The document outlines the contact hour distribution for a computer system administration level 4 course. It is broken into 5 core competency units which make up 100% of the course and 1 elective competency unit. The core units cover server configuration (25% of course), computer network installation (24%), computer system security control (20%), computer system maintenance management (20%), and computer system and network procurement (11%). The elective unit covers network cabling management (11%). For each unit, the percentage of time spent and number of hours are provided for various work activities and their knowledge and performance components.
The document outlines the contact hour distribution for a computer system administration level 4 course. It is broken into 5 core competency units which make up 100% of the course and 1 elective competency unit. The core units cover server configuration (25% of course), computer network installation (24%), computer system security control (20%), computer system maintenance management (20%), and computer system and network procurement (11%). The elective unit covers network cabling management (11%). For each unit, the percentage of time spent and number of hours are provided for various work activities and their knowledge and performance components.
The document outlines the contact hour distribution for a computer system administration level 4 course. It is broken into 5 core competency units which make up 100% of the course and 1 elective competency unit. The core units cover server configuration (25% of course), computer network installation (24%), computer system security control (20%), computer system maintenance management (20%), and computer system and network procurement (11%). The elective unit covers network cabling management (11%). For each unit, the percentage of time spent and number of hours are provided for various work activities and their knowledge and performance components.
CORE COMPETENCY UNIT % Hrs WORK ACTIVITIES % Hrs 40% (HRS) 60% (HRS) Plan server deployment 20.00% 52 21 31 SERVER Monitor server installation 12.00% 31 12 19 1 25.00% 260.00 CONFIGURATION Carry out server configuration 62.00% 161 64 97 Prepare server configuration report 6.00% 16 6 10 100.00% 260 103 157 Analyse computer network installation requirements 25.00% 60 18 42 COMPUTER NETWORK Plan computer network installation 50.00% 120 36 84 2 INSTALLATION 24.00% 240.00 MANAGEMENT Manage computer network installation work 20.00% 48 14 34 Produce computer network installation management report 5.00% 12 4 8 100.00% 240 72 168 Analyse computer system security requirements 18.00% 36 16 20 COMPUTER SYSTEM Plan computer system security control 25.00% 50 20 30 3 20.00% 200.00 SECURITY CONTROL Perform computer system security control 50.00% 100 40 60 Produce computer security control report 7.00% 14 5 9 100.00% 200 81 119 Analyse computer system maintenance requirement 18.00% 36 15 21
COMPUTER SYSTEM Develop computer system maintenance management plan 15.00% 30 12 18
4 MAINTENANCE 20.00% 200.00 Manage computer system maintenance work 40.00% 80 32 48 MANAGEMENT Manage computer system troubleshoot issue / failures 20.00% 40 16 24 Produce computer system maintenance report. 7.00% 14 6 8 100.00% 200 81 119 Analyse computer system and network requirement 18.00% 25 10 15 COMPUTER SYSTEM & Carry out procurement activities 45.00% 63 25 38 5 NETWORK 11.00% 140.00 PROCUREMENT Administer omputer system and network product/ item receiving 25.00% 35 14 21 Report the new received product/item to the related department 12.00% 17 7 10 100.00% 140 56 84 TOTAL 100.00% 1040.00 1040 393 647