APAM Conference – Proper Setup & use of Grade controls
- Controlling Segregation
Wide-width paving
Nars
Principles of the Free Floating Screed
Un-Compacted
aggregate flowing
under screed
Final Screed
Compaction
Nars
Principles of the Free Floating Screed
Main
Screed
Main
Strikeoff
Max. Compaction
at Trailing Edge
0 Compaction at
Strikeoff
Screed
Compaction
Material Flowing Mat Thickness
(Angle of Attack)
Under Screed
Nars
Principles of the Free Floating Screed
Main Screed
Max Compaction at
Main Strikeoff trailing edge
Mat Thickness
Occurs at the Bull Nose Occurs along the flat of the Angled Screed plate
Tow Arm
(Leveling Arm)
Tow Point
Cylinder
Screed Arm
Pivot Point
Nars
Principles of the Free Floating Screed
Screed Weight
W
Pull
Force P
Material Head M
Nars
Stopping / starting / steering a straight line
Speed
Dial & Display
P
Pull Force
Nars
Stopping / starting / steering a straight line
Nars
Stopping / starting / steering a straight line
Nars
Stopping / starting / steering a straight line
Nars
Stopping / starting / steering a straight line
Nars
Stopping / starting / steering a straight line
Nars
Stopping / starting / steering a straight line
Safety Edge
Nars
Stopping / starting / steering a straight line
Nars
Stopping / starting / steering a straight line
Nars
Managing Head of Material
Decrease Head..
Screed Drops
Nars
Managing Head of Material
Nars
Managing Head of Material
Nars
Managing Head of Material
Nars
Proper Setup
Paving
Direction
VA
A
A A
Main B
LH & RH
Extension B B
Thickness
of Mat
Plane A
Plane B
Amount of
material Flowing
Under Screeds
Nars
Proper Setup
VA
Ext Main
Mat Depth
Plane A
Plane B EIAA
Amount of
material Flowing
Under Screeds
Nars
Proper Setup
Nars
Proper Setup
Ideal Vertical Adjust (VA)…… for Unequal Width Front Mount Screed
Extension Slightly Higher than Main Screed to ensure Main is dominant
Nars
Proper Setup
Excess Wear
Too Low… Screed Rides on Trailing Edge Too High… Screed Rides on Nose
…..Premature Wear on Trailing Edge …..Premature Wear on the Bull nose
Nars
Proper Setup
Pull point
Approximately Parallel
to Base P
Tow Tow
Point Point
Nars
Proper Setup
Nars
Controlling Segregation
Gradation Thermal
Segregation (Cold Crust)
Sloping Surface
Larger Stones
Nars
Gradation & Thermal Segregation
Nars
Gradation & Thermal Segregation
Nars
Segregation
2. Thermal Segregation:
Cold crust from Long Haul etc.
Nars
Controlling Segregation
1 2
Nars
Controlling Segregation – Pushing Trucks
Nars
Controlling Segregation – Pushing Trucks
Change in Grade
Nars
Controlling Segregation – Pushing Trucks
Nars
Controlling Segregation when Using MTV / MTD
1. Non-Shuttle Type
Nars
Controlling Segregation when Using MTV / MTD & Insert
1 2 3 4
Nars
1. Gradation Segregation at the side wall of the truck bed
Truck
Sidewall
Nars
2. Gradation Segregation at the End & Start of Truck Dumping
Nars
3. Thermal Segregation (Crust) on surface & side wall of truck bed
Solution 1:
Combination of Re-blending Augers and Flight Chains
Augers re-blend cold crust as it moves the material to the belt
Several flight Chains brakes up the crust as it moves to the next conveyor
Crust
Nars
3. Thermal Segregation (Crust) on surface & side wall of truck bed
Passive Remixing
Non-Shuttle Concept Grate System
Active Remixing
Shuttle Concept
Active Remixing
Nars
4. Gradation Segregation at Hopper Insert Side wall during Filling
17 Tons 22 Tons
(10 cu yd) (13 cu yd)
Nars
Material management as tractor delivers to Screed
B, C, D
Center Line
& wheel path
Nars
Material management as tractor delivers to Screed
Solutions: (A, B, C, D, E)
Proper Auger & Conveyor Controls
Provides consistent Metering of material for Continuous Auger rotation
Always Ensure that the Augers are ½ Covered
Constant
Conveyor delivery same as Auger Displacement Feeding
Nars
Material management as tractor delivers to Screed
¼ flight
Nars
Material management as tractor delivers to Screed
Solutions: (B, C, D, E)
Auger & Tunnel Extensions & Material Chutes
Augers - Help move the material to the End gates
Some State specify 18” to 24” From End gates
Tunnel Extensions: Confine material
Material Chutes – Allow material to drop closer to augers
Auger Re-blends as it moves the material
Outer Tunnel
segregation
Nars
Wide Paving
Specific Focus:
Setup
Maintain Consistency – material feed and paving speed
Balance Paving where Possible – Influence by Crown & Shoulder Slope
Nars
Wide Paving
Nars
Wide Paving
Material Feed:
MTV Where possible
Proper Auger Extensions
Proper Tunnel Extensions.
Wide RM Wide FM
Nars
Automatic Grade & Slope
Nars
Automatic Grade & Slope
Nars
Automatic Grade & Slope
Nars
Automatic Grade & Slope
Single
5 Eye
Eye
18 – 22”
Nars
Automatic Grade & Slope
Nars
Automatic Grade & Slope
Nars
1
Mat Reference Ski - Last Sensor Swivels over Mat
Automatic Grade & Slope
As such - Yield, Grade & Slope CANNOT be controlled at the same time
G2
G1
S1
Slope must Move up to Hold S1
Nars
Automatic Grade & Slope
D3 Steering
Control (Y)
D2 Screed
D1 Mat
Width (X) D1 Mat
Depth L
Depth R
3D – No
Operator
Nars