You are on page 1of 12
HR CEC fra. 29s DOZD vara, ‘Oo -frotty erat, noe FARRIS ge BH. For, wee | rar s- Incerasin Height of Existing old New Jersey Barrier (NJB) by Modification and Reshaping with necessary repair & widening of Service lane by HBB at 10 km (p) (adjacent to old Zirani Footover Bridge) and other ancillary works of Nabinagar-EPZ-kaliakoir (Chandra) National Highway (N-540) under Manikganj Road Division during the year 2021-2022 tet ere es a coe eH | YE | HTN OTHE TES M00 09.2008.099.89.093.22-200, BFE. 09.04.2088 6 | Scare fem e -pae cefere wren He we cafe ay ANT wre FI wTER eee eceTET SN ARIA BT Lee AT CT | RAR # FIA TTI 99 (QT TET Od (AF) CR Cag oa ‘ofA ANH Bose Pre ear (Hom) TAR 108. 8808304 ahs 21 ARI, (2 et, Mew) Be ae, Fae, TET Government of the People’s Republic of Bangladesh Bangladesh Road Research Laboratory,RHD fa oD ‘TEST OF CEMENT DATA & REPORT SHEET NO-Ol_ Project / Work :-Incerasing Height of Existing old New Jersey Barrier (NJB) by Modification and Reshaping with necessary repair & widening of Service lane by HBB at 10th km (p) (adjacent to old Zirani.Footover Bridge) and other ancillary works of Nabinagar-EPZ-Kaliakoir (Chandra) National Highway (N-540) under Manikganj Road Division during the year 2021-2022. Date of receive at Lab : 23/06/2022 Date of Test : 23/06/2022 to 26/06/2022 ‘Sample description :- Cement (Crown) Quantity supplied : One bag [Name of Agency :Abaid Monsur Constructions, Laboratory Identification No:-139 COMPRESSIVE STRENGTH TEST OF CEMENT ‘Type of Specimen Type- Type of FA: OTTOWA Sand ‘Type of CA: Mix Proportion (by weight):-Cement= 1 FAs 3 :CA= +s Water/C = 0.40 Test | Dateof | Dateof | Age | Area, | Load, Strength No Casting | Testing P oe cr = @ayy | a | yy i a (PrAys1000 | Syx10.2 | Sx 145 mn’ Nimm? | Kg/em? | psi | Remarks T | 23-06-2022 | 26-06-2022 | 3 | 4900 | 149.54 | 3081 | 311.20 | 4423.95 2 | 23-06-2022 [26-06-2022 [3 [4900 | 15458 | 3154 | 321.70 | 457330 3 | 23-06-2022 [26-06-2022 | 3 | 4900 | 13946 | 2846 | 290.92 | 4126.70 “Avg: strength = 30.17 Nimm"=307.73 gm/em™=4374.65 PSI Note:- Test was performed on the basis of supplied sample. Counter Signed by Yoctedby dove. Haid Yr\ re — tv. (MD.Nizam Uddin) (Munshi Masudur Rahman) (Mofazzal Haider) Asst. Research Officer ‘Sub-Divisional Engineer (A.C) Executive Engineer (RHD) (RHD) (RHD) Material Testing & Maintenance Division Road Research Laboratory, Mirpur, Dhaka Government of the People’s Republic of Bangladesh Bangladesh Road Research Laboratory, RHD Paikpara, Mirpur, Dhaka, Bangladesh TEST OF CEMENT DATA & REPORT SHEET NO.02 FINENESS OF CEMENT “Amount Taken] Amount Reiained on] — %Retained | % Passing through Remarks Agm #200 sieve R= (B/A) « 100% #200 sieve Bgm P= (100-R) % 100 1.50, 1.50 98.50 NORMAL CONSISTENCY DETERMINATION ‘Observation No or] a | 0 | o | os | 06 | o7 oF Wt. of Cement, gm 500 500 500 Vol. of Water, cc 150. 155_[157.50 Penetration, mm 2 31 [34 ‘Normal Consist = 32 SETTING TIME DETERMINATION Obs. | Time | Bangladesh | Penetration, | Obs. | Time | Bangladesh | Penetration, mm No. | Elapsed | Time mm No Elapsed Time minute ‘minute ayo 1020 0 10 255 235 5 2 | @ 1120 w 1 265 aS Tust an Impression 3 | 90 T30 w @ | [a0 0 | | __i2a0 w oe |S [1235 7 7 | 1% 100 36 te | 230 | 2:00 5 | 20 | 230 5 Note= Test was performed on the basis of supplied sample. Initial Setting Time (Time elapsed for 35mm penetration): 160 minutes & 2 hours 40 minutes. ToT Fp Pr35)= Final Setting Time: 265 Minutes * 4 hours 25 minutes. ‘Note: Initial Setting Time Final Setting Time 2.45 minutes $6 hr.15 min, yp” Tested By: + Counter Signed by Kae dere hn Haides oye (Md. Nizam Uddin) meade, (Mofazzal Haidar) ai Asst. Research Officer ‘Sub-Divisional Engineer (A.C) Executive Engineer (RHD) (RHD) (RHD) Material Testing & Maintenance Division Road Research Laboratory, Mirpur, Dhaka. Government of the People’s Republic of Bangladesh Bangladesh Road Research Laboratory, RHD Paikpara, Mirpur, Dhaka, Bangladesh COMPRESSIVE STRENGTH TEST OF BRICK DATA & REPORT SHEET ion,Nayerhat, Manikganj... Memo No:-35.01.2614.81 1.41.031.22-250, Client:- SDE,RHD,Road Sub-Di Date:- 09/06/2022 Project / Work :-Incerasing Height of Existing old New Jersey Barrier (NJB) by Modification and Reshaping with necessary repair & widening of Service Iane by HBB at 10th km (p) (adjacent to old Zirani Footover Bridge) and other ancillary works of Nabinagar-EPZ-Kaliakoir (Chandra) National Highway (N-540) under Manikganj Road ‘during the year 2021-2022. Date of receive at Lab : 23/06/2022 Date of Test : 26/06/2022 Sample description :- Ist Cass Bricks ‘Quantity supplied : 10 Nos. Name of Agency :Abaid Monsur Constructions. Laboratory Identification No:-140 Test | Frog ] Specimen | Average | Load, Strength No | Marks | Surface Area, | P 2 - | kN Bek “ Remarks Top | Bottom s= =] Se Al | A (P/Ayx1000 | S,*10.2 | Sx 145 Nimm* | Kg/om? psi i 10700 | 10300 39994 | 185i | 188.80 | 2683.95 | I" Class Bricks not 2. 10900 | 11000 [10950 | 21002 | 1918 | 195.63 | a7eia0 | Picts 3. 10900 | 21550 | 11225 [22010 | 19.60 | 199.92 | 2842.00 | 17/Nmm*& rr PJ Bricks not less than Sal : : : : 5 : *_} 200mm? ‘Average Sirength= 19.09 Nimm’= 194,72 Kglem"=2768.35 psi ‘Notes Test was performed on the basis of supplied sampl Tested by Counter Signed by av ses howe ted (Md. Nizam Uddin) (wunsit eal Wot) e (Mofezzal Haider) ©” %* + Asst. Research Officer __Sub-Divisional Engineer (A.C) Executive Engineer (RHD) (RHO) (RHO) Material Testing & Maintenance Division Road Research Laboratory, Mirpur, Dhaka. Government of the People’s Republic of Bangladesh Bangladesh Road Research Laboratory, RHD Tal spur, Dhaka. B UNIT WEIGHT OF AGGREGATE (Oven-Dry Basis) DATA & REPORT SHEET Client:- SDE,RHD,Road Sub-Division,Nayerhat, Manikganj... Memo No:-35.01.2614.81 .41.031.22-250, Date:- 09/06/2022 Project / Work -Incerasing Height of Existing old New Jersey Barrier (NJB) by Modification and Reshaping with necessary repair & widening of Service lane by HBB at 10th km (p) (adjacent to old ZiraniFootover Bridge) and other ancillary works of Nabinagar-EPZ-Kaliakoir (Chandra) National Highway (N-540) under Manikganj Road Division during the year 2021-2022. Date of receive at Lab : 23/06/2022 Date of Test : 26/06/2022 ‘Sample description :- Ist Cass Bricks Quantity supplied : 10 Nos. ‘Name of Agency :Abaid Monsur Constructions. Laboratory Identification No:-140 Mould Calibration Weight of water to fill the mould : (W) .......2.799 kg ........Water Temp. Density of water (D) ... 998.6.........Kg/m3. Actual Volume of Mould, 25°C. Test No, | WiofAggrMould | Wi of Mould ] Wi of Agg WS Wikg Woke (WL ~W2) kg Specification Limit i 6026 2820 3.206 Note:- Test was performed on the basis of supplied sample Note: 1) 11b/A3 = 16.018 kg/m? 2) SS.D. Unit Wt. = Oven Dry Unit. Wt. (1+Water Absorption/100 3) As per ASTM, Average of three tes is not required. 4) Mould size as per BRRL Manual. Max. Size of Age: mm Gnch) 0 oan oa] Gas a] w @ Capacity oF mould required, Lire) | 3 (10) | 7 (Way [La upent 2 aa | gen Tested by 3 Counter Signed by 7! ee $e va (Ma Nizamudsin) (MuRhrMaRGAAaRAam ——_(Mofazza Haier) ‘Asst. Research Officer Sub-Divisional Engineer (A.C) Executive Engineer (RHD) _{RHD) (RHO) Material Testing & Maintenance Division Road Research Laboratory, Mirpur, Dhaka. | TH Government of the People's Republic of Bangladesh Bangladesh Road Research Laboratory, RHD Ks eae WATER ARSORPTION TEST OF BRICKS DATA & REPORT SHEET Client: SDE,RHD,Road Sub-Division,Nayerhat, Manikganj.. Memo No:-35.01.2614.811.41.031.22-250, Date:- 09/06/2022 Project / Work :-Incerasing Height of Existing old New Jersey Barrier (NJB) by Modification and Reshaping with necessary repair & widening of Service lane by HBB at 10th km (p) (adjacent to old Zirani Footover Bridge) and other ancillary works of Nabinagar-EPZ-Kaliakoir (Chandra) National Highway (N-540) under Manikganj Road Division during the year 2021-2022. Date of receive at Lab : 23/06/2022 Date of Test : 26/06/2022 Sample description :- Ist Cass Bricks Quantity supplied: 10 Nos. ‘Name of Agency :Abaid Monsur Construct Laboratory Identification No:-140 Wat War] Wai Ateraon etna, | Over |= BW yew] | CWA WEI TOT Speci Line ‘am on | WoO : a m2 938 2 [30 3490 0 938 af Nat xen 16 67% (16 ofits weight) average =9.%6 ‘Note:- Test was performed on the basis of supplied | | sample. [9% Tested by Counter Signed by ¢! 6" shoal beeen ras Bette, van (Md.Nizam Uddin) (Munshi Nissi tah (Mofazzal Haider) Asst. Research Officer ‘Sub-Divisional Engineer (Ac) Executive (RHD) (RHD) (RHD) Material Testing & Maintenance Division Road Research Laboratory, Mirpur, Dhaka. Government of the People’s Republic of Bangladesh Bangladesh Road Research Laboratory,RHD Paikpara, Mirpur, Dhaka, Bangladesh, SIEVE ANALYSIS OF AGGREGATES DATA & REPORT SHEET Client:- SDE,RHD,Road Sub-Division.Nayerhat, Manikganj.. Memo No:-35.01.2614.81 1.41.031.22-250, Date:- 09/06/2022 Project / Work :-Incerasing Height of Existing old New Jersey Barrier (NIB) by Modification and Reshaping with necessary repair & widening of Service lane by HBB at 10th km (p) (adjacent to old Zirani Footover Bridge) and other ancillary works of Nabinagar-EPZ-Kaliakoir (Chandra) National Highway (N-540) under Manikganj Road Division during the year 2021-2022. Date of receive at Lab : 23/06/2022 Date of Test : 26/06/2022 ‘Sample description :- Local Sand Quantity supplied: One bag. Name of Agency :Abaid Monsur Constructions. Laboratory Identification No:-141 SIEVE ANALYSIS DATA ei Laboratory Identification No : 95 ‘Weight of Dry Sample = 200gm STANDARD | WEIGHT % | CUMULITIVE % OPENING, RETAINED | % RETAINED | PASSING Remarks (mm) 5.0 0 0 100 24 12 = 0.600 150) 150 38.50 0.300 3230 33.80 66.20 0.150 55.10 88.90 11.10 FM=124 = | Tested by: ‘Counter Signed by ~ “al tow Lan “ (a ee (Munshi Rial ebay Motazzal nach" 72 Asst. Research Officer ‘Sub-Divisional Engineer (A.C) Executive Engineer (RHO (RHO) (RHD) Material Testing & Maintenance Division Road Research Laboratory, Mirpur, Dhaka. Government of the People’s Republic of Bangladesh Bangladesh Road Research Laboratory,RHD Paikpara, Mirpur, Dhaka, Bangladesh, SIEVE ANALYSIS OF AGGREGATES Client. ‘SDE.RHD,Rosd Sub-Division.Nayerhat, Manikganj... Memo No:-35.01.2614.811.41.031.22-250, Date:- 09/06/2022 Project / Work :-Incerasing Height of Existing old New Jersey Barrier (NJB) by Modification and Reshaping with necessary repair & widening of Service lane by HBB at 10th km (p) (adjacent to old Zirani Footover Bridge) and other ancillary works of Nabinagar-EPZ-Kaliakoir (Chandra) National Highway (N-340) under ‘Manikganj Road Division during the year 2021-2022. Date of receive at Lab : 23/06/2022 Date of Test : 26/06/2022 ‘Sample description - Sylhet Sand. Quantity supplied : One bag. ‘Name of Agency :Abaid Monsur Constructions. Laboratory Identification No:-142. SIEVE ANALYSIS DATA (FM). ‘Laboratory Identification No : 94 Weight of le = 200, STANDARD | _ WEIGHT % a CUNT eo OPENING, | RETAINED, | RETAINED | % RETAINED | PASSING Remarks (mm) (gm) 5.0. 0 0 0 100 24 25 1.25 1.25 98.75 12 28.5 14.25 15.50 84.50 0.600 95.80 47.90, 63.40 36.60, 0.300 58.70 29.35 92.75 7.25 a 0.150 12.0 6.00 98.75 1.25 an weight 2.0 = FM=2.71 = Loss weigh 05 = Note:- Test was performed on the basis of supplied sample. Tested by: Counter Signed by yr fa coed rand be (Md. a und tibd Karson (Motezzal Haider)” %* > Asst. Research Officer ‘Sub-Divisional Engineer (A.C) Executive Engineer (RHO (RHD) (RHD) Material Testing & Maintenance Division Road Research Laboratory, Mirpur, Dhaka. Government of the People’s Republic of Bangladesh Bangladesh Road Research Laboratory, RHD Paikpara, Mirpur, Dhaka, Bangladesh, SIEVE ANALYSIS OF AGGREGATES DATA & REPORT SHEET ;Nayerhat, Manikganj.. Memo No:-35.01.2614.81 1.41.031.22-250, Project / Work :-Incerasing Height of Existing old New Jersey Barrier (NJB) by Modification and Reshaping with necessary repair & widening of Service lane by HBB at 10th km (p) (adjacent to old Zirani Footover Bridge) and other ancillary works of Nabinagar-EPZ-Kaliakoir (Chandra) National Highway (N-540) under Manikganj Road Division during the year 2021-2022, Date of receive at Lab : 23/06/2022 Date of Test : 26/06/2022 Sample description :-Pea-pravels Quantity supplied : One bag. ‘Name of Agency :Abaid Monsur Constructions. Laboratory Identification No:-143 ‘SIEVE ANALYSIS DATA (Gradation) Laboratory Identification No: ‘Weight of Dry Sample = 5000; ‘STANDARD | _ WEIGHT % CoMULTIIGE + eae OPENING, | RETAINED, | RETAINED | %RETAINED | PASSING | RHD, Technical (mm) (gm) Spe-Table 3.12-1 10.0 0 0 0 100 100 63 160.5 321 3.21 96.79 30-100 5.0) 296.0 592 9.13 90.87 75-95 24 2165.5 4331 52.44 47.56 20-50 0.600 1425.0 28.50 80.94 19.06 S15 0.075 842.5 16.85 97.79 2.21 210 Panweight 102.5 = = - = Loss 8.0 = = = = Note:- Test was performed on the basis of supplied sample. Tested by: Counter Signed by hee a (Ma. BK san (Munshceadec Nakinssy (Matar Haiae** = Asst. Research Officer ‘Sub-Divisional Engineer (A.C) Executive Engineer (RHO (RHO) _{RHD) Material Testing & Maintenance Division Road Research Laboratory, Mirpur, Dhaka. Government of the People’s Republic of Bangladesh Bangladesh Road Research Laboratory,RHD Paikpara, Mirpur, Dhaka, Bangladesh ABRASION TEST OF COARSE AGGREGATE BY LOS ANGELES METHOD DATA & REPORT SHEET Client:- SDE,RHD,Road Sub-Division,Nayethat, Manikganj.. Memo No:-35.01.2614811.41.031.22-250, Date:- 09/06/2022 Project / Work :-Incerasing Height of Existing old New Jersey Barrier (NJB) by Modification and Reshaping with necessary repair & widening of Service lane by HBB at 10th km (p) (adjacent to old Zirani Footover Bridge) and other ancillary works of Nabinagar-EPZ-Kaliakoir (Chandra) National Highway (N-40) under Manikganj Road Division during the year 2021-2022. Date of receive at Lab : 23/06/2022 Date of Test : 26/06/2022 ‘Sample description :- Brick Chips (Sub-Base, Materials) Quantity supplied: One Bag (50 kg) Name of Agency :Abaid Monsur Constructions. Laboratory Identification No:-144 TestNo: | __SieveSive | Weight | Weight | Other Information | Abrasion value of | Retained a ification Passing [ Retained | material | on # 12 =. 100% | Stine mm} mm | Taken | (1.70.mm) : sieve Mt | wae 20.00 | 1250 | 2500 Gardin No. of charge 11 : oO 3285 | Wtof Charges, gm | 34.30% 1250 | 1000 | aso 4586 Toial, Wigm= | S000 Note= Test was performed on the basis of supplied sample. Jet E Counter Signed by pp LO th Harder, RTE (Md.Nizam Uddin) (Munshi (Mofazzal Haider) ~~” Asst. Research Officer Sub-Divi ineer(AC) Executive Engineer (RHO) (RHO) (RHO) Material Testing & Maintenance Division Road Research Laboratory, Mirpur, Dhaka. Government of the People’s Republic of Bangladesh Bangladesh Road Research Laboratory,RHD AGGREGATE CRUSHING VALUE & TEN PERCENT FINES VALUE DATA & REPORT SHEET Client: SDE.RHD,Road Sub-Division,Nayerhat, Manikganj.. Memo No:-35,01.261481 141.031 22.250, Date:- 09/06/2022 Project / Work :-Incerasing Height of Existing old New Jersey Barrer (NJB) by Modification and Reshaping with necessary repair & widening of Service lane by HBB at 10th km (p) (adjacent to old Zirani Footover Bridge) and other ancillary works of Nabinagar-EPZ-Kaliakoir (Chandra) National Highway (N-540) under Manikganj Road Division during the year 2021-2022. Date of receive at Lab : 23/06/2022 Date of Test : 26/06/2022 ‘Sample description - Stone Chips Quantity supplied: One Bag (50 kg) ‘Name of Agency :Abaid Monsur Constructions. Laboratory Identification No:-144 ‘AGGREGATE CRUSHING VALUE Test No. Gi ok eee ar ‘Specification Limit ‘We. of Sample (Surface Dry) A gm 2530 2546 Wt tPasine renee #8 Sieve) 320 330 | Aggregate Crushing Value = NRT | 20.55, 20.81 Mean Value (ACV) % 20.68% TEN PERCENT FINES VALUE Test No. Pre Test | O1 “Specification Limit ‘Wt. of Sample (Surface Dry) A em 2565 | 2548 | 2536 We of Passing (through #8 Sieve) B gm 340 | 27 | 276 Applied Primary Load, 240 5 Maximum Load, | X, KN. Note : Based on X;, X is + Yi=ByV/A;X100=13.25% calculated, which represents © X= 14XV(¥iH4) = 194.78 KN ~195KN applicable load for 10% fines value. ‘Secondary Load, X le T93KN Percent Fines= | Individual Case 1167 ]__ 10.88 (B/A)X 100% [Mean Value 10.77% Load for 10% fines value = T4X/(Y +4) KN 184.83 KN = 185KN Note:- Test was performed on the basis of supplied sample. Counter Signed by ko aye > pee: BO ( wm Uddin) (Munshi Rapid ee) —— mete ) weak: Asst. Research Officer Sub-DivisionafE? ro (RHO) (RH) oe Material Testing & Maintenance Division Road Research Laboratory, Mirpur, Dhaka. ‘Government of the People’s Republic of Bangladesh Bangladesh Road Research Laboratory,RHD Material Testing & Maintenance Division Palkoara, Mepur, Dhaka, Bangladesh TENSION TEST OF DEFORMED M.S. BARS Memo No.: SAS Date: 27.-@- 2e2E Cient'SDE RHO Road Sub-Divsion Nayethat Clients Ref: Memo no 250 Date 0906/2022 [Name of Agency: Abaid Monsur Constructions. Date of Material Received: 23-06-22 ‘Sample Sealing Status: sealed Date of testing: 26-06-22 Name ofthe Work inoerasing Height of Exising ol New Jersey Bare (NIB) by Motfication and Reshaping wih necessary rep & widening of Service lanw by HBB at 10th km (p) (adjacent to old Zran\ Fotover Bridge) and ther ancilary works of Nabinagar-EPZ:Kalikoir (Chandra) National Highway (N-S40) under Manikgarj Road Divison daring the year 2021-2022.

You might also like