Professional Documents
Culture Documents
CG-PRC009-E4
Contents
CG-PRC009-E4 3
Control module SMM
(Scroll Manager Module)
4 CG-PRC009-E4
General Data
CG-PRC009-E4 5
Condenser Fan Performance
Unit nominal amps = nominal fan amps (according to static pressure) + compressor nominal amps
Unit starting amps = nominal fan amps (according tostatic pressure) + compressor starting amps
6 CG-PRC009-E4
Pressure drop through condenser coil
and air filter
CG-PRC009-E4 7
Application considerations
Clearance requirements
The recommended clearances
identified with unit di0mensions
should be maintained to assure
adequate serviceability, maximum
capacity and peak operating
efficiency. Actual clearances that
appear inadequate should be
reviewed with the local TRANE
representative.
Operating limits.
Table 4 - Operating limits R 407C
Min. outdoor air temperature -5°C
Min. outdoor air temperature + 40°C
Min. leaving water temperature -12°C (37% glycol)
Max. leaving water temperature + 12°C
8 CG-PRC009-E4
Performance Data
Waterflow (l/s) = Cap/(4.18 x Dt), With Dt = Entering - Leaving Water Temperature (°C) and Cap (kW)
CG-PRC009-E4 9
Performance Data
Waterflow (l/s) = Cap/(4.18 x Dt), With Dt = Entering - Leaving Water Temperature (°C) and Cap (kW)
10 CG-PRC009-E4
Performance Data
Waterflow (l/s) = Cap/(4.18 x Dt), With Dt = Entering - Leaving Water Temperature (°C) and Cap (kW)
CG-PRC009-E4 11
Performance Data
12 CG-PRC009-E4
Performance Data
CG-PRC009-E4 13
Typical Wiring
14 CG-PRC009-E4
Typical Wiring
CG-PRC009-E4 15
Typical Wiring
16 CG-PRC009-E4
Typical Wiring
CG-PRC009-E4 17
Dimensional Data
18 CG-PRC009-E4
Dimensional Data
CG-PRC009-E4 19
Dimensional Data
20 CG-PRC009-E4
Mechanical Specifications
CG-PRC009-E4 21
Notes
22 CG-PRC009-E4
Notes
CG-PRC009-E4 23
Safety recommendations Maintenance contract Training
To avoid accidents and damage, the It is strongly recommended that you The equipment described in this
following recommendations should sign a maintenance contract with manual is the result of many years
be observed during maintenance your local Service Agency. This of research and continuous
and service visits: contract provides regular development. To assist you in
1. The maximum allowable maintenance of your installation by obtaining the best use of it and
pressures for system leak testing a specialist in our equipment. maintaining it in perfect operating
on low and high pressure side are Regular maintenance ensures that condition over a long period of time,
given in the chapter “Installation”. any malfunction is detected and the manufacturer has at your
Always provide a pressure corrected in good time and disposal a refrigeration and air
regulator. minimizes the possibility that conditioning service school. The
2. Disconnect the main supply serious damage will occur. Finally, principal aim of this is to give
before any servicing on the unit. regular maintenance ensures the operators and technicians a better
3. Service work on the refrigeration maximum operating life of your knowledge of the equipment they
system and the electrical system equipment. We would remind you are using, or that is under their
should be carried out only by that failure to respect these charge. Emphasis is particularly
qualified and experienced installation and maintenance given to the importance of periodic
personnel. instructions may result in immediate checks on the unit operating
cancellation of the warranty. parameters as well as on preventive
maintenance, which reduces the cost
of owning the unit by avoiding
serious and costly breakdown.