NR PCS9705 08.12.22 07.12.23 OK
(VCB)
Schneider 23.04.23
73 33 kV Marthadu 400-200-100/1-1A 400/1-1A NR PCS9705 08.12.22 07.12.23 OK
(VCB)
Schneider 21.04.23
74 33 kV Rachanapalli 400-200-100/1-1A 400/1-1A NR PCS9705 08.12.22 07.12.23 OK
(VCB)
Schneider 24.04.23
75 33 kV Kuderu 400-200-100/1-1A 400/1-1A NR PCS9705 08.12.22 07.12.23 OK
(VCB)
ABB/
76 33 kV feeder-5 1VYNO31722000 400-200/1-1 400/1-1 Alstom P40 Agile 07.02.2023 ~ 08.02.2024 OK
106
ABB/
77 33 KV D5 1VYNO31722000 400-200/1-1 400/1-1 Alstom P40 Agile 07.02.2023 25.04.23 08.02.2024 OK
106
132/33 kV SS TADIMARRI
78 33 kV Tadimarri ABB (VCB) 400-200-100/1-1A 400/1-1A ABB REF-615 19.10.2022 22.04.23 18.10.2023 OK
79 33 kV Kanukuntla ABB (VCB) 400-200-100/1-1A 400/1-1A ABB REF-615 19.10.2022 22.04.23 18.10.2023 OK
80 33 kV M.Agraharam ABB (VCB) 400-200-100/1-1A 400/1-1A ABB REF-615 19.10.2022 21.03.23 18.10.2023 OK
81 33 kV B.Pappuru ABB (VCB) 400-200-100/1-1A 400/1-1A ABB REF-615 19.10.2022 22.04.23 18.10.2023 OK
132/11 kV LISS ANKAMPALLI
82 11 kV Ankampalli -I PCES(VCB) 3000-2000/1-1-0.557 A 2000/1-1--A ERL MIT114 20.10.22 29.09.22 19.10.23 OK
83 11 kV Ankampalli-II ABB(VCB) ERL MJT314 20.10.22 ~ 19.10.23 OK
84 11 kV Jeedipalli - I PCES(VCB) 3000-2000/1-1-0.557 A 2000/1-1--A ERL MIT114 20.10.22 18.04.23 19.10.23 OK
85 11 kV Jeedipalli - II ABB(VCB) 1200-800-400/1-1-1-1A 400/1--1--A JVS JNC 068 20.10.22 17.12.21 19.10.23 OK
132/33 kV SS NAGALAPURAM
Schneider
86 33 kV Pamidi 400-200/1-1 A 400/1-1 A NR PCS9705 28.07.2022 29.04.23 27.07.2023 OK
(VCB)

EXECUTIVE ENGINEER DEPUTY EXECUTIVE ENGINEER ASSISTANT EXECUTIVE ENGINEER


MRT & TRE DIVISION MRT SUB-DIVISION MRT SUB-DIVISION
ANANTHAPURAMU ANANTHAPURAMU ANANTHAPURAMU

Page 14