Appendix-1 to
Vol-I :
Design Report
Submitted To
Engineer in Chief (R&B), SR & CRN
R&B Department, Government of Telangana,
Errumanzil, Hyderabad
Consultant
C. E. Testing Company Pvt. Ltd.
124-A, NSC Bose Road, Kolkata 700092
Design Report
R0 July-16 Page 1
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Contents
1.0 EXECUTIVE SUMMARY .........................................................................................................................2
1.1 Introduction ...............................................................................................................................2
2.0 PLANNING, DESIGN BASIS & STANDARDS............................................................................................3
2.1 Planning......................................................................................................................................3
2.2 Structures...................................................................................................................................3
A. Design Basis....................................................................................................................................3
B. Design Standards: ..........................................................................................................................4
2.3 Design Philosophy ......................................................................................................................4
R0 July-16 Page 2
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 3
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
2.1 Planning
After submitting the Inception Report, various discussions were held and the alignment & span
arrangement has been finalized.
All the proposals have been prepared in following approach.
In depth study of the inventory data, site data, terrain condition and the survey drawing
has been carried out.
The Srisailam dam is located at the downstream side of the location. The river cross
section has a distinct deep portion of around 600m and rest portion is low land portion.
During flood, this low land portion acts as water storage.
The maximum discharge released from the dam is considered as the discharge through
the cross section.
The waterway is considered as class-l waterway.
In the deep portion of the river, PSC Integral bridge of 120.0m span has been provided. In
the low land portion, 50m span PSC Box girder type super-structure is provided.
In the low land portion, open foundation has been proposed and in the deep channel
portion, pile foundation has been provided.
The approach roads are considered to cater two lane traffic whereas bridge is provided
for three lane traffic.
2.2 Structures
A. Design Basis
The structural scheme has been chosen considering the following:
Two types of superstructure chosen: PSC box girder of 50m in low land portion and 120m
span PSC Integral Box in deep channel portion.
Long span superstructure is chosen to minimize the nos. of foundation in the deep
channel portion.
Solid type circular pier has been chosen considering speedy construction.
Middle 60m portion of each 120m segment is considered for waterway usage. For
waterway, class-l waterway has been considered.
Diameter of circular pier is varied as per height of pier.
POT-Cum-PTFE bearing has been chosen for 50m PSC.
Circular single pier has been chosen to minimize the obstruction.
R0 July-16 Page 4
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
B. Design Standards:
I. GEOMETRIC DESIGN
i) The overall width (out to out of kerb) of the deck slab will be kept as 14.8m for three
lane.
ii) The span type and arrangement will be proposed considering site constraint,
optimize the pier number and aesthetics.
iii) Environmental loadings such as earth pressure, water current, seismic forces and
temperature effect will be taken as per IRC/BIS Codes. IS-1893 will be followed in
evaluating dynamic increment of earth pressure.
Introduction : The length of the most appropriate alignment connecting Somsila to the
Kapileswaram is approximately 10.9 Km. Out of this 10.9 Km we have bridge and viaduct
of about 1.836 Km long. The details of the alignment selection has been presented in our
Feasibility Report and not repeated herein. In this we are primarily concerned in the
structural planning and designing.
Basic Division : We have divided the bridge length into basic components viz. (a) Viaduct
and (b) Bridge proper. The location of the bridge is on the pond of the dam on Krishna. As
a result once the irrigation water distribution starts the water level falls rapidly. Generally
about 8 months we have a channel of about 600m of flowing water. However, during
monsoon the water is stored and a huge area gets inundated. After survey it is seen that
we may face difficulty in placing open foundation in a stretch about 600m. Further, rock
appears at shallow depth and within a depth of 3/4m a net bearing capacity of 40 t/m2
can be achieved. Therefore, open shallow foundation wherever construction is feasible is
the obvious choice. In other portion we use to 2500 mm dia pile with a pile cap slightly
above low water level.
a. Viaduct Portion : We have viaduct at both ends and we are provided span of
50.0m. In the Somsila side we have 6 such span and in the temple side we have 16
such spans. Viaduct is resting on pier of 3m to 4m diameter on open/pile
foundation with an estimated bearing capacity of 40 t/m2. Viaduct portion is
straight in plan at locations and this is taken care of using straight beam and slabs.
b. Bridge Portion : For the ease of construction we have used balance cantilever
section using prestress concrete box girder with depth varying parabolicaly
construction proceeds from the pier head equally on both sides upto 59.5m. This
R0 July-16 Page 5
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
is done in 19 stages. Each stage for concreting and prestressing takes 3 weeks and
therefore completion period of 1 pair of pier with super structure deck will be
about 57 weeks. After completion of 59.5m arm of two adjacent piers the central
1.0m is concreted with prestressing at bottom.
i. Analysis : The incremental method of construction is presented through
longhand calculations. As a first step the dead load stresses are worked
out and prestressing forces are applied. The net stresses on concrete at top
and bottom fibers are obtained.
ii. After two segments are cast one in each side, second segment is cast and
prestressed to take another 3 weeks.
iii. This analysis is carried out upto 19 segments.
iv. After two segments are cast one in each side, second segment is cast and
prestressed to take another 3 weeks.
v. Relaxation of stresses in the prestressing cables are evaluated segment
wise and superimposed on earlier results.
vi. Thereafter, effect of shrinkage and creep and strength gain with time is
taken care of and superimposed on previous results.
vii. At the last stage the central portion (1 mtr. long) is cast and the resulting
stresses are distributed.
c. Live Load Analysis : A model of the superstructure is made in SAP 2000 V-14.3
and analysis for live load and seismic loads are made. The effect of live load and
seismic load are superimposed from earlier stress results.
d. Foundation : Based on the results obtained from longhand calculations for dead
load and results for continuity and live load and seismic load applications are
applied from the foundation. It is designed to rest on piles of 2500mm dia with at
least 5000 mm embedment in bed rock to attain fixity.
We have used limit state method of design for superstructure as recommended by IRC:112-2011 .
The heavy vehicle of 385 ton as recommended by IRC:6-2014 Amendment-1 is also considered.
The details of code used are given separately in the following.
Part-A(6 Nos 50 m PSC, All spans are not shown for clarity)
R0 July-16 Page 6
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Part-B(64+120x5+64m)
Part-C(16 Nos 50 m PSC, All spans are not shown for clarity)
R0 July-16 Page 7
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Where IRC Codes are silent relevant BIS Codes will be followed. And where even BIS codes are
silent, international codes / MOST, MORTH guidelines will be adopted.
The project road falls in Seismic Zone II, as per the classification specified in IRC: 6:2014. All
structure has been designed accordingly.
The Soil parameters used in the preliminary design of foundations for Bridges are taken from the
report of soil investigation and information obtained from local authorities / existing bridge
design data.
The following soil parameters will be used for material for back fill behind abutment /retaining
walls for design purpose.
φ = 30°
δ = 20°
γd = 20 KN/m3
γsub = 10 KN/m3
A 600 mm thick granular material filter media behind abutment and adequate weep holes in
abutment walls will be provided for proper drainage.
V. FOUNDATIONS:
Type of foundation has been chosen according to the geotechnical investigation report.
VI. SUBSTRUCTURE:
RC column type piers (circular) and wall type abutment is provided in general matching the
requirements, site conditions and constraints. The design has been carried out in conformity with
IRC-78:2014 and IRC:112-2011..
VII. SUPERSTRUCTURE:
Type & Span arrangement of superstructure has been chosen considering alignment, obstruction
due deepest channel width, width of total water body, constructability, aesthetics etc. With due
consideration, on various options, 64m+5x120m+64m PSC double cell box girder integral bridge
has been proposed over the deepest channel. 6no and 16 no 50m PSC double cell cast-in situ
girder has been proposed in A1(Somsila side) & A2(Kapileswaram side) side respectively.
In the approach road part, 31 number cross drainage structures have been provided depending
on site requirement. These are all box culvert.
R0 July-16 Page 8
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
II) BEARINGS:
POT /POT cum PTFE bearings has been used in the bridges as required for 50m PSC span, loads
etc. and tar paper used in the slabs.
V) WEARING COURSE:
Average 86mm thick asphaltic concrete wearing course comprising one layer of 25mm thick
Mastic asphalt and rest BC in 2/3 layers adopted.
R.C. approach slabs, 3.50m long in M-30 concrete used at either end of the Bridge to ensure riding
comfort and to reduce vehicular surcharge on the abutment walls. One end of the approach slab is
supported on R.C. bracket projecting out, from dirt wall while the rest of the slab may be placed
on compacted soil/ brick foundation(in case of RE wall) as per the MoRTH guidelines. A leveling
course, 15 cm thick in M-15 grade concrete has been used under the approach slab.
VIII. ILLUMINATION:
Proper illumination arrangement by two sided mast, central mast (pole & lantern type) provided.
IX. ASTHETICS:
Aesthetics has been considered during the preparation of scheme of the flyover as it will be
constructed at a built up area. Proper painting should also be provided.
R0 July-16 Page 9
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Design Calculation
R0 July-16 Page 10
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 11
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
1.GENERAL
Length of Intermediate Span, = 120 m
Number of Intermediate Span= 5
Length of End Span, = 64 m
Number of End Span= 2
Total length= 728 m
2. SELF WEIGHT:
Self weight of one exterior span= 21350 KN
Self weight of one interior span= 42700 KN
Total self weight= 256200 KN
3.SIDL
s/w of wearing coat = 0.5x(0.176+0.045)x10.5 x 22 = 25.526 KN/m
s/w of outer kerb = 0.25 x 0.3 x 25 x 2 = 3.750 KN/m
s/w of crash barrier = 0.253 x 25 x 2 = 12.650 KN/m
s/w WC om footpath = 0.075 x1.5x25 x 2 = 5.625 KN/m
Wt. of railing = 1.5 x 2 = 3.000 KN/m
footpath live load = 4 x 1.5 x 2 = 12.000 KN/m
Total SIDL on Superstructure = 62.551 KN/m
3.SEISMIC LOAD
R0 July-16 Page 12
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
4. LIVE LOAD
Live Load
We use IRC Class A two-lane or IRC 70R both wheeled and tracked vehicle whichever governs.
For Class A:
Impact Factor = 4.5/(L + 6) 0.04
Factor = 1.04
For Class 70R ( wheeled ):
Impact Factor = 0.04
Factor = 1.04
For Class A:
Total load of a single train= 554 KN
Train length= 19 m
Nose to tail distance= 20 m
Number of full train load on the total bridge= 18
Remaining length= 29.600
Additional load on remaining length= 554
For calculating Braking force, we try placing the vertical loads as much as possible.
Assuming that Axle - 1 falls just inside the bridge, we can have additional
Total Vehicular load = 10526 KN
Number of loaded lane 3
Braking force = 1634.30 kN No of dist points = 6
Applied Point Load at Deck Level = 272 kN (FOR CLASS A 3 LANE)
R0 July-16 Page 13
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
6. Temparature load
Taking change of temparature = 30 °
R0 July-16 Page 14
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
At Pier
Rotation
Assume 16 piles with spacings @ 5000mm
Z_xx1 = 66.66667
Assume moment = 100 kN.M = 1E+08 Nmm
Push = M/Z = 1.50 kN
Deflection of a pile = Push / Stiffness = 0.0031 mm
Rotation = 4.17E-07 radians [ S/R, R = 2500 mm ]
Stiffness = Moment/Rotation = 2.40E+08 kN.m/Radian
= 2.40E+14 Nmm/Rad
Horizontal
Average 25 mm for 480 kN load
K_h = P/S = 19.20 kN/mm
As we use a group of piles of 16 nos
Use group reduction factor = 1
Hence final Group stiffness = K_xx = 307.2 kN/mm
= 307200 N/mm
R0 July-16 Page 15
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Project: Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana.
1 2 3 4
5 6 7 8
P
9 10 11 12
13 14 15 16
Design Data:
a) Pile Diameter = 2500 mm with 5m embedment inside rock layer.
b) Pile Group configuration = Square (4 X 4 )
c) Young’s modulus of Rock material = 15000 kg/sqcm
d) Poisson ratio of rock = 0.25
e) Load carried by each pile = 1600 Ton in which End bearing component = 900T &
Socket side resistance component = 700 T
f) Pile spacing = 2D = 5m c/c
g) For the calculation of pile group settlement stress co-efficient for end bearing and
uniform skin friction is calculated as per: Geddes, J.D. (1969), “Boussinesq –
R0 July-16 Page 16
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Project: Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana.
Analysis considering Group 1 (Pile 1, 4, 13 & 14 i.e. four outer corner piles) :
r = Radial distance of outer end pile from centre of pile group = (152+152) / 2 = 10.61m
Lp = 5.0m , Z = 5.20m (say)
m = Z / Lp = 1.04
n = r / Lp = 2.12 2.00
Stress co-efficient is calculated separately for two parts i.e. end bearing and uniform skin
friction
Case 1 : Stress co-efficient for end bearing, Kze = (-) 0.0092
Case 2 : Stress co-efficient for uniform skin friction, Kzs = (-) 0.0085
For case - 1, Stress z = P x Kze / L2p = 900 x 4 x (-) 0.0092 / 52 = (-) 1.3248 t/sqm
For case - 2, Stress z = P x Kzs / L2p = 700 x 4 x (-) 0.0085 / 52 = (-) 0.9520 t/sqm
For case - 1, Stress z = P x Kze / L2p = 900 x 4 x (-) 0.0683 / 52 = (-) 9.84 t/sqm
For case - 2, Stress z = P x Kzs / L2p = 700 x 4 x (-) 0.1649 / 52 = (-) 18.47 t/sqm
R0 July-16 Page 17
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Project: Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana.
Analysis considering Group 3 (Pile 2,3,5,8,9,12,14 & 15 i.e. rest eight piles):
r = Radial distance of outer end pile from centre of pile group = (152+52) / 2 = 7.905m
m = Z / Lp = 1.04
n = r / Lp = 1.581
Stress co-efficient is calculated separately for two parts i.e. end bearing and uniform skin
friction
Case 1 : Stress co-efficient for end bearing, Kze = (-) 0.0194
Case 2 : Stress co-efficient for uniform skin friction, Kzs = (-) 0.0344
For case - 1, Stress z = P x Kz / L2p = 900 x 8 x (-) 0.0194/ 52 = (-) 5.587 t/sqm
For case - 2, Stress z = P x Kz / L2p = 700 x 8 x (-) 0.0344 / 52 = (-) 7.70 t/sqm
Total stress for end bearing = (-) 1.3248 – 9.835 – 5.587 t/sqm = (-) 16.75 t/sqm
Total stress for shaft resistance = (-) 0.952 – 18.47 – 7.70 t/sqm = (-) 27.12 t/sqm
Total stress 44 t/sqm (Compression)
Settlement Calculation :
p * B * (1 2 ) * I
Si
E
B = 17.50m , I = Influence factor depends on length and breadth of footing
= 1.12 at centre of square
p = Total Stress = 44 t/sqm
Settlement = 44 x 17.50 x (1-0.252) x 1.12 / 150000 m = 5.39 x 10-3 m = 5.39mm
Applying rigidity correction of 0.80, corrected settlement = 5.39*0.80mm = 4.312mm
Stiffness of pile = Load per pile/ settlement = 1600/4.312 t/mm = 371 t/mm,
say 370 t/mm
R0 July-16 Page 18
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Superstructure Design
R0 July-16 Page 19
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 20
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
14800
10500 1100
300
225
600 250 600
2300
450
C. Analysis:
The deck slab is designed as a simply supported slab on webs of box girder with cantilever overhang on both sides as shown above. The deck
section has been modelled as frame element and analysed element by SAP2000 software.
1. Load Calculation:
a) DL & SIDL Calculation:
(i). Cantilever Portion :
Span, L = 4.200 m
Due to self weight of slab = 0.250 x 25 = 6.3 KN/m
Due to wearing course = 0.111 x 22 = 2.442 KN/m
b) LL Calculation:
LL-Case-1: Crowd Load one sided
Intensity of crowd load on footpath = 4.0 KN/sqm
Load per metre length of footpath = 6.0 KN/m
Acting at 1.00 m from deck end
LL-Case-2: Crowd Load both sided
Place the crowd load symetrically
R0 July-16 Page 21
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LL-Case-3: Place Class A with minimum edge distance at deck end.
400
57KN
850
500
250
1200
One 57 KN wheel for IRC class A loading is placed with minimum 150mm clearance from road kerb
Distance of CG of load from face of support = 450 mm
beff= 1012 mm
Hence overlaaping not occurs
LL-Case-4: Place Class A with minimum edge distance at other than deck end.
beff= 1.012 m
Load per metre including impact factor = 84.49 KN/m
LL-Case-5: Two 57 KN wheel symetrically placed w.r.t. centre of span
bw = 0.472 m
Impact factor for class A loading =4.5/(6+L) 0.441
57 KN 57 KN
1200 1800 1200
(a) (b)
A B
4200
4200
Effective width:
Load beff beff for two adjacent axles Load per metre width in KN
R0 July-16 Page 22
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LL-Case-7: IRC Class 70R wheeled vehicle: 20T axle placed symetrically on span
4200
Effective width:
Load beff beff for two adjacent axles Load per metre width in KN
LL-Case-8: IRC Class A vehicle: 2 Lane load placed symetrically on interior support
bw = 0.472 m
Impact factor for class A loading =4.5/(6+L) 0.441 m
57KN 57KN 57KN 57KN
1550 1800 850 850 1800 1550
A (a) (b) B (d)
4200 (c) 4200 C
Effective width:
Load beff beff for two adjacent axles Load per metre width in KN
(a) 4.501 4.400 38.14
(b) 2.682 3.882 43.23
(c) 2.682 3.882 43.23
(d) 4.501 4.400 38.14
LL-Case-9: IRC Class 70R wheeled vehicle: one 5.0 T load is placed over interior support
A 4200 B 4200 C
Effective width:
Load beff beff for two adjacent axles Load per metre width in KN
R0 July-16 Page 23
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Effective width:
Load beff beff for two adjacent axles Load per metre width in KN
D.Analysis Output:
The analysis of deck slab has been carried by SAP 2000, considering the deck slab as a beam of unit width. The output at various location has been
tabulated below.
LL Maximum
5 -54.92 -44.32 38.88 117.84 62.30 -5.93 7.45 2.66
Moment
Support
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Displacement
D.Load Combination
R0 July-16 Page 24
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Servicibilty Limit State (Rare Combination) Ref.: Table 3.3, IRC-6:2014
E.Design Parameters
Grade of concrete = M60
fck= 60 MPa
fctm= = 4 MPa
Grade of steel = Fe500
fy=fyk= = 500 MPa
σsc= = 205 MPa
Es= = 200000 MPa
Ec= = 32000 MPa
Clear cover= = 40 mm Ref-Cl-14.3.2.1, IRC-112:2011
F. Design
R0 July-16 Page 25
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
(II) SLS Checking
At
At Mid At Mid At
At Mid support: Cantilever
Sl No. Parameters span: Top span: Soffit support:
Top Slab part: top
Slab Slab Soffit Slab
Slab
1 Minimum Reinforcement for crack control Ref.: Cl-12.3.3,IRC-112:2011
Required Minimum Reinforcement for crack control= As,min=kc*k*fct,eff*Act/σs
Act= Concrete area within the tensile zone (in sqmm) 162000 181000 471000 362000 362000
σs= Maximum tensile stress permitted= 400 Mpa Ref.: Table-12.2,IRC-112:2011
fct,eff= Mean value of the tensile strength of concrete (fctm)= 4 Mpa
k=Coefficient which allows for the effect of non-uniform self
equilibrating stresses, which lead to a reduction of restraint 1
forces=
kc=Coefficient which takes account of the stress distribution
within the section just prior to cracking and of the change of the
lever arm= 0.40 0.40 0.40 0.40 0.40
=0.4 x [1-{σc/(k1 x (h/h*)*fct,eff}]=
σc= compressive stress in the concrete= 0 0 0 0 0
k1= Coefficient considering the effects of axial force in the
1 1 0.82 0.93 0.93
stress distribution=
h=(mm) 202 204 552 402 402
h*= (mm) 202 204 552 402 402
Asmin= Minimum area of steel within the tensile zone = 648 724 1884 1448 1448
CHECK Hence OK Hence OK Hence OK Hence OK Hence OK
2 Checking for Stress level
Moment (kN-m) 53.50 47.40 146.90 20.70 25.10
Neutral axis depth: Xu= (0.87*fy*Astprov)/(0.36*fck*b)= 40 23 81 40 40
deff=(in mm) 202 204 552 402 402
Diameter of bar=(in mm) 16 12 16 16 16
Spacing of bar=(in mm) 100 100 100 100 100
Astprovided=(in sqmm) 2010 1130 4020 2010 2010
m (lomgterm)= 12.5
Equating the moments of areas about the centroidal axis, b*Yt2=m*Astprov*(d-Yt)
Solving thae equation, Yt= [-(m*Astprov)±{(-m*Astprov)2-4*(-m*Astprov)*deff*0.5*b}0.5]/(2*0.5*b)
Solving thae equation, Yt= 79 63 191 119 119
(Neglect the -ve value) -129 -91 -291 -169 -169
Distance of CG from reinforcing steel, Ys=(in mm) 123 141 361 283 283
Inertia of the section, Icr=m*Atprov*Ys2+b*Yt3= (in mm4) 5.44E+08 3.64E+08 8.87E+09 2.57E+09 2.57E+09
Section modulus=Zt= Icr/Yt= (in mm3) 6.89E+06 5.78E+06 4.64E+07 2.16E+07 2.16E+07
sc = stress in the tension reinforcement = in Mpa 152 229 75 28 34
Maximum permissible stress in tensile steel=0.8*fyk=
400 Mpa Ref.:-Cl- 12.2.2, IRC:112-2011
Ref.:-Cl- 12.2.2, IRC:112-2011
Hence OK Hence OK Hence OK Hence OK Hence OK
fc = stress in the concrete = 7.7 8.2 3.2 0.9 1.1
Maximum allowable stress in concrete = 0.48fck = (in Mpa) 28.8 Mpa Ref.:-Cl- 12.2.1(1), IRC:112-2011
Hence OK Hence OK Hence OK Hence OK Hence OK
R0 July-16 Page 26
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
3 Calculation of crack width Ref.:-Cl- 12.3.4, IRC:112-2011
Crack width= Wk=Sr max*(εsm-εcm)
Where, Sr.max = Maximum crack spacing
sm = mean strain in the reinforcement under the relavant combination of loads
cm = mean strain in the concrete between cracks.
Now,
e = Es/Ecm = 12.5
fct.eff = mean value of tensile strength of concrete = 4 Mpa
.eff = As/Ac.eff= 0.016750 0.009826 0.033500 0.016750 0.016750
f = diameter of bar = mm 16 12 16 16 16
c = clear cover = mm 40 40 40 40 40
The The The The
Checking for Validity of the Equation Equation The Equation is Equation is Equation is Equation
is valid valid valid valid is valid
k1 = co-efficient taking acount of bond properties of reinforcement = 0.8
k2 = co- efficient taking account of distribution of strain = 0.5
So,Sr.max = 298 344 217 298 298
And, sm- cm = 0.000038 0.000127 0.000076 -0.000457 -0.000427
Minimum value of sm - cm = 0.000456 0.000687 0.000225 0.000084 0.000102
So, governing value of sm - cm = 0.000456 0.000687 0.000225 0.000084 0.000102
So, crack width, Wk = Sr.max( sm- cm) = (in mm) 0.136 0.236 0.049 0.025 0.030
Ref.:-Table 12.1, IRC:112-2011, page-
Maximum crack width = 0.3 mm
122
Check OK OK OK OK OK
At Exterior Support
Design Shear Force = 254.200 KN at Girder centre
Design Shear Force at girder face = 230.81 KN at Girder face/support location
The design shear resistance of the member without shear reinforcement, VRd.c =
=[0.12K(80 1.fck)0.33+0.15 cp]bw.d Ref:-. Eq-10.1, IRC:112-2011
Where, K = 1+√(200/d)<=2.0
So, K = 1.602
ρ1 = Asl/bw.d
2
Where Asl = Area of steel provided = 4020 mm
bw = Width of section = 1000 mm
d= 552 mm
1= 0.0073
cp = NEd/Ac < 0.2fcd, where, NEd = Axial compressive force = 0
Ac = Cross Sectional area of concrete
cp = 0
So,VRd.c = 343.15 KN
R0 July-16 Page 27
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
k. Summary of Reinforcement
R0 July-16 Page 28
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
DESIGN OF DECK SLAB FOR BOX GIRDER SUPERSTRUCTURE (TOTAL DEPTH 7.5M)
A. Background Calculations:
Effective span (c/c of bearing) = 120.00 m
Carriageway width = 10500 mm
Width of Footpath = 1500 mm on either side
Width of Crash Barrier = 400 mm
Width of Kerb = 250 mm
Total Width of Road = 14800 mm
Thickness of wearing coat = 111 mm
Total height of girder at crown = 7500 mm
Total height of girder at edge = 7500 mm
B. Cross-section of superstructure at mid-span will be as follows:-
14800
10500 1100
300
225
600 250 600
6800
450
C. Analysis:
The deck slab is designed as a simply supported slab on webs of box girder with cantilever overhang on both sides as shown above. The deck
section has been modelled as frame element and analysed element by SAP2000 software.
1. Load Calculation:
a) DL & SIDL Calculation:
(i). Cantilever Portion :
Span, L = 4.200 m
Due to self weight of slab = 0.250 x 25 = 6.3 KN/m
Due to wearing course = 0.111 x 22 = 2.442 KN/m
b) LL Calculation:
LL-Case-1: Crowd Load one sided
Intensity of crowd load on footpath = 4.0 KN/sqm
Load per metre length of footpath = 6.0 KN/m
Acting at 1.00 m from deck end
LL-Case-2: Crowd Load both sided
Place the crowd load symetrically
R0 July-16 Page 29
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LL-Case-3: Place Class A with minimum edge distance at deck end.
400
57KN
850
500
250
1200
One 57 KN wheel for IRC class A loading is placed with minimum 150mm clearance from road kerb
Distance of CG of load from face of support = 450 mm
beff= 1012 mm
Hence overlaaping not occurs
LL-Case-4: Place Class A with minimum edge distance at other than deck end.
beff= 1.012 m
Load per metre including impact factor = 84.49 KN/m
LL-Case-5: Two 57 KN wheel symetrically placed w.r.t. centre of span
bw = 0.472 m
Impact factor for class A loading =4.5/(6+L) 0.441
57 KN 57 KN
1200 1800 1200
(a) (b)
A B
4200
4200
Effective width:
Load beff beff for two adjacent axles Load per metre width in KN
R0 July-16 Page 30
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LL-Case-7: IRC Class 70R wheeled vehicle: 20T axle placed symetrically on span
4200
Effective width:
Load beff beff for two adjacent axles Load per metre width in KN
LL-Case-8: IRC Class A vehicle: 2 Lane load placed symetrically on interior support
bw = 0.472 m
Impact factor for class A loading =4.5/(6+L) 0.441 m
57KN 57KN 57KN 57KN
1550 1800 850 850 1800 1550
A (a) (b) B (d)
4200 (c) 4200 C
Effective width:
Load beff beff for two adjacent axles Load per metre width in KN
(a) 4.501 4.400 38.14
(b) 2.682 3.882 43.23
(c) 2.682 3.882 43.23
(d) 4.501 4.400 38.14
LL-Case-9: IRC Class 70R wheeled vehicle: one 5.0 T load is placed over interior support
A 4200 B 4200 C
Effective width:
Load beff beff for two adjacent axles Load per metre width in KN
R0 July-16 Page 31
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LL-Case-10: 3 Lane IRC class A packed all over the deck
bw = 0.472 m
Impact factor for class A loading =4.5/(6+L) 0.441 m
57KN 57KN 57KN 57KN 57KN 57KN
1800 1700 1800 1700 1800
(a) (b) (c) (d) (e) (f)
A B C
900 900 1600 200
200 1600
4200 4200
Effective width:
Load beff beff for two adjacent axles Load per metre width in KN
D.Analysis Output:
The analysis of deck slab has been carried by SAP 2000, considering the deck slab as a beam of unit width. The output at various location has been
tabulated below.
LL Maximum
5 -54.92 -44.63 46.52 117.84 64.28 -5.75 7.35 2.60
Moment
Support
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Displacement
R0 July-16 Page 32
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
D.Load Combination
E.Design Parameters
Grade of concrete = M60
fck= 60 MPa
fctm= = 4 MPa
Grade of steel = Fe500
fy=fyk= = 500 MPa
σsc= = 205 MPa
Es= = 200000 MPa
Ec= = 32000 MPa
Clear cover= = 40 mm Ref-Cl-14.3.2.1, IRC-112:2011
R0 July-16 Page 33
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
F. Design
At
At Mid At Mid
At Mid support: Cantilever At support:
Sl No. Parameters span: Top span: Soffit
Top Slab part: top Soffit Slab
Slab Slab
Slab
1 Minimum Reinforcement for crack control Ref.: Cl-12.3.3,IRC-112:2011
Required Minimum Reinforcement for crack control= As,min=kc*k*fct,eff*Act/σs
Act= Concrete area within the tensile zone (in sqmm) =bx(d-
Xu) 162000 181000 471000 362000 362000
σs= Maximum tensile stress permitted= 400 Mpa Ref.: Table-12.2,IRC-112:2011
fct,eff= Mean value of the tensile strength of concrete (fctm)= 4 Mpa
k=Coefficient which allows for the effect of non-uniform self
equilibrating stresses, which lead to a reduction of restraint 1
forces=
kc=Coefficient which takes account of the stress distribution
within the section just prior to cracking and of the change of the
lever arm= 0.40 0.40 0.40 0.40 0.40
=0.4 x [1-{σc/(k1 x (h/h*)*fct,eff}]=
σc= compressive stress in the concrete= 0 0 0 0 0
k1= Coefficient considering the effects of axial force in the
1 1 0.82 0.93 0.93
stress distribution=
h=(mm) 202 204 552 402 402
h*= (mm) 202 204 552 402 402
Asmin= Minimum area of steel within the tensile zone = 648 724 1884 1448 1448
CHECK Hence OK Hence OK Hence OK Hence OK Hence OK
R0 July-16 Page 34
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
2 Checking for Stress level
Moment (kN-m) 63.30 42.00 146.40 20.90 28.90
Neutral axis depth: Xu= (0.87*fy*Astprov)/(0.36*fck*b)= 40 23 81 40 40
deff=(in mm) 202 204 552 402 402
Diameter of bar=(in mm) 16 12 16 16 16
Spacing of bar=(in mm) 100 100 100 100 100
Astprovided=(in sqmm) 2010 1130 4020 2010 2010
m (lomgterm)= 12.5
Equating the moments of areas about the centroidal axis, b*Yt2=m*Astprov*(d-Yt)
Solving thae equation, Yt= [-(m*Astprov)±{(-m*Astprov)2-4*(-m*Astprov)*deff*0.5*b}0.5]/(2*0.5*b)
Solving thae equation, Yt= 79 63 191 119 119
(Neglect the -ve value) -129 -91 -291 -169 -169
Distance of CG from reinforcing steel, Ys=(in mm) 123 141 361 283 283
Inertia of the section, Icr=m*Atprov*Ys2+b*Yt3= (in mm4) 5.44E+08 3.64E+08 8.87E+09 2.57E+09 2.57E+09
Section modulus=Zt= Icr/Yt= (in mm3) 6.89E+06 5.78E+06 4.64E+07 2.16E+07 2.16E+07
sc = stress in the tension reinforcement = in Mpa 179 203 75 29 40
Maximum permissible stress in tensile steel=0.8*fyk=
400 Mpa Ref.:-Cl- 12.2.2, IRC:112-2011
Ref.:-Cl- 12.2.2, IRC:112-2011
Hence OK Hence OK Hence OK Hence OK Hence OK
fc = stress in the concrete = 9.1 7.3 3.2 1.0 1.4
Maximum allowable stress in concrete = 0.48fck = (in Mpa) 28.8 Mpa Ref.:-Cl- 12.2.1(1), IRC:112-2011
Hence OK Hence OK Hence OK Hence OK Hence OK
3 Calculation of crack width Ref.:-Cl- 12.3.4, IRC:112-2011
Crack width= Wk=Sr max*(εsm-εcm)
Where, Sr.max = Maximum crack spacing
sm = mean strain in the reinforcement under the relavant combination of loads
cm = mean strain in the concrete between cracks.
Now,
e = Es/Ecm = 12.5
fct.eff = mean value of tensile strength of concrete = 4 Mpa
.eff = As/Ac.eff= 0.016750 0.009826 0.033500 0.016750 0.016750
f = diameter of bar = mm 16 12 16 16 16
c = clear cover = mm 40 40 40 40 40
The The The The
Checking for Validity of the Equation Equation The Equation is Equation is Equation is Equation
is valid valid valid valid is valid
k1 = co-efficient taking acount of bond properties of reinforcement = 0.8
k2 = co- efficient taking account of distribution of strain = 0.5
So,Sr.max = 298 344 217 298 298
And, sm- cm = 0.000173 -0.000003 0.000076 -0.000452 -0.000397
Minimum value of sm - cm = 0.000537 0.000609 0.000225 0.000087 0.000120
So, governing value of sm - cm = 0.000537 0.000609 0.000225 0.000087 0.000120
So, crack width, Wk = Sr.max( sm- cm) = (in mm) 0.160 0.209 0.049 0.026 0.036
Ref.:-Table 12.1, IRC:112-2011, page-
Maximum crack width = 0.3 mm
122
Check OK OK OK OK OK
R0 July-16 Page 35
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
(III) Shear Check Ref.: Cl-10.3.2,IRC-112:2011
At Exterior Support
Design Shear Force = 253.900 KN at Girder centre
Design Shear Force at girder face = 230.54 KN at Girder face/support location
The design shear resistance of the member without shear reinforcement, VRd.c =
=[0.12K(80 1.fck)0.33+0.15 cp]bw.d Ref:-. Eq-10.1, IRC:112-2011
Where, K = 1+√(200/d)<=2.0
So, K = 1.602
ρ1 = Asl/bw.d
2
Where Asl = Area of steel provided = 4020 mm
bw = Width of section = 1000 mm
d= 552 mm
1= 0.0073
cp = NEd/Ac < 0.2fcd, where, NEd = Axial compressive force = 0
Ac = Cross Sectional area of concrete
cp = 0
So,VRd.c = 343.15 KN
k. Summary of Reinforcement
R0 July-16 Page 36
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 37
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
The continuous box girder will be built in stages. The construction of superstructure will commence from the face of pier support
and progress to the mid/tip of the span in segments. Later on the superstructure will be joined by closure pour.
Segment
Number
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
645
3855
12 no @ 4000 3 no @ 3000
The equation of the depth for the cantilever from support is as follows:
R0 July-16 Page 38
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
1500 1500
250
225 a c c a
b b
600 350
800 6800
f
400
3800
d d d
g 300 450
150
e e
R0 July-16 Page 39
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Calculation of properties of Box section at Section: 16-16
R0 July-16 Page 40
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Calculation of properties of Box section at Section: 12-12
R0 July-16 Page 41
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Calculation of properties of Box section at Section: 8-8
R0 July-16 Page 42
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Calculation of properties of Box section at Section: 4-4
R0 July-16 Page 43
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
2.5 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 2.5
The equation of the depth for the cantilever from support is as follows:
Section 30-30 31-31 32-32 33-33 34-34 35-35 36-36 37-37 38-38 39-39 40-40
Distance
from
41 45 49 53 57 58 62 66 70 74 78
support
(m)
Depth
3.355 3.199 3.089 3.022 3.000 3.000 3.022 3.089 3.199 3.355 3.554
(m), D'=
Section 41-41 42-42 43-43 44-44 45-45 46-46 47-47 48-48 49-49 50-50
Distance
from
82 86 90 94 98 102 106 109 112 115
support
(m)
Depth
3.798 4.086 4.418 4.795 5.216 5.681 6.191 6.602 7.039 7.500
(m), D'=
R0 July-16 Page 44
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
1500 1500
250
225 a c c a
b b
600 350
800 6800
f
400
3800
d d d
g 300 450
150
e e
R0 July-16 Page 45
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Calculation of properties of Box section at Section: 21-21 & 48-48
R0 July-16 Page 46
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Calculation of properties of Box section at Section: 25-25 & 44-44
R0 July-16 Page 47
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Calculation of properties of Box section at Section: 29-29 & 40-40
R0 July-16 Page 48
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Calculation of properties of Box section at Section: 33-33 & 36-36
SUMMARY OF PROPERTIES
TOTAL
Ybottom =
SECTION DEPTH AREA (m2) Ytop=(m) Itotal (m4) Ztop= (m3) Zbottom= (m3)
(m)
(m)
50-50 7.500 17.445 3.454 4.046 146.433 42.40 36.19
49-49 7.039 16.892 3.233 3.806 126.761 39.21 33.31
48-48 6.602 16.368 3.024 3.578 111.216 36.77 31.08
47-47 6.191 15.874 2.829 3.362 99.104 35.04 29.47
46-46 5.681 15.263 2.587 3.095 87.269 33.73 28.20
45-45 5.216 14.704 2.367 2.849 79.276 33.49 27.83
44-44 4.795 14.199 2.169 2.626 74.151 34.18 28.24
43-43 4.418 13.747 1.993 2.425 71.109 35.68 29.32
42-42 4.086 13.348 1.838 2.248 69.529 37.83 30.93
41-41 3.798 13.002 1.704 2.094 68.926 40.45 32.92
40-40 3.554 12.710 1.591 1.963 68.927 43.31 35.12
39-39 3.355 12.470 1.500 1.855 69.250 46.18 37.33
38-38 3.199 12.284 1.428 1.771 69.689 48.79 39.35
37-37 3.089 12.151 1.378 1.711 70.098 50.89 40.97
36-36 3.022 12.072 1.347 1.675 70.379 52.24 42.02
35-35 3.000 12.045 1.337 1.663 70.479 52.71 42.38
34-34 3.000 12.045 1.337 1.663 70.479 52.715 42.380
33-33 3.022 12.072 1.347 1.675 70.379 52.244 42.016
32-32 3.089 12.151 1.378 1.711 70.098 50.886 40.966
31-31 3.199 12.284 1.428 1.771 69.689 48.791 39.347
30-30 3.355 12.470 1.500 1.855 69.250 46.180 37.332
29-29 3.554 12.710 1.591 1.963 68.927 43.311 35.121
28-28 3.798 13.002 1.704 2.094 68.926 40.446 32.922
27-27 4.086 13.348 1.838 2.248 69.529 37.831 30.929
26-26 4.418 13.747 1.993 2.425 71.109 35.683 29.317
25-25 4.795 14.199 2.169 2.626 74.151 34.184 28.238
24-24 5.216 14.704 2.367 2.849 79.276 33.491 27.826
23-23 5.681 15.263 2.587 3.095 87.269 33.735 28.201
22-22 6.191 15.874 2.829 3.362 99.104 35.036 29.474
21-21 6.602 16.368 3.024 3.578 111.216 36.772 31.083
20-20 7.039 16.892 3.233 3.806 126.761 39.211 33.306
19-19 7.500 17.445 3.454 4.046 146.433 42.399 36.189
R0 July-16 Page 49
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
17-17 7.500 17.445 3.454 4.046 146.433 42.399 36.189
16-16 7.039 16.892 3.233 3.806 126.761 39.211 33.306
15-15 6.602 16.368 3.024 3.578 111.216 36.772 31.083
14-14 6.191 15.874 2.829 3.362 99.104 35.036 29.474
13-13 5.681 15.263 2.587 3.095 87.269 33.735 28.201
12-12 5.216 14.704 2.367 2.849 79.276 33.491 27.826
11-11 4.795 14.199 2.169 2.626 74.151 34.184 28.238
10-10 4.418 13.747 1.993 2.425 71.109 35.683 29.317
9-9 4.086 13.348 1.838 2.248 69.529 37.831 30.929
8-8 3.798 13.002 1.704 2.094 68.926 40.446 32.922
7-7 3.554 12.710 1.591 1.963 68.927 43.311 35.121
6-6 3.355 12.470 1.500 1.855 69.250 46.180 37.332
5-5 3.199 12.284 1.428 1.771 69.689 48.791 39.347
4-4 3.089 12.151 1.378 1.711 70.098 50.886 40.966
3-3 3.022 12.072 1.347 1.675 70.379 52.244 42.016
2-2 3.000 12.045 1.337 1.663 70.479 52.715 42.380
1-1 3.000 12.045 1.337 1.663 70.479 52.715 42.380
Calculation of properties of Box section at Section: 35-35 & 34-34
R0 July-16 Page 50
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Area of cross section of Box girder at any distance "x" from face of support will be as follows:
Area of deck with haunches:(a+b+c+f)= 4.935 m2
Area of bottom slab & haunches:(e+g)= 3.510 m2
Area of web: 3 X0.4X ( 7.5 - 0.1578947 X+ 0.001385 X 2)
Total Area: 17.445 - 0.189474 X+ 0.00166 X2
Load for Box girder at any distance "x" is given by:
= 2.5 X( 17.445 - 0.189474 X+ 0.00166 X2) Ton
= 43.6125 - 0.473684 X+ 0.00416 X2 Ton
Load of a particular segment:
∫( 43.6125 - 0.4736842 X+ 0.00416 X2)dx Ton
= 43.6125 X- 0.2368421 X2+ 0.001385 X3 Ton
Moment at support dueto dead load of a particular segment:
∫( 43.6125 - 0.4736842 X+ 0.00416 X2)Xdx Ton-m
= 21.80625 X2- 0.1578947 X3+ 0.0010388 X4 Ton-m
R0 July-16 Page 51
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 52
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 53
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 54
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
xvii) Moment & Shear due to additional load on tip (Load of haunches, diaphragm, end cantilever deck slab etc)
Load for cross girder:
Area of cross girder= 16.83 m2
Opening area= 2.07 m2
Thickness of end diaphragm= 0.75 m
Weight of cross girder= 27.675 Ton
Load for Haunches:
Area of Haunch= 800 mmx 350 mm= 0.14 m2
Perimeter of cross girder along the inner box= 24.4 m
Weight of Haunches= 8.54 Ton
Load for End cantilever deck slab:
Area of cantilever deck= 14.8 mx 0.45 m= 6.66 m2
Length of cantilever deck= 0.58 m
Weight of Deck= 9.657 Ton
R0 July-16 Page 55
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
The superstructure has a symmetrical profile with respect to centre line of pier. Hence the depth, distance of CG from pier face of following
sections are same.
LHS OF P7 RHS OF P7 LHS OF P8 Distance
from pier
Section Depth (m) Section Depth (m) Section Depth (m) face (m)
17-17 7.500 19-19 7.500 50-50 7.500 0
16-16 7.039 20-20 7.039 49-49 7.039 3
15-15 6.602 21-21 6.602 48-48 6.602 6
14-14 6.191 22-22 6.191 47-47 6.191 9
13-13 5.681 23-23 5.681 46-46 5.681 13 Hence, it can be concluded that the DL moment will be
12-12 5.216 24-24 5.216 45-45 5.216 17 same at all the symmetric sections. However, as the
11-11 4.795 25-25 4.795 44-44 4.795 21 segment number 34 between section 34 & 35 is of
10-10 4.418 26-26 4.418 43-43 4.418 25 different length, this has been taken seperately.
9-9 4.086 27-27 4.086 42-42 4.086 29
8-8 3.798 28-28 3.798 41-41 3.798 33
7-7 3.554 29-29 3.554 40-40 3.554 37
6-6 3.355 30-30 3.355 39-39 3.355 41
5-5 3.199 31-31 3.199 38-38 3.199 45
4-4 3.089 32-32 3.089 37-37 3.089 49
3-3 3.022 33-33 3.022 36-36 3.022 53
2-2 3.000 34-34 3.000 35-35 3.000 57
1-1 3.000
Moment & Shear due to additional load at closure pour Segment no: 34
Load for closure pore:
Area of section= 12.045 m2
Length of the segmment= 1m
Weight of segment= 31.317 Ton
R0 July-16 Page 56
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 57
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
SECTION
17-17 16-16 15-15 14-14 13-13 12-12 11-11 10-10 9-9 8-8 7-7 6-6 5-5 4-4 3-3 2-2
LOAD DUE TO
16th Segment 192.077
15th Segment 560.189 186.074
14th Segment 905.75 543.08 180.41
13th Segment 1710.014 1243.091 776.168 309.245
12th Segment 2244.999 1795.626 1346.253 896.88 297.716
11th Segment 2743.287 2309.871 1876.455 1443.039 865.151 287.263
10th Segment 3211.259 2792.204 2373.149 1954.094 1395.354 836.614 277.874
9th Segment 3655.297 3249.004 2842.711 2436.418 1894.694 1352.97 811.246 269.522
8th Segment 4081.784 3686.66 3291.536 2896.412 2369.58 1842.748 1315.916 789.084 262.252
7th Segment 4497.102 4111.554 3726.006 3340.458 2826.394 2312.33 1798.266 1284.202 770.138 256.074
6th Segment 4907.633 4530.062 4152.491 3774.92 3271.492 2768.064 2264.636 1761.208 1257.78 754.352 250.924
5th Segment 5319.76 4948.57 4577.38 4206.19 3711.27 3216.35 2721.43 2226.51 1731.59 1236.67 741.75 246.83
4th Segment 5739.865 5373.463 5007.061 4640.659 4152.123 3663.587 3175.051 2686.515 2197.979 1709.443 1220.907 732.371 243.835
3rd Segment 6174.33 5811.12 5447.91 5084.7 4600.42 4116.14 3631.86 3147.58 2663.3 2179.02 1694.74 1210.46 726.18 241.9
2nd Segment 6629.537 6267.92 5906.303 5544.686 5062.53 4580.374 4098.218 3616.062 3133.906 2651.75 2169.594 1687.438 1205.282 723.126 240.97
1st Segment 9623.754 9137.649 8651.544 8165.439 7517.299 6869.159 6221.019 5572.879 4924.739 4276.599 3628.459 2980.319 2332.179 1684.039 1035.899 387.759
Total 62196.64 55985.95 50155.38 44693.14 37964.02 31845.6 26315.52 21353.56 16941.68 13063.91 9706.374 6857.418 4507.476 2649.065 1276.869 387.759
R0 July-16 Page 58
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
SHEAR FORCE(t):
SECTION
17-17 16-16 15-15 14-14 13-13 12-12 11-11 10-10 9-9 8-8 7-7 6-6 5-5 4-4 3-3 2-2
LOAD DUE TO
16th Segment 128.743
15th Segment 124.705 124.705
14th Segment 120.89 120.89 120.89
13th Segment 155.641 155.641 155.641 155.641
12th Segment 149.791 149.791 149.791 149.791 149.791
11th Segment 144.472 144.472 144.472 144.472 144.472 144.472
10th Segment 139.685 139.685 139.685 139.685 139.685 139.685 139.685
9th Segment 135.431 135.431 135.431 135.431 135.431 135.431 135.431 135.431
8th Segment 131.708 131.708 131.708 131.708 131.708 131.708 131.708 131.708 131.708
7th Segment 128.516 128.516 128.516 128.516 128.516 128.516 128.516 128.516 128.516 128.516
6th Segment 125.857 125.857 125.857 125.857 125.857 125.857 125.857 125.857 125.857 125.857 125.857
5th Segment 123.73 123.73 123.73 123.73 123.73 123.73 123.73 123.73 123.73 123.73 123.73 123.73
4th Segment 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134
3rd Segment 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07
2nd Segment 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539
1st Segment 162.035 162.035 162.035 162.035 162.035 162.035 162.035 162.035 162.035 162.035 162.035 162.035 162.035 162.035 162.035 162.035
Total 2134.947 2006.204 1881.499 1760.609 1604.968 1455.177 1310.705 1171.02 1035.589 903.881 775.365 649.508 525.778 403.644 282.574 162.035
R0 July-16 Page 59
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
SECTION RHS
LOAD
P7 19-19 20-20 21-21 22-22 23-23 24-24 25-25 26-26 27-27 28-28 29-29 30-30 31-31 32-32 33-33
DUE TO
LOAD DUE TO
49th
19th Segment 192.077
Segment
48th
20th Segment 560.189 186.074
Segment
47th
21th Segment 905.75 543.08 180.41
Segment
46th
22th Segment 1710.014 1243.091 776.168 309.245
Segment
45th
23th Segment 2244.999 1795.626 1346.253 896.88 297.716
Segment
44th
24th Segment 2743.287 2309.871 1876.455 1443.039 865.151 287.263
Segment
43th
25th Segment 3211.259 2792.204 2373.149 1954.094 1395.354 836.614 277.874
Segment
42th
26th Segment 3655.297 3249.004 2842.711 2436.418 1894.694 1352.97 811.246 269.522
Segment
41th
27th Segment 4081.784 3686.66 3291.536 2896.412 2369.58 1842.748 1315.916 789.084 262.252
Segment
40th
28th Segment 4497.102 4111.554 3726.006 3340.458 2826.394 2312.33 1798.266 1284.202 770.138 256.074
Segment
39th
29th Segment 4907.633 4530.062 4152.491 3774.92 3271.492 2768.064 2264.636 1761.208 1257.78 754.352 250.924
Segment
38th
30th Segment 5319.76 4948.57 4577.38 4206.19 3711.27 3216.35 2721.43 2226.51 1731.59 1236.67 741.75 246.83
Segment
37th
31th Segment 5739.865 5373.463 5007.061 4640.659 4152.123 3663.587 3175.051 2686.515 2197.979 1709.443 1220.907 732.371 243.835
Segment
36th
32th Segment 6174.33 5811.12 5447.91 5084.7 4600.42 4116.14 3631.86 3147.58 2663.3 2179.02 1694.74 1210.46 726.18 241.9
Segment
35th
33th Segment 6629.537 6267.92 5906.303 5544.686 5062.53 4580.374 4098.218 3616.062 3133.906 2651.75 2169.594 1687.438 1205.282 723.126 240.97
Segment
34th
34th Segment 908.193 861.2175 814.242 767.2665 704.6325 641.9985 579.3645 516.7305 454.0965 391.4625 328.8285 266.1945 203.5605 140.9265 78.2925
Segment
Total 53481.08 47709.52 42318.08 37294.97 31151.36 25618.44 20673.86 16297.41 12471.04 9178.772 6406.744 4143.294 2378.858 1105.953 319.2625 Total
SECTION
50-50 49-49 48-48 47-47 46-46 45-45 44-44 43-43 42-42 41-41 40-40 39-39 38-38 37-37 36-36
LHS P8
R0 July-16 Page 60
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
SHEAR FORCE(t):
SECTION RHS
LOAD
P7 19-19 20-20 21-21 22-22 23-23 24-24 25-25 26-26 27-27 28-28 29-29 30-30 31-31 32-32 33-33
DUE TO
LOAD DUE TO
49th
19th Segment 128.743
Segment
48th
20th Segment 124.705 124.705
Segment
47th
21th Segment 120.89 120.89 120.89
Segment
46th
22th Segment 155.641 155.641 155.641 155.641
Segment
45th
23th Segment 149.791 149.791 149.791 149.791 149.791
Segment
44th
24th Segment 144.472 144.472 144.472 144.472 144.472 144.472
Segment
43th
25th Segment 139.685 139.685 139.685 139.685 139.685 139.685 139.685
Segment
42th
26th Segment 135.431 135.431 135.431 135.431 135.431 135.431 135.431 135.431
Segment
41th
27th Segment 131.708 131.708 131.708 131.708 131.708 131.708 131.708 131.708 131.708
Segment
40th
28th Segment 128.516 128.516 128.516 128.516 128.516 128.516 128.516 128.516 128.516 128.516
Segment
39th
29th Segment 125.857 125.857 125.857 125.857 125.857 125.857 125.857 125.857 125.857 125.857 125.857
Segment
38th
30th Segment 123.73 123.73 123.73 123.73 123.73 123.73 123.73 123.73 123.73 123.73 123.73 123.73
Segment
37th
31th Segment 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134 122.134
Segment
36th
32th Segment 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07 121.07
Segment
35th
33th Segment 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539 120.539
Segment
34th
34th Segment 31.317 31.317 31.317 31.317 31.317 31.317 31.317 31.317 31.317 31.317 31.317 31.317 31.317 31.317 31.317
Segment
Total 2004.229 1875.486 1750.781 1629.891 1474.25 1324.459 1179.987 1040.302 904.871 773.163 644.647 518.79 395.06 272.926 151.856 Total
SECTION
SECTION LHS P8 50-50 49-49 48-48 47-47 46-46 45-45 44-44 43-43 42-42 41-41 40-40 39-39 38-38 37-37 36-36
LHS P8
R0 July-16 Page 61
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LOAD
15th 14th 13th 12th 11th 10th 9th 8th 7th 6th 5th 4th 3rd 2nd 1st
DUE TO 16th Segment Total (T-m)
Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
SECTION
17-17 192.077 560.189 905.75 1710.014 2244.999 2743.287 3211.259 3655.297 4081.784 4497.102 4907.633 5319.76 5739.865 6174.33 6629.537 9623.754 62196.637
16-16 186.074 543.08 1243.091 1795.626 2309.871 2792.204 3249.004 3686.66 4111.554 4530.062 4948.57 5373.463 5811.12 6267.92 9137.649 55985.948
15-15 180.41 776.168 1346.253 1876.455 2373.149 2842.711 3291.536 3726.006 4152.491 4577.38 5007.061 5447.91 5906.303 8651.544 50155.377
14-14 309.245 896.88 1443.039 1954.094 2436.418 2896.412 3340.458 3774.92 4206.19 4640.659 5084.7 5544.686 8165.439 44693.14
13-13 297.716 865.151 1395.354 1894.694 2369.58 2826.394 3271.492 3711.27 4152.123 4600.42 5062.53 7517.299 37964.023
12-12 287.263 836.614 1352.97 1842.748 2312.33 2768.064 3216.35 3663.587 4116.14 4580.374 6869.159 31845.599
11-11 277.874 811.246 1315.916 1798.266 2264.636 2721.43 3175.051 3631.86 4098.218 6221.019 26315.516
10-10 269.522 789.084 1284.202 1761.208 2226.51 2686.515 3147.58 3616.062 5572.879 21353.562
9-9 262.252 770.138 1257.78 1731.59 2197.979 2663.3 3133.906 4924.739 16941.684
8-8 256.074 754.352 1236.67 1709.443 2179.02 2651.75 4276.599 13063.908
7-7 250.924 741.75 1220.907 1694.74 2169.594 3628.459 9706.374
6-6 246.83 732.371 1210.46 1687.438 2980.319 6857.418
5-5 243.835 726.18 1205.282 2332.179 4507.476
4-4 241.9 723.126 1684.039 2649.065
3-3 240.97 1035.899 1276.869
2-2 387.759 387.759
R0 July-16 Page 62
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LOAD
48th 47th 46th 45th 44th 43th 42th 41th 40th 39th 38th 37th 36th 35th 34th
DUE TO 49th Segment Total (T-m)
Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
SECTION
50-50 192.077 560.189 905.75 1710.014 2244.999 2743.287 3211.259 3655.297 4081.784 4497.102 4907.633 5319.76 5739.865 6174.33 6629.537 908.193 53481.076
49-49 186.074 543.08 1243.091 1795.626 2309.871 2792.204 3249.004 3686.66 4111.554 4530.062 4948.57 5373.463 5811.12 6267.92 861.2175 47709.5165
48-48 180.41 776.168 1346.253 1876.455 2373.149 2842.711 3291.536 3726.006 4152.491 4577.38 5007.061 5447.91 5906.303 814.242 42318.075
47-47 309.245 896.88 1443.039 1954.094 2436.418 2896.412 3340.458 3774.92 4206.19 4640.659 5084.7 5544.686 767.2665 37294.9675
46-46 297.716 865.151 1395.354 1894.694 2369.58 2826.394 3271.492 3711.27 4152.123 4600.42 5062.53 704.6325 31151.3565
45-45 287.263 836.614 1352.97 1842.748 2312.33 2768.064 3216.35 3663.587 4116.14 4580.374 641.9985 25618.4385
44-44 277.874 811.246 1315.916 1798.266 2264.636 2721.43 3175.051 3631.86 4098.218 579.3645 20673.8615
43-43 269.522 789.084 1284.202 1761.208 2226.51 2686.515 3147.58 3616.062 516.7305 16297.4135
42-42 262.252 770.138 1257.78 1731.59 2197.979 2663.3 3133.906 454.0965 12471.0415
41-41 256.074 754.352 1236.67 1709.443 2179.02 2651.75 391.4625 9178.7715
40-40 250.924 741.75 1220.907 1694.74 2169.594 328.8285 6406.7435
39-39 246.83 732.371 1210.46 1687.438 266.1945 4143.2935
38-38 243.835 726.18 1205.282 203.5605 2378.8575
37-37 241.9 723.126 140.9265 1105.9525
36-36 240.97 78.2925 319.2625
35-35 0
34-34 0
33-33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 240.97 78.2925 319.2625
32-32 0 0 0 0 0 0 0 0 0 0 0 0 0 241.9 723.126 140.9265 1105.9525
31-31 0 0 0 0 0 0 0 0 0 0 0 0 243.835 726.18 1205.282 203.5605 2378.8575
30-30 0 0 0 0 0 0 0 0 0 0 0 246.83 732.371 1210.46 1687.438 266.1945 4143.2935
29-29 0 0 0 0 0 0 0 0 0 0 250.924 741.75 1220.907 1694.74 2169.594 328.8285 6406.7435
28-28 0 0 0 0 0 0 0 0 0 256.074 754.352 1236.67 1709.443 2179.02 2651.75 391.4625 9178.7715
27-27 0 0 0 0 0 0 0 0 262.252 770.138 1257.78 1731.59 2197.979 2663.3 3133.906 454.0965 12471.0415
26-26 0 0 0 0 0 0 0 269.522 789.084 1284.202 1761.208 2226.51 2686.515 3147.58 3616.062 516.7305 16297.4135
25-25 0 0 0 0 0 0 277.874 811.246 1315.916 1798.266 2264.636 2721.43 3175.051 3631.86 4098.218 579.3645 20673.8615
24-24 0 0 0 0 0 287.263 836.614 1352.97 1842.748 2312.33 2768.064 3216.35 3663.587 4116.14 4580.374 641.9985 25618.4385
23-23 0 0 0 0 297.716 865.151 1395.354 1894.694 2369.58 2826.394 3271.492 3711.27 4152.123 4600.42 5062.53 704.6325 31151.3565
22-22 0 0 0 309.245 896.88 1443.039 1954.094 2436.418 2896.412 3340.458 3774.92 4206.19 4640.659 5084.7 5544.686 767.2665 37294.9675
21-21 0 0 180.41 776.168 1346.253 1876.455 2373.149 2842.711 3291.536 3726.006 4152.491 4577.38 5007.061 5447.91 5906.303 814.242 42318.075
20-20 0 186.074 543.08 1243.091 1795.626 2309.871 2792.204 3249.004 3686.66 4111.554 4530.062 4948.57 5373.463 5811.12 6267.92 861.2175 47709.5165
19-19 192.077 560.189 905.75 1710.014 2244.999 2743.287 3211.259 3655.297 4081.784 4497.102 4907.633 5319.76 5739.865 6174.33 6629.537 908.193 53481.076
SECTION
20th 21th 22th 23th 24th 25th 26th 27th 28th 29th 30th 31th 32th 33th 34th
LOAD 19th Segment Total (T-m)
Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
DUE TO
R0 July-16 Page 63
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 64
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LOAD DUE TO 16th 15th 14th 13th 12th 11th 10th 9th 8th 7th 6th 5th 4th 3rd 2nd
1st Segment Total (T/m2)
SECTION Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
Top (ft)= -4.530 -13.212 -21.362 -40.331 -52.949 -64.701 -75.738 -86.211 -96.270 -106.065 -115.748 -125.468 -135.376 -145.623 -156.359 -226.979 -1466.92
17-17
Bottom (fb)= 5.308 15.480 25.028 47.253 62.036 75.805 88.736 101.006 112.791 124.268 135.612 147.000 158.609 170.614 183.193 265.932 1718.67
Top (ft)= -4.745 -13.850 -31.702 -45.794 -58.909 -71.209 -82.859 -94.021 -104.857 -115.530 -126.203 -137.039 -148.201 -159.850 -233.037 -1427.81
16-16
Bottom (fb)= 5.587 16.306 37.324 53.913 69.354 83.836 97.551 110.692 123.449 136.015 148.580 161.338 174.478 188.194 274.357 1680.97
Top (ft)= -4.906 -21.107 -36.611 -51.029 -64.536 -77.306 -89.512 -101.327 -112.925 -124.479 -136.164 -148.153 -160.619 -235.274 -1363.95
15-15
Bottom (fb)= 5.804 24.971 43.311 60.369 76.348 91.455 105.895 119.872 133.593 147.262 161.086 175.269 190.016 278.335 1613.59
Top (ft)= -8.826 -25.599 -41.187 -55.774 -69.540 -82.670 -95.344 -107.744 -120.053 -132.454 -145.128 -158.257 -233.058 -1275.63
14-14
Bottom (fb)= 10.492 30.430 48.960 66.300 82.665 98.272 113.338 128.078 142.711 157.452 172.517 188.124 277.043 1516.38
Top (ft)= -8.825 -25.646 -41.362 -56.164 -70.241 -83.782 -96.976 -110.013 -123.081 -136.370 -150.068 -222.834 -1125.36
13-13
Bottom (fb)= 10.557 30.678 49.479 67.186 84.025 100.224 116.007 131.601 147.234 163.131 179.517 266.563 1346.20
Top (ft)= -8.577 -24.981 -40.399 -55.023 -69.044 -82.652 -96.038 -109.392 -122.905 -136.766 -205.108 -950.88
12-12
Bottom (fb)= 10.323 30.065 48.622 66.223 83.098 99.476 115.586 131.659 147.922 164.605 246.858 1144.44
Top (ft)= -8.129 -23.732 -38.495 -52.605 -66.248 -79.611 -92.881 -106.244 -119.886 -181.985 -769.82
11-11
Bottom (fb)= 9.840 28.728 46.600 63.681 80.197 96.373 112.437 128.614 145.129 220.303 931.90
Top (ft)= -7.553 -22.114 -35.989 -49.357 -62.397 -75.289 -88.210 -101.339 -156.178 -598.43
10-10
Bottom (fb)= 9.193 26.915 43.804 60.074 75.945 91.636 107.363 123.342 190.089 728.36
Top (ft)= -6.932 -20.357 -33.247 -45.771 -58.099 -70.399 -82.839 -130.176 -447.82
9-9
Bottom (fb)= 8.479 24.900 40.666 55.986 71.065 86.109 101.325 159.226 547.76
Top (ft)= -6.331 -18.651 -30.576 -42.265 -53.875 -65.563 -105.736 -323.00
8-8
Bottom (fb)= 7.778 22.913 37.564 51.924 66.187 80.546 129.901 396.81
Top (ft)= -5.794 -17.126 -28.190 -39.130 -50.094 -83.778 -224.111
7-7
Bottom (fb)= 7.145 21.120 34.763 48.254 61.775 103.313 276.369
Top (ft)= -5.345 -15.859 -26.212 -36.540 -64.537 -148.49
6-6
Bottom (fb)= 6.612 19.618 32.424 45.201 79.833 183.69
Top (ft)= -4.998 -14.883 -24.703 -47.799 -92.38
5-5
Bottom (fb)= 6.197 18.456 30.632 59.272 114.56
Top (ft)= -4.754 -14.211 -33.094 -52.06
4-4
Bottom (fb)= 5.905 17.652 41.108 64.66
Top (ft)= -4.612 -19.828 -24.44
3-3
Bottom (fb)= 5.735 24.655 30.39
Top (ft)= -7.356 -7.36
2-2
Bottom (fb)= 9.150 9.15
R0 July-16 Page 65
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
TEMPARA TEMPARA
LOAD DUE TO LL- Total Total
SIDL LL-Sagging BRAKING TURE- TURE-
TOTAL DL Hogging Maximum Minimum
(T/m2) (T/m2) (T/m2) Hogging Sagging
SECTION (T/m2) case (T/m2) case (T/m2)
(T/m2) (T/m2)
Top (ft)= -1466.924 -134.297 -94.247 21.472 -6.364 -169.727 169.727 -1871.56 -1416.39
17-17
Bottom (fb)= 1718.670 157.344 110.421 -25.157 7.456 198.855 -198.855 2192.75 1659.46
Top (ft)= -1427.806 -123.862 -96.940 22.087 -6.546 -174.572 174.572 -1829.73 -1361.56
16-16
Bottom (fb)= 1680.971 145.824 114.128 -26.003 7.707 205.525 -205.525 2154.16 1602.97
Top (ft)= -1363.948 -110.868 -98.069 22.346 -6.431 -176.609 176.609 -1755.93 -1282.29
15-15
Bottom (fb)= 1613.587 131.160 116.018 -26.436 7.608 208.933 -208.933 2077.31 1516.99
Top (ft)= -1275.634 -95.742 -97.366 22.185 -6.578 -175.340 175.340 -1650.66 -1180.43
14-14
Bottom (fb)= 1516.382 113.812 115.742 -26.372 7.820 208.432 -208.432 1962.19 1403.21
Top (ft)= -1125.362 -73.713 -93.417 35.570 -6.307 -168.227 168.227 -1467.03 -1001.59
13-13
Bottom (fb)= 1346.203 88.179 111.749 -42.551 7.545 201.240 -201.240 1754.92 1198.14
Top (ft)= -950.884 -51.198 -86.337 50.917 -5.831 -155.478 155.478 -1249.73 -801.52
12-12
Bottom (fb)= 1144.438 61.619 103.911 -61.281 7.018 187.126 -187.126 1504.11 964.67
Top (ft)= -769.815 -30.372 -76.983 65.091 -5.199 -138.631 138.631 -1021.00 -601.66
11-11
Bottom (fb)= 931.902 36.767 93.192 -78.796 6.294 167.821 -167.821 1235.97 728.35
Top (ft)= -598.427 -13.357 -66.464 71.285 -4.489 -119.692 119.692 -802.43 -425.29
10-10
Bottom (fb)= 728.361 16.257 80.895 -86.763 5.463 145.681 -145.681 976.66 517.64
Top (ft)= -447.822 -0.281 -55.820 74.613 -3.770 -100.523 100.523 -608.22 -276.74
9-9
Bottom (fb)= 547.756 0.343 68.277 -91.263 4.611 122.955 -122.955 743.94 338.49
Top (ft)= -322.997 8.894 -45.784 74.191 -3.092 -82.452 82.452 -445.43 -160.55
8-8
Bottom (fb)= 396.814 -10.927 56.248 -91.146 3.799 101.296 -101.296 547.23 197.24
Top (ft)= -224.111 14.207 -36.756 70.111 -2.482 -66.192 66.192 -315.33 -76.08
7-7
Bottom (fb)= 276.369 -17.519 45.326 -86.460 3.061 81.627 -81.627 388.86 93.82
Top (ft)= -148.493 16.787 -28.845 63.725 -1.948 -51.944 51.944 -214.44 -17.98
6-6
Bottom (fb)= 183.689 -20.766 35.681 -78.830 2.410 64.256 -64.256 265.27 22.25
Top (ft)= -92.383 17.206 -21.975 55.528 -1.484 -39.571 39.571 -138.21 18.44
5-5
Bottom (fb)= 114.556 -21.336 27.249 -68.856 1.840 49.068 -49.068 171.38 -22.86
Top (ft)= -52.058 15.506 -15.962 45.203 -1.078 -28.744 28.744 -82.34 36.32
4-4
Bottom (fb)= 64.665 -19.260 19.828 -56.149 1.339 35.704 -35.704 102.27 -45.11
Top (ft)= -24.440 12.306 -10.573 33.278 -0.714 -19.038 19.038 -42.46 39.47
3-3
Bottom (fb)= 30.390 -15.301 13.147 -41.379 0.888 23.672 -23.672 52.80 -49.07
Top (ft)= -7.356 7.609 -5.546 19.370 -0.375 -9.989 9.989 -15.66 29.24
2-2
Bottom (fb)= 9.150 -9.465 6.898 -24.094 0.466 12.425 -12.425 19.47 -36.37
R0 July-16 Page 66
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LOAD DUE TO 49th 48th 47th 46th 45th 44th 43th 42th 41th 40th 39th 38th 37th 36th 35th 34th
Total (T/m2)
SECTION Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
Top (ft)= -4.530 -13.212 -21.362 -40.331 -52.949 -64.701 -75.738 -86.211 -96.270 -106.065 -115.748 -125.468 -135.376 -145.623 -156.359 -21.420 -1261.37
50-50
Bottom (fb)= 5.308 15.480 25.028 47.253 62.036 75.805 88.736 101.006 112.791 124.268 135.612 147.000 158.609 170.614 183.193 25.096 1477.83
Top (ft)= -4.745 -13.850 -31.702 -45.794 -58.909 -71.209 -82.859 -94.021 -104.857 -115.530 -126.203 -137.039 -148.201 -159.850 -21.964 -1216.73
49-49
Bottom (fb)= 5.587 16.306 37.324 53.913 69.354 83.836 97.551 110.692 123.449 136.015 148.580 161.338 174.478 188.194 25.858 1432.47
Top (ft)= -4.906 -21.107 -36.611 -51.029 -64.536 -77.306 -89.512 -101.327 -112.925 -124.479 -136.164 -148.153 -160.619 -22.143 -1150.82
48-48
Bottom (fb)= 5.804 24.971 43.311 60.369 76.348 91.455 105.895 119.872 133.593 147.262 161.086 175.269 190.016 26.196 1361.45
Top (ft)= -8.826 -25.599 -41.187 -55.774 -69.540 -82.670 -95.344 -107.744 -120.053 -132.454 -145.128 -158.257 -21.899 -1064.47
47-47
Bottom (fb)= 10.492 30.430 48.960 66.300 82.665 98.272 113.338 128.078 142.711 157.452 172.517 188.124 26.032 1265.37
Top (ft)= -8.825 -25.646 -41.362 -56.164 -70.241 -83.782 -96.976 -110.013 -123.081 -136.370 -150.068 -20.887 -923.42
46-46
Bottom (fb)= 10.557 30.678 49.479 67.186 84.025 100.224 116.007 131.601 147.234 163.131 179.517 24.986 1104.63
Top (ft)= -8.577 -24.981 -40.399 -55.023 -69.044 -82.652 -96.038 -109.392 -122.905 -136.766 -19.170 -764.95
45-45
Bottom (fb)= 10.323 30.065 48.622 66.223 83.098 99.476 115.586 131.659 147.922 164.605 23.072 920.65
Top (ft)= -8.129 -23.732 -38.495 -52.605 -66.248 -79.611 -92.881 -106.244 -119.886 -16.948 -604.78
44-44
Bottom (fb)= 9.840 28.728 46.600 63.681 80.197 96.373 112.437 128.614 145.129 20.517 732.12
Top (ft)= -7.553 -22.114 -35.989 -49.357 -62.397 -75.289 -88.210 -101.339 -14.481 -456.73
43-43
Bottom (fb)= 9.193 26.915 43.804 60.074 75.945 91.636 107.363 123.342 17.625 555.90
Top (ft)= -6.932 -20.357 -33.247 -45.771 -58.099 -70.399 -82.839 -12.003 -329.65
42-42
Bottom (fb)= 8.479 24.900 40.666 55.986 71.065 86.109 101.325 14.682 403.21
Top (ft)= -6.331 -18.651 -30.576 -42.265 -53.875 -65.563 -9.679 -226.94
41-41
Bottom (fb)= 7.778 22.913 37.564 51.924 66.187 80.546 11.891 278.80
Top (ft)= -5.794 -17.126 -28.190 -39.130 -50.094 -7.592 -147.93
40-40
Bottom (fb)= 7.145 21.120 34.763 48.254 61.775 9.363 182.42
Top (ft)= -5.345 -15.859 -26.212 -36.540 -5.764 -89.72
39-39
Bottom (fb)= 6.612 19.618 32.424 45.201 7.131 110.99
Top (ft)= -4.998 -14.883 -24.703 -4.172 -48.76
38-38
Bottom (fb)= 6.197 18.456 30.632 5.173 60.46
R0 July-16 Page 67
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 68
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
TEMPARA TEMPARA
LOAD DUE TO LL- Total Total
SIDL LL-Sagging BRAKING TURE- TURE-
TOTAL DL Hogging Maximum Minimum
(T/m2) (T/m2) (T/m2) Hogging Sagging
SECTION (T/m2) case (T/m ) case (T/m2)
2
(T/m2) (T/m2)
Top (ft)= -1261.365 -210.890 -146.574 17.944 -7.059 -164.886 164.886 -1790.77 -1296.48
50-50
Bottom (fb)= 1477.834 247.082 171.729 -21.024 8.271 193.182 -193.182 2098.10 1518.98
Top (ft)= -1216.733 -200.256 -140.619 18.136 -7.234 -166.167 166.167 -1731.01 -1239.92
49-49
Bottom (fb)= 1432.473 235.763 165.553 -21.352 8.517 195.630 -195.630 2037.94 1459.77
Top (ft)= -1150.817 -185.448 -131.644 17.970 -7.288 -164.497 164.497 -1639.69 -1161.09
48-48
Bottom (fb)= 1361.447 219.390 155.738 -21.259 8.622 194.604 -194.604 1939.80 1373.60
Top (ft)= -1064.475 -166.766 -119.796 17.468 -7.203 -159.576 159.576 -1517.82 -1061.40
47-47
Bottom (fb)= 1265.371 198.240 142.405 -20.765 8.562 189.693 -189.693 1804.27 1261.72
Top (ft)= -923.415 -137.278 -100.556 20.805 -6.862 -148.040 148.040 -1316.15 -898.71
46-46
Bottom (fb)= 1104.626 164.218 120.289 -24.888 8.208 177.091 -177.091 1574.43 1075.07
Top (ft)= -764.946 -104.862 -79.010 31.312 -6.289 -131.722 131.722 -1086.83 -713.06
45-45
Bottom (fb)= 920.652 126.206 95.092 -37.686 7.569 158.534 -158.534 1308.05 858.21
Top (ft)= -604.778 -73.162 -60.297 41.370 -5.550 -112.484 112.484 -856.27 -529.64
44-44
Bottom (fb)= 732.116 88.567 72.993 -50.081 6.719 136.168 -136.168 1036.56 641.15
Top (ft)= -456.730 -44.481 -52.192 49.728 -4.732 -92.299 92.299 -650.43 -363.92
43-43
Bottom (fb)= 555.898 54.139 63.525 -60.526 5.760 112.339 -112.339 791.66 442.93
Top (ft)= -329.649 -20.366 -45.047 55.986 -3.911 -72.856 72.856 -471.83 -225.08
42-42
Bottom (fb)= 403.212 24.911 55.100 -68.480 4.784 89.114 -89.114 577.12 275.31
Top (ft)= -226.940 -1.537 -38.237 60.011 -3.142 -55.258 55.258 -325.11 -116.35
41-41
Bottom (fb)= 278.804 1.888 46.976 -73.725 3.860 67.886 -67.886 399.41 142.94
Top (ft)= -147.925 12.782 -32.077 62.364 -2.452 -39.879 39.879 -209.55 -35.35
40-40
Bottom (fb)= 182.419 -15.762 39.557 -76.906 3.024 49.178 -49.178 258.42 43.60
Top (ft)= -89.720 23.022 -26.690 63.482 -1.847 -26.738 26.738 -121.97 21.67
39-39
Bottom (fb)= 110.986 -28.478 33.016 -78.528 2.285 33.075 -33.075 150.88 -26.81
Top (ft)= -48.756 30.197 -22.058 63.782 -1.320 -15.506 15.506 -57.44 59.41
38-38
Bottom (fb)= 60.458 -37.444 27.352 -79.090 1.637 19.228 -19.228 71.23 -73.67
Top (ft)= -21.734 35.149 -18.087 63.660 -0.856 -5.768 5.768 -11.29 81.99
37-37
Bottom (fb)= 26.997 -43.661 22.466 -79.075 1.063 7.165 -7.165 14.03 -101.84
Top (ft)= -6.111 38.151 -14.643 63.216 -0.433 -3.009 3.009 13.96 97.83
36-36
Bottom (fb)= 7.599 -47.439 18.208 -78.605 0.539 3.742 -3.742 -17.35 -121.65
Top (ft)= 0.000 39.934 -11.574 62.790 -0.033 -11.254 11.254 17.07 113.94
35-35
Bottom (fb)= 0.000 -49.673 14.397 -78.102 0.041 13.998 -13.998 -21.24 -141.73
Top (ft)= 0.000 40.154 -10.842 62.631 0.066 -13.278 13.278 16.10 116.13
34-34
Bottom (fb)= 0.000 -49.946 13.486 -77.904 -0.082 16.516 -16.516 -20.03 -144.45
Top (ft)= -6.111 40.150 -8.521 61.799 0.467 -21.390 21.390 4.59 117.70
33-33
Bottom (fb)= 7.599 -49.924 10.595 -76.843 -0.580 26.598 -26.598 -5.71 -146.35
Top (ft)= -21.734 39.025 -9.350 60.973 0.890 -29.911 29.911 -21.08 109.07
32-32
Bottom (fb)= 26.997 -48.475 11.614 -75.738 -1.105 37.155 -37.155 26.18 -135.48
Top (ft)= -48.756 36.141 -11.479 59.905 1.357 -39.167 39.167 -61.90 87.81
31-31
Bottom (fb)= 60.458 -44.816 14.234 -74.283 -1.682 48.567 -48.567 76.76 -108.89
Top (ft)= -89.720 31.313 -13.975 58.463 1.886 -49.511 49.511 -120.01 51.45
30-30
Bottom (fb)= 110.986 -38.734 17.287 -72.319 -2.333 61.246 -61.246 148.45 -63.65
R0 July-16 Page 69
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Top (ft)= -147.925 23.765 -16.894 56.399 2.494 -61.131 61.131 -199.69 -4.14
29-29
Bottom (fb)= 182.419 -29.306 20.833 -69.550 -3.075 75.385 -75.385 246.26 5.10
Top (ft)= -226.940 12.519 -20.392 53.276 3.187 -74.011 74.011 -305.64 -83.95
28-28
Bottom (fb)= 278.804 -15.381 25.052 -65.452 -3.916 90.926 -90.926 375.48 103.13
Top (ft)= -329.649 -2.885 -31.597 48.870 3.961 -87.911 87.911 -448.08 -191.79
27-27
Bottom (fb)= 403.212 3.529 38.649 -59.775 -4.844 107.529 -107.529 548.07 234.59
Top (ft)= -456.730 -23.346 -49.942 42.734 4.785 -102.070 102.070 -627.30 -330.49
26-26
Bottom (fb)= 544.768 19.657 42.049 -35.981 -4.029 85.940 -85.940 688.39 438.48
Top (ft)= -604.778 -48.386 -71.606 35.060 5.607 -115.377 115.377 -834.54 -497.12
25-25
Bottom (fb)= 732.116 58.573 86.683 -42.442 -6.788 139.670 -139.670 1010.26 601.79
Top (ft)= -764.946 -76.800 -95.026 28.497 6.348 -126.347 126.347 -1056.77 -680.55
24-24
Bottom (fb)= 920.652 92.433 114.369 -34.297 -7.640 152.065 -152.065 1271.88 819.08
Top (ft)= -923.415 -106.669 -118.134 32.732 6.922 -133.463 133.463 -1274.76 -856.97
23-23
Bottom (fb)= 1104.626 127.602 141.317 -39.155 -8.280 159.653 -159.653 1524.92 1025.14
Top (ft)= -1064.475 -134.644 -138.123 35.780 7.262 -135.837 135.837 -1465.82 -1020.24
22-22
Bottom (fb)= 1265.371 160.055 164.191 -42.533 -8.633 161.473 -161.473 1742.46 1212.79
Top (ft)= -1150.817 -152.950 -149.943 37.129 7.346 -134.379 134.379 -1580.74 -1124.91
21-21
Bottom (fb)= 1361.447 180.943 177.387 -43.925 -8.691 158.973 -158.973 1870.06 1330.80
Top (ft)= -1216.733 -168.003 -158.474 37.668 7.290 -130.813 130.813 -1666.73 -1208.97
20-20
Bottom (fb)= 1432.473 197.792 186.573 -44.347 -8.582 154.007 -154.007 1962.26 1423.33
Top (ft)= -1261.365 -179.421 -163.625 37.453 7.112 -124.523 124.523 -1721.82 -1271.70
19-19
Bottom (fb)= 1477.834 210.212 191.706 -43.880 -8.332 145.893 -145.893 2017.31 1489.94
R0 July-16 Page 70
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
8. TABLE SHOWING MOMENTS & STRESSES AT DIFFERENT SECTION DUE TO CONSTRUCTION LOADING
LOAD Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to
Due to 16th Due to 1st
DUE TO 15th 14th 13th 12th 11th 10th 9th 8th 7th 6th 5th 4th 3rd 2nd Total (T-m)
Segment Segment
SECTION Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
17-17 0 925.547 1512.825 2674.969 3556.425 4399.697 5211.43 5998.32 6766.93 7523.92 8275.92 9029.61 9791.56 10568.48 11367.02 14676.25 102278.882
16-16 907.695 1945.432 2845.14 3705.008 4531.68 5331.84 6112.06 6879.01 7639.31 8399.64 9166.56 9946.80 10747.00 13929.08 92086.254
15-15 1215.895 2133.855 3010.319 3851.93 4665.36 5457.20 6234.10 7002.70 7769.67 8541.57 9325.13 10126.98 13181.91 82516.608
14-14 1422.57 2315.63 3172.18 3998.88 4802.34 5589.19 6366.09 7139.69 7916.58 8703.45 9506.96 12434.74 73368.299
13-13 1389.378 2265.84 3110.24 3929.18 4729.32 5517.28 6299.73 7083.25 7874.55 8680.27 11438.52 62317.557
12-12 1359.50 2221.60 3056.03 3869.44 4668.47 5459.77 6249.93 7045.65 7853.57 10442.30 52226.259
11-11 1332.96 2182.88 3009.57 3819.65 4619.80 5416.61 6216.75 7026.88 9446.07 43071.171
10-10 0.00 1309.73 2149.69 2970.84 3779.84 4583.28 5387.85 6200.19 8449.85 34831.267
9-9 1289.81 2122.03 2939.87 3749.96 4558.95 5373.50 7453.62 27487.747
8-8 1273.22 2099.91 2916.63 3730.05 4546.81 6457.40 21024.017
7-7 1259.95 2083.31 2901.15 3720.11 5461.18 15425.695
6-6 1249.99 2072.25 2893.42 4464.95 10680.609
5-5 1243.35 2066.73 3468.73 6778.807
4-4 1240.04 2472.50 3712.541
3-3 1476.28 1476.279
2-2 0.00 0
R0 July-16 Page 71
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LOAD Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to
Due to 49th
DUE TO 48th 47th 46th 45th 44th 43th 42th 41th 40th 39th 38th 37th 36th 35th 34th Total (T-m)
Segment
SECTION Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
50-50 0 925.547 1512.825 2674.969 3556.425 4399.697 5211.432 5998.32 6766.928 7523.915 8275.917 9029.613 9791.557 10568.48 11367.02 5629.14 93231.77
49-49 0 0 907.695 1945.432 2845.14 3705.008 4531.68 5331.84 6112.064 6879.008 7639.308 8399.64 9166.564 9946.8 10747 5335.44 83492.616
48-48 0 0 0 1215.895 2133.855 3010.319 3851.928 4665.36 5457.2 6234.101 7002.699 7769.667 8541.571 9325.125 10126.98 5041.75 74376.444
47-47 0 0 0 0 1422.57 2315.63 3172.176 3998.88 4802.336 5589.194 6366.09 7139.694 7916.578 8703.45 9506.958 4748.05 65681.609
46-46 0 0 0 0 0 1389.378 2265.84 3110.24 3929.184 4729.318 5517.278 6299.73 7083.254 7874.55 8680.266 4356.46 55235.499
45-45 0 0 0 0 0 0 1359.504 2221.6 3056.032 3869.442 4668.466 5459.766 6249.93 7045.65 7853.574 3964.87 45748.833
44-44 0 0 0 0 0 0 0 1332.96 2182.88 3009.566 3819.654 4619.802 5416.606 6216.75 7026.882 3573.28 37198.377
43-43 0 0 0 0 0 0 0 0 1309.728 2149.69 2970.842 3779.838 4583.282 5387.85 6200.19 3181.69 29563.105
42-42 0 0 0 0 0 0 0 0 0 1289.814 2122.03 2939.874 3749.958 4558.95 5373.498 2790.09 22824.217
41-41 0 0 0 0 0 0 0 0 0 0 1273.218 2099.91 2916.634 3730.05 4546.806 2398.50 16965.119
40-40 0 0 0 0 0 0 0 0 0 0 0 1259.946 2083.31 2901.15 3720.114 2006.91 11971.429
39-39 0 0 0 0 0 0 0 0 0 0 0 0 1249.986 2072.25 2893.422 1615.32 7830.975
38-38 0 0 0 0 0 0 0 0 0 0 0 0 0 1243.35 2066.73 1223.73 4533.805
37-37 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1240.038 832.13 2072.171
36-36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 440.54 440.541
35-35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
34-34 0 0
33-33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 440.54 440.541
32-32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1240.038 832.133 2072.171
31-31 0 0 0 0 0 0 0 0 0 0 0 0 0 1243.35 2066.73 1223.725 4533.805
30-30 0 0 0 0 0 0 0 0 0 0 0 0 1249.986 2072.25 2893.422 1615.317 7830.975
29-29 0 0 0 0 0 0 0 0 0 0 0 1259.946 2083.31 2901.15 3720.114 2006.909 11971.429
28-28 0 0 0 0 0 0 0 0 0 0 1273.218 2099.91 2916.634 3730.05 4546.806 2398.501 16965.119
27-27 0 0 0 0 0 0 0 0 0 1289.814 2122.03 2939.874 3749.958 4558.95 5373.498 2790.093 22824.217
26-26 0 0 0 0 0 0 0 0 1309.728 2149.69 2970.842 3779.838 4583.282 5387.85 6200.19 3181.685 29563.105
25-25 0 0 0 0 0 0 0 1332.96 2182.88 3009.566 3819.654 4619.802 5416.606 6216.75 7026.882 3573.277 37198.377
24-24 0 0 0 0 0 0 1359.504 2221.6 3056.032 3869.442 4668.466 5459.766 6249.93 7045.65 7853.574 3964.869 45748.833
23-23 0 0 0 0 0 1389.378 2265.84 3110.24 3929.184 4729.318 5517.278 6299.73 7083.254 7874.55 8680.266 4356.461 55235.499
22-22 0 0 0 0 1422.57 2315.63 3172.176 3998.88 4802.336 5589.194 6366.09 7139.694 7916.578 8703.45 9506.958 4748.053 65681.609
21-21 0 0 0 1215.895 2133.855 3010.319 3851.928 4665.36 5457.2 6234.101 7002.699 7769.667 8541.571 9325.125 10126.98 5041.747 74376.444
20-20 0 0 907.695 1945.432 2845.14 3705.008 4531.68 5331.84 6112.064 6879.008 7639.308 8399.64 9166.564 9946.8 10747 5335.441 83492.616
19-19 0 925.547 1512.825 2674.969 3556.425 4399.697 5211.432 5998.32 6766.928 7523.915 8275.917 9029.613 9791.557 10568.48 11367.02 5629.135 93231.77
SECTION Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to
Due to 19th
LOAD 20th 21th 22th 23th 24th 25th 26th 27th 28th 29th 30th 31th 32th 33th 34th Total (T-m)
Segment
DUE TO Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
R0 July-16 Page 72
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LOAD DUE TO Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to
Due to 2nd Due to 1st
16th 15th 14th 13th 12th 11th 10th 9th 8th 7th 6th 5th 4th 3rd Total (T/m2)
Segment Segment
SECTION Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
Top (ft)= 0.000 -21.829 -35.680 -63.090 -83.879 -103.768 -122.913 -141.472 -159.600 -177.454 -195.190 -212.966 -230.936 -249.260 -268.094 -346.143 -2412.27
17-17
Bottom (fb)= 0.000 25.575 41.804 73.917 98.274 121.576 144.007 165.751 186.989 207.907 228.687 249.514 270.568 292.037 314.103 405.546 2826.26
Top (ft)= 0.000 -23.149 -49.614 -72.559 -94.489 -115.571 -135.978 -155.876 -175.435 -194.825 -214.216 -233.774 -253.673 -274.080 -355.232 -2348.47
16-16
Bottom (fb)= 0.000 27.253 58.411 85.425 111.242 136.063 160.088 183.514 206.541 229.369 252.198 275.225 298.651 322.677 418.219 2764.88
Top (ft)= 0.000 -33.066 -58.029 -81.864 -104.751 -126.872 -148.406 -169.533 -190.435 -211.292 -232.283 -253.592 -275.398 -358.475 -2243.99
15-15
Bottom (fb)= 0.000 39.117 68.650 96.847 123.923 150.093 175.568 200.562 225.289 249.964 274.797 300.006 325.803 424.085 2654.71
Top (ft)= 0.000 -40.603 -66.093 -90.540 -114.136 -137.069 -159.527 -181.701 -203.782 -225.955 -248.414 -271.348 -354.913 -2094.08
14-14
Bottom (fb)= 0.000 48.266 78.566 107.628 135.677 162.937 189.634 215.993 242.241 268.600 295.297 322.559 421.895 2489.29
Top (ft)= 0.000 -41.185 -67.166 -92.196 -116.472 -140.191 -163.548 -186.742 -209.968 -233.424 -257.308 -339.070 -1847.27
13-13
Bottom (fb)= 0.000 49.267 80.347 110.289 139.329 167.701 195.642 223.388 251.172 279.231 307.802 405.609 2209.78
Top (ft)= 0.000 -40.594 -66.335 -91.251 -115.538 -139.397 -163.024 -186.618 -210.377 -234.501 -311.798 -1559.43
12-12
Bottom (fb)= 0.000 48.857 79.838 109.825 139.056 167.771 196.208 224.604 253.200 282.235 375.266 1876.86
Top (ft)= 0.000 -38.993 -63.856 -88.040 -111.737 -135.144 -158.454 -181.860 -205.559 -276.329 -1259.97
11-11
Bottom (fb)= 0.000 47.204 77.302 106.577 135.264 163.599 191.816 220.152 248.840 334.510 1525.26
Top (ft)= 0.000 -36.705 -60.244 -83.257 -105.929 -128.445 -150.993 -173.758 -236.804 -976.14
10-10
Bottom (fb)= 0.000 44.674 73.325 101.334 128.929 156.334 183.777 211.486 288.221 1188.08
Top (ft)= 0.000 -34.094 -56.092 -77.710 -99.123 -120.507 -142.038 -197.023 -726.59
9-9
Bottom (fb)= 0.000 41.702 68.609 95.052 121.243 147.399 173.735 240.989 888.73
Top (ft)= 0.000 -31.480 -51.919 -72.112 -92.223 -112.417 -159.655 -519.81
8-8
Bottom (fb)= 0.000 38.674 63.784 88.592 113.300 138.108 196.142 638.60
Top (ft)= 0.000 -29.091 -48.102 -66.985 -85.894 -126.093 -356.164
7-7
Bottom (fb)= 0.000 35.874 59.318 82.604 105.922 155.496 439.214
Top (ft)= 0.000 -27.068 -44.873 -62.655 -96.686 -231.28
6-6
Bottom (fb)= 0.000 33.483 55.509 77.506 119.602 286.10
Top (ft)= 0.000 -25.483 -42.359 -71.093 -138.93
5-5
Bottom (fb)= 0.000 31.599 52.525 88.157 172.28
Top (ft)= 0.000 -24.369 -48.589 -72.96
4-4
Bottom (fb)= 0.000 30.270 60.355 90.62
Top (ft)= 0.000 -28.257 -28.26
3-3
Bottom (fb)= 0.000 35.136 35.14
Top (ft)= 0.000 0.00
2-2
Bottom (fb)= 0.000 0.00
R0 July-16 Page 73
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
LOAD DUE TO Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to Due to
Due to 34th
49th 48th 47th 46th 45th 44th 43th 42th 41th 40th 39th 38th 37th 36th 35th Total (T/m2)
SECTION Segment
Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment Segment
Top (ft)= 0.000 -21.829 -35.680 -63.090 -83.879 -103.768 -122.913 -141.472 -159.600 -177.454 -195.190 -212.966 -230.936 -249.260 -268.094 -132.765 -2198.90
50-50
Bottom (fb)= 0.000 25.575 41.804 73.917 98.274 121.576 144.007 165.751 186.989 207.907 228.687 249.514 270.568 292.037 314.103 155.549 2576.26
Top (ft)= 0.000 -23.149 -49.614 -72.559 -94.489 -115.571 -135.978 -155.876 -175.435 -194.825 -214.216 -233.774 -253.673 -274.080 -136.069 -2129.31
49-49
Bottom (fb)= 0.000 27.253 58.411 85.425 111.242 136.063 160.088 183.514 206.541 229.369 252.198 275.225 298.651 322.677 160.196 2506.86
Top (ft)= 0.000 -33.066 -58.029 -81.864 -104.751 -126.872 -148.406 -169.533 -190.435 -211.292 -232.283 -253.592 -275.398 -137.108 -2022.63
48-48
Bottom (fb)= 0.000 39.117 68.650 96.847 123.923 150.093 175.568 200.562 225.289 249.964 274.797 300.006 325.803 162.202 2392.82
Top (ft)= 0.000 -40.603 -66.093 -90.540 -114.136 -137.069 -159.527 -181.701 -203.782 -225.955 -248.414 -271.348 -135.519 -1874.69
47-47
Bottom (fb)= 0.000 48.266 78.566 107.628 135.677 162.937 189.634 215.993 242.241 268.600 295.297 322.559 161.095 2228.49
Top (ft)= 0.000 -41.185 -67.166 -92.196 -116.472 -140.191 -163.548 -186.742 -209.968 -233.424 -257.308 -129.138 -1637.34
46-46
Bottom (fb)= 0.000 49.267 80.347 110.289 139.329 167.701 195.642 223.388 251.172 279.231 307.802 154.480 1958.65
Top (ft)= 0.000 -40.594 -66.335 -91.251 -115.538 -139.397 -163.024 -186.618 -210.377 -234.501 -118.388 -1366.02
45-45
Bottom (fb)= 0.000 48.857 79.838 109.825 139.056 167.771 196.208 224.604 253.200 282.235 142.486 1644.08
Top (ft)= 0.000 -38.993 -63.856 -88.040 -111.737 -135.144 -158.454 -181.860 -205.559 -104.530 -1088.17
44-44
Bottom (fb)= 0.000 47.204 77.302 106.577 135.264 163.599 191.816 220.152 248.840 126.539 1317.29
Top (ft)= 0.000 -36.705 -60.244 -83.257 -105.929 -128.445 -150.993 -173.758 -89.166 -828.50
43-43
Bottom (fb)= 0.000 44.674 73.325 101.334 128.929 156.334 183.777 211.486 108.526 1008.39
Top (ft)= 0.000 -34.094 -56.092 -77.710 -99.123 -120.507 -142.038 -73.751 -603.32
42-42
Bottom (fb)= 0.000 41.702 68.609 95.052 121.243 147.399 173.735 90.209 737.95
Top (ft)= 0.000 -31.480 -51.919 -72.112 -92.223 -112.417 -59.302 -419.45
41-41
Bottom (fb)= 0.000 38.674 63.784 88.592 113.300 138.108 72.854 515.31
Top (ft)= 0.000 -29.091 -48.102 -66.985 -85.894 -46.338 -276.41
40-40
Bottom (fb)= 0.000 35.874 59.318 82.604 105.922 57.143 340.86
Top (ft)= 0.000 -27.068 -44.873 -62.655 -34.979 -169.57
39-39
Bottom (fb)= 0.000 33.483 55.509 77.506 43.269 209.77
Top (ft)= 0.000 -25.483 -42.359 -25.081 -92.92
38-38
Bottom (fb)= 0.000 31.599 52.525 31.101 115.23
Top (ft)= 0.000 -24.369 -16.353 -40.72
37-37
Bottom (fb)= 0.000 30.270 20.313 50.58
R0 July-16 Page 74
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
R0 July-16 Page 75
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
200 200 550 200 200 200 400 200 200 200 200 200.0 200
125
341a 321 301 281 271a 261a 251a 251b 261b 271b 291 311 331 341b
250
200
241a 231a 221 231b 241b
200 200 200
350
335 85 200
211
800
335
201
400
R0 July-16 Page 76
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
X4 X3 X2 X1
Y1
Vc Ɵv
Y2
L4 L3
Ɵv
ELEVATION OF CABLE
ƟH
Z
L2
L1
Eqn-1-Eqn-2
=>X3= [{X -(X1+X2)}-Y2/tanθv]x2 Eqn-3
Substitute the value of X3 in Eqn-1,
=>X4= X -(X1+X2+X3) Eqn-4
R0 July-16 Page 77
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Y1 Y2 Z ƟH X X1 = L1 X2 X3 X4 Ɵv L2 L3 L4
Cable no
(mm) (mm) (mm) (rad) mm (mm) (mm) (mm) (mm) DEGREE (mm) (mm) (mm)
201 995 0 85 0.1000 5500 4150 850 0 500 0.0 854 0 500 5504
211 660 0 85 0.1000 8500 7150 850 0 500 0.0 854 0 500 8504
221 325 335 0 0.0000 11500 8977 0 2000 523 12.5 0 2040 536 11553
231a 325 335 200 0.1000 15500 10977 2000 2000 523 12.5 2010 2040 536 15563
231b 325 845 0 0.0000 15500 11601 0 3386 513 21.5 0 3596 551 15749
241a 325 335 400 0.1000 19500 12977 4000 2000 523 12.5 4020 2040 536 19573
241b 325 845 200 0.1000 19500 13601 2000 3386 513 21.5 2010 3596 551 19759
251a 125 335 200 0.1000 23500 18977 2000 2000 523 12.5 2010 2040 536 23563
251b 125 845 0 0.0000 23500 19601 0 3386 513 21.5 0 3596 551 23749
261a 125 335 400 0.1000 27500 20977 4000 2000 523 12.5 4020 2040 536 27573
261b 125 845 200 0.1000 27500 21601 2000 3386 513 21.5 2010 3596 551 27759
271a 125 335 600 0.1000 31500 22977 6000 2000 523 12.5 6030 2040 536 31583
271b 125 845 400 0.1000 31500 23601 4000 3386 513 21.5 4020 3596 551 31769
281 125 335 800 0.1000 35500 24977 8000 2000 523 12.5 8040 2040 536 35593
291 125 335 800 0.1000 39500 28977 8000 2000 523 12.5 8040 2040 536 39593
301 125 335 1350 0.1000 43500 27477 13500 2000 523 12.5 13567 2040 536 43620
311 125 335 1000 0.1000 47500 34977 10000 2000 523 12.5 10050 2040 536 47603
321 125 335 1550 0.1000 51500 33477 15500 2000 523 12.5 15577 2040 536 51630
331 125 335 1200 0.1000 55500 40977 12000 2000 523 12.5 12060 2040 536 55613
341a 125 335 1750 0.1000 59500 39477 17500 2000 523 12.5 17587 2040 536 59640
341b-L 125 335 1400 0.1000 63355 46832 14000 2000 523 12.5 14070 2040 536 63478
341b-R 125 845 1200 0.1000 59500 43601 12000 3386 513 21.5 12060 3596 551 59809
Force diagram of each cable after after anchorage slip will be as shown follow:
R0 July-16 Page 78
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 201: Anchorage section LHS = 16-16 Anchorage section RHS = 20-20
346.92 t
338.35 t
337.0 t
328.70 t 322.673 t
322.5 t
279.873 t
267.96 t
259.72 t 260.31 t 4025
For cable 211: Anchorage section LHS = 15-15 Anchorage section RHS = 21-21
346.92 t
338.35 t
337.0 t
328.70 t 318.068 t
318.1 t
300.068 t
283.19 t
274.48 t 275.11 t 7150
R0 July-16 Page 79
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 221: Anchorage section LHS = 14-14 Anchorage section RHS = 22-22
291.91 t 304.217 t
291.91 t 8977.0
273.16 t 273.83 t
R0 July-16 Page 80
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 231a: Anchorage section LHS = 13-13 Anchorage section RHS = 23-23
281.99 t 297.765 t
272.50 t 6400.0
254.99 t 255.62 t
R0 July-16 Page 81
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 231b: Anchorage section LHS = 13-13 Anchorage section RHS = 23-23
285.55 t 297.761 t
285.55 t 9101.0
255.07 t 255.72 t
R0 July-16 Page 82
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 241a: Anchorage section LHS = 12-12 Anchorage section RHS = 24-24
286.55 t 298.781 t
274.36 t 3650.0
256.73 t 257.37 t
R0 July-16 Page 83
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 241b: Anchorage section LHS = 12-12 Anchorage section RHS = 24-24
278.50 t 289.116 t
269.12 t 2700.0
240.39 t 241.00 t
R0 July-16 Page 84
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 251a: Anchorage section LHS = 11-11 Anchorage section RHS = 25-25
281.99 t 297.765 t
272.50 t 6400.0
254.99 t 255.62 t
R0 July-16 Page 85
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 251b: Anchorage section LHS = 11-11 Anchorage section RHS = 25-25
295.54 t 302.976 t
295.54 t 5400.0
263.99 t 264.66 t
R0 July-16 Page 86
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 261a: Anchorage section LHS = 10-10 Anchorage section RHS = 26-26
286.68 t 298.850 t
274.48 t 3600.0
256.85 t 257.48 t
R0 July-16 Page 87
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 261b: Anchorage section LHS = 10-10 Anchorage section RHS = 26-26
278.75 t 289.249 t
269.37 t 2600.0
240.61 t 241.22 t
R0 July-16 Page 88
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 271a: Anchorage section LHS = 9-9 Anchorage section RHS = 27-27
291.19 t 299.800 t
276.23 t 900.0
258.49 t 259.12 t
R0 July-16 Page 89
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 271b: Anchorage section LHS = 9-9 Anchorage section RHS = 27-27
284.03 t
271.95 t
242.92 t 243.53 t
R0 July-16 Page 90
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 281: Anchorage section LHS = 8-8 Anchorage section RHS = 28-28
296.77 t
278.94 t
261.02 t 261.66 t
R0 July-16 Page 91
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 291: Anchorage section LHS = 7-7 Anchorage section RHS = 29-29
296.77 t
278.94 t
261.02 t 261.66 t
R0 July-16 Page 92
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 301: Anchorage section LHS = 6-6 Anchorage section RHS = 30-30
289.36 t
270.77 t 271.44 t 1100
R0 July-16 Page 93
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 311: Anchorage section LHS = 5-5 Anchorage section RHS = 31-31
293.97 t
275.08 t 275.76 t 1175
R0 July-16 Page 94
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 321: Anchorage section LHS = 4-4 Anchorage section RHS = 32-32
286.77 t
268.34 t 269.01 t 1050
R0 July-16 Page 95
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 331: Anchorage section LHS = 3-3 Anchorage section RHS = 33-33
291.33 t
272.62 t 273.29 t 1125
R0 July-16 Page 96
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 341a: Anchorage section LHS = 2-2 Anchorage section RHS = 34-34
284.20 t
265.94 t 266.60 t 1000
R0 July-16 Page 97
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 341b-L: Anchorage section LHS = 1-1 Anchorage section RHS = 34-34
288.72 t
270.18 t 270.84 t 1075
R0 July-16 Page 98
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
For cable 341b-R: Anchorage section LHS = 1-1 Anchorage section RHS = 34-34
278.72 t
248.97 t 249.60 t 625
R0 July-16 Page 99
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
AT SECTION : 33-33
A= 12.072 m2 Ytop= 1.347 m Ybottom = 1.675 m Ztop= 52.2 m3 Zbottom= 42.016 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 1.222 302.996 370.296 32.188 16.287
15 th 341a 125 1.22 314.906 384.851 33.453 16.927
Total 617.902 755.147 65.641 33.214
AT SECTION : 32-32
A= 12.151 m2 Ytop= 1.378 m Ybottom = 1.711 m Ztop= 50.9 m3 Zbottom= 40.966 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment P .e top F t
n Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 1.253 295.099 369.621 31.549 15.263
15 th 341a 125 1.25 307.555 385.223 32.881 15.907
14 th 331 125 1.25 314.884 394.403 33.664 16.286
Total 917.538 1149.247 98.094 47.456
AT SECTION : 31-31
A= 12.284 m2 Ytop= 1.428 m Ybottom = 1.771 m Ztop= 48.8 m3 Zbottom= 39.347 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top F t
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 1.303 287.202 374.314 31.051 13.866
15 th 341a 125 1.30 300.203 391.259 32.457 14.494
14 th 331 125 1.30 306.493 399.457 33.137 14.798
13 th 321 125 1.30 314.903 410.417 34.046 15.204
Total 1208.801 1575.447 130.691 58.362
AT SECTION : 30-30
A= 12.470 m2 Ytop= 1.500 m Ybottom = 1.855 m Ztop= 46.2 m3 Zbottom= 37.332 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 1.375 279.386 384.036 30.72 12.117
15 th 341a 125 1.37 292.851 402.545 32.2 12.701
14 th 331 125 1.37 298.101 409.761 32.778 12.928
13 th 321 125 1.37 307.260 422.351 33.785 13.326
12 th 311 125 1.37 314.871 432.813 34.622 13.656
Total 1492.469 2051.506 164.105 64.728
AT SECTION : 29-29
A= 12.710 m2 Ytop= 1.591 m Ybottom = 1.963 m Ztop= 43.3 m3 Zbottom= 35.121 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment P .e top F t
n Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 1.466 274.727 402.876 30.917 10.144
15 th 341a 125 1.47 285.484 418.651 32.128 10.541
14 th 331 125 1.47 290.995 426.733 32.748 10.745
13 th 321 125 1.47 299.617 439.377 33.718 11.063
12 th 311 125 1.47 305.793 448.433 34.413 11.291
11 th 301 125 1.47 314.898 461.785 35.438 11.628
Total 1771.514 2597.855 199.362 65.412
AT SECTION : 28-28
A= 13.002 m2 Ytop= 1.704 m Ybottom = 2.094 m Ztop= 40.4 m3 Zbottom= 32.922 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 1.579 270.067 426.479 31.315 7.816
15 th 341a 125 1.58 280.681 443.240 32.546 8.124
14 th 331 125 1.58 286.084 451.773 33.172 8.28
13 th 321 125 1.58 291.974 461.074 33.855 8.45
12 th 311 125 1.58 296.715 468.561 34.405 8.588
11 th 301 125 1.58 306.876 484.607 35.583 8.882
10 th 291 125 1.58 282.302 445.800 32.734 8.171
Total 2014.699 3181.533 233.610 58.311
AT SECTION : 27-27
A= 13.348 m2 Ytop= 1.838 m Ybottom = 2.248 m Ztop= 37.8 m3 Zbottom= 30.929 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 1.713 265.407 454.608 31.9 5.185
15 th 341a 125 1.71 275.878 472.543 33.159 5.39
14 th 331 125 1.71 281.174 481.615 33.795 5.493
13 th 321 125 1.71 285.680 489.333 34.337 5.581
12 th 311 125 1.71 291.162 498.723 34.996 5.688
11 th 301 125 1.71 298.853 511.897 35.92 5.839
10 th 291 125 1.71 291.176 498.747 34.998 5.689
9 th 281 125 1.71 282.302 483.547 33.931 5.515
Total 2271.632 3891.012 273.036 44.380
AT SECTION : 26-26
A= 13.747 m2 Ytop= 1.993 m Ybottom = 2.425 m Ztop= 35.7 m3 Zbottom= 29.317 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 1.868 260.747 487.023 32.616 2.356
15 th 341a 125 1.87 271.075 506.313 33.908 2.449
14 th 331 125 1.87 276.264 516.005 34.557 2.496
13 th 321 125 1.87 280.767 524.416 35.121 2.536
12 th 311 125 1.87 286.139 534.450 35.793 2.585
11 th 301 125 1.87 290.831 543.213 36.379 2.627
10 th 291 125 1.87 296.376 553.570 37.073 2.677
9 th 281 125 1.87 291.176 543.858 36.423 2.63
8 th 271b 125 1.87 272.310 508.620 34.063 2.46
8 th 271a 125 1.87 279.969 522.925 35.021 2.529
Total 2805.654 5240.393 350.954 25.345
AT SECTION : 25-25
A= 14.199 m2 Ytop= 2.169 m Ybottom = 2.626 m Ztop= 34.2 m3 Zbottom= 28.238 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 2.044 256.087 523.479 33.349 -0.502
15 th 341a 125 2.04 266.272 544.299 34.675 -0.522
14 th 331 125 2.04 271.353 554.685 35.337 -0.532
13 th 321 125 2.04 275.854 563.886 35.923 -0.541
12 th 311 125 2.04 281.116 574.642 36.608 -0.551
11 th 301 125 2.04 285.787 584.191 37.217 -0.56
10 th 291 125 2.04 291.237 595.331 37.926 -0.571
9 th 281 125 2.04 296.358 605.799 38.593 -0.581
8 th 271b 125 2.04 289.907 592.612 37.753 -0.569
8 th 271a 125 2.04 289.892 592.582 37.751 -0.569
7 th 261b 125 2.04 269.887 551.689 35.146 -0.529
7 th 261a 125 2.04 279.026 570.370 36.336 -0.547
Total 3352.776 6853.566 436.614 -6.574
AT SECTION : 24-24
A= 14.704 m2 Ytop= 2.367 m Ybottom = 2.849 m Ztop= 33.5 m3 Zbottom= 27.826 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 2.242 251.427 563.729 33.931 -3.16
15 th 341a 125 2.24 261.469 586.244 35.287 -3.286
14 th 331 125 2.24 266.443 597.397 35.958 -3.349
13 th 321 125 2.24 270.940 607.479 36.565 -3.405
12 th 311 125 2.24 276.093 619.033 37.26 -3.47
11 th 301 125 2.24 280.761 629.499 37.89 -3.529
10 th 291 125 2.24 286.099 641.468 38.611 -3.596
9 th 281 125 2.24 291.174 652.846 39.295 -3.659
8 th 271b 125 2.24 284.850 638.667 38.442 -3.58
8 th 271a 125 2.24 296.420 664.609 40.003 -3.725
7 th 261b 125 2.24 287.234 644.012 38.764 -3.61
7 th 261a 125 2.24 291.675 653.970 39.363 -3.666
6 th 251b 125 2.24 295.681 662.952 39.904 -3.716
6 th 251a 125 2.24 279.506 626.685 37.721 -3.513
Total 3919.772 8788.590 528.994 -49.264
AT SECTION : 23-23
A= 15.263 m2 Ytop= 2.587 m Ybottom = 3.095 m Ztop= 33.7 m3 Zbottom= 28.201 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top F t
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 2.462 246.767 607.514 34.176 -5.374
15 th 341a 125 2.462 256.666 631.885 35.547 -5.59
14 th 331 125 2.462 261.533 643.867 36.221 -5.696
13 th 321 125 2.462 266.027 654.930 36.844 -5.794
12 th 311 125 2.462 271.070 667.346 37.542 -5.904
11 th 301 125 2.462 275.735 678.831 38.188 -6.005
10 th 291 125 2.462 280.961 691.696 38.912 -6.119
9 th 281 125 2.462 285.989 704.075 39.609 -6.229
8 th 271b 125 2.462 279.793 688.821 38.75 -6.094
8 th 271a 125 2.462 291.175 716.842 40.327 -6.342
7 th 261b 125 2.462 284.788 701.118 39.442 -6.203
7 th 261a 125 2.462 296.370 729.632 41.046 -6.455
6 th 251b 125 2.462 301.188 741.493 41.714 -6.56
6 th 251a 125 2.462 290.560 715.328 40.242 -6.328
5 th 241b 325 2.262 269.594 609.793 35.74 -3.96
5 th 241a 325 2.262 278.860 630.752 36.968 -4.096
Total 4437.076 10813.924 611.268 -92.749
AT SECTION : 22-22
A= 15.874 m2 Ytop= 2.829 m Ybottom = 3.362 m Ztop= 35.0 m3 Zbottom= 29.474 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 2.704 242.107 654.571 33.934 -6.957
15 th 341a 125 2.704 251.863 680.948 35.302 -7.238
14 th 331 125 2.704 256.622 693.815 35.969 -7.374
13 th 321 125 2.704 261.114 705.960 36.598 -7.504
12 th 311 125 2.704 266.048 719.299 37.29 -7.645
11 th 301 125 2.704 270.709 731.901 37.943 -7.779
10 th 291 125 2.704 275.823 745.728 38.66 -7.926
9 th 281 125 2.704 280.804 759.194 39.358 -8.069
8 th 271b 125 2.704 274.736 742.789 38.508 -7.895
8 th 271a 125 2.704 285.929 773.051 40.076 -8.217
7 th 261b 125 2.704 279.692 756.188 39.202 -8.037
7 th 261a 125 2.704 291.085 786.991 40.799 -8.365
6 th 251b 125 2.704 299.332 809.288 41.955 -8.602
6 th 251a 125 2.704 296.332 801.177 41.535 -8.516
5 th 241b 325 2.504 286.760 717.945 38.556 -6.295
5 th 241a 325 2.504 291.501 729.815 39.193 -6.399
4 th 231b 325 2.504 285.690 715.266 38.412 -6.271
4 th 231a 325 2.504 279.506 699.784 37.581 -6.135
Total 4975.653 13223.709 690.871 -135.224
AT SECTION : 21-21
A= 16.368 m2 Ytop= 3.024 m Ybottom = 3.578 m Ztop= 36.8 m3 Zbottom= 31.083 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 2.899 238.612 691.848 33.392 -7.68
15 th 341a 125 2.899 251.863 730.269 35.247 -8.106
14 th 331 125 2.899 256.622 744.067 35.913 -8.26
13 th 321 125 2.899 261.114 757.092 36.541 -8.404
12 th 311 125 2.899 266.048 771.398 37.232 -8.563
11 th 301 125 2.899 270.709 784.912 37.884 -8.713
10 th 291 125 2.899 275.823 799.740 38.6 -8.878
9 th 281 125 2.899 280.804 814.182 39.297 -9.038
8 th 271b 125 2.899 274.736 796.588 38.448 -8.843
8 th 271a 125 2.899 285.929 829.042 40.014 -9.203
7 th 261b 125 2.899 279.692 810.958 39.141 -9.002
7 th 261a 125 2.899 291.085 843.991 40.736 -9.369
6 th 251b 125 2.899 299.332 867.903 41.89 -9.634
6 th 251a 125 2.899 296.332 859.205 41.47 -9.538
5 th 241b 325 2.699 286.760 774.099 38.571 -7.385
5 th 241a 325 2.699 291.501 786.897 39.208 -7.507
4 th 231b 325 2.699 285.690 771.211 38.427 -7.357
4 th 231a 325 2.699 279.506 754.517 37.595 -7.198
3 rd 221 325 2.699 296.222 799.642 39.843 -7.628
Total 5268.380 14987.560 729.449 -160.306
AT SECTION : 20-20
A= 16.892 m2 Ytop= 3.233 m Ybottom = 3.806 m Ztop= 39.2 m3 Zbottom= 33.306 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 3.108 238.612 741.555 33.038 -8.139
15 th 341a 125 3.108 248.260 771.539 34.374 -8.468
14 th 331 125 3.108 252.940 786.084 35.022 -8.628
13 th 321 125 3.108 257.429 800.035 35.643 -8.781
12 th 311 125 3.108 262.280 815.110 36.315 -8.946
11 th 301 125 3.108 266.939 829.590 36.96 -9.105
10 th 291 125 3.108 271.969 845.222 37.657 -9.277
9 th 281 125 3.108 276.916 860.596 38.342 -9.446
8 th 271b 125 3.108 270.943 842.033 37.514 -9.242
8 th 271a 125 3.108 281.995 876.380 39.045 -9.619
7 th 261b 125 3.108 275.870 857.345 38.197 -9.41
7 th 261a 125 3.108 287.121 892.311 39.754 -9.794
6 th 251b 125 3.108 295.284 917.680 40.885 -10.072
6 th 251a 125 3.108 292.340 908.530 40.477 -9.972
5 th 241b 325 2.908 286.001 831.630 38.141 -8.038
5 th 241a 325 2.908 297.668 865.555 39.697 -8.366
4 th 231b 325 2.908 289.713 842.424 38.636 -8.142
4 th 231a 325 2.908 288.095 837.719 38.42 -8.097
3 rd 221 325 2.908 296.677 862.674 39.564 -8.338
2 nd 211 660 2.573 287.085 738.609 35.832 -5.181
Total 5524.137 16722.620 753.513 -175.061
AT SECTION : 19-19
A= 17.445 m2 Ytop= 3.454 m Ybottom = 4.046 m Ztop= 42.4 m3 Zbottom= 36.189 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-R 125 3.329 231.622 770.989 31.461 -8.027
15 th 341a 125 3.329 244.658 814.381 33.232 -8.479
14 th 331 125 3.329 249.257 829.690 33.857 -8.639
13 th 321 125 3.329 253.744 844.625 34.466 -8.794
12 th 311 125 3.329 258.513 860.500 35.114 -8.959
11 th 301 125 3.329 263.170 876.001 35.746 -9.121
10 th 291 125 3.329 268.116 892.465 36.418 -9.292
9 th 281 125 3.329 273.027 908.812 37.085 -9.462
8 th 271b 125 3.329 267.150 889.249 36.287 -9.259
8 th 271a 125 3.329 278.061 925.568 37.769 -9.637
7 th 261b 125 3.329 272.048 905.553 36.952 -9.428
7 th 261a 125 3.329 283.158 942.534 38.461 -9.813
6 th 251b 125 3.329 291.237 969.427 39.559 -10.093
6 th 251a 125 3.329 288.347 959.807 39.166 -9.993
5 th 241b 325 3.129 282.110 882.624 36.988 -8.218
5 th 241a 325 3.129 293.632 918.672 38.499 -8.554
4 th 231b 325 3.129 293.737 919.001 38.513 -8.557
4 th 231a 325 3.129 295.490 924.485 38.743 -8.608
3 rd 221 325 3.129 300.790 941.067 39.438 -8.762
2 nd 211 660 2.794 294.166 821.797 36.245 -5.846
1 st 201 995 2.459 272.694 670.460 31.445 -2.895
Total 5754.727 18467.709 765.444 -180.436
AT SECTION : 17-17
A= 17.445 m2 Ytop= 3.454 m Ybottom = 4.046 m Ztop= 42.4 m3 Zbottom= 36.189 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 3.329 236.890 788.524 32.177 -8.21
15 th 341a 125 3.329 244.658 814.381 33.232 -8.479
14 th 331 125 3.329 249.257 829.690 33.857 -8.639
13 th 321 125 3.329 253.744 844.625 34.466 -8.794
12 th 311 125 3.329 258.513 860.500 35.114 -8.959
11 th 301 125 3.329 263.170 876.001 35.746 -9.121
10 th 291 125 3.329 268.116 892.465 36.418 -9.292
9 th 281 125 3.329 273.027 908.812 37.085 -9.462
8 th 271b 125 3.329 267.150 889.249 36.287 -9.259
8 th 271a 125 3.329 278.061 925.568 37.769 -9.637
7 th 261b 125 3.329 272.048 905.553 36.952 -9.428
7 th 261a 125 3.329 283.158 942.534 38.461 -9.813
6 th 251b 125 3.329 291.237 969.427 39.559 -10.093
6 th 251a 125 3.329 288.347 959.807 39.166 -9.993
5 th 241b 325 3.129 282.110 882.624 36.988 -8.218
5 th 241a 325 3.129 293.632 918.672 38.499 -8.554
4 th 231b 325 3.129 293.737 919.001 38.513 -8.557
4 th 231a 325 3.129 295.490 924.485 38.743 -8.608
3 rd 221 325 3.129 300.790 941.067 39.438 -8.762
2 nd 211 660 2.794 294.166 821.797 36.245 -5.846
1 st 201 995 2.459 272.694 670.460 31.445 -2.895
Total 5759.995 18485.244 766.160 -180.619
AT SECTION : 16-16
A= 16.892 m2 Ytop= 3.233 m Ybottom = 3.806 m Ztop= 39.2 m3 Zbottom= 33.306 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 3.108 240.491 747.395 33.298 -8.203
15 th 341a 125 3.108 248.260 771.539 34.374 -8.468
14 th 331 125 3.108 252.940 786.084 35.022 -8.628
13 th 321 125 3.108 257.429 800.035 35.643 -8.781
12 th 311 125 3.108 262.280 815.110 36.315 -8.946
11 th 301 125 3.108 266.939 829.590 36.96 -9.105
10 th 291 125 3.108 271.969 845.222 37.657 -9.277
9 th 281 125 3.108 276.916 860.596 38.342 -9.446
8 th 271b 125 3.108 270.943 842.033 37.514 -9.242
8 th 271a 125 3.108 281.995 876.380 39.045 -9.619
7 th 261b 125 3.108 275.870 857.345 38.197 -9.41
7 th 261a 125 3.108 287.121 892.311 39.754 -9.794
6 th 251b 125 3.108 295.284 917.680 40.885 -10.072
6 th 251a 125 3.108 292.340 908.530 40.477 -9.972
5 th 241b 325 2.908 286.001 831.630 38.141 -8.038
5 th 241a 325 2.908 297.668 865.555 39.697 -8.366
4 th 231b 325 2.908 289.713 842.424 38.636 -8.142
4 th 231a 325 2.908 288.095 837.719 38.42 -8.097
3 rd 221 325 2.908 296.677 862.674 39.564 -8.338
2 nd 211 660 2.573 287.085 738.609 35.832 -5.181
Total 5526.016 16728.460 753.773 -175.125
AT SECTION : 15-15
A= 16.368 m2 Ytop= 3.024 m Ybottom = 3.578 m Ztop= 36.8 m3 Zbottom= 31.083 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 2.899 244.093 707.740 34.159 -7.856
15 th 341a 125 2.899 251.863 730.269 35.247 -8.106
14 th 331 125 2.899 256.622 744.067 35.913 -8.26
13 th 321 125 2.899 261.114 757.092 36.541 -8.404
12 th 311 125 2.899 266.048 771.398 37.232 -8.563
11 th 301 125 2.899 270.709 784.912 37.884 -8.713
10 th 291 125 2.899 275.823 799.740 38.6 -8.878
9 th 281 125 2.899 280.804 814.182 39.297 -9.038
8 th 271b 125 2.899 274.736 796.588 38.448 -8.843
8 th 271a 125 2.899 285.929 829.042 40.014 -9.203
7 th 261b 125 2.899 279.692 810.958 39.141 -9.002
7 th 261a 125 2.899 291.085 843.991 40.736 -9.369
6 th 251b 125 2.899 299.332 867.903 41.89 -9.634
6 th 251a 125 2.899 296.332 859.205 41.47 -9.538
5 th 241b 325 2.699 286.760 774.099 38.571 -7.385
5 th 241a 325 2.699 291.501 786.897 39.208 -7.507
4 th 231b 325 2.699 285.690 771.211 38.427 -7.357
4 th 231a 325 2.699 279.506 754.517 37.595 -7.198
3 rd 221 325 2.699 296.222 799.642 39.843 -7.628
Total 5273.861 15003.452 730.216 -160.482
AT SECTION : 14-14
A= 15.874 m2 Ytop= 2.829 m Ybottom = 3.362 m Ztop= 35.0 m3 Zbottom= 29.474 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top F t
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 2.704 247.695 669.679 34.717 -7.118
15 th 341a 125 2.704 251.863 680.948 35.302 -7.238
14 th 331 125 2.704 256.622 693.815 35.969 -7.374
13 th 321 125 2.704 261.114 705.960 36.598 -7.504
12 th 311 125 2.704 266.048 719.299 37.29 -7.645
11 th 301 125 2.704 270.709 731.901 37.943 -7.779
10 th 291 125 2.704 275.823 745.728 38.66 -7.926
9 th 281 125 2.704 280.804 759.194 39.358 -8.069
8 th 271b 125 2.704 274.736 742.789 38.508 -7.895
8 th 271a 125 2.704 285.929 773.051 40.076 -8.217
7 th 261b 125 2.704 279.692 756.188 39.202 -8.037
7 th 261a 125 2.704 291.085 786.991 40.799 -8.365
6 th 251b 125 2.704 299.332 809.288 41.955 -8.602
AT SECTION : 12-12
A= 14.704 m2 Ytop= 2.367 m Ybottom = 2.849 m Ztop= 33.5 m3 Zbottom= 27.826 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 2.242 257.299 576.895 34.724 -3.234
15 th 341a 125 2.242 261.469 586.244 35.287 -3.286
14 th 331 125 2.242 266.443 597.397 35.958 -3.349
13 th 321 125 2.242 270.940 607.479 36.565 -3.405
12 th 311 125 2.242 276.093 619.033 37.26 -3.47
11 th 301 125 2.242 280.761 629.499 37.89 -3.529
10 th 291 125 2.242 286.099 641.468 38.611 -3.596
9 th 281 125 2.242 291.174 652.846 39.295 -3.659
8 th 271b 125 2.242 284.850 638.667 38.442 -3.58
8 th 271a 125 2.242 296.420 664.609 40.003 -3.725
7 th 261b 125 2.242 287.234 644.012 38.764 -3.61
7 th 261a 125 2.242 291.675 653.970 39.363 -3.666
6 th 251b 125 2.242 295.681 662.952 39.904 -3.716
6 th 251a 125 2.242 279.506 626.685 37.721 -3.513
Total 3925.644 8801.756 529.787 -49.338
AT SECTION : 11-11
A= 14.199 m2 Ytop= 2.169 m Ybottom = 2.626 m Ztop= 34.2 m3 Zbottom= 28.238 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top F t
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 2.044 262.102 535.775 34.132 -0.514
15 th 341a 125 2.044 266.272 544.299 34.675 -0.522
14 th 331 125 2.044 271.353 554.685 35.337 -0.532
13 th 321 125 2.044 275.854 563.886 35.923 -0.541
12 th 311 125 2.044 281.116 574.642 36.608 -0.551
11 th 301 125 2.044 285.787 584.191 37.217 -0.56
10 th 291 125 2.044 291.237 595.331 37.926 -0.571
9 th 281 125 2.044 296.358 605.799 38.593 -0.581
8 th 271b 125 2.044 289.907 592.612 37.753 -0.569
8 th 271a 125 2.044 289.892 592.582 37.751 -0.569
7 th 261b 125 2.044 269.887 551.689 35.146 -0.529
7 th 261a 125 2.044 279.026 570.370 36.336 -0.547
Total 3358.791 6865.862 437.397 -6.586
AT SECTION : 10-10
A= 13.747 m2 Ytop= 1.993 m Ybottom = 2.425 m Ztop= 35.7 m3 Zbottom= 29.317 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 1.868 266.904 498.523 33.386 2.411
15 th 341a 125 1.868 271.075 506.313 33.908 2.449
14 th 331 125 1.868 276.264 516.005 34.557 2.496
13 th 321 125 1.868 280.767 524.416 35.121 2.536
12 th 311 125 1.868 286.139 534.450 35.793 2.585
11 th 301 125 1.868 290.831 543.213 36.379 2.627
10 th 291 125 1.868 296.376 553.570 37.073 2.677
9 th 281 125 1.868 291.176 543.858 36.423 2.63
8 th 271b 125 1.868 272.310 508.620 34.063 2.46
8 th 271a 125 1.868 279.969 522.925 35.021 2.529
Total 2811.811 5251.893 351.724 25.400
AT SECTION : 9-9
A= 13.348 m2 Ytop= 1.838 m Ybottom = 2.248 m Ztop= 37.8 m3 Zbottom= 30.929 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 1.713 271.706 465.397 32.657 5.308
15 th 341a 125 1.713 275.878 472.543 33.159 5.39
14 th 331 125 1.713 281.174 481.615 33.795 5.493
13 th 321 125 1.713 285.680 489.333 34.337 5.581
12 th 311 125 1.713 291.162 498.723 34.996 5.688
11 th 301 125 1.713 298.853 511.897 35.92 5.839
10 th 291 125 1.713 291.176 498.747 34.998 5.689
9 th 281 125 1.713 282.302 483.547 33.931 5.515
Total 2277.931 3901.801 273.793 44.503
AT SECTION : 8-8
A= 13.002 m2 Ytop= 1.704 m Ybottom = 2.094 m Ztop= 40.4 m3 Zbottom= 32.922 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 1.579 276.508 436.651 32.062 8.003
15 th 341a 125 1.579 280.681 443.240 32.546 8.124
14 th 331 125 1.579 286.084 451.773 33.172 8.28
13 th 321 125 1.579 291.974 461.074 33.855 8.45
12 th 311 125 1.579 296.715 468.561 34.405 8.588
11 th 301 125 1.579 306.876 484.607 35.583 8.882
10 th 291 125 1.579 282.302 445.800 32.734 8.171
Total 2021.140 3191.705 234.357 58.498
AT SECTION : 7-7
A= 12.710 m2 Ytop= 1.591 m Ybottom = 1.963 m Ztop= 43.3 m3 Zbottom= 35.121 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 1.466 281.311 412.531 31.658 10.387
15 th 341a 125 1.466 285.484 418.651 32.128 10.541
14 th 331 125 1.466 290.995 426.733 32.748 10.745
13 th 321 125 1.466 299.617 439.377 33.718 11.063
12 th 311 125 1.466 305.793 448.433 34.413 11.291
11 th 301 125 1.466 314.898 461.785 35.438 11.628
Total 1778.098 2607.511 200.103 65.655
AT SECTION : 6-6
A= 12.470 m2 Ytop= 1.500 m Ybottom = 1.855 m Ztop= 46.2 m3 Zbottom= 37.332 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top F t
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 1.375 286.113 393.283 31.46 12.408
15 th 341a 125 1.375 292.851 402.545 32.2 12.701
14 th 331 125 1.375 298.101 409.761 32.778 12.928
13 th 321 125 1.375 307.260 422.351 33.785 13.326
12 th 311 125 1.375 314.871 432.813 34.622 13.656
Total 1499.196 2060.753 164.845 65.019
AT SECTION : 5-5
A= 12.284 m2 Ytop= 1.428 m Ybottom = 1.771 m Ztop= 48.8 m3 Zbottom= 39.347 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 1.303 291.435 379.831 31.509 14.071
15 th 341a 125 1.303 300.203 391.259 32.457 14.494
14 th 331 125 1.303 306.493 399.457 33.137 14.798
13 th 321 125 1.303 314.903 410.417 34.046 15.204
Total 1213.034 1580.964 131.149 58.567
AT SECTION : 4-4
A= 12.151 m2 Ytop= 1.378 m Ybottom = 1.711 m Ztop= 50.9 m3 Zbottom= 40.966 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 1.253 299.350 374.946 32.003 15.483
15 th 341a 125 1.253 307.555 385.223 32.881 15.907
14 th 331 125 1.253 314.884 394.403 33.664 16.286
Total 921.789 1154.572 98.548 47.676
AT SECTION : 3-3
A= 12.072 m2 Ytop= 1.347 m Ybottom = 1.675 m Ztop= 52.2 m3 Zbottom= 42.016 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment P .e top F t
n Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 1.222 307.265 375.513 32.641 16.516
15 th 341a 125 1.222 384.851 470.332 40.883 20.687
Total 692.116 845.845 73.524 37.203
AT SECTION : 2-2
A= 12.045 m2 Ytop= 1.337 m Ybottom = 1.663 m Ztop= 52.7 m3 Zbottom= 42.380 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment P .e top F t
n Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 341b-L 125 1.212 315.180 381.993 33.413 17.153
Total 315.180 381.993 33.413 17.153
Stress at Stress at
Vertical top Ft bottom
Stage of Section Dist. From Eccentrici Normal Pull Pn Vertical Pull Pn Moment
Area (m2) Ytop (m) Ztop (m3) Zbottom (m3) Cable no inclinatio =Pn/A+Pn. Fb=Pn/A-
Prestress No top (mm) ty (m) (T) (T) Pn.e (T-m)
n angle θv e/Ztop Pn.e/Zbotto
2
(T/m2) m (T/m )
200 200 200 200 200 200 510 200 200 200 200 200 200
125
342a 322 302 282 272a 262a 252a 252b 262b 272b 292 312 332 342b
200 200 255 255 200 250
242a 232a 222 232b 242b
335 350
212
800
335
202
400
X4 X3 X2 X1
Y1
Vc Ɵv
Y2
L4 L3
Ɵv
ELEVATION OF CABLE
ƟH
Z
L2
L1
Y1 Y2 Z ƟH X X1 = L1 X2 X3 X4 Ɵv L2 L3 L4
Cable no
(mm) (mm) (mm) (rad) mm (mm) (mm) (mm) (mm) DEGREE (mm) (mm) (mm)
202 995 0 0 0.0000 5500 5000 0 0 500 0.000 0 0 500 5500
212 660 0 0 0.0000 8500 8000 0 0 500 0.000 0 0 500 8500
222 325 335 0 0.0000 11500 8977 0 2000 523 12.500 0 2040 536 11553
232a 325 335 0 0.0000 15500 12977 0 2000 523 12.500 0 2040 536 15553
232b 325 335 0 0.0000 15500 12977 0 2000 523 12.500 0 2040 536 15553
242a 325 335 200 0.1000 19500 14977 2000 2000 523 12.500 2010 2040 536 19563
242b 325 335 200 0.1000 19500 14977 2000 2000 523 12.500 2010 2040 536 19563
252a 125 335 0 0.0000 23500 20977 0 2000 523 12.500 0 2040 536 23553
252b 125 335 0 0.0000 23500 20977 0 2000 523 12.500 0 2040 536 23553
262a 125 335 200 0.1000 27500 22977 2000 2000 523 12.500 2010 2040 536 27563
262b 125 335 200 0.1000 27500 22977 2000 2000 523 12.500 2010 2040 536 27563
272a 125 335 400 0.1000 31500 23728 4000 2000 1772 6.900 4020 2012 1785 31545
272b 125 335 400 0.1000 31500 23728 4000 2000 1772 6.900 4020 2012 1785 31545
282 125 335 855 0.1000 35500 24427 8550 2000 523 12.500 8593 2040 536 35596
292 125 335 855 0.1000 39500 28427 8550 2000 523 12.500 8593 2040 536 39596
302 125 335 1055 0.1000 43500 30427 10550 2000 523 12.500 10603 2040 536 43606
312 125 335 1055 0.1000 47500 34427 10550 2000 523 12.500 10603 2040 536 47606
322 125 335 1255 0.1000 51500 36427 12550 2000 523 12.500 12613 2040 536 51616
332 125 335 1255 0.1000 55500 40427 12550 2000 523 12.500 12613 2040 536 55616
342a-L 125 335 1455 0.1000 59500 42427 14550 2000 523 12.500 14623 2040 536 59626
342a-R 125 335 1200 0.1000 59500 44977 12000 2000 523 12.500 12060 2040 536 59613
342b-L 125 335 1455 0.1000 63355 46282 14550 2000 523 12.500 14623 2040 536 63481
342b-R 125 335 1200 0.1000 59500 44977 12000 2000 523 12.500 12060 2040 536 59613
Force diagram of each cable after after anchorage slip will be as shown follow:
For cable 202: Anchorage section LHS = 16-16 Anchorage section RHS = 20-20
346.92 t
346.92 t
346.9 t
346.92 t 340.552 t
339.03 t
278.052 t
272.95 t
272.32 t 272.95 t 4025
L= 500 0 5000
X= 500 0 5000
For cable 212: Anchorage section LHS = 15-15 Anchorage section RHS = 21-21
346.92 t
346.92 t
346.9 t
346.92 t 334.382 t
334.38 t
310.382 t
299.17 t
298.48 t 299.17 t 8000
L= 500 0 8000
X= 500 0 8000
For cable 222: Anchorage section LHS = 14-14 Anchorage section RHS = 22-22
291.91 t 304.217 t
291.91 t 8977
273.16 t 273.83 t
For cable 232a: Anchorage section LHS = 13-13 Anchorage section RHS = 23-23
292.20 t 305.110 t
292.20 t 9400
273.43 t 274.10 t
For cable 232b: Anchorage section LHS = 13-13 Anchorage section RHS = 23-23
292.20 t 305.110 t
292.20 t 9400
273.43 t 274.10 t
For cable 242a: Anchorage section LHS = 12-12 Anchorage section RHS = 24-24
282.25 t 297.902 t
272.75 t 6300
255.23 t 255.86 t
For cable 242b: Anchorage section LHS = 12-12 Anchorage section RHS = 24-24
282.25 t 297.902 t
272.75 t 6300
255.23 t 255.86 t
For cable 252a: Anchorage section LHS = 11-11 Anchorage section RHS = 25-25
292.71 t 308.614 t
292.71 t 11500
273.91 t 274.59 t
For cable 252b: Anchorage section LHS = 11-11 Anchorage section RHS = 25-25
292.71 t 308.614 t
292.71 t 11500
273.91 t 274.59 t
For cable 262a: Anchorage section LHS = 10-10 Anchorage section RHS = 26-26
282.25 t 297.902 t
272.75 t 6300
255.23 t 255.86 t
For cable 262b: Anchorage section LHS = 10-10 Anchorage section RHS = 26-26
282.25 t 297.902 t
272.75 t 6300
255.23 t 255.86 t
For cable 272a: Anchorage section LHS = 9-9 Anchorage section RHS = 27-27
299.86 t 308.531 t
287.10 t 760
273.76 t 276.02 t
For cable 272b: Anchorage section LHS = 9-9 Anchorage section RHS = 27-27
299.86 t 308.531 t
287.10 t 760
273.76 t 276.02 t
For cable 282: Anchorage section LHS = 8-8 Anchorage section RHS = 28-28
297.52 t
278.92 t
261.01 t 261.65 t
For cable 292: Anchorage section LHS = 7-7 Anchorage section RHS = 29-29
297.52 t
278.92 t
261.01 t 261.65 t
For cable 302: Anchorage section LHS = 6-6 Anchorage section RHS = 30-30
293.24 t
274.41 t 275.08 t 1160
For cable 312: Anchorage section LHS = 5-5 Anchorage section RHS = 31-31
293.24 t
274.41 t 275.08 t 1160
For cable 322: Anchorage section LHS = 4-4 Anchorage section RHS = 32-32
290.62 t
271.95 t 272.62 t 1110
For cable 332: Anchorage section LHS = 3-3 Anchorage section RHS = 33-33
290.61 t
271.94 t 272.61 t 1117
For cable 342a-L: Anchorage section LHS = 2-2 Anchorage section RHS = 34-34
288.00 t
269.50 t 270.16 t 1070
For cable 342a-R: Anchorage section LHS = 2-2 Anchorage section RHS = 34-34
291.34 t
272.63 t 273.30 t 1120
For cable 342b-L: Anchorage section LHS = 1-1 Anchorage section RHS = 34-34
287.99 t
269.49 t 270.16 t 1075
For cable 342b-R: Anchorage section LHS = 1-1 Anchorage section RHS = 34-34
291.33 t
272.61 t 273.29 t 1130
AT SECTION : 33-33
A= 12.072 m2 Ytop= 1.347 m Ybottom = 1.675 m Ztop= 52.244 m3 Zbottom= 42.016 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 1.222 314.887 384.828 33.451 16.926
15 th 342a-R 125 1.22 314.881 384.821 33.45 16.926
Total 629.768 769.648 66.901 33.852
AT SECTION : 32-32
A= 12.151 m2 Ytop= 1.378 m Ybottom = 1.711 m Ztop= 50.886 m3 Zbottom= 40.966 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment P .e top F t
n Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 1.253 306.495 383.895 32.767 15.852
15 th 342a-R 125 1.25 306.491 383.890 32.767 15.852
14 th 332 125 1.25 314.890 394.410 33.665 16.286
Total 927.876 1162.196 99.199 47.990
AT SECTION : 31-31
A= 12.284 m2 Ytop= 1.428 m Ybottom = 1.771 m Ztop= 48.791 m3 Zbottom= 39.347 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top F t
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 1.303 298.102 388.520 32.23 14.393
15 th 342a-R 125 1.30 298.100 388.518 32.23 14.393
14 th 332 125 1.30 306.645 399.655 33.153 14.805
13 th 322 125 1.30 314.886 410.395 34.044 15.203
Total 1217.733 1587.088 131.657 58.794
AT SECTION : 30-30
A= 12.470 m2 Ytop= 1.500 m Ybottom = 1.855 m Ztop= 46.180 m3 Zbottom= 37.332 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 1.375 291.011 400.016 31.998 12.621
15 th 342a-R 125 1.37 289.710 398.227 31.855 12.564
14 th 332 125 1.37 298.399 410.171 32.81 12.941
13 th 322 125 1.37 306.642 421.501 33.717 13.299
12 th 312 125 1.37 314.874 432.817 34.622 13.656
Total 1500.636 2062.732 165.002 65.081
AT SECTION : 29-29
A= 12.710 m2 Ytop= 1.591 m Ybottom = 1.963 m Ztop= 43.311 m3 Zbottom= 35.121 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment P .e top F t
n Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 1.466 286.144 419.619 32.202 10.566
15 th 342a-R 125 1.47 286.144 419.619 32.202 10.566
14 th 332 125 1.47 290.928 426.634 32.741 10.742
13 th 322 125 1.47 298.398 437.589 33.581 11.018
12 th 312 125 1.47 306.014 448.757 34.438 11.3
11 th 302 125 1.47 314.874 461.750 35.435 11.627
Total 1782.502 2613.969 200.599 65.819
AT SECTION : 28-28
A= 13.002 m2 Ytop= 1.704 m Ybottom = 2.094 m Ztop= 40.446 m3 Zbottom= 32.922 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 1.579 281.277 444.182 32.615 8.141
15 th 342a-R 125 1.58 281.277 444.182 32.615 8.141
14 th 332 125 1.58 286.024 451.678 33.165 8.278
13 th 322 125 1.58 290.154 458.200 33.644 8.398
12 th 312 125 1.58 297.154 469.254 34.456 8.6
11 th 302 125 1.58 306.014 483.245 35.483 8.857
10 th 292 125 1.58 282.212 445.658 32.723 8.168
Total 2024.112 3196.398 234.701 58.583
AT SECTION : 27-27
A= 13.348 m2 Ytop= 1.838 m Ybottom = 2.248 m Ztop= 37.831 m3 Zbottom= 30.929 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 1.713 276.410 473.455 33.223 5.4
15 th 342a-R 125 1.71 276.410 473.455 33.223 5.4
14 th 332 125 1.71 281.120 481.522 33.789 5.492
13 th 322 125 1.71 285.970 489.830 34.372 5.587
12 th 312 125 1.71 291.107 498.629 34.989 5.687
11 th 302 125 1.71 297.154 508.986 35.716 5.806
10 th 292 125 1.71 290.867 498.218 34.96 5.683
9 th 282 125 1.71 282.212 483.393 33.92 5.514
Total 2281.250 3907.486 274.192 44.569
AT SECTION : 26-26
A= 13.747 m2 Ytop= 1.993 m Ybottom = 2.425 m Ztop= 35.683 m3 Zbottom= 29.317 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 1.868 271.543 507.187 33.967 2.453
15 th 342a-R 125 1.87 271.543 507.187 33.967 2.453
14 th 332 125 1.87 276.216 515.915 34.551 2.495
13 th 322 125 1.87 281.022 524.892 35.152 2.539
12 th 312 125 1.87 286.090 534.358 35.786 2.584
11 th 302 125 1.87 288.294 538.475 36.062 2.604
10 th 292 125 1.87 296.326 553.477 37.067 2.677
9 th 282 125 1.87 290.867 543.281 36.384 2.628
8 th 272a 125 1.87 287.888 537.716 36.011 2.601
8 th 272b 125 1.87 287.888 537.716 36.011 2.601
Total 2837.677 5300.205 354.958 25.635
AT SECTION : 25-25
A= 14.199 m2 Ytop= 2.169 m Ybottom = 2.626 m Ztop= 34.184 m3 Zbottom= 28.238 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 2.044 266.677 545.127 34.728 -0.523
15 th 342a-R 125 2.04 266.677 545.127 34.728 -0.523
14 th 332 125 2.04 271.312 554.602 35.332 -0.532
13 th 322 125 2.04 276.074 564.336 35.952 -0.541
12 th 312 125 2.04 281.074 574.557 36.603 -0.551
11 th 302 125 2.04 286.012 584.651 37.246 -0.561
10 th 292 125 2.04 291.195 595.245 37.921 -0.571
9 th 282 125 2.04 296.315 605.711 38.588 -0.581
8 th 272a 125 2.04 302.464 618.281 39.389 -0.593
8 th 272b 125 2.04 302.464 618.281 39.389 -0.593
7 th 262b 125 2.04 279.776 571.903 36.434 -0.549
7 th 262a 125 2.04 279.776 571.903 36.434 -0.549
Total 3399.816 6949.723 442.744 -6.667
AT SECTION : 24-24
A= 14.704 m2 Ytop= 2.367 m Ybottom = 2.849 m Ztop= 33.491 m3 Zbottom= 27.826 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 2.242 261.810 587.009 35.333 -3.29
15 th 342a-R 125 2.24 261.810 587.009 35.333 -3.29
14 th 332 125 2.24 266.408 597.318 35.953 -3.348
13 th 322 125 2.24 271.126 607.896 36.59 -3.407
12 th 312 125 2.24 276.058 618.955 37.255 -3.469
11 th 302 125 2.24 280.951 629.925 37.916 -3.531
10 th 292 125 2.24 286.063 641.387 38.606 -3.595
9 th 282 125 2.24 291.137 652.763 39.29 -3.659
8 th 272a 125 2.24 303.860 681.290 41.007 -3.819
8 th 272b 125 2.24 303.860 681.290 41.007 -3.819
7 th 262b 125 2.24 290.888 652.205 39.257 -3.656
7 th 262a 125 2.24 290.888 652.205 39.257 -3.656
6 th 252b 125 2.24 294.755 660.875 39.779 -3.704
6 th 252a 125 2.24 294.755 660.875 39.779 -3.704
Total 3974.369 8911.003 536.362 -49.947
AT SECTION : 23-23
A= 15.263 m2 Ytop= 2.587 m Ybottom = 3.095 m Ztop= 33.735 m3 Zbottom= 28.201 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top F t
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 2.462 256.943 632.567 35.586 -5.596
15 th 342a-R 125 2.462 256.943 632.567 35.586 -5.596
14 th 332 125 2.462 261.505 643.798 36.218 -5.695
13 th 322 125 2.462 266.178 655.302 36.865 -5.797
12 th 312 125 2.462 271.042 667.277 37.538 -5.903
11 th 302 125 2.462 275.889 679.210 38.21 -6.009
10 th 292 125 2.462 280.932 691.625 38.908 -6.119
9 th 282 125 2.462 285.960 704.003 39.605 -6.228
8 th 272a 125 2.462 298.473 734.809 41.338 -6.501
8 th 272b 125 2.462 298.473 734.809 41.338 -6.501
7 th 262b 125 2.462 296.350 729.583 41.043 -6.454
7 th 262a 125 2.462 296.350 729.583 41.043 -6.454
6 th 252b 125 2.462 300.286 739.273 41.589 -6.54
6 th 252a 125 2.462 300.286 739.273 41.589 -6.54
5 th 242b 325 2.262 279.763 632.794 37.088 -4.109
5 th 242a 325 2.262 279.763 632.794 37.088 -4.109
Total 4505.136 10979.266 620.632 -94.151
AT SECTION : 22-22
A= 15.874 m2 Ytop= 2.829 m Ybottom = 3.362 m Ztop= 35.036 m3 Zbottom= 29.474 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 2.704 252.076 681.524 35.332 -7.244
15 th 342a-R 125 2.704 252.076 681.524 35.332 -7.244
14 th 332 125 2.704 256.601 693.758 35.966 -7.374
13 th 322 125 2.704 261.230 706.273 36.615 -7.507
12 th 312 125 2.704 266.025 719.237 37.287 -7.645
11 th 302 125 2.704 270.828 732.223 37.96 -7.783
10 th 292 125 2.704 275.800 745.665 38.657 -7.926
9 th 282 125 2.704 280.782 759.135 39.355 -8.069
8 th 272a 125 2.704 293.085 792.398 41.079 -8.422
8 th 272b 125 2.704 293.085 792.398 41.079 -8.422
7 th 262b 125 2.704 291.073 786.958 40.797 -8.364
7 th 262a 125 2.704 291.073 786.958 40.797 -8.364
6 th 252b 125 2.704 305.817 826.821 42.864 -8.788
6 th 252a 125 2.704 305.817 826.821 42.864 -8.788
5 th 242b 325 2.504 290.888 728.280 39.111 -6.385
5 th 242a 325 2.504 290.888 728.280 39.111 -6.385
4 th 232b 325 2.504 295.248 739.196 39.697 -6.481
4 th 232a 325 2.504 305.561 765.016 41.084 -6.707
Total 5077.953 13492.467 704.987 -137.898
AT SECTION : 21-21
A= 16.368 m2 Ytop= 3.024 m Ybottom = 3.578 m Ztop= 36.772 m3 Zbottom= 31.083 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 2.899 248.426 720.303 34.766 -7.996
15 th 342a-R 125 2.899 248.426 720.303 34.766 -7.996
14 th 332 125 2.899 256.601 744.006 35.91 -8.259
13 th 322 125 2.899 261.230 757.428 36.558 -8.408
12 th 312 125 2.899 266.025 771.331 37.229 -8.562
11 th 302 125 2.899 270.828 785.257 37.901 -8.717
10 th 292 125 2.899 275.800 799.673 38.597 -8.877
9 th 282 125 2.899 280.782 814.118 39.294 -9.037
8 th 272a 125 2.899 293.085 849.790 41.016 -9.433
8 th 272b 125 2.899 293.085 849.790 41.016 -9.433
7 th 262b 125 2.899 291.073 843.957 40.734 -9.369
7 th 262a 125 2.899 291.073 843.957 40.734 -9.369
6 th 252b 125 2.899 305.817 886.706 42.797 -9.843
6 th 252a 125 2.899 305.817 886.706 42.797 -9.843
5 th 242b 325 2.699 290.888 785.243 39.126 -7.491
5 th 242a 325 2.699 290.888 785.243 39.126 -7.491
4 th 232b 325 2.699 295.248 797.012 39.712 -7.603
4 th 232a 325 2.699 305.561 824.852 41.1 -7.869
3 rd 222 325 2.699 296.222 799.642 39.843 -7.628
Total 5366.875 15265.318 743.022 -163.224
AT SECTION : 20-20
A= 16.892 m2 Ytop= 3.233 m Ybottom = 3.806 m Ztop= 39.211 m3 Zbottom= 33.306 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 3.108 248.426 772.055 34.397 -8.474
15 th 342a-R 125 3.108 244.776 760.712 33.891 -8.349
14 th 332 125 3.108 252.923 786.031 35.019 -8.627
13 th 322 125 3.108 257.520 800.317 35.656 -8.784
12 th 312 125 3.108 262.263 815.058 36.313 -8.946
11 th 302 125 3.108 267.032 829.879 36.973 -9.108
10 th 292 125 3.108 271.952 845.169 37.654 -9.276
9 th 282 125 3.108 276.898 860.540 38.339 -9.445
8 th 272a 125 3.108 289.045 898.290 40.021 -9.859
8 th 272b 125 3.108 289.045 898.290 40.021 -9.859
7 th 262b 125 3.108 287.116 892.295 39.754 -9.793
7 th 262a 125 3.108 287.116 892.295 39.754 -9.793
6 th 252b 125 3.108 307.257 954.889 42.542 -10.48
6 th 252a 125 3.108 307.257 954.889 42.542 -10.48
5 th 242b 325 2.908 297.665 865.546 39.696 -8.366
5 th 242a 325 2.908 297.665 865.546 39.696 -8.366
4 th 232b 325 2.908 298.348 867.532 39.787 -8.385
4 th 232a 325 2.908 298.348 867.532 39.787 -8.385
3 rd 222 325 2.908 296.677 862.674 39.564 -8.338
2 nd 212 660 2.573 302.672 778.711 37.778 -5.462
Total 5640.001 17068.252 769.184 -178.575
AT SECTION : 19-19
A= 17.445 m2 Ytop= 3.454 m Ybottom = 4.046 m Ztop= 42.399 m3 Zbottom= 36.189 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-R 125 3.329 241.126 802.625 32.752 -8.357
15 th 342a-R 125 3.329 241.126 802.625 32.752 -8.357
14 th 332 125 3.329 249.245 829.650 33.855 -8.638
13 th 322 125 3.329 253.809 844.842 34.475 -8.796
12 th 312 125 3.329 258.501 860.460 35.112 -8.959
11 th 302 125 3.329 263.236 876.221 35.755 -9.123
10 th 292 125 3.329 268.103 892.422 36.416 -9.292
9 th 282 125 3.329 273.015 908.772 37.084 -9.462
8 th 272a 125 3.329 285.004 948.679 38.712 -9.877
8 th 272b 125 3.329 285.004 948.679 38.712 -9.877
7 th 262b 125 3.329 283.159 942.538 38.462 -9.813
7 th 262a 125 3.329 283.159 942.538 38.462 -9.813
6 th 252b 125 3.329 303.090 1008.881 41.169 -10.504
6 th 252a 125 3.329 303.090 1008.881 41.169 -10.504
5 th 242b 325 3.129 293.635 918.682 38.499 -8.554
5 th 242a 325 3.129 293.635 918.682 38.499 -8.554
4 th 232b 325 3.129 302.468 946.317 39.658 -8.811
4 th 232a 325 3.129 302.468 946.317 39.658 -8.811
3 rd 222 325 3.129 300.790 941.067 39.438 -8.762
2 nd 212 660 2.794 306.877 857.308 37.811 -6.099
1 st 202 995 2.459 275.502 677.364 31.768 -2.925
Total 5866.042 18823.547 780.218 -183.888
AT SECTION : 17-17
A= 17.445 m2 Ytop= 3.454 m Ybottom = 4.046 m Ztop= 42.399 m3 Zbottom= 36.189 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 3.329 236.883 788.501 32.176 -8.21
15 th 342a-L 125 3.329 241.093 802.515 32.748 -8.356
14 th 332 125 3.329 249.245 829.650 33.855 -8.638
13 th 322 125 3.329 253.809 844.842 34.475 -8.796
12 th 312 125 3.329 258.501 860.460 35.112 -8.959
11 th 302 125 3.329 263.236 876.221 35.755 -9.123
10 th 292 125 3.329 268.103 892.422 36.416 -9.292
9 th 282 125 3.329 273.015 908.772 37.084 -9.462
8 th 272a 125 3.329 285.004 948.679 38.712 -9.877
8 th 272b 125 3.329 285.004 948.679 38.712 -9.877
7 th 262b 125 3.329 283.159 942.538 38.462 -9.813
7 th 262a 125 3.329 283.159 942.538 38.462 -9.813
6 th 252b 125 3.329 303.090 1008.881 41.169 -10.504
6 th 252a 125 3.329 303.090 1008.881 41.169 -10.504
5 th 242b 325 3.129 293.635 918.682 38.499 -8.554
5 th 242a 325 3.129 293.635 918.682 38.499 -8.554
4 th 232b 325 3.129 302.468 946.317 39.658 -8.811
4 th 232a 325 3.129 302.468 946.317 39.658 -8.811
3 rd 222 325 3.129 300.790 941.067 39.438 -8.762
2 nd 212 660 2.794 306.877 857.308 37.811 -6.099
1 st 202 995 2.459 275.502 677.364 31.768 -2.925
Total 5861.766 18809.314 779.638 -183.740
AT SECTION : 16-16
A= 16.892 m2 Ytop= 3.233 m Ybottom = 3.806 m Ztop= 39.211 m3 Zbottom= 33.306 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 3.108 240.480 747.361 33.297 -8.203
15 th 342a-L 125 3.108 244.721 760.541 33.884 -8.347
14 th 332 125 3.108 252.923 786.031 35.019 -8.627
13 th 322 125 3.108 257.520 800.317 35.656 -8.784
12 th 312 125 3.108 262.263 815.058 36.313 -8.946
11 th 302 125 3.108 267.032 829.879 36.973 -9.108
10 th 292 125 3.108 271.952 845.169 37.654 -9.276
9 th 282 125 3.108 276.898 860.540 38.339 -9.445
8 th 272a 125 3.108 289.045 898.290 40.021 -9.859
8 th 272b 125 3.108 289.045 898.290 40.021 -9.859
7 th 262b 125 3.108 287.116 892.295 39.754 -9.793
7 th 262a 125 3.108 287.116 892.295 39.754 -9.793
6 th 252b 125 3.108 307.257 954.889 42.542 -10.48
6 th 252a 125 3.108 307.257 954.889 42.542 -10.48
5 th 242b 325 2.908 297.665 865.546 39.696 -8.366
5 th 242a 325 2.908 297.665 865.546 39.696 -8.366
4 th 232b 325 2.908 298.348 867.532 39.787 -8.385
4 th 232a 325 2.908 298.348 867.532 39.787 -8.385
3 rd 222 325 2.908 296.677 862.674 39.564 -8.338
2 nd 212 660 2.573 302.672 778.711 37.778 -5.462
Total 5632.000 17043.387 768.077 -178.302
AT SECTION : 15-15
A= 16.368 m2 Ytop= 3.024 m Ybottom = 3.578 m Ztop= 36.772 m3 Zbottom= 31.083 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 2.899 244.077 707.693 34.157 -7.856
15 th 342a-L 125 2.899 248.349 720.080 34.755 -7.993
14 th 332 125 2.899 256.601 744.006 35.91 -8.259
13 th 322 125 2.899 261.230 757.428 36.558 -8.408
12 th 312 125 2.899 266.025 771.331 37.229 -8.562
11 th 302 125 2.899 270.828 785.257 37.901 -8.717
10 th 292 125 2.899 275.800 799.673 38.597 -8.877
9 th 282 125 2.899 280.782 814.118 39.294 -9.037
8 th 272a 125 2.899 293.085 849.790 41.016 -9.433
8 th 272b 125 2.899 293.085 849.790 41.016 -9.433
7 th 262b 125 2.899 291.073 843.957 40.734 -9.369
7 th 262a 125 2.899 291.073 843.957 40.734 -9.369
6 th 252b 125 2.899 305.817 886.706 42.797 -9.843
6 th 252a 125 2.899 305.817 886.706 42.797 -9.843
5 th 242b 325 2.699 290.888 785.243 39.126 -7.491
5 th 242a 325 2.699 290.888 785.243 39.126 -7.491
4 th 232b 325 2.699 295.248 797.012 39.712 -7.603
4 th 232a 325 2.699 305.561 824.852 41.1 -7.869
3 rd 222 325 2.699 296.222 799.642 39.843 -7.628
Total 5362.449 15252.485 742.402 -163.081
AT SECTION : 14-14
A= 15.874 m2 Ytop= 2.829 m Ybottom = 3.362 m Ztop= 35.036 m3 Zbottom= 29.474 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top F t
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 2.704 247.674 669.623 34.715 -7.117
15 th 342a-L 125 2.704 251.977 681.256 35.318 -7.241
14 th 332 125 2.704 256.601 693.758 35.966 -7.374
13 th 322 125 2.704 261.230 706.273 36.615 -7.507
12 th 312 125 2.704 266.025 719.237 37.287 -7.645
11 th 302 125 2.704 270.828 732.223 37.96 -7.783
10 th 292 125 2.704 275.800 745.665 38.657 -7.926
9 th 282 125 2.704 280.782 759.135 39.355 -8.069
8 th 272a 125 2.704 293.085 792.398 41.079 -8.422
8 th 272b 125 2.704 293.085 792.398 41.079 -8.422
7 th 262b 125 2.704 291.073 786.958 40.797 -8.364
7 th 262a 125 2.704 291.073 786.958 40.797 -8.364
6 th 252b 125 2.704 305.817 826.821 42.864 -8.788
AT SECTION : 12-12
A= 14.704 m2 Ytop= 2.367 m Ybottom = 2.849 m Ztop= 33.491 m3 Zbottom= 27.826 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 2.242 257.265 576.818 34.719 -3.233
15 th 342a-L 125 2.242 261.651 586.652 35.311 -3.288
14 th 332 125 2.242 266.408 597.318 35.953 -3.348
13 th 322 125 2.242 271.126 607.896 36.59 -3.407
12 th 312 125 2.242 276.058 618.955 37.255 -3.469
11 th 302 125 2.242 280.951 629.925 37.916 -3.531
10 th 292 125 2.242 286.063 641.387 38.606 -3.595
9 th 282 125 2.242 291.137 652.763 39.29 -3.659
8 th 272a 125 2.242 303.860 681.290 41.007 -3.819
8 th 272b 125 2.242 303.860 681.290 41.007 -3.819
7 th 262b 125 2.242 290.888 652.205 39.257 -3.656
7 th 262a 125 2.242 290.888 652.205 39.257 -3.656
6 th 252b 125 2.242 294.755 660.875 39.779 -3.704
6 th 252a 125 2.242 294.755 660.875 39.779 -3.704
Total 3969.665 8900.456 535.726 -49.888
AT SECTION : 11-11
A= 14.199 m2 Ytop= 2.169 m Ybottom = 2.626 m Ztop= 34.184 m3 Zbottom= 28.238 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top F t
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 2.044 262.061 535.691 34.127 -0.514
15 th 342a-L 125 2.044 266.488 544.741 34.704 -0.523
14 th 332 125 2.044 271.312 554.602 35.332 -0.532
13 th 322 125 2.044 276.074 564.336 35.952 -0.541
12 th 312 125 2.044 281.074 574.557 36.603 -0.551
11 th 302 125 2.044 286.012 584.651 37.246 -0.561
10 th 292 125 2.044 291.195 595.245 37.921 -0.571
9 th 282 125 2.044 296.315 605.711 38.588 -0.581
8 th 272a 125 2.044 302.464 618.281 39.389 -0.593
8 th 272b 125 2.044 302.464 618.281 39.389 -0.593
7 th 262b 125 2.044 279.776 571.903 36.434 -0.549
7 th 262a 125 2.044 279.776 571.903 36.434 -0.549
Total 3395.011 6939.901 442.119 -6.658
AT SECTION : 10-10
A= 13.747 m2 Ytop= 1.993 m Ybottom = 2.425 m Ztop= 35.683 m3 Zbottom= 29.317 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 1.868 266.857 498.435 33.381 2.411
15 th 342a-L 125 1.868 271.325 506.780 33.939 2.451
14 th 332 125 1.868 276.216 515.915 34.551 2.495
13 th 322 125 1.868 281.022 524.892 35.152 2.539
12 th 312 125 1.868 286.090 534.358 35.786 2.584
11 th 302 125 1.868 288.294 538.475 36.062 2.604
10 th 292 125 1.868 296.326 553.477 37.067 2.677
9 th 282 125 1.868 290.867 543.281 36.384 2.628
8 th 272a 125 1.868 287.888 537.716 36.011 2.601
8 th 272b 125 1.868 287.888 537.716 36.011 2.601
Total 2832.773 5291.046 354.344 25.591
AT SECTION : 9-9
A= 13.348 m2 Ytop= 1.838 m Ybottom = 2.248 m Ztop= 37.831 m3 Zbottom= 30.929 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 1.713 271.653 465.306 32.651 5.307
15 th 342a-L 125 1.713 276.162 473.030 33.193 5.395
14 th 332 125 1.713 281.120 481.522 33.789 5.492
13 th 322 125 1.713 285.970 489.830 34.372 5.587
12 th 312 125 1.713 291.107 498.629 34.989 5.687
11 th 302 125 1.713 297.154 508.986 35.716 5.806
10 th 292 125 1.713 290.867 498.218 34.96 5.683
9 th 282 125 1.713 282.212 483.393 33.92 5.514
Total 2276.245 3898.913 273.590 44.471
AT SECTION : 8-8
A= 13.002 m2 Ytop= 1.704 m Ybottom = 2.094 m Ztop= 40.446 m3 Zbottom= 32.922 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 1.579 276.449 436.557 32.055 8.001
15 th 342a-L 125 1.579 281.000 443.744 32.583 8.133
14 th 332 125 1.579 286.024 451.678 33.165 8.278
13 th 322 125 1.579 290.154 458.200 33.644 8.398
12 th 312 125 1.579 297.154 469.254 34.456 8.6
11 th 302 125 1.579 306.014 483.245 35.483 8.857
10 th 292 125 1.579 282.212 445.658 32.723 8.168
Total 2019.007 3188.336 234.109 58.435
AT SECTION : 7-7
A= 12.710 m2 Ytop= 1.591 m Ybottom = 1.963 m Ztop= 43.311 m3 Zbottom= 35.121 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 1.466 281.245 412.435 31.651 10.385
15 th 342a-L 125 1.466 285.837 419.169 32.168 10.555
14 th 332 125 1.466 290.928 426.634 32.741 10.742
13 th 322 125 1.466 298.398 437.589 33.581 11.018
12 th 312 125 1.466 306.014 448.757 34.438 11.3
11 th 302 125 1.466 314.874 461.750 35.435 11.627
Total 1777.296 2606.334 200.014 65.627
AT SECTION : 6-6
A= 12.470 m2 Ytop= 1.500 m Ybottom = 1.855 m Ztop= 46.180 m3 Zbottom= 37.332 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top F t
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 1.375 286.041 393.184 31.452 12.405
15 th 342a-L 125 1.375 291.471 400.648 32.049 12.641
14 th 332 125 1.375 298.399 410.171 32.81 12.941
13 th 322 125 1.375 306.642 421.501 33.717 13.299
12 th 312 125 1.375 314.874 432.817 34.622 13.656
Total 1497.427 2058.321 164.650 64.942
AT SECTION : 5-5
A= 12.284 m2 Ytop= 1.428 m Ybottom = 1.771 m Ztop= 48.791 m3 Zbottom= 39.347 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 1.303 291.755 380.248 31.544 14.086
15 th 342a-L 125 1.303 299.280 390.056 32.357 14.45
14 th 332 125 1.303 306.645 399.655 33.153 14.805
13 th 322 125 1.303 314.886 410.395 34.044 15.203
Total 1212.566 1580.354 131.098 58.544
AT SECTION : 4-4
A= 12.151 m2 Ytop= 1.378 m Ybottom = 1.711 m Ztop= 50.886 m3 Zbottom= 40.966 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment Pn.e top Ft
Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =P n /A+Pn .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 1.253 299.565 375.215 32.026 15.494
15 th 342a-L 125 1.253 307.090 384.641 32.831 15.883
14 th 332 125 1.253 314.890 394.410 33.665 16.286
Total 921.545 1154.266 98.522 47.663
AT SECTION : 3-3
A= 12.072 m2 Ytop= 1.347 m Ybottom = 1.675 m Ztop= 52.244 m3 Zbottom= 42.016 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment P .e top F t
n Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 1.222 307.375 375.647 32.653 16.522
15 th 342a-L 125 1.222 314.899 384.843 33.452 16.927
Total 622.274 760.490 66.105 33.449
AT SECTION : 2-2
A= 12.045 m2 Ytop= 1.337 m Ybottom = 1.663 m Ztop= 52.715 m3 Zbottom= 42.380 m3
Stress at
Stress at
bottom
Stages of Cable Dist. From top Eccentrici Normal Pull Moment P .e top F t
n Fb=Pn/A-
Prestress No (mm) ty (m) Pn (T) (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 342b-L 125 1.212 315.185 381.999 33.414 17.154
Total 315.185 381.999 33.414 17.154
Stress at Stress at
Vertical top Ft bottom
Stage of Section Dist. From Eccentrici Normal Pull Pn Vertical Pull Pn Moment
Area (m2) Ytop (m) Ztop (m3) Zbottom (m3) Cable no inclinatio =Pn/A+Pn. Fb=Pn/A-
Prestress No top (mm) ty (m) (T) (T) Pn.e (T-m)
n angle θv e/Ztop Pn.e/Zbotto
2
(T/m2) m (T/m )
13. CALCULATION FOR TOP CABLE PRESTRESSES : SUMMARY OF PRESTRESS FOR CABLE OVER P7
AT SECTION : 33-33
A= 12.072 m2 Ytop= 1.3 m Ybottom = 1.675 m Ztop= 52.244 m3 Zbottom= 42.016 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.22 920.9 1125.4 97.8 49.5
15 th 125 1.22 944.7 1154.5 100.4 50.8
Total 1865.6 2279.9 198.2 100.3
AT SECTION : 32-32
A= 12.151 m2 Ytop= 1.4 m Ybottom = 1.711 m Ztop= 50.886 m3 Zbottom= 40.966 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.25 896.7 1123.1 95.9 46.4
15 th 125 1.25 921.6 1154.3 98.5 47.7
14 th 125 1.25 944.7 1183.2 101.0 48.9
Total 2763.0 3460.7 295.4 142.9
AT SECTION :31-31
A= 12.284 m2 Ytop= 1.4 m Ybottom = 1.771 m Ztop= 48.791 m3 Zbottom= 39.347 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.30 872.5 1137.1 94.3 42.1
15 th 125 1.30 898.5 1171.0 97.1 43.4
14 th 125 1.30 919.6 1198.6 99.4 44.4
13 th 125 1.30 944.7 1231.2 102.1 45.6
Total 3635.3 4738.0 393.0 175.5
AT SECTION :30-30
A= 12.470 m2 Ytop= 1.5 m Ybottom = 1.855 m Ztop= 46.180 m3 Zbottom= 37.332 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.37 849.8 1168.1 93.4 36.9
15 th 125 1.37 875.4 1203.3 96.3 38.0
14 th 125 1.37 894.6 1229.7 98.4 38.8
13 th 125 1.37 921.2 1266.2 101.3 40.0
12 th 125 1.37 944.6 1298.4 103.9 41.0
Total 4485.6 6165.7 493.2 194.5
AT SECTION :29-29
A= 12.710 m2 Ytop= 1.6 m Ybottom = 1.963 m Ztop= 43.311 m3 Zbottom= 35.121 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.47 835.6 1225.4 94.0 30.9
15 th 125 1.47 857.1 1256.9 96.5 31.6
14 th 125 1.47 872.9 1280.1 98.2 32.2
13 th 125 1.47 897.6 1316.3 101.0 33.1
12 th 125 1.47 917.6 1345.6 103.3 33.9
11 th 125 1.47 944.7 1385.3 106.3 34.9
Total 5325.5 7809.7 599.3 196.6
AT SECTION :28-28
A= 13.002 m2 Ytop= 1.7 m Ybottom = 2.094 m Ztop= 40.446 m3 Zbottom= 32.922 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.58 821.4 1297.1 95.2 23.8
15 th 125 1.58 842.6 1330.7 97.7 24.4
14 th 125 1.58 858.2 1355.2 99.5 24.8
13 th 125 1.58 874.1 1380.3 101.4 25.3
12 th 125 1.58 890.6 1406.4 103.3 25.8
11 th 125 1.58 919.8 1452.5 106.6 26.6
10 th 125 1.58 846.8 1337.3 98.2 24.5
Total 6053.5 9559.5 701.9 175.2
AT SECTION :27-27
A= 13.348 m2 Ytop= 1.8 m Ybottom = 2.248 m Ztop= 37.831 m3 Zbottom= 30.929 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.71 807.2 1382.7 97.0 15.8
15 th 125 1.71 828.2 1418.5 99.5 16.2
14 th 125 1.71 843.5 1444.8 101.4 16.5
13 th 125 1.71 857.3 1468.5 103.0 16.7
12 th 125 1.71 873.4 1496.1 105.0 17.1
11 th 125 1.71 894.9 1532.8 107.6 17.5
10 th 125 1.71 873.2 1495.7 105.0 17.1
9 th 125 1.71 846.8 1450.5 101.8 16.5
Total 6824.5 11689.5 820.3 133.3
AT SECTION :26-26
A= 13.747 m2 Ytop= 2.0 m Ybottom = 2.425 m Ztop= 35.683 m3 Zbottom= 29.317 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.87 793.0 1481.2 99.2 7.2
15 th 125 1.87 813.7 1519.8 101.8 7.4
14 th 125 1.87 828.7 1547.9 103.7 7.5
13 th 125 1.87 842.6 1573.7 105.4 7.6
12 th 125 1.87 858.4 1603.3 107.4 7.8
11 th 125 1.87 870.0 1624.9 108.8 7.9
10 th 125 1.87 889.1 1660.6 111.2 8.0
9 th 125 1.87 873.2 1631.0 109.2 7.9
8 th 125 1.87 832.5 1555.0 104.1 7.5
8 th 125 1.87 847.8 1583.6 106.1 7.7
Total 8449.0 15781.0 1056.9 76.3
AT SECTION :25-25
A= 14.199 m2 Ytop= 2.2 m Ybottom = 2.626 m Ztop= 34.184 m3 Zbottom= 28.238 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 2.04 778.9 1592.1 101.4 -1.5
15 th 125 2.04 799.2 1633.7 104.1 -1.6
14 th 125 2.04 814.0 1664.0 106.0 -1.6
13 th 125 2.04 827.8 1692.1 107.8 -1.6
12 th 125 2.04 843.3 1723.8 109.8 -1.7
11 th 125 2.04 857.6 1753.0 111.7 -1.7
10 th 125 2.04 873.7 1785.9 113.8 -1.7
9 th 125 2.04 889.0 1817.3 115.8 -1.7
8 th 125 2.04 882.3 1803.5 114.9 -1.7
8 th 125 2.04 882.2 1803.4 114.9 -1.7
7 th 125 2.04 819.6 1675.3 106.7 -1.6
7 th 125 2.04 837.8 1712.6 109.1 -1.6
Total 10105.4 20656.9 1316.0 -19.8
AT SECTION :24-24
A= 14.704 m2 Ytop= 2.4 m Ybottom = 2.849 m Ztop= 33.491 m3 Zbottom= 27.826 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 2.24 764.7 1714.5 103.2 -9.6
15 th 125 2.24 784.7 1759.5 105.9 -9.9
14 th 125 2.24 799.3 1792.1 107.9 -10.0
13 th 125 2.24 813.0 1822.9 109.7 -10.2
12 th 125 2.24 828.2 1857.0 111.8 -10.4
11 th 125 2.24 842.5 1888.9 113.7 -10.6
10 th 125 2.24 858.3 1924.3 115.8 -10.8
9 th 125 2.24 873.5 1958.5 117.9 -11.0
8 th 125 2.24 873.6 1958.6 117.9 -11.0
8 th 125 2.24 896.7 2010.5 121.0 -11.3
7 th 125 2.24 865.4 1940.2 116.8 -10.9
7 th 125 2.24 874.2 1960.1 118.0 -11.0
6 th 125 2.24 886.1 1986.8 119.6 -11.1
6 th 125 2.24 853.8 1914.2 115.2 -10.7
Total 11813.9 26488.2 1594.4 -148.5
AT SECTION :23-23
A= 15.263 m2 Ytop= 2.6 m Ybottom = 3.095 m Ztop= 33.735 m3 Zbottom= 28.201 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 2.46 750.5 1847.6 103.9 -16.3
15 th 125 2.46 770.3 1896.3 106.7 -16.8
14 th 125 2.46 784.6 1931.5 108.7 -17.1
13 th 125 2.46 798.2 1965.2 110.6 -17.4
12 th 125 2.46 813.2 2002.0 112.6 -17.7
11 th 125 2.46 827.4 2036.9 114.6 -18.0
10 th 125 2.46 842.9 2075.0 116.7 -18.4
9 th 125 2.46 857.9 2112.2 118.8 -18.7
8 th 125 2.46 858.1 2112.5 118.8 -18.7
8 th 125 2.46 880.8 2168.5 122.0 -19.2
7 th 125 2.46 865.9 2131.8 119.9 -18.9
7 th 125 2.46 889.1 2188.8 123.1 -19.4
6 th 125 2.46 902.7 2222.3 125.0 -19.7
6 th 125 2.46 881.4 2169.9 122.1 -19.2
5 th 325 2.26 819.0 1852.4 108.6 -12.0
5 th 325 2.26 837.5 1894.3 111.0 -12.3
Total 13379.3 32607.1 1843.2 -279.6
AT SECTION :22-22
A= 15.874 m2 Ytop= 2.8 m Ybottom = 3.362 m Ztop= 35.036 m3 Zbottom= 29.474 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 2.70 736.3 1990.7 103.2 -21.2
15 th 125 2.70 755.8 2043.4 105.9 -21.7
14 th 125 2.70 769.8 2081.4 107.9 -22.1
13 th 125 2.70 783.5 2118.2 109.8 -22.5
12 th 125 2.70 798.1 2157.8 111.9 -22.9
11 th 125 2.70 812.2 2196.0 113.8 -23.3
10 th 125 2.70 827.4 2237.1 116.0 -23.8
9 th 125 2.70 842.4 2277.5 118.1 -24.2
8 th 125 2.70 842.6 2278.0 118.1 -24.2
8 th 125 2.70 864.9 2338.5 121.2 -24.9
7 th 125 2.70 850.5 2299.3 119.2 -24.4
7 th 125 2.70 873.2 2360.9 122.4 -25.1
6 th 125 2.70 904.5 2445.4 126.8 -26.0
6 th 125 2.70 898.5 2429.2 125.9 -25.8
5 th 325 2.50 864.4 2164.2 116.2 -19.0
5 th 325 2.50 873.9 2187.9 117.5 -19.2
4 th 325 2.50 866.6 2169.7 116.5 -19.0
4 th 325 2.50 864.6 2164.6 116.2 -19.0
Total 15029.3 39939.9 2086.7 -408.3
AT SECTION :21-21
A= 16.368 m2 Ytop= 3.0 m Ybottom = 3.578 m Ztop= 36.772 m3 Zbottom= 31.083 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 2.90 725.7 2104.0 101.6 -23.4
15 th 125 2.90 752.2 2180.8 105.3 -24.2
14 th 125 2.90 769.8 2232.1 107.7 -24.8
13 th 125 2.90 783.5 2271.6 109.6 -25.2
12 th 125 2.90 798.1 2314.1 111.7 -25.7
11 th 125 2.90 812.2 2355.1 113.7 -26.1
10 th 125 2.90 827.4 2399.2 115.8 -26.6
9 th 125 2.90 842.4 2442.5 117.9 -27.1
8 th 125 2.90 842.6 2443.0 117.9 -27.1
8 th 125 2.90 864.9 2507.9 121.0 -27.8
7 th 125 2.90 850.5 2465.9 119.0 -27.4
7 th 125 2.90 873.2 2531.9 122.2 -28.1
6 th 125 2.90 904.5 2622.5 126.6 -29.1
6 th 125 2.90 898.5 2605.1 125.7 -28.9
5 th 325 2.70 864.4 2333.4 116.3 -22.3
5 th 325 2.70 873.9 2359.0 117.5 -22.5
4 th 325 2.70 866.6 2339.4 116.6 -22.3
4 th 325 2.70 864.6 2333.9 116.3 -22.3
3 rd 325 2.70 888.7 2398.9 119.5 -22.9
Total 15903.6 45240.4 2201.9 -483.8
AT SECTION :20-20
A= 16.892 m2 Ytop= 3.2 m Ybottom = 3.806 m Ztop= 39.211 m3 Zbottom= 33.306 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top F t
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =P n /A+P n .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 3.11 725.7 2255.2 100.5 -24.8
15 th 125 3.11 741.3 2303.8 102.6 -25.3
14 th 125 3.11 758.8 2358.2 105.1 -25.9
13 th 125 3.11 772.4 2400.4 106.9 -26.3
12 th 125 3.11 786.8 2445.3 108.9 -26.8
11 th 125 3.11 800.9 2489.1 110.9 -27.3
10 th 125 3.11 815.9 2535.6 113.0 -27.8
9 th 125 3.11 830.7 2581.7 115.0 -28.3
8 th 125 3.11 830.9 2582.4 115.0 -28.3
8 th 125 3.11 853.0 2651.1 118.1 -29.1
7 th 125 3.11 838.9 2607.0 116.1 -28.6
7 th 125 3.11 861.4 2676.9 119.3 -29.4
6 th 125 3.11 897.8 2790.2 124.3 -30.6
6 th 125 3.11 891.9 2772.0 123.5 -30.4
5 th 325 2.91 869.7 2528.8 116.0 -24.4
5 th 325 2.91 893.0 2596.7 119.1 -25.1
4 th 325 2.91 877.8 2552.4 117.1 -24.7
4 th 325 2.91 874.5 2543.0 116.6 -24.6
3 rd 325 2.91 890.0 2588.0 118.7 -25.0
2 nd 660 2.57 876.8 2255.9 109.4 -15.8
Total 16688.3 50513.5 2276.2 -528.7
AT SECTION :19-19
A= 17.445 m2 Ytop= 3.5 m Ybottom = 4.046 m Ztop= 42.399 m3 Zbottom= 36.189 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 3.33 704.4 2344.6 95.7 -24.4
15 th 125 3.33 730.4 2431.4 99.2 -25.3
14 th 125 3.33 747.8 2489.0 101.6 -25.9
13 th 125 3.33 761.3 2534.1 103.4 -26.4
12 th 125 3.33 775.5 2581.5 105.3 -26.9
11 th 125 3.33 789.6 2628.2 107.2 -27.4
10 th 125 3.33 804.3 2677.4 109.3 -27.9
9 th 125 3.33 819.1 2726.4 111.3 -28.4
8 th 125 3.33 819.3 2727.2 111.3 -28.4
8 th 125 3.33 841.1 2799.8 114.3 -29.2
7 th 125 3.33 827.3 2753.6 112.4 -28.7
7 th 125 3.33 849.5 2827.6 115.4 -29.4
6 th 125 3.33 885.6 2947.7 120.3 -30.7
6 th 125 3.33 879.8 2928.5 119.5 -30.5
5 th 325 3.13 857.9 2683.9 112.5 -25.0
5 th 325 3.13 880.9 2756.0 115.5 -25.7
4 th 325 3.13 889.9 2784.3 116.7 -25.9
4 th 325 3.13 893.4 2795.3 117.1 -26.0
3 rd 325 3.13 902.4 2823.2 118.3 -26.3
2 nd 660 2.79 895.2 2500.9 110.3 -17.8
1 st 995 2.46 820.9 2018.3 94.7 -8.7
Total 17375.5 55759.0 2311.1 -544.8
AT SECTION :17-17
A= 17.445 m2 Ytop= 3.5 m Ybottom = 4.046 m Ztop= 42.399 m3 Zbottom= 36.189 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top F t
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 3.33 710.7 2365.5 96.5 -24.6
15 th 125 3.33 730.4 2431.3 99.2 -25.3
14 th 125 3.33 747.8 2489.0 101.6 -25.9
13 th 125 3.33 761.3 2534.1 103.4 -26.4
12 th 125 3.33 775.5 2581.5 105.3 -26.9
11 th 125 3.33 789.6 2628.2 107.2 -27.4
10 th 125 3.33 804.3 2677.4 109.3 -27.9
9 th 125 3.33 819.1 2726.4 111.3 -28.4
8 th 125 3.33 819.3 2727.2 111.3 -28.4
8 th 125 3.33 841.1 2799.8 114.3 -29.2
7 th 125 3.33 827.3 2753.6 112.4 -28.7
7 th 125 3.33 849.5 2827.6 115.4 -29.4
6 th 125 3.33 885.6 2947.7 120.3 -30.7
6 th 125 3.33 879.8 2928.5 119.5 -30.5
5 th 325 3.13 857.9 2683.9 112.5 -25.0
5 th 325 3.13 880.9 2756.0 115.5 -25.7
4 th 325 3.13 889.9 2784.3 116.7 -25.9
4 th 325 3.13 893.4 2795.3 117.1 -26.0
3 rd 325 3.13 902.4 2823.2 118.3 -26.3
2 nd 660 2.79 895.2 2500.9 110.3 -17.8
1 st 995 2.46 820.9 2018.3 94.7 -8.7
Total 17381.8 55779.8 2312.0 -545.0
AT SECTION :16-16
A= 16.892 m2 Ytop= 3.2 m Ybottom = 3.806 m Ztop= 39.211 m3 Zbottom= 33.306 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 3.11 721.5 2242.2 99.9 -24.6
15 th 125 3.11 741.2 2303.6 102.6 -25.3
14 th 125 3.11 758.8 2358.2 105.1 -25.9
13 th 125 3.11 772.4 2400.4 106.9 -26.3
12 th 125 3.11 786.8 2445.3 108.9 -26.8
11 th 125 3.11 800.9 2489.1 110.9 -27.3
10 th 125 3.11 815.9 2535.6 113.0 -27.8
9 th 125 3.11 830.7 2581.7 115.0 -28.3
8 th 125 3.11 830.9 2582.4 115.0 -28.3
8 th 125 3.11 853.0 2651.1 118.1 -29.1
7 th 125 3.11 838.9 2607.0 116.1 -28.6
7 th 125 3.11 861.4 2676.9 119.3 -29.4
6 th 125 3.11 897.8 2790.2 124.3 -30.6
6 th 125 3.11 891.9 2772.0 123.5 -30.4
5 th 325 2.91 869.7 2528.8 116.0 -24.4
5 th 325 2.91 893.0 2596.7 119.1 -25.1
4 th 325 2.91 877.8 2552.4 117.1 -24.7
4 th 325 2.91 874.5 2543.0 116.6 -24.6
3 rd 325 2.91 890.0 2588.0 118.7 -25.0
2 nd 660 2.57 876.8 2255.9 109.4 -15.8
Total 16684.0 50500.3 2275.6 -528.6
AT SECTION :15-15
A= 16.368 m2 Ytop= 3.0 m Ybottom = 3.578 m Ztop= 36.772 m3 Zbottom= 31.083 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top F t
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =P n /A+P n .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 2.90 732.3 2123.2 102.5 -23.6
15 th 125 2.90 752.1 2180.6 105.2 -24.2
14 th 125 2.90 769.8 2232.1 107.7 -24.8
13 th 125 2.90 783.5 2271.6 109.6 -25.2
12 th 125 2.90 798.1 2314.1 111.7 -25.7
11 th 125 2.90 812.2 2355.1 113.7 -26.1
10 th 125 2.90 827.4 2399.2 115.8 -26.6
9 th 125 2.90 842.4 2442.5 117.9 -27.1
8 th 125 2.90 842.6 2443.0 117.9 -27.1
8 th 125 2.90 864.9 2507.9 121.0 -27.8
7 th 125 2.90 850.5 2465.9 119.0 -27.4
7 th 125 2.90 873.2 2531.9 122.2 -28.1
6 th 125 2.90 904.5 2622.5 126.6 -29.1
6 th 125 2.90 898.5 2605.1 125.7 -28.9
5 th 325 2.70 864.4 2333.4 116.3 -22.3
5 th 325 2.70 873.9 2359.0 117.5 -22.5
4 th 325 2.70 866.6 2339.4 116.6 -22.3
4 th 325 2.70 864.6 2333.9 116.3 -22.3
3 rd 325 2.70 888.7 2398.9 119.5 -22.9
Total 15910.2 45259.4 2202.8 -484.0
AT SECTION :14-14
A= 15.874 m2 Ytop= 2.8 m Ybottom = 3.362 m Ztop= 35.036 m3 Zbottom= 29.474 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 2.70 743.1 2009.0 104.1 -21.4
15 th 125 2.70 755.7 2043.2 105.9 -21.7
14 th 125 2.70 769.8 2081.4 107.9 -22.1
13 th 125 2.70 783.5 2118.2 109.8 -22.5
12 th 125 2.70 798.1 2157.8 111.9 -22.9
11 th 125 2.70 812.2 2196.0 113.8 -23.3
10 th 125 2.70 827.4 2237.1 116.0 -23.8
9 th 125 2.70 842.4 2277.5 118.1 -24.2
8 th 125 2.70 842.6 2278.0 118.1 -24.2
8 th 125 2.70 864.9 2338.5 121.2 -24.9
7 th 125 2.70 850.5 2299.3 119.2 -24.4
7 th 125 2.70 873.2 2360.9 122.4 -25.1
6 th 125 2.70 904.5 2445.4 126.8 -26.0
6 th 125 2.70 898.5 2429.2 125.9 -25.8
5 th 325 2.50 864.4 2164.2 116.2 -19.0
5 th 325 2.50 873.9 2187.9 117.5 -19.2
4 th 325 2.50 866.6 2169.7 116.5 -19.0
4 th 325 2.50 864.6 2164.6 116.2 -19.0
Total 15035.9 39957.9 2087.7 -408.5
AT SECTION :13-13
A= 15.263 m2 Ytop= 2.6 m Ybottom = 3.095 m Ztop= 33.735 m3 Zbottom= 28.201 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =P n /A+P n .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 2.46 757.5 1864.8 104.9 -16.5
15 th 125 2.46 770.1 1896.0 106.7 -16.8
14 th 125 2.46 784.6 1931.5 108.7 -17.1
13 th 125 2.46 798.2 1965.2 110.6 -17.4
12 th 125 2.46 813.2 2002.0 112.6 -17.7
11 th 125 2.46 827.4 2036.9 114.6 -18.0
10 th 125 2.46 842.9 2075.0 116.7 -18.4
9 th 125 2.46 857.9 2112.2 118.8 -18.7
8 th 125 2.46 858.1 2112.5 118.8 -18.7
8 th 125 2.46 880.8 2168.5 122.0 -19.2
7 th 125 2.46 865.9 2131.8 119.9 -18.9
7 th 125 2.46 889.1 2188.8 123.1 -19.4
6 th 125 2.46 902.7 2222.3 125.0 -19.7
6 th 125 2.46 881.4 2169.9 122.1 -19.2
5 th 325 2.26 819.0 1852.4 108.6 -12.0
5 th 325 2.26 837.5 1894.3 111.0 -12.3
Total 13386.1 32624.0 1844.1 -279.8
AT SECTION :12-12
A= 14.704 m2 Ytop= 2.4 m Ybottom = 2.849 m Ztop= 33.491 m3 Zbottom= 27.826 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 2.24 771.9 1730.6 104.2 -9.7
15 th 125 2.24 784.6 1759.1 105.9 -9.9
14 th 125 2.24 799.3 1792.1 107.9 -10.0
13 th 125 2.24 813.0 1822.9 109.7 -10.2
12 th 125 2.24 828.2 1857.0 111.8 -10.4
11 th 125 2.24 842.5 1888.9 113.7 -10.6
10 th 125 2.24 858.3 1924.3 115.8 -10.8
9 th 125 2.24 873.5 1958.5 117.9 -11.0
8 th 125 2.24 873.6 1958.6 117.9 -11.0
8 th 125 2.24 896.7 2010.5 121.0 -11.3
7 th 125 2.24 865.4 1940.2 116.8 -10.9
7 th 125 2.24 874.2 1960.1 118.0 -11.0
6 th 125 2.24 886.1 1986.8 119.6 -11.1
6 th 125 2.24 853.8 1914.2 115.2 -10.7
Total 11821.0 26504.0 1595.3 -148.6
AT SECTION :11-11
A= 14.199 m2 Ytop= 2.2 m Ybottom = 2.626 m Ztop= 34.184 m3 Zbottom= 28.238 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 2.04 786.3 1607.2 102.4 -1.5
15 th 125 2.04 799.0 1633.3 104.1 -1.6
14 th 125 2.04 814.0 1664.0 106.0 -1.6
13 th 125 2.04 827.8 1692.1 107.8 -1.6
12 th 125 2.04 843.3 1723.8 109.8 -1.7
11 th 125 2.04 857.6 1753.0 111.7 -1.7
10 th 125 2.04 873.7 1785.9 113.8 -1.7
9 th 125 2.04 889.0 1817.3 115.8 -1.7
8 th 125 2.04 882.3 1803.5 114.9 -1.7
8 th 125 2.04 882.2 1803.4 114.9 -1.7
7 th 125 2.04 819.6 1675.3 106.7 -1.6
7 th 125 2.04 837.8 1712.6 109.1 -1.6
Total 10112.6 20671.6 1316.9 -19.8
AT SECTION :10-10
A= 13.747 m2 Ytop= 2.0 m Ybottom = 2.425 m Ztop= 35.683 m3 Zbottom= 29.317 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.87 800.7 1495.5 100.2 7.2
15 th 125 1.87 813.5 1519.4 101.8 7.3
14 th 125 1.87 828.7 1547.9 103.7 7.5
13 th 125 1.87 842.6 1573.7 105.4 7.6
12 th 125 1.87 858.4 1603.3 107.4 7.8
11 th 125 1.87 870.0 1624.9 108.8 7.9
10 th 125 1.87 889.1 1660.6 111.2 8.0
9 th 125 1.87 873.2 1631.0 109.2 7.9
8 th 125 1.87 832.5 1555.0 104.1 7.5
8 th 125 1.87 847.8 1583.6 106.1 7.7
Total 8456.4 15794.8 1057.8 76.4
AT SECTION :9-9
A= 13.348 m2 Ytop= 1.8 m Ybottom = 2.248 m Ztop= 37.831 m3 Zbottom= 30.929 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.71 815.1 1396.1 98.0 15.9
15 th 125 1.71 827.9 1418.1 99.5 16.2
14 th 125 1.71 843.5 1444.8 101.4 16.5
13 th 125 1.71 857.3 1468.5 103.0 16.7
12 th 125 1.71 873.4 1496.1 105.0 17.1
11 th 125 1.71 894.9 1532.8 107.6 17.5
10 th 125 1.71 873.2 1495.7 105.0 17.1
9 th 125 1.71 846.8 1450.5 101.8 16.5
Total 6832.1 11702.5 821.2 133.5
AT SECTION :8-8
A= 13.002 m2 Ytop= 1.7 m Ybottom = 2.094 m Ztop= 40.446 m3 Zbottom= 32.922 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.58 829.5 1309.9 96.2 24.0
15 th 125 1.58 842.4 1330.2 97.7 24.4
14 th 125 1.58 858.2 1355.2 99.5 24.8
13 th 125 1.58 874.1 1380.3 101.4 25.3
12 th 125 1.58 890.6 1406.4 103.3 25.8
11 th 125 1.58 919.8 1452.5 106.6 26.6
10 th 125 1.58 846.8 1337.3 98.2 24.5
Total 6061.3 9571.7 702.8 175.4
AT SECTION :7-7
A= 12.710 m2 Ytop= 1.6 m Ybottom = 1.963 m Ztop= 43.311 m3 Zbottom= 35.121 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.47 843.9 1237.5 95.0 31.2
15 th 125 1.47 856.8 1256.5 96.4 31.6
14 th 125 1.47 872.9 1280.1 98.2 32.2
13 th 125 1.47 897.6 1316.3 101.0 33.1
12 th 125 1.47 917.6 1345.6 103.3 33.9
11 th 125 1.47 944.7 1385.3 106.3 34.9
Total 5333.5 7821.4 600.2 196.9
AT SECTION :6-6
A= 12.470 m2 Ytop= 1.5 m Ybottom = 1.855 m Ztop= 46.180 m3 Zbottom= 37.332 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top F t
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =P n /A+P n .e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.37 858.3 1179.7 94.4 37.2
15 th 125 1.37 877.2 1205.7 96.4 38.0
14 th 125 1.37 894.6 1229.7 98.4 38.8
13 th 125 1.37 921.2 1266.2 101.3 40.0
12 th 125 1.37 944.6 1298.4 103.9 41.0
Total 4495.8 6179.8 494.3 195.0
AT SECTION :5-5
A= 12.284 m2 Ytop= 1.4 m Ybottom = 1.771 m Ztop= 48.791 m3 Zbottom= 39.347 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.30 874.6 1139.9 94.6 42.2
15 th 125 1.30 899.7 1172.6 97.3 43.4
14 th 125 1.30 919.6 1198.6 99.4 44.4
13 th 125 1.30 944.7 1231.2 102.1 45.6
Total 3638.6 4742.3 393.4 175.7
AT SECTION :4-4
A= 12.151 m2 Ytop= 1.4 m Ybottom = 1.711 m Ztop= 50.886 m3 Zbottom= 40.966 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.25 898.3 1125.1 96.0 46.5
15 th 125 1.25 922.2 1155.1 98.6 47.7
14 th 125 1.25 944.7 1183.2 101.0 48.9
Total 2765.1 3463.4 295.6 143.0
AT SECTION :3-3
A= 12.072 m2 Ytop= 1.3 m Ybottom = 1.675 m Ztop= 52.244 m3 Zbottom= 42.016 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.22 921.9 1126.7 97.9 49.6
15 th 125 1.22 1084.6 1325.5 115.2 58.3
Total 2006.5 2452.2 213.2 107.9
AT SECTION :2-2
A= 12.045 m2 Ytop= 1.3 m Ybottom = 1.663 m Ztop= 52.715 m3 Zbottom= 42.380 m3
Stress at
Stress at
bottom
Stages of Dist. From Eccentricity Normal Moment top Ft
Fb=Pn/A-
Prestress top (mm) (m) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
16th 125 1.21 945.5 1146.0 100.2 51.5
Total 945.5 1146.0 100.2 51.5
Stress at
Stress at
bottom
Stage of Normal Vertical Moment top Ft
Section No 2
Area (m ) Ytop (m) 3
Ztop (m ) 3
Zbottom (m ) Fb=Pn/A-
Prestress Pull Pn (T) Pull Pn (T) Pn.e (T-m) =Pn/A+Pn.e
Pn.e/Zbottom
/Ztop (T/m2)
(T/m2)
Towards RHS from P7
1 st 20-20 16.892 3.233 39.211 33.306 791.758 0.000 1771.785
92.059 -6.325
Total 791.758 0.000 1771.785
2 nd 21-21 16.368 3.024 36.772 31.083 847.446 0.000 2003.758
106.266 -12.690
Total 847.446 0.000 2003.758
3 rd 22-22 15.874 2.829 35.036 29.474 819.478 177.367 1777.156
102.346 -8.674
Total 819.478 177.367 1777.156
4 th 23-23 15.263 2.587 33.735 28.201 783.411 169.561 1509.550
4 th 23-23 15.263 2.587 33.735 28.201 783.568 246.147 1249.681 184.459 4.825
Total 1566.978 415.708 2759.231
5 th 24-24 14.704 2.367 33.491 27.826 768.692 166.375 1312.247
5 th 24-24 14.704 2.367 33.491 27.826 736.009 231.449 1011.255 171.709 18.831
Total 1504.701 397.824 2323.502
6 th 25-25 14.199 2.169 34.184 28.238 783.892 169.665 1339.787
6 th 25-25 14.199 2.169 34.184 28.238 801.895 252.792 1101.285 183.092 25.238
Total 1585.788 422.458 2441.072
7 th 26-26 13.747 1.993 35.683 29.317 768.928 166.427 1178.611
7 th 26-26 13.747 1.993 35.683 29.317 736.452 231.611 883.406 167.294 39.172
Total 1505.380 398.037 2062.017
8 th 27-27 13.348 1.838 37.831 30.929 790.736 144.783 1089.532
8 th 27-27 13.348 1.838 37.831 30.929 759.594 210.947 798.848 166.062 55.092
Total 1550.330 355.729 1888.380
9 th 28-28 13.002 1.704 40.446 32.922 783.044 169.482 974.233
84.311 30.631
Total 783.044 169.482 974.233
10 th 29-29 12.710 1.591 43.311 35.121 783.044 169.482 885.984
82.066 36.383
Total 783.044 169.482 885.984
11 th 30-30 12.470 1.500 46.180 37.332 815.947 176.603 848.236
83.798 42.709
Total 815.947 176.603 848.236
12 th 31-31 12.284 1.428 48.791 39.347 824.573 178.470 798.445
83.488 46.832
Total 824.573 178.470 798.445
13 th 32-32 12.151 1.378 50.886 40.966 808.637 175.021 741.952
81.128 48.436
Total 808.637 175.021 741.952
14 th 33-33 12.072 1.347 52.244 42.016 817.179 176.870 724.931
81.570 50.441
Total 817.179 176.870 724.931
15 th 34-34 12.045 1.337 52.715 42.380 804.506 174.127 705.538
80.176 50.144
Total 804.506 174.127 705.538
16th 34-34 12.045 1.337 52.715 42.380 770.550 241.499 421.812
71.974 54.020
Total 770.550 241.499 421.812
CONSTRUCTION SEQUENCE:
A cycle of 15 days shall be maintained in casting of segment. Hence casting of any segment will be complete after 15 days from the
date of casting of previous segment. The casting will progress symmetrically from the centre line.
Prestressing will be done after 7 days of casting of each segment.
Prestressing will be done in 16 stages. The staging sequence will be as follows.
Total cable
Cable Number number Age of 16th
Stage of Anchorage Anchorage
stressed at segment Age of 16th
Prestressin segment Event Time of Prestressing segment
this a after segment
g Intermedia particular Left Right
End Web casting
te Web stage
LAYING OF SIDL LAYING OF KERB, CRASH BARRIER, RAILING, WEARING COURSE ETC. 322
Total
number of 63
Top cable
For the purpose of calculation of loss, maturity of concrete at different days and their properties are taken as follows:
Relaxation of Steel:
STAGE
1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th 13 th 14 th 15 th 16th All Stage
SECTION
34-34 0.46 0.707 0.583
33-33 0.46 0.125 0.125 0.237
32-32 0.46 0.125 0.125 0.125 0.209
31-31 0.46 0.125 0.125 0.125 0.125 0.192
30-30 0.46 0.125 0.125 0.125 0.125 0.125 0.181
29-29 0.46 0.125 0.125 0.125 0.125 0.125 0.125 0.173
28-28 0.46 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.167
27-27 0.46 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.162
26-26 0.46 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.159
25-25 0.46 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.155
24-24 0.66 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.170
23-23 0.66 0.325 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.182
22-22 0.66 0.325 0.325 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.192
21-21 0.66 0.325 0.325 0.325 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.201
20-20 0.995 0.660 0.325 0.325 0.325 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.250
19-19 0.995 0.660 0.325 0.325 0.325 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.250
17-17 0.995 0.66 0.325 0.325 0.325 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.250
16-16 0.995 0.66 0.325 0.325 0.325 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.250
15-15 0.66 0.325 0.325 0.325 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.201
14-14 0.66 0.325 0.325 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.192
13-13 0.66 0.325 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.182
12-12 0.66 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.170
11-11 0.46 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.155
10-10 0.46 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.159
9-9 0.46 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.162
8-8 0.46 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.167
7-7 0.46 0.125 0.125 0.125 0.125 0.125 0.125 0.173
6-6 0.46 0.125 0.125 0.125 0.125 0.125 0.181
5-5 0.46 0.125 0.125 0.125 0.125 0.192
4-4 0.46 0.125 0.125 0.125 0.209
3-3 0.46 0.125 0.125 0.237
2-2 0.46 0.125 0.293
1-1 0.877 0.877
400 400
S51
300
510
150
S61
700
450 450
S51 S61
CENTRAL WEB
400 400
300
150
S52 S62
700
S52 S62 450 450
L4
L3
Y2
VC Ɵv
Y1
X4 X3 X2 X1
ELEVATION OF CABLE
ƟH
Z
L2
L1
Eqn-1-Eqn-2
=>X3= [{X -(X1+X2)}-Y2/tanθv]x2 Eqn-3
Substitute the value of X3 in Eqn-1,
=>X4= X -(X1+X2+X3) Eqn-4
Y1 Y2 Z ƟH X X1 = L1 X2 X3 X4 Ɵv L2 L3 L4
Cable no
(mm) (mm) (mm) (rad) mm (mm) (mm) (mm) (mm) DEGREE (mm) (mm) (mm)
S51-
SOMASIL
A 125 1085 0 0.0000 7928 2952 0 2584 2392 16.5 0 2676 2495
S51-
SIDDHES
WARAM 125 575 0 0.0000 7928 4698 0 2701 529 15.5 0 2786 549
S61-
SOMASIL
A 125 575 200 0.1000 9928 4595 2000 2470 863 15.5 2010 2548 896
S61-
SIDDHES
WARAM 125 575 200 0.1000 9928 4698 2000 2723 507 15.0 2010 2803 525
Force diagram of each cable after after anchorage slip will be as shown follow:
343.75 t
319.87 t
315.96 t
315.96 t
311.7 t
274.356 t
267.91 t 271.00 t
For cable S51-SIDDHESWARAM:Anchorage section LHS = 1-1 Anchorage section RHS = 5-5
346.84 t
324.16 t
320.03 t
320.03 t 315.934
313.2 t
275.584
272.057 t
267.92 t 268.59 t 2800
For cable S61-SOMASILA: Anchorage section LHS = 1-1 Anchorage section RHS = 6-6
278.14 t 280.708 t
275.58 t 2000.0
253.51 t 254.56 t
For cable S61-SIDDHESWARAM:Anchorage section LHS = 1-1 Anchorage section RHS = 6-6
275.97 t 278.520 t
273.43 t 2000.0
252.22 t 252.83 t
For cable S52 & S62-SOMASILA: Anchorage section LHS = 1-1 Anchorage section RHS = 6-6
275.05 t 277.597 t
275.05 t 2000
253.55 t 254.73 t
For cable S52 & S62- SIDDHESWARAM: Anchorage section LHS = 1-1 Anchorage section RHS = 6-6
275.26 t 277.801 t
275.26 t 2000
253.90 t 254.52 t
AT SECTION : 6-6
A= 12.470 m
2 Ytop= 1.500 m Ybottom = 1.855 m Ztop= 46.2 m
3 Zbottom = 37.332 m
3
Stress at Stress at
Dist. From top Ft bottom
Stages of Eccentrici Normal Pull Pn Moment
Cable No bottom =Pn/A- Fb=Pn/A+
Prestress ty (m) (T) Pn.e (T-m)
(mm) Pn.e/Ztop Pn.e/Zbotto
2
(T/m2) m (T/m )
S61-
SIDDHES
17th WARAM 125 1.730 504.432 872.666 21.553 63.826
Stress at Stress at
Dist. From top Ft bottom
Stages of Eccentrici Normal Pull Pn Moment
Cable No bottom =Pn/A- Fb=Pn/A+
Prestress ty (m) (T) Pn.e (T-m)
(mm) Pn.e/Ztop Pn.e/Zbotto
2
(T/m2) m (T/m )
S61-
SIDDHES
17th WARAM 125 1.646 548.558 902.999 26.148 67.605
AT SECTION : 4-4
A= 12.151 m
2 Ytop= 1.378 m Ybottom = 1.711 m Ztop= 50.9 m
3 Zbottom = 40.966 m
3
Stress at Stress at
top Ft bottom
Stages of Dist. From Eccentrici Normal Pull Pn Moment
Cable No =Pn/A- Fb=Pn/A+
Prestress top (mm) ty (m) (T) Pn.e (T-m)
Pn.e/Ztop Pn.e/Zbotto
(T/m2) m (T/m2)
S51-
SIDDHES
17th WARAM 125 1.586 546.348 866.568 27.932 66.115
S61-
SIDDHES
17th WARAM 125 1.586 565.536 897.002 28.913 68.437
AT SECTION3-3
:
A= 12.072 m
2 Ytop= 1.347 m Ybottom = 1.675 m Ztop= 52.2 m
3 Zbottom = 42.016 m
3
Stress at Stress at
top Ft bottom
Stages of Dist. From Eccentrici Normal Pull Pn Moment
Cable No =Pn/A- Fb=Pn/A+
Prestress top (mm) ty (m) (T) Pn.e (T-m)
Pn.e/Ztop Pn.e/Zbotto
(T/m2) m (T/m2)
S51-
SOMASIL
17th A 125 1.550 621.556 963.441 33.048 74.419
S61-
SOMASIL
17th A 125 1.550 565.896 877.165 30.089 67.755
Stress at Stress at
top Ft bottom
Stages of Dist. From Eccentrici Normal Pull Pn Moment =P /A- F =P /A+
Cable No n b n
Prestress top (mm) ty (m) (T) Pn.e (T-m)
Pn.e/Ztop n.e/Zbotto
P
2 2
(T/m ) m (T/m )
S51-
SOMASIL
17th A 125 1.538 545.798 839.447 29.389 65.121
S61-
SOMASIL
17th A 125 1.538 552.204 849.299 29.734 65.885
Stress at Stress at
top Ft bottom
Stages of Dist. From Eccentrici Normal Pull Pn Moment
Cable No =Pn/A- Fb=Pn/A+
Prestress top (mm) ty (m) (T) Pn.e (T-m)
Pn.e/Ztop Pn.e/Zbotto
(T/m2) m (T/m2)
S51-
SOMASIL
17th A 125 1.538 535.813 824.090 28.851 63.929
S61-
SOMASIL
17th A 125 1.538 507.019 779.803 27.301 60.494
400 400
S38,39,40,41
300
150
700
450 450
S381 S391 S401 S411
CENTRAL WEB
400 400
300
150
700
412a 392a S392b 412b 450 450
L4
L3
Y2
VC Ɵv
Y1
X4 X3 X2 X1
ELEVATION OF CABLE
ƟH
Z
L2
L1
Eqn-1-Eqn-2
=>X3= [{X -(X1+X2)}-Y2/tanθv]x2 Eqn-3
Substitute the value of X3 in Eqn-1,
=>X4= X -(X1+X2+X3) Eqn-4
Y1 Y2 Z ƟH X X1 = L1 X2 X3 X4 Ɵv L2 L3 L4
Cable no
(mm) (mm) (mm) (rad) mm (mm) (mm) (mm) (mm) DEGREE (mm) (mm) (mm)
S381 125 575 0 0.0000 12500 9269 0 2701 530 15.5 0 2786 550
S391 125 575 0 0.0000 16500 13268 0 2723 509 15.0 0 2803 527
S401 125 575 0 0.0000 20500 17251 0 2666 583 14.0 0 2734 601
S411 125 575 0 0.0000 24500 21252 0 2688 560 13.5 0 2752 576
S392a 125 575 0 0.0000 16500 13271 0 2723 506 15.0 0 2803 524
S392b 125 575 0 0.0000 16500 13271 0 2723 506 15.0 0 2803 524
S412a 125 575 200 0.1000 24500 19256 2000 2688 556 13.5 2010 2752 572
S412b 125 575 200 0.1000 24500 19256 2000 2688 556 13.5 2010 2752 572
Force diagram of each cable after after anchorage slip will be as shown follow:
346.84 t
324.16 t
320.03 t
320.03 t 315.932
306.7 t
275.932
272.401 t
268.25 t 268.93 t 2800
For cable S391: Anchorage section LHS = 30-30 Anchorage section RHS = 39-39
346.87 t
324.90 t
320.74 t
320.74 t 316.631
301.7 t
276.061
272.528 t
268.39 t 269.04 t 2800
For cable S401: Anchorage section LHS = 29-29 Anchorage section RHS = 40-40
281.91 t 286.486 t
281.91 t 3500.0
261.17 t 261.89 t
For cable S411: Anchorage section LHS = 28-28 Anchorage section RHS = 41-41
288.23 t 293.043 t
288.23 t 3600.0
267.61 t 268.32 t
For cable S392a: Anchorage section LHS = 30-30 Anchorage section RHS = 39-39
281.28 t 285.972 t
281.28 t 3600.0
259.45 t 260.08 t
For cable S392b: Anchorage section LHS = 30-30 Anchorage section RHS = 39-39
281.28 t 285.972 t
281.28 t 3600.0
259.45 t 260.08 t
For cable S412a: Anchorage section LHS = 28-28 Anchorage section RHS = 41-41
281.58 t 286.282 t
278.99 t 3600
259.04 t 259.72 t
For cable S412b: Anchorage section LHS = 28-28 Anchorage section RHS = 41-41
281.58 t 286.282 t
278.99 t 3600
259.04 t 259.72 t
AT SECTION : 29-29
A= 12.710 m
2 Ytop= 1.591 m Ybottom = 1.963 m Ztop= 43.3 m
3 Zbottom = 35.121 m
3
Stress at Stress at
Dist. From top Ft bottom
Stages of Eccentrici Normal Pull Pn Moment
Cable No bottom =Pn/A- Fb=Pn/A+
Prestress ty (m) (T) Pn.e (T-m)
(mm) Pn.e/Ztop Pn.e/Zbotto
2
(T/m2) m (T/m )
18th S411 125 1.838 578.470 1062.971 20.971 75.78
18th S412a 125 1.838 279.968 514.457 10.149 36.676
18th S412b 125 1.838 279.968 514.457 10.149 36.676
Total 1138.406 2091.885 41.269 149.132
AT SECTION : 30-30
A= 12.470 m
2 Ytop= 1.500 m Ybottom = 1.855 m Ztop= 46.2 m
3 Zbottom = 37.332 m
3
Stress at Stress at
Dist. From top Ft bottom
Stages of Eccentrici Normal Pull Pn Moment
Cable No bottom =Pn/A- Fb=Pn/A+
Prestress ty (m) (T) Pn.e (T-m)
(mm) Pn.e/Ztop Pn.e/Zbotto
2
(T/m2) m (T/m )
18th S401 125 1.730 565.784 978.806 24.174 71.589
18th S411 125 1.730 586.160 1014.056 25.045 74.167
18th S412a 125 1.730 285.179 493.359 12.185 36.084
18th S412b 125 1.730 285.179 493.359 12.185 36.084
Total 1722.302 2979.580 73.589 217.924
AT SECTION : 31-31
A= 12.284 m
2 Ytop= 1.428 m Ybottom = 1.771 m Ztop= 48.8 m
3 Zbottom = 39.347 m
3
Stress at Stress at
top Ft bottom
Stages of Dist. From Eccentrici Normal Pull Pn Moment
Cable No =Pn/A- Fb=Pn/A+
Prestress top (mm) ty (m) (T) Pn.e (T-m)
Pn.e/Ztop Pn.e/Zbotto
(T/m2) m (T/m2)
18th S391 125 1.646 547.050 900.517 26.076 67.419
18th S401 125 1.646 569.350 937.225 27.139 70.167
18th S411 125 1.646 586.038 964.696 27.934 72.224
18th S412a 125 1.646 285.507 469.982 13.609 35.186
18th S412b 125 1.646 285.507 469.982 13.609 35.186
18th S392a 125 1.646 282.281 464.672 13.455 34.788
18th S392b 125 1.646 282.281 464.672 13.455 34.788
Total 2838.014 4671.746 135.277 349.758
AT SECTION : 32-32
A= 12.151 m
2 Ytop= 1.378 m Ybottom = 1.711 m Ztop= 50.9 m
3 Zbottom = 40.966 m
3
Stress at Stress at
top Ft bottom
Stages of Dist. From Eccentrici Normal Pull Pn Moment
Cable No =Pn/A- Fb=Pn/A+
Prestress top (mm) ty (m) (T) Pn.e (T-m)
Pn.e/Ztop Pn.e/Zbotto
2
(T/m2) m (T/m )
18th S381 125 1.586 546.742 867.192 27.953 66.163
18th S391 125 1.586 593.726 941.714 30.355 71.848
18th S401 125 1.586 575.792 913.269 29.438 69.678
18th S411 125 1.586 585.918 929.330 29.955 70.904
18th S412a 125 1.586 283.515 449.686 14.495 34.309
18th S412b 125 1.586 283.515 449.686 14.495 34.309
18th S392a 125 1.586 282.836 448.609 14.46 34.227
18th S392b 125 1.586 282.011 447.300 14.418 34.127
Total 3434.055 5446.786 175.569 415.565
AT SECTION : 33-33
A= 12.072 m
2 Ytop= 1.347 m Ybottom = 1.675 m Ztop= 52.2 m
3 Zbottom = 42.016 m
3
Stress at Stress at
top Ft bottom
Stages of Dist. From Eccentrici Normal Pull Pn Moment
Cable No =Pn/A- Fb=Pn/A+
Prestress top (mm) ty (m) (T) Pn.e (T-m)
Pn.e/Ztop Pn.e/Zbotto
2
(T/m2) m (T/m )
18th S381 125 1.550 594.628 921.701 31.616 71.195
18th S391 125 1.550 567.238 879.245 30.16 67.916
18th S401 125 1.550 582.232 902.487 30.957 69.711
18th S411 125 1.550 585.798 908.014 31.147 70.138
18th S412a 125 1.550 281.523 436.374 14.969 33.707
18th S412b 125 1.550 281.523 436.374 14.969 33.707
18th S412b 125 1.550 289.360 448.521 15.385 34.645
18th S392a 125 1.550 288.535 447.243 15.341 34.547
Total 3470.837 5379.958 184.544 415.566
AT SECTION : 34-34
A= 12.045 m
2 Ytop= 1.337 m Ybottom = 1.663 m Ztop= 52.7 m
3 Zbottom = 42.380 m
3
Stress at Stress at
top Ft bottom
Stages of Dist. From Eccentrici Normal Pull Pn Moment =P /A- F =P /A+
Cable No n b n
Prestress top (mm) ty (m) (T) Pn.e (T-m)
Pn.e/Ztop Pn.e/Zbotto
2 2
(T/m ) m (T/m )
18th S381 125 1.538 556.616 856.085 29.971 66.412
18th S391 125 1.538 577.332 887.947 31.087 68.883
18th S401 125 1.538 588.672 905.388 31.698 70.236
18th S411 125 1.538 585.678 900.783 31.536 69.879
18th S412a 125 1.538 279.532 429.925 15.052 33.352
18th S412b 125 1.538 279.532 429.925 15.052 33.352
18th S412b 125 1.538 295.884 455.075 15.932 35.303
18th S412b 125 1.538 295.058 453.804 15.888 35.204
Total 3458.304 5318.931 186.216 412.621
i) 1 st STAGE STRESSING
LHS of P7:
Stress due Prestress Stress at
Depth of
to DL of at 1 Depth CG of
Section Location Total CG from
16th stStage (m) cables: 1
top (m)
Segment cables st Stage
ft= (t/m2) -4.530 94.658 90.128
17-17 7.5 0.995 77.72
fb= (t/m2) 5.308 -8.715 -3.407
ft= (t/m2) 0.000 92.059 92.059
16-16 7.039 0.995 78.15
fb= (t/m2) 0.000 -6.325 -6.325
Average Stress (T/m2) 77.94
Age of 16th segment 7 day
Number of cable stressed 3
Eps/Ec= 5.68
Loss due to elastic shortening 1.18 Ton
% loss due to elastic shortening 0.14%
1 st STAGE STRESSING
RHS of P7:
Stress duePrestress Depth of Stress at
to DL at 1 st Depth
Section Location Total CG from CG of
of19th Stage (m)
top (m) cables:1
Segment cables st Stage
f = (t/m2) -4.530 94.658 90.128
19-19 t 7.5 0.995 77.72
fb= (t/m2) 5.308 -8.715 -3.407
2 0.000 92.059 92.059
f = (t/m )
20-20 t 2
7.039 0.995 78.15
fb= (t/m ) 0.000 -6.3246 -6.325
Average Stress (T/m2) 77.94
Age of 16th segment 7 day
Number of cable stressed 3
Eps/Ec= 5.68
Loss due to elastic shortening 1.18 Ton
% loss due to elastic shortening 0.14%
Prestressing Stage 1 st 2 nd
Average Stress (T/m2) 86.18 92.21
Stage wise Age of segment Days 22 7
Number of cable stressed 3 3
Eps/Ec= 5.32 5.68
Loss due to elastic shortening Ton 3.66 1.35
Average force at cables Ton 820.89 876.8
% loss due to elastic shortening 0.45% 0.15%
2 nd STAGE STRESSING
RHS of P7:
Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG
at 2 nd
to DL Depth CG of CG of of of
Section Location STAGE Total
of20th (m) cables:1 cables:1 cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd
G
Stage Stage
ft= (t/m2) -13.212 110.301 97.089
19-19 7.5 0.995 83.90 0.66 88.34
fb= (t/m2) 15.480 -17.791 -2.311
ft= (t/m2) -4.745 109.442 104.697
20-20 7.039 0.995 88.45 0.66 93.92
fb= (t/m2) 5.587 -15.824 -10.237
ft= (t/m2) 0.000 106.266 106.266
21-21 6.602 0.66 94.37
fb= (t/m2) 0.000 -12.6899 -12.690
Average Stress (T/m2) 86.18 92.21
Prestressing Stage 1 st 2 nd
Average Stress (T/m2) 86.18 92.21
Stage wise Age of segment Days 22 7
Number of cable stressed 3 3
Eps/Ec= 5.32 5.68
Loss due to elastic shortening Ton 3.659 1.35
Average force at cables Ton 820.89 876.8
% loss due to elastic shortening 0.45% 0.15%
Prestressing Stage 1 st 2 nd 3 rd
Average Stress (T/m2) 450.70 498.4 539.6
Stage wise Age of segment Days 37 22 7
Number of cable stressed 3 3 3
Eps/Ec= 5.22 5.32 5.68
Loss due to elastic shortening Ton 3.597 3.98 1.44
Average force at cables Ton 820.89 876.8 888.7
% loss due to elastic shortening 0.44% 0.45% 0.16%
3 rd STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG
at 3 rd
to DL Depth CG of CG of of of of of
Section Location STAGE Total
of21th (m) cables:1 cables:1 cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd
G
Stage Stage Stage Stage
ft= (t/m2) -21.362 118.314 96.952
19-19 7.5 0.995 83.92 0.66 88.31 0.325 92.70
fb= (t/m2) 25.028 -26.286 -1.258
ft= (t/m2) -13.850 118.692 104.842
20-20 7.039 0.995 88.79 0.66 94.19 0.325 99.6
fb= (t/m2) 16.306 -25.014 -8.708
ft= (t/m2) -4.906 119.529 114.623
21-21 6.602 0.66 101.5 0.325 108.1
fb= (t/m2) 5.804 -22.884 -17.080
ft= (t/m2) 0.000 102.346 102.346
22-22 6.191 0.66 90.5
fb= (t/m2) 0.000 -8.674 -8.674
Eps/Ec*Average Stress (T/m 2) 450.70 498.4 539.6
Prestressing Stage 1 st 2 nd 3 rd
Average Stress (T/m2) 450.70 498.4 539.6
Stage wise Age of segment Days 37 22 7
Number of cable stressed 3 3 3
Eps/Ec= 5.22 5.32 5.68
Loss due to elastic shortening Ton 3.597 3.98 1.44
Average force at cables Ton 820.89 876.8 888.7
% loss due to elastic shortening 0.44% 0.45% 0.16%
Prestressing Stage 1 st 2 nd 3 rd 4 th
Average Stress (T/m2) 875.52 946 1019 1039
Stage wise Age of segment Days 52 37 22 7
Number of cable stressed 3 3 3 6
Eps/Ec= 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 6.99 7.55 8.13 6.91
Average force at cables Ton 820.89 876.8 888.7 1731
% loss due to elastic shortening 0.85% 0.86% 0.91% 0.40%
4 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG
at 4 th
to DL of Depth CG of CG of of of of of of of
Section Location STAGE Total
22th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th
G
Stage Stage Stage Stage Stage Stage
ft= (t/m2) -40.331 233.828 193.497
19-19 7.5 0.995 167.20 0.66 176.1 0.325 184.9 0.325 184.9
fb= (t/m2) 47.253 -51.952 -4.699
ft= (t/m2) -31.702 233.686 201.984
20-20 7.039 0.995 171.75 0.66 181.9 0.325 192.1 0.325 192.1
fb= (t/m2) 37.324 -49.248 -11.924
ft= (t/m2) -21.107 232.856 211.749
21-21 6.602 0.66 188.6 0.325 200.4 0.325 200.4
fb= (t/m2) 24.971 -44.582 -19.611
ft= (t/m2) -8.826 232.767 223.941
22-22 6.191 0.66 197.1 0.325 210.7
fb= (t/m2) 10.492 -38 -27.508
ft= (t/m2) 0.000 184.459 184.459
23-23 5.681 0.325 174.2
fb= (t/m2) 0.000 4.825 4.825
Eps/Ec*Average Stress (T/m 2) 875.52 946 1019 1046
Prestressing Stage 1 st 2 nd 3 rd 4 th
Average Stress (T/m2) 875.52 946 1019 1046
Stage wise Age of segment Days 52 37 22 7
Number of cable stressed 3 3 3 6
Eps/Ec= 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 6.99 7.55 8.13 6.96
Average force at cables Ton 820.89 876.8 888.7 1731
% loss due to elastic shortening 0.85% 0.86% 0.91% 0.40%
v) 5 th STAGE STRESSING
LHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG
at 5 th
to DL Depth CG of CG of of of of of of of of of
Section Location STAGE Total
of12th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th
G
Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -52.949 227.972 175.023
17-17 7.5 0.995 153.31 0.66 160.6 0.325 167.9 0.325 167.9 0.325 167.9
fb= (t/m2) 62.036 -50.652 11.384
ft= (t/m2) -45.794 235.068 189.274
16-16 7.039 0.995 163.14 0.66 171.9 0.325 180.7 0.325 180.7 0.325 180.7
fb= (t/m2) 53.913 -49.54 4.373
ft= (t/m2) -36.611 233.810 197.199
15-15 6.602 0.66 177.3 0.325 187.4 0.325 187.4 0.325 187.4
fb= (t/m2) 43.311 -44.766 -1.455
ft= (t/m2) -25.599 233.720 208.121
14-14 6.191 0.66 185.1 0.325 196.8 0.325 196.8
fb= (t/m2) 30.430 -38.158 -7.728
ft= (t/m2) -8.825 219.592 210.767
13-13 5.681 0.66 184.7 0.325 197.9
fb= (t/m2) 10.557 -24.330 -13.773
ft= (t/m2) 0.000 171.709 171.709
12-12 5.216 171.7 0.66 152.4
fb= (t/m2) 0.000 18.831 18.831
Eps/Ec*Average Stress (T/m 2) 812.1 878 939 966 979
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th
Average Stress (T/m2) 812.07 878 939 966 979
Stage wise Age of segment Days 67 52 37 22 7
Number of cable stressed 3 3 3 6 6
Eps/Ec= 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 6.48 7.00 7.50 15.41 6.51
Average force at cables Ton 820.89 876.8 888.7 1731 1656
% loss due to elastic shortening 0.79% 0.80% 0.84% 0.89% 0.39%
5 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG
at 5 th
to DL of Depth CG of CG of of of of of of of of of
Section Location STAGE Total
23th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th
G
Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -52.949 227.972 175.023
19-19 7.5 0.995 153.31 0.66 160.6 0.325 167.9 0.325 167.9 0.325 167.9
fb= (t/m2) 62.036 -50.652 11.384
ft= (t/m2) -45.794 235.068 189.274
20-20 7.039 0.995 163.14 0.66 171.9 0.325 180.7 0.325 180.7 0.325 180.7
fb= (t/m2) 53.913 -49.54 4.373
ft= (t/m2) -36.611 232.856 196.245
21-21 6.602 0.66 176.5 0.325 186.5 0.325 186.5 0.325 186.5
fb= (t/m2) 43.311 -44.582 -1.271
ft= (t/m2) -25.599 232.767 207.168
22-22 6.191 0.66 184.3 0.325 195.9 0.325 195.9
fb= (t/m2) 30.430 -38.000 -7.570
ft= (t/m2) -8.825 219.592 210.767
23-23 5.681 0.325 197.9 0.325 197.9
fb= (t/m2) 10.557 -24.330 -13.773
ft= (t/m2) 0.000 171.709 171.709
24-24 5.216 0.325 162.2
fb= (t/m2) 0.000 18.831 18.831
Eps/Ec*Average Stress (T/m 2) 812.07 877 937 972 982
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th
Average Stress (T/m2) 812.07 877 937 972 982
Stage wise Age of segment Days 67 52 37 22 7
Number of cable stressed 3 3 3 6 6
Eps/Ec= 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 6.48 7.00 7.48 15.52 6.53
Average force at cables Ton 820.89 876.8 888.7 1731 1656
% loss due to elastic shortening 0.79% 0.80% 0.84% 0.90% 0.39%
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th
Average Stress (T/m2) 810.13 879 942 972 1008 1052
Stage wise Age of segment Days 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6
Eps/Ec= 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 6.46 7.01 7.52 15.51 16.09 7.00
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740
% loss due to elastic shortening 0.79% 0.80% 0.85% 0.90% 0.97% 0.40%
6 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 6 th
to DL of Depth CG of CG of of of of of of of of of of of
Section Location STAGE Total
24th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -64.701 239.788 175.087
19-19 7.5 0.995 153.80 0.66 161.0 0.325 168.1 0.325 168.1 0.325 168.1 0.125 172.4
fb= (t/m2) 75.805 -61.18 14.625
ft= (t/m2) -58.909 247.808 188.899
20-20 7.039 0.995 163.34 0.66 171.9 0.325 180.6 0.325 180.6 0.325 180.6 0.125 185.7
fb= (t/m2) 69.354 -61.248 8.106
ft= (t/m2) -51.029 252.314 201.285
21-21 6.602 0.66 181.4 0.325 191.5 0.325 191.5 0.325 191.5 0.125 197.5
fb= (t/m2) 60.369 -58.03 2.339
ft= (t/m2) -41.187 252.708 211.521
22-22 6.191 0.66 188.7 0.325 200.3 0.325 200.3 0.125 207.2
fb= (t/m2) 48.960 -51.812 -2.852
ft= (t/m2) -25.646 247.090 221.444
23-23 5.681 0.325 208.3 0.325 208.3 0.125 216.4
fb= (t/m2) 30.678 -38.856 -8.178
ft= (t/m2) -8.577 234.808 226.231
24-24 5.216 0.325 211.4 0.125 220.5
fb= (t/m2) 10.323 -21.866 -11.543
ft= (t/m2) 0.000 183.092 183.092
25-25 4.795 0.125 179.0
fb= (t/m2) 0.000 25.238 25.238
Eps/Ec*Average Stress (T/m 2) 810.06 879 942 981 1008 1058
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th
Average Stress (T/m2) 810.06 879 942 981 1008 1058
Stage wise Age of segment Days 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6
Eps/Ec= 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 6.46 7.01 7.52 15.65 16.09 7.03
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740
% loss due to elastic shortening 0.79% 0.80% 0.85% 0.90% 0.97% 0.40%
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th
Average Stress (T/m2) 714.07 771 825 855 892 940 947
Stage wise Age of segment Days 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6
Eps/Ec= 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 5.70 6.15 6.58 13.64 14.24 15.01 6.30
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657
% loss due to elastic shortening 0.69% 0.70% 0.74% 0.79% 0.86% 0.86% 0.38%
7 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 7 th
to DL of Depth CG of CG of of of of of of of of of of of of of
Section Location STAGE Total
25th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -75.738 227.75 152.012
19-19 7.5 0.995 135.91 0.66 141.3 0.325 146.8 0.325 146.8 0.325 146.8 0.125 150.0 0.125 150.0
fb= (t/m2) 88.736 -58.108 30.628
ft= (t/m2) -71.209 235.410 164.201
20-20 7.039 0.995 144.64 0.66 151.2 0.325 157.8 0.325 157.8 0.325 157.8 0.125 161.7 0.125 161.7
fb= (t/m2) 83.836 -57.994 25.842
ft= (t/m2) -64.536 241.222 176.686
21-21 6.602 0.66 161.1 0.325 169.0 0.325 169.0 0.325 169.0 0.125 173.7 0.125 173.7
fb= (t/m2) 76.348 -55.48 20.868
ft= (t/m2) -55.774 241.596 185.822
22-22 6.191 0.66 167.7 0.325 176.9 0.325 176.9 0.125 182.4 0.125 182.4
fb= (t/m2) 66.300 -50.43 15.870
ft= (t/m2) -41.362 243.062 201.700
23-23 5.681 0.325 190.8 0.325 190.8 0.125 197.5 0.125 197.5
fb= (t/m2) 49.479 -38.224 11.255
ft= (t/m2) -24.981 234.768 209.787
24-24 5.216 0.325 197.2 0.125 205.0 0.125 205.0
fb= (t/m2) 30.065 -21.864 8.201
ft= (t/m2) -8.129 215.832 207.703
25-25 4.795 0.125 202.5 0.125 202.5
fb= (t/m2) 9.840 -3.250 6.590
ft= (t/m2) 0.000 167.294 167.294
26-26 4.418 0.46 154.0
fb= (t/m2) 0.000 39.172 39.172
Eps/Ec*Average Stress (T/m 2) 714.07 771 825 862 892 947 956
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th
Average Stress (T/m2) 714.07 771 825 862 892 947 956
Stage wise Age of segment Days 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6
Eps/Ec= 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 5.70 6.15 6.58 13.76 14.24 15.11 6.36
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657
% loss due to elastic shortening 0.69% 0.70% 0.74% 0.79% 0.86% 0.87% 0.38%
viiI) 8 th STAGE STRESSING
LHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 8 th
to DL Depth CG of CG of of of of of of of of of of of of of of of
Section Location STAGE Total
of9th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -86.211 225.536 139.325
17-17 7.5 0.995 126.61 0.66 130.9 0.325 135.2 0.325 135.2 0.325 135.2 0.125 137.7 0.125 137.7 0.125 137.7
fb= (t/m2) 101.006 -57.546 43.460
ft= (t/m2) -82.859 233.160 150.301
16-16 7.039 0.995 134.72 0.66 140.0 0.325 145.2 0.325 145.2 0.325 145.2 0.125 148.3 0.125 148.3 0.125 148.3
fb= (t/m2) 97.551 -57.44 40.111
ft= (t/m2) -77.306 238.956 161.650
15-15 6.602 0.66 149.2 0.325 155.5 0.325 155.5 0.325 155.5 0.125 159.3 0.125 159.3 0.125 159.3
fb= (t/m2) 91.455 -54.492 36.963
ft= (t/m2) -69.540 239.326 169.786
14-14 6.191 0.66 155.3 0.325 162.6 0.325 162.6 0.125 167.0 0.125 167.0 0.125 167.0
fb= (t/m2) 82.665 -49.068 33.597
ft= (t/m2) -56.164 240.830 184.666
13-13 5.681 0.66 166.6 0.325 175.8 0.125 181.2 0.125 181.2 0.125 181.2
fb= (t/m2) 67.186 -37.874 29.312
ft= (t/m2) -40.399 238.904 198.505
12-12 5.216 198.5 0.325 187.8 0.125 194.4 0.125 194.4 0.125 194.4
fb= (t/m2) 48.622 -22.248 26.374
ft= (t/m2) -23.732 229.786 206.054
11-11 4.795 0.46 188.7 0.125 201.3 0.125 201.3
fb= (t/m2) 28.728 -3.462 25.266
ft= (t/m2) -7.553 210.190 202.637
10-10 4.418 0.46 184.1 0.125 197.6
fb= (t/m2) 9.193 15.180 24.373
ft= (t/m2) 0.000 166.062 166.062
9-9 4.086 0.46 153.6
fb= (t/m2) 0.000 55.092 55.092
Eps/Ec*Average Stress (T/m 2) 663.3 712 757 784 819 868 892 914
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th
Average Stress (T/m2) 663.30 712 757 784 819 868 892 914
Stage wise Age of segment Days 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6
Eps/Ec= 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 5.29 5.68 6.04 12.51 13.08 13.85 14.24 6.08
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680
% loss due to elastic shortening 0.64% 0.65% 0.68% 0.72% 0.79% 0.80% 0.86% 0.36%
8 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 8 th
to DL of Depth CG of CG of of of of of of of of of of of of of of of
Section Location STAGE Total
26th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -86.211 225.536 139.325
19-19 7.5 0.995 126.61 0.66 130.9 0.325 135.2 0.325 135.2 0.325 135.2 0.125 137.7 0.125 137.7 0.125 137.7
fb= (t/m2) 101.006 -57.546 43.460
ft= (t/m2) -82.859 233.160 150.301
20-20 7.039 0.995 134.72 0.66 140.0 0.325 145.2 0.325 145.2 0.325 145.2 0.125 148.3 0.125 148.3 0.125 148.3
fb= (t/m2) 97.551 -57.440 40.111
ft= (t/m2) -77.306 238.956 161.650
21-21 6.602 0.66 149.1 0.325 155.5 0.325 155.5 0.325 155.5 0.125 159.3 0.125 159.3 0.125 159.3
fb= (t/m2) 91.455 -54.958 36.497
ft= (t/m2) -69.540 239.326 169.786
22-22 6.191 0.66 155.3 0.325 162.6 0.325 162.6 0.125 167.0 0.125 167.0 0.125 167.0
fb= (t/m2) 82.665 -49.068 33.597
ft= (t/m2) -56.164 240.830 184.666
23-23 5.681 0.325 175.8 0.325 175.8 0.125 181.2 0.125 181.2 0.125 181.2
fb= (t/m2) 67.186 -37.874 29.312
ft= (t/m2) -40.399 238.904 198.505
24-24 5.216 0.325 187.8 0.125 194.4 0.125 194.4 0.125 194.4
fb= (t/m2) 48.622 -22.248 26.374
ft= (t/m2) -23.732 229.786 206.054
25-25 4.795 0.125 201.3 0.125 201.3 0.125 201.3
fb= (t/m2) 28.728 -3.462 25.266
ft= (t/m2) -7.553 210.190 202.637
26-26 4.418 0.46 183.8 0.125 197.5
fb= (t/m2) 6.360 15.180 21.540
ft= (t/m2) 0.000 166.062 166.062
27-27 4.086 0.46 153.6
fb= (t/m2) 0.000 55.092 55.092
Eps/Ec*Average Stress (T/m 2) 663.30 712 757 790 819 873 895 912
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th
Average Stress (T/m2) 663.30 712 757 790 819 873 895 912
Stage wise Age of segment Days 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6
Eps/Ec= 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 5.29 5.68 6.04 12.60 13.08 13.94 14.28 6.07
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680
% loss due to elastic shortening 0.64% 0.65% 0.68% 0.73% 0.79% 0.80% 0.86% 0.36%
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th
Average Stress (T/m2) 136.42 137 141 161 186 209 238 264 291
Stage wise Age of segment Days 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3
Eps/Ec= 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 1.09 1.09 1.13 2.57 2.96 3.33 3.80 4.22 0.77
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8
% loss due to elastic shortening 0.13% 0.12% 0.13% 0.15% 0.18% 0.19% 0.23% 0.25% 0.09%
9 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 9 th
to DL of Depth CG of CG of of of of of of of of of of of of of of of of of
Section Location STAGE Total
27th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th 9 th 9 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -96.270 111.254 14.984
19-19 7.5 0.995 24.19 0.66 21.1 0.325 18.0 0.325 18.0 0.325 18.0 0.125 16.1 0.125 16.1 0.125 16.1 0.125 16.1
fb= (t/m2) 112.791 -28.386 84.405
ft= (t/m2) -94.021 115.023 21.002
20-20 7.039 0.995 29.68 0.66 26.8 0.325 23.8 0.325 23.8 0.325 23.8 0.125 22.1 0.125 22.1 0.125 22.1 0.125 22.1
fb= (t/m2) 110.692 -28.337 82.355
ft= (t/m2) -89.512 117.888 28.376
21-21 6.602 0.66 33.4 0.325 30.9 0.325 30.9 0.325 30.9 0.125 29.3 0.125 29.3 0.125 29.3 0.125 29.3
fb= (t/m2) 105.895 -27.113 78.782
ft= (t/m2) -82.670 118.071 35.401
22-22 6.191 0.66 39.5 0.325 37.4 0.325 37.4 0.125 36.2 0.125 36.2 0.125 36.2 0.125 36.2
fb= (t/m2) 98.272 -24.207 74.065
ft= (t/m2) -70.241 118.823 48.582
23-23 5.681 0.325 49.5 0.325 49.5 0.125 49.0 0.125 49.0 0.125 49.0 0.125 49.0
fb= (t/m2) 84.025 -18.686 65.339
ft= (t/m2) -55.023 115.828 60.805
24-24 5.216 0.325 60.5 0.125 60.7 0.125 60.7 0.125 60.7 0.125 60.7
fb= (t/m2) 66.223 -10.787 55.436
ft= (t/m2) -38.495 115.774 77.279
25-25 4.795 0.125 76.4 0.125 76.4 0.125 76.4 0.125 76.4
fb= (t/m2) 46.600 -1.743 44.857
ft= (t/m2) -22.114 111.213 89.099
26-26 4.418 0.46 82.6 0.125 87.3 0.125 87.3
fb= (t/m2) 18.619 8.031 26.650
ft= (t/m2) -6.932 101.782 94.850
27-27 4.086 0.46 87.0 0.125 92.7
fb= (t/m2) 8.479 16.544 25.023
ft= (t/m2) 0.000 84.311 84.311
28-28 3.798 0.46 77.8
fb= (t/m2) 0.000 30.631 30.631
Eps/Ec*Average Stress (T/m 2) 136.42 137 141 160 185 208 237 267 290
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th
Average Stress (T/m2) 136.42 137 141 160 185 208 237 267 290
Stage wise Age of segment Days 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3
Eps/Ec= 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 1.09 1.09 1.13 2.56 2.95 3.32 3.79 4.27 0.77
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8
% loss due to elastic shortening 0.13% 0.12% 0.13% 0.15% 0.18% 0.19% 0.23% 0.25% 0.09%
X) 10 th STAGE STRESSING
LHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 10 th
to DL of Depth CG of CG of of of of of of of of of of of of of of of of of of of
Section Location STAGE Total
7th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th 9 th 9 th 10 th 10 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -106.065 109.252 3.187
17-17 7.5 0.995 15.55 0.66 11.4 0.325 7.2 0.325 7.2 0.325 7.2 0.125 4.7 0.125 4.7 0.125 4.7 0.125 4.7 0.125 4.7
fb= (t/m2) 124.268 -27.876 96.392
ft= (t/m2) -104.857 112.968 8.111
16-16 7.039 0.995 20.48 0.66 16.3 0.325 12.2 0.325 12.2 0.325 12.2 0.125 9.7 0.125 9.7 0.125 9.7 0.125 9.7 0.125 9.7
fb= (t/m2) 123.449 -27.83 95.619
ft= (t/m2) -101.327 115.797 14.470
15-15 6.602 0.66 22.3 0.325 18.3 0.325 18.3 0.325 18.3 0.125 16.0 0.125 16.0 0.125 16.0 0.125 16.0 0.125 16.0
fb= (t/m2) 119.872 -26.633 93.239
ft= (t/m2) -95.344 115.977 20.633
14-14 6.191 0.66 28.0 0.325 24.3 0.325 24.3 0.125 22.0 0.125 22.0 0.125 22.0 0.125 22.0 0.125 22.0
fb= (t/m2) 113.338 -23.778 89.560
ft= (t/m2) -83.782 116.732 32.950
13-13 5.681 0.66 38.6 0.325 35.7 0.125 34.0 0.125 34.0 0.125 34.0 0.125 34.0 0.125 34.0
fb= (t/m2) 100.224 -18.357 81.867
ft= (t/m2) -69.044 115.828 46.784
12-12 5.216 46.8 0.325 48.4 0.125 47.4 0.125 47.4 0.125 47.4 0.125 47.4 0.125 47.4
fb= (t/m2) 83.098 -10.787 72.311
ft= (t/m2) -52.605 113.773 61.168
11-11 4.795 0.46 61.2 0.125 61.2 0.125 61.2 0.125 61.2 0.125 61.2
fb= (t/m2) 63.681 -1.713 61.968
ft= (t/m2) -35.989 111.213 75.224
10-10 4.418 0.46 72.8 0.125 74.6 0.125 74.6 0.125 74.6
fb= (t/m2) 43.804 8.031 51.835
ft= (t/m2) -20.357 104.956 84.599
9-9 4.086 0.46 79.8 0.125 83.3 0.125 83.3
fb= (t/m2) 24.900 17.061 41.961
ft= (t/m2) -6.331 98.191 91.860
8-8 3.798 0.46 84.6 0.125 89.9
fb= (t/m2) 7.778 24.510 32.288
ft= (t/m2) 0.000 82.066 82.066
7-7 3.554 0.46 76.2
fb= (t/m2) 0.000 36.383 36.383
Eps/Ec*Average Stress (T/m 2) 91.1 84 81 99 120 138 167 193 222 249
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th
Average Stress (T/m2) 91.07 84 81 99 120 138 167 193 222 249
Stage wise Age of segment Days 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3
Eps/Ec= 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 0.73 0.67 0.65 1.57 1.92 2.20 2.67 3.08 1.77 0.66
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8
% loss due to elastic shortening 0.09% 0.08% 0.07% 0.09% 0.12% 0.13% 0.16% 0.18% 0.21% 0.08%
10 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 10 th
to DL of Depth CG of CG of of of of of of of of of of of of of of of of of of of
Section Location STAGE Total
28th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th 9 th 9 th 10 th 10 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -106.065 109.252 3.187
19-19 7.5 0.995 15.55 0.66 11.4 0.325 7.2 0.325 7.2 0.325 7.2 0.125 4.7 0.125 4.7 0.125 4.7 0.125 4.7 0.125 4.7
fb= (t/m2) 124.268 -27.876 96.392
ft= (t/m2) -104.857 112.968 8.111
20-20 7.039 0.995 20.48 0.66 16.3 0.325 12.2 0.325 12.2 0.325 12.2 0.125 9.7 0.125 9.7 0.125 9.7 0.125 9.7 0.125 9.7
fb= (t/m2) 123.449 -27.830 95.619
ft= (t/m2) -101.327 115.797 14.470
21-21 6.602 0.66 22.3 0.325 18.3 0.325 18.3 0.325 18.3 0.125 16.0 0.125 16.0 0.125 16.0 0.125 16.0 0.125 16.0
fb= (t/m2) 119.872 -26.633 93.239
ft= (t/m2) -95.344 115.977 20.633
22-22 6.191 0.66 28.0 0.325 24.3 0.325 24.3 0.125 22.0 0.125 22.0 0.125 22.0 0.125 22.0 0.125 22.0
fb= (t/m2) 113.338 -23.778 89.560
ft= (t/m2) -83.782 116.732 32.950
23-23 5.681 0.325 35.7 0.325 35.7 0.125 34.0 0.125 34.0 0.125 34.0 0.125 34.0 0.125 34.0
fb= (t/m2) 100.224 -18.357 81.867
ft= (t/m2) -69.044 115.828 46.784
24-24 5.216 0.325 48.4 0.125 47.4 0.125 47.4 0.125 47.4 0.125 47.4 0.125 47.4
fb= (t/m2) 83.098 -10.787 72.311
ft= (t/m2) -52.605 113.773 61.168
25-25 4.795 0.125 61.2 0.125 61.2 0.125 61.2 0.125 61.2 0.125 61.2
fb= (t/m2) 63.681 -1.713 61.968
ft= (t/m2) -35.989 111.213 75.224
26-26 4.418 0.46 72.8 0.125 74.6 0.125 74.6 0.125 74.6
fb= (t/m2) 43.804 8.031 51.835
ft= (t/m2) -20.357 104.956 84.599
27-27 4.086 0.46 79.8 0.125 83.3 0.125 83.3
fb= (t/m2) 24.900 17.061 41.961
ft= (t/m2) -6.331 98.191 91.860
28-28 3.798 0.46 84.6 0.13 89.9
fb= (t/m2) 7.778 24.510 32.288
ft= (t/m2) 0.000 82.066 82.066
29-29 3.554 0.46 76.2
fb= (t/m2) 0.000 36.383 36.383
Eps/Ec*Average Stress (T/m 2) 91.07 84 81 97 120 138 168 198 226 252
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th
Average Stress (T/m2) 91.07 84 81 97 120 138 168 198 226 252
Stage wise Age of segment Days 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3
Eps/Ec= 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 0.73 0.67 0.65 1.54 1.92 2.20 2.67 3.15 1.81 0.67
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8
% loss due to elastic shortening 0.09% 0.08% 0.07% 0.09% 0.12% 0.13% 0.16% 0.19% 0.21% 0.08%
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th
Average Stress (T/m2) 46.36 32 22 38 57 69 97 123 156 189 218
Stage wise Age of segment Days 157 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3 3
Eps/Ec= 5.05 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 0.37 0.25 0.18 0.60 0.90 1.10 1.55 1.97 1.24 1.51 0.58
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8 944.7
% loss due to elastic shortening 0.05% 0.03% 0.02% 0.03% 0.05% 0.06% 0.09% 0.12% 0.15% 0.18% 0.06%
11 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 11 th
to DL of Depth CG of CG of of of of of of of of of of of of of of of of of of of of of
Section Location STAGE Total
29th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th 9 th 9 th 10 th 10 th 11 th 11 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -115.748 107.247 -8.501
19-19 7.5 0.995 6.99 0.66 1.8 0.325 -3.4 0.325 -3.4 0.325 -3.4 0.125 -6.6 0.125 -6.6 0.125 -6.6 0.125 -6.6 0.125 -6.6 0.125 -6.6
fb= (t/m2) 135.612 -27.365 108.247
ft= (t/m2) -115.530 110.893 -4.637
20-20 7.039 0.995 11.38 0.66 6.0 0.325 0.6 0.325 0.6 0.325 0.6 0.125 -2.6 0.125 -2.6 0.125 -2.6 0.125 -2.6 0.125 -2.6 0.125 -2.6
fb= (t/m2) 136.015 -27.318 108.697
ft= (t/m2) -112.925 113.669 0.744
21-21 6.602 0.66 11.4 0.325 6.0 0.325 6.0 0.325 6.0 0.125 2.8 0.125 2.8 0.125 2.8 0.125 2.8 0.125 2.8 0.125 2.8
fb= (t/m2) 133.593 -26.143 107.450
ft= (t/m2) -107.744 113.846 6.102
22-22 6.191 0.66 16.6 0.325 11.3 0.325 11.3 0.125 8.1 0.125 8.1 0.125 8.1 0.125 8.1 0.125 8.1 0.125 8.1
fb= (t/m2) 128.078 -23.341 104.737
ft= (t/m2) -96.976 114.586 17.610
23-23 5.681 0.325 22.2 0.325 22.2 0.125 19.4 0.125 19.4 0.125 19.4 0.125 19.4 0.125 19.4 0.125 19.4
fb= (t/m2) 116.007 -18.019 97.988
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th
Average Stress (T/m2) 46.36 32 22 35 57 68 97 128 159 192 222
Stage wise Age of segment Days 157 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3 3
Eps/Ec= 5.05 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 0.37 0.25 0.18 0.55 0.90 1.08 1.55 2.04 1.27 1.53 0.59
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8 944.7
% loss due to elastic shortening 0.05% 0.03% 0.02% 0.03% 0.05% 0.06% 0.09% 0.12% 0.15% 0.18% 0.06%
XII) 12 th STAGE STRESSING
LHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 12 th
to DL of Depth CG of CG of of of of of of of of of of of of of of of of of of of of of of of
Section Location STAGE Total
5th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th 9 th 9 th 10 th 10 th 11 th 11 th 12 th 12 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -125.468 105.34 -20.128
17-17 7.5 0.995 -1.52 0.66 -7.8 0.325 -14.1 0.325 -14.1 0.325 -14.1 0.125 -17.8 0.125 -17.8 0.125 -17.8 0.125 -17.8 0.125 -17.8 0.125 -17.8 0.125 -17.8
fb= (t/m2) 147.000 -26.877 120.123
ft= (t/m2) -126.203 108.943 -17.260
16-16 7.039 0.995 2.39 0.66 -4.2 0.325 -10.8 0.325 -10.8 0.325 -10.8 0.125 -14.8 0.125 -14.8 0.125 -14.8 0.125 -14.8 0.125 -14.8 0.125 -14.8 0.125 -14.8
fb= (t/m2) 148.580 -26.838 121.742
ft= (t/m2) -124.479 111.693 -12.786
15-15 6.602 0.66 0.6 0.325 -6.2 0.325 -6.2 0.325 -6.2 0.125 -10.2 0.125 -10.2 0.125 -10.2 0.125 -10.2 0.125 -10.2 0.125 -10.2 0.125 -10.2
fb= (t/m2) 147.262 -25.688 121.574
ft= (t/m2) -120.053 111.867 -8.186
14-14 6.191 0.66 5.5 0.325 -1.5 0.325 -1.5 0.125 -5.6 0.125 -5.6 0.125 -5.6 0.125 -5.6 0.125 -5.6 0.125 -5.6 0.125 -5.6
fb= (t/m2) 142.711 -22.935 119.776
ft= (t/m2) -110.013 112.622 2.609
13-13 5.681 0.66 15.5 0.325 9.0 0.125 5.1 0.125 5.1 0.125 5.1 0.125 5.1 0.125 5.1 0.125 5.1 0.125 5.1
fb= (t/m2) 131.601 -17.711 113.890
ft= (t/m2) -96.038 111.775 15.737
12-12 5.216 15.7 0.325 21.3 0.125 17.9 0.125 17.9 0.125 17.9 0.125 17.9 0.125 17.9 0.125 17.9 0.125 17.9
fb= (t/m2) 115.586 -10.409 105.177
ft= (t/m2) -79.611 109.819 30.208
11-11 4.795 0.46 36.4 0.125 31.9 0.125 31.9 0.125 31.9 0.125 31.9 0.125 31.9 0.125 31.9
fb= (t/m2) 96.373 -1.653 94.720
ft= (t/m2) -62.397 107.372 44.975
10-10 4.418 0.46 49.0 0.125 46.1 0.125 46.1 0.125 46.1 0.125 46.1 0.125 46.1
fb= (t/m2) 75.945 7.754 83.699
ft= (t/m2) -45.771 104.981 59.210
9-9 4.086 0.46 60.8 0.125 59.6 0.125 59.6 0.125 59.6 0.125 59.6
fb= (t/m2) 55.986 17.063 73.049
ft= (t/m2) -30.576 103.266 72.690
8-8 3.798 0.46 71.6 0.125 72.4 0.125 72.4 0.125 72.4
fb= (t/m2) 37.564 25.776 63.340
ft= (t/m2) -17.126 103.264 86.138
7-7 3.554 0.46 82.1 0.125 85.0 0.125 85.0
fb= (t/m2) 21.120 33.882 55.002
ft= (t/m2) -5.345 103.866 98.521
6-6 3.355 0.46 91.5 0.125 96.6
fb= (t/m2) 6.612 40.968 47.580
ft= (t/m2) 0.000 83.488 83.488
5-5 3.199 0.46 78.2
fb= (t/m2) 0.000 46.832 46.832
Eps/Ec*Average Stress (T/m 2) 2.2 -20 -36 -22 -6 2 29 54 86 118 150 180
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th
Average Stress (T/m2) 2.19 -20 -36 -22 -6 2 29 54 86 118 150 180
Stage wise Age of segment Days 172 157 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3 3 3
Eps/Ec= 5.04 5.05 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 0.02 -0.16 -0.29 -0.36 -0.09 0.03 0.47 0.87 0.68 0.94 1.20 0.48
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8 944.7 944.6
% loss due to elastic shortening 0.00% -0.02% -0.03% -0.02% -0.01% 0.00% 0.03% 0.05% 0.08% 0.11% 0.13% 0.05%
12 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 12 th
to DL of Depth CG of CG of of of of of of of of of of of of of of of of of of of of of of of
Section Location STAGE Total
30th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th 9 th 9 th 10 th 10 th 11 th 11 th 12 th 12 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -125.468 105.34 -20.128
19-19 7.5 0.995 -1.52 0.66 -7.8 0.325 -14.1 0.325 -14.1 0.325 -14.1 0.125 -17.8 0.125 -17.8 0.125 -17.8 0.125 -17.8 0.125 -17.8 0.125 -17.8 0.125 -17.8
fb= (t/m2) 147.000 -26.877 120.123
ft= (t/m2) -126.203 108.943 -17.260
20-20 7.039 0.995 2.39 0.66 -4.2 0.325 -10.8 0.325 -10.8 0.325 -10.8 0.125 -14.8 0.125 -14.8 0.125 -14.8 0.125 -14.8 0.125 -14.8 0.125 -14.8 0.125 -14.8
fb= (t/m2) 148.580 -26.838 121.742
ft= (t/m2) -124.479 111.693 -12.786
21-21 6.602 0.66 0.6 0.325 -6.2 0.325 -6.2 0.325 -6.2 0.125 -10.2 0.125 -10.2 0.125 -10.2 0.125 -10.2 0.125 -10.2 0.125 -10.2 0.125 -10.2
fb= (t/m2) 147.262 -25.688 121.574
ft= (t/m2) -120.053 111.867 -8.186
22-22 6.191 0.66 5.5 0.325 -1.5 0.325 -1.5 0.125 -5.6 0.125 -5.6 0.125 -5.6 0.125 -5.6 0.125 -5.6 0.125 -5.6 0.125 -5.6
fb= (t/m2) 142.711 -22.935 119.776
ft= (t/m2) -110.013 112.622 2.609
23-23 5.681 0.325 9.0 0.325 9.0 0.125 5.1 0.125 5.1 0.125 5.1 0.125 5.1 0.125 5.1 0.125 5.1 0.125 5.1
fb= (t/m2) 131.601 -17.711 113.890
ft= (t/m2) -96.038 111.775 15.737
24-24 5.216 0.325 21.3 0.125 17.9 0.125 17.9 0.125 17.9 0.125 17.9 0.125 17.9 0.125 17.9 0.125 17.9
fb= (t/m2) 115.586 -10.409 105.177
ft= (t/m2) -79.611 109.819 30.208
25-25 4.795 0.125 31.9 0.125 31.9 0.125 31.9 0.125 31.9 0.125 31.9 0.125 31.9 0.125 31.9
fb= (t/m2) 96.373 -1.653 94.720
ft= (t/m2) -62.397 107.372 44.975
26-26 4.418 0.46 49.0 0.125 46.1 0.125 46.1 0.125 46.1 0.125 46.1 0.125 46.1
fb= (t/m2) 75.945 7.754 83.699
ft= (t/m2) -45.771 104.981 59.210
27-27 4.086 0.46 60.8 0.125 59.6 0.125 59.6 0.125 59.6 0.125 59.6
fb= (t/m2) 55.986 17.063 73.049
ft= (t/m2) -30.576 103.266 72.690
28-28 3.798 0.46 71.6 0.13 72.4 0.125 72.4 0.125 72.4
fb= (t/m2) 37.564 25.776 63.340
ft= (t/m2) -17.126 103.264 86.138
29-29 3.554 0.46 82.1 0.125 85.0 0.125 85.0
fb= (t/m2) 21.120 33.882 55.002
ft= (t/m2) -5.345 103.866 98.521
30-30 3.355 0.46 91.5 0.125 96.6
fb= (t/m2) 6.612 40.968 47.580
ft= (t/m2) 0.000 83.488 83.488
31-31 3.199 0.46 78.2
fb= (t/m2) 0.000 46.832 46.832
Eps/Ec*Average Stress (T/m 2) 2.19 -20 -36 -26 -6 0 29 59 90 121 154 180
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th
Average Stress (T/m2) 2.19 -20 -36 -26 -6 0 29 59 90 121 154 180
Stage wise Age of segment Days 172 157 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3 3 3
Eps/Ec= 5.04 5.05 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton 0.02 -0.16 -0.29 -0.42 -0.09 0.00 0.47 0.94 0.72 0.97 1.23 0.48
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8 944.7 944.6
% loss due to elastic shortening 0.00% -0.02% -0.03% -0.02% -0.01% 0.00% 0.03% 0.06% 0.08% 0.11% 0.13% 0.05%
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th 13 th
Average Stress (T/m2) -42.65 -72 -95 -83 -69 -66 -39 -15 17 49 81 114 143
Stage wise Age of segment Days 187 172 157 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3 3 3 3
Eps/Ec= 5.03 5.04 5.05 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton -0.34 -0.57 -0.76 -1.32 -1.10 -1.06 -0.63 -0.23 0.13 0.39 0.65 0.91 0.38
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8 944.7 944.6 944.7
% loss due to elastic shortening -0.04% -0.07% -0.08% -0.08% -0.07% -0.06% -0.04% -0.01% 0.02% 0.05% 0.07% 0.10% 0.04%
13 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 13 th
to DL of Depth CG of CG of of of of of of of of of of of of of of of of of of of of of of of of of
Section Location STAGE Total
31th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th 9 th 9 th 10 th 10 th 11 th 11 th 12 th 12 th 13 th 13 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -135.376 103.407 -31.969
19-19 7.5 0.995 -10.19 0.66 -17.5 0.325 -24.9 0.325 -24.9 0.325 -24.9 0.125 -29.2 0.125 -29.2 0.125 -29.2 0.125 -29.2 0.125 -29.2 0.125 -29.2 0.125 -29.2 0.125 -29.2
fb= (t/m2) 158.609 -26.384 132.225
ft= (t/m2) -137.039 106.942 -30.097
20-20 7.039 0.995 -6.76 0.66 -14.6 0.325 -22.5 0.325 -22.5 0.325 -22.5 0.125 -27.2 0.125 -27.2 0.125 -27.2 0.125 -27.2 0.125 -27.2 0.125 -27.2 0.125 -27.2 0.125 -27.2
fb= (t/m2) 161.338 -26.346 134.992
ft= (t/m2) -136.164 109.640 -26.524
21-21 6.602 0.66 -10.3 0.325 -18.5 0.325 -18.5 0.325 -18.5 0.125 -23.4 0.125 -23.4 0.125 -23.4 0.125 -23.4 0.125 -23.4 0.125 -23.4 0.125 -23.4 0.125 -23.4
fb= (t/m2) 161.086 -25.216 135.870
ft= (t/m2) -132.454 109.811 -22.643
22-22 6.191 0.66 -5.8 0.325 -14.4 0.325 -14.4 0.125 -19.5 0.125 -19.5 0.125 -19.5 0.125 -19.5 0.125 -19.5 0.125 -19.5 0.125 -19.5 0.125 -19.5
fb= (t/m2) 157.452 -22.515 134.937
ft= (t/m2) -123.081 110.553 -12.528
23-23 5.681 0.325 -4.4 0.325 -4.4 0.125 -9.4 0.125 -9.4 0.125 -9.4 0.125 -9.4 0.125 -9.4 0.125 -9.4 0.125 -9.4 0.125 -9.4
fb= (t/m2) 147.234 -17.385 129.849
ft= (t/m2) -109.392 109.720 0.328
24-24 5.216 0.325 7.9 0.125 3.2 0.125 3.2 0.125 3.2 0.125 3.2 0.125 3.2 0.125 3.2 0.125 3.2 0.125 3.2
fb= (t/m2) 131.659 -10.217 121.442
ft= (t/m2) -92.881 107.798 14.917
25-25 4.795 0.125 17.4 0.125 17.4 0.125 17.4 0.125 17.4 0.125 17.4 0.125 17.4 0.125 17.4 0.125 17.4
fb= (t/m2) 112.437 -1.623 110.814
ft= (t/m2) -75.289 105.394 30.105
26-26 4.418 0.46 37.3 0.125 32.1 0.125 32.1 0.125 32.1 0.125 32.1 0.125 32.1 0.125 32.1
fb= (t/m2) 91.636 7.611 99.247
ft= (t/m2) -58.099 103.046 44.947
27-27 4.086 0.46 49.8 0.125 46.3 0.125 46.3 0.125 46.3 0.125 46.3 0.125 46.3
fb= (t/m2) 71.065 16.749 87.814
ft= (t/m2) -42.265 101.354 59.089
28-28 3.798 0.46 61.3 0.13 59.7 0.125 59.7 0.125 59.7 0.125 59.7
fb= (t/m2) 51.924 25.298 77.222
ft= (t/m2) -28.190 101.017 72.827
29-29 3.554 0.46 72.2 0.125 72.7 0.125 72.7 0.125 72.7
fb= (t/m2) 34.763 33.144 67.907
ft= (t/m2) -15.859 101.287 85.428
30-30 3.355 0.46 81.9 0.125 84.5 0.125 84.5
fb= (t/m2) 19.618 39.951 59.569
ft= (t/m2) -4.998 102.136 97.138
31-31 3.199 0.46 90.6 0.125 95.4
fb= (t/m2) 6.197 45.611 51.808
ft= (t/m2) 0.000 81.128 81.128
32-32 3.089 81.1 0.46 76.3
fb= (t/m2) 0.000 48.436 48.436
Eps/Ec*Average Stress (T/m 2) -42.65 -72 -95 -88 -69 -69 -39 -10 21 52 84 114 143
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th 13 th
Average Stress (T/m2) -42.65 -72 -95 -88 -69 -69 -39 -10 21 52 84 114 143
Stage wise Age of segment Days 187 172 157 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3 3 3 3
Eps/Ec= 5.03 5.04 5.05 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton -0.34 -0.57 -0.76 -1.41 -1.10 -1.10 -0.63 -0.16 0.17 0.42 0.67 0.91 0.38
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8 944.7 944.7 944.7
% loss due to elastic shortening -0.04% -0.07% -0.08% -0.08% -0.07% -0.06% -0.04% -0.01% 0.02% 0.05% 0.07% 0.10% 0.04%
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th 13 th 14 th
Average Stress (T/m2) -88.11 -125 -154 -144 -132 -134 -108 -83 -52 -20 13 45 78 107
Stage wise Age of segment Days 202 187 172 157 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3 3 3 3 3
Eps/Ec= 5.03 5.03 5.04 5.05 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton -0.70 -0.99 -1.23 -2.30 -2.11 -2.14 -1.72 -1.33 -0.41 -0.16 0.10 0.36 0.62 0.29
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8 944.7 944.6 944.7 944.7
% loss due to elastic shortening -0.09% -0.11% -0.14% -0.13% -0.13% -0.12% -0.10% -0.08% -0.05% -0.02% 0.01% 0.04% 0.07% 0.03%
14 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 14 th
to DL of Depth CG of CG of of of of of of of of of of of of of of of of of of of of of of of of of of of
Section Location STAGE Total
32th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th 9 th 9 th 10 th 10 th 11 th 11 th 12 th 12 th 13 th 13 th 14 th 14 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -145.623 101.569 -44.054
19-19 7.5 0.995 -19.01 0.66 -27.4 0.325 -35.9 0.325 -35.9 0.325 -35.9 0.125 -40.9 0.125 -40.9 0.125 -40.9 0.125 -40.9 0.125 -40.9 0.125 -40.9 0.125 -40.9 0.125 -40.9 0.125 -40.9
fb= (t/m2) 170.614 -25.916 144.698
ft= (t/m2) -148.201 105.063 -43.138
20-20 7.039 0.995 -16.03 0.66 -25.2 0.325 -34.3 0.325 -34.3 0.325 -34.3 0.125 -39.7 0.125 -39.7 0.125 -39.7 0.125 -39.7 0.125 -39.7 0.125 -39.7 0.125 -39.7 0.125 -39.7 0.125 -39.7
fb= (t/m2) 174.478 -25.883 148.595
ft= (t/m2) -148.153 107.736 -40.417
21-21 6.602 0.66 -21.3 0.325 -31.0 0.325 -31.0 0.325 -31.0 0.125 -36.8 0.125 -36.8 0.125 -36.8 0.125 -36.8 0.125 -36.8 0.125 -36.8 0.125 -36.8 0.125 -36.8 0.125 -36.8
fb= (t/m2) 175.269 -24.779 150.490
ft= (t/m2) -145.128 107.904 -37.224
22-22 6.191 0.66 -17.2 0.325 -27.4 0.325 -27.4 0.125 -33.4 0.125 -33.4 0.125 -33.4 0.125 -33.4 0.125 -33.4 0.125 -33.4 0.125 -33.4 0.125 -33.4 0.125 -33.4
fb= (t/m2) 172.517 -22.122 150.395
ft= (t/m2) -136.370 108.660 -27.710
23-23 5.681 0.325 -17.8 0.325 -17.8 0.125 -23.9 0.125 -23.9 0.125 -23.9 0.125 -23.9 0.125 -23.9 0.125 -23.9 0.125 -23.9 0.125 -23.9 0.125 -23.9
fb= (t/m2) 163.131 -17.087 146.044
ft= (t/m2) -122.905 107.869 -15.036
24-24 5.216 0.325 -5.5 0.125 -11.4 0.125 -11.4 0.125 -11.4 0.125 -11.4 0.125 -11.4 0.125 -11.4 0.125 -11.4 0.125 -11.4 0.125 -11.4
fb= (t/m2) 147.922 -10.046 137.876
ft= (t/m2) -106.244 106.006 -0.238
25-25 4.795 0.125 3.1 0.125 3.1 0.125 3.1 0.125 3.1 0.125 3.1 0.125 3.1 0.125 3.1 0.125 3.1 0.125 3.1
fb= (t/m2) 128.614 -1.596 127.018
ft= (t/m2) -88.210 103.665 15.455
26-26 4.418 0.46 25.8 0.125 18.3 0.125 18.3 0.125 18.3 0.125 18.3 0.125 18.3 0.125 18.3 0.125 18.3
fb= (t/m2) 107.363 7.487 114.850
ft= (t/m2) -70.399 101.379 30.980
27-27 4.086 0.46 39.0 0.125 33.2 0.125 33.2 0.125 33.2 0.125 33.2 0.125 33.2 0.125 33.2
fb= (t/m2) 86.109 16.478 102.587
ft= (t/m2) -53.875 99.509 45.634
28-28 3.798 0.46 51.1 0.13 47.1 0.125 47.1 0.125 47.1 0.125 47.1 0.125 47.1
fb= (t/m2) 66.187 24.838 91.025
ft= (t/m2) -39.130 98.237 59.107
29-29 3.554 0.46 61.9 0.125 59.9 0.125 59.9 0.125 59.9 0.125 59.9
fb= (t/m2) 48.254 32.232 80.486
ft= (t/m2) -26.212 98.366 72.154
30-30 3.355 0.46 72.0 0.125 72.1 0.125 72.1 0.125 72.1
fb= (t/m2) 32.424 38.797 71.221
ft= (t/m2) -14.883 99.427 84.544
31-31 3.199 0.46 81.4 0.125 83.7 0.125 83.7
fb= (t/m2) 18.456 44.401 62.857
ft= (t/m2) -4.754 100.993 96.239
32-32 3.089 0.46 90.1 0.125 94.6
fb= (t/m2) 5.905 48.858 54.763
ft= (t/m2) -4.754 81.570 76.816
33-33 3.022 0.460 73.7
fb= (t/m2) 5.905 50.441 56.346
Eps/Ec*Average Stress (T/m 2) -88.11 -125 -154 -150 -132 -138 -108 -78 -47 -16 16 45 78 107
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th 13 th 14 th
Average Stress (T/m2) -88.11 -125 -154 -150 -132 -138 -108 -78 -47 -16 16 45 78 107
Stage wise Age of segment Days 202 187 172 157 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3 3 3 3 3
Eps/Ec= 5.03 5.03 5.04 5.05 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton -0.70 -0.99 -1.23 -2.40 -2.11 -2.20 -1.72 -1.25 -0.38 -0.13 0.13 0.36 0.62 0.28
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8 944.7 944.7 944.7 944.7
% loss due to elastic shortening -0.09% -0.11% -0.14% -0.14% -0.13% -0.13% -0.10% -0.07% -0.04% -0.01% 0.01% 0.04% 0.07% 0.03%
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th 13 th 14 th 15 th
Average Stress (T/m2) -137.43 -182 -218 -209 -199 -205 -179 -155 -123 -90 -57 -24 9 44 77
Stage wise Age of segment Days 217 202 187 172 157 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3 3 3 3 3 3
Eps/Ec= 5.02 5.03 5.03 5.04 5.05 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton -1.10 -1.45 -1.74 -3.33 -3.17 -3.28 -2.86 -2.47 -0.98 -0.72 -0.45 -0.19 0.07 0.35 0.20
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8 944.7 944.6 944.7 944.7 1085
% loss due to elastic shortening -0.13% -0.17% -0.20% -0.19% -0.19% -0.19% -0.17% -0.15% -0.12% -0.08% -0.05% -0.02% 0.01% 0.04% 0.02%
15 th STAGE STRESSING
RHS of P7:
Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress Depth Stress
Prestress
Stress due Depth of Stress at of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG of CG at CG
at 15 th
to DL of Depth CG of CG of of of of of of of of of of of of of of of of of of of of of of of of of of of of of
Section Location STAGE Total
33th (m) cables:1 cables:1 cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables: cables:
STRESSIN
Segment st Stage st Stage 2 nd 2 nd 3 rd 3 rd 4 th 4 th 5 th 5 th 6 th 6 th 7 th 7 th 8 th 8 th 9 th 9 th 10 th 10 th 11 th 11 th 12 th 12 th 13 th 13 th 14 th 14 th 15 th 15 th
G
Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage Stage
ft= (t/m2) -156.359 99.216 -57.143
19-19 7.5 0.995 -28.62 0.66 -38.2 0.325 -47.8 0.325 -47.8 0.325 -47.8 0.125 -53.6 0.125 -53.6 0.125 -53.6 0.125 -53.6 0.125 -53.6 0.125 -53.6 0.125 -53.6 0.125 -53.6 0.125 -53.6 0.125 -53.6
fb= (t/m2) 183.193 -25.315 157.878
ft= (t/m2) -159.850 102.639 -57.211
20-20 7.039 0.995 -26.10 0.66 -36.6 0.325 -47.0 0.325 -47.0 0.325 -47.0 0.125 -53.3 0.125 -53.3 0.125 -53.3 0.125 -53.3 0.125 -53.3 0.125 -53.3 0.125 -53.3 0.125 -53.3 0.125 -53.3 0.125 -53.3
fb= (t/m2) 188.194 -25.285 162.909
ft= (t/m2) -160.619 105.260 -55.359
21-21 6.602 0.66 -33.3 0.325 -44.5 0.325 -44.5 0.325 -44.5 0.125 -51.2 0.125 -51.2 0.125 -51.2 0.125 -51.2 0.125 -51.2 0.125 -51.2 0.125 -51.2 0.125 -51.2 0.125 -51.2 0.125 -51.2
fb= (t/m2) 190.016 -24.208 165.808
ft= (t/m2) -158.257 105.936 -52.321
22-22 6.191 0.66 -29.0 0.325 -40.8 0.325 -40.8 0.125 -47.9 0.125 -47.9 0.125 -47.9 0.125 -47.9 0.125 -47.9 0.125 -47.9 0.125 -47.9 0.125 -47.9 0.125 -47.9 0.125 -47.9
fb= (t/m2) 188.124 -21.72 166.404
ft= (t/m2) -150.068 106.680 -43.388
23-23 5.681 0.325 -31.6 0.325 -31.6 0.125 -38.9 0.125 -38.9 0.125 -38.9 0.125 -38.9 0.125 -38.9 0.125 -38.9 0.125 -38.9 0.125 -38.9 0.125 -38.9 0.125 -38.9
fb= (t/m2) 179.517 -16.776 162.741
ft= (t/m2) -136.766 105.907 -30.859
24-24 5.216 0.325 -19.3 0.125 -26.4 0.125 -26.4 0.125 -26.4 0.125 -26.4 0.125 -26.4 0.125 -26.4 0.125 -26.4 0.125 -26.4 0.125 -26.4 0.125 -26.4
fb= (t/m2) 164.605 -9.862 154.743
ft= (t/m2) -119.886 104.078 -15.808
25-25 4.795 0.125 -11.7 0.125 -11.7 0.125 -11.7 0.125 -11.7 0.125 -11.7 0.125 -11.7 0.125 -11.7 0.125 -11.7 0.125 -11.7 0.125 -11.7
fb= (t/m2) 145.129 -1.567 143.562
ft= (t/m2) -101.339 101.783 0.444
26-26 4.418 0.46 14.0 0.125 4.1 0.125 4.1 0.125 4.1 0.125 4.1 0.125 4.1 0.125 4.1 0.125 4.1 0.125 4.1
fb= (t/m2) 123.342 7.351 130.693
ft= (t/m2) -82.839 99.541 16.702
27-27 4.086 0.46 28.1 0.125 19.8 0.125 19.8 0.125 19.8 0.125 19.8 0.125 19.8 0.125 19.8 0.125 19.8
fb= (t/m2) 101.325 16.180 117.505
ft= (t/m2) -65.563 97.707 32.144
28-28 3.798 0.46 41.0 0.13 34.5 0.125 34.5 0.125 34.5 0.125 34.5 0.125 34.5 0.125 34.5
fb= (t/m2) 80.546 24.389 104.935
ft= (t/m2) -50.094 96.458 46.364
29-29 3.554 0.46 52.5 0.125 48.0 0.125 48.0 0.125 48.0 0.125 48.0 0.125 48.0
fb= (t/m2) 61.775 31.648 93.423
ft= (t/m2) -36.540 96.255 59.715
30-30 3.355 0.46 62.9 0.125 60.6 0.125 60.6 0.125 60.6 0.125 60.6
fb= (t/m2) 45.201 37.966 83.167
ft= (t/m2) -24.703 97.144 72.441
31-31 3.199 0.46 72.7 0.125 72.5 0.125 72.5 0.125 72.5
fb= (t/m2) 30.632 43.381 74.013
ft= (t/m2) -14.211 98.529 84.318
32-32 3.089 0.46 81.5 0.125 83.5 0.125 83.5
fb= (t/m2) 17.652 47.666 65.318
ft= (t/m2) -4.612 100.356 95.744
33-33 3.022 0.460 89.8 0.125 94.1
fb= (t/m2) 5.735 50.780 56.515
ft= (t/m2) 0.000 80.176 80.176
34-34 3.000 0.46 75.6
fb= (t/m2) 0.000 50.144 50.144
Eps/Ec*Average Stress (T/m 2) -137.41 -182 -218 -216 -199 -210 -179 -150 -118 -86 -53 -24 9 42 72
Prestressing Stage 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th 13 th 14 th 15 th
Average Stress (T/m2) -137.41 -182 -218 -216 -199 -210 -179 -150 -118 -86 -53 -24 9 42 72
Stage wise Age of segment Days 217 202 187 172 157 142 127 112 97 82 67 52 37 22 7
Number of cable stressed 3 3 3 6 6 6 6 6 3 3 3 3 3 3 3
Eps/Ec= 5.02 5.03 5.03 5.04 5.05 5.06 5.06 5.08 5.09 5.11 5.13 5.17 5.22 5.32 5.68
Loss due to elastic shortening Ton -1.10 -1.45 -1.74 -3.45 -3.17 -3.35 -2.86 -2.39 -0.94 -0.68 -0.42 -0.19 0.07 0.33 0.19
Average force at cables Ton 820.89 876.8 888.7 1731 1656 1740 1657 1680 846.8 846.8 944.7 944.7 944.7 944.7 944.7
% loss due to elastic shortening -0.13% -0.17% -0.20% -0.20% -0.19% -0.19% -0.17% -0.14% -0.11% -0.08% -0.04% -0.02% 0.01% 0.04% 0.02%
DAYS 7 22
CREEP CO-EFFICIENT 5.31E-04 4.13E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04
MODULUS OF
ELASTICITY OF 3432651 3664608
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 312 T/m2
DAYS 7 22 37
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 387 T/m2
2 nd stage
Stress
prestress Stress Depth of Stress at Depth of Stress at Depth of Stress at
1st stage due to
with due to DL CG of CG of CG of CG of CG of all CG of
Section Location Prestress Truss & Total Depth (m)
elastic up to15th cables:1 cables: 1 cables:2 cables: 2 stage cables: All
with loss working
shortening Segment st Stage st Stage nd Stage nd Stage cables Stage
load
loss
ft= (t/m2) 92.045 110.131 -17.742 -15.342 169.091
17-17 7.5 0.995 148.32 0.66 155.31 0.2503 163.87
fb= (t/m2) -8.474 -17.764 20.787 17.975 12.524
ft= (t/m2) 109.274 -4.745 -10.368 94.160
16-16 7.04 0.66 85.52
fb= (t/m2) -15.800 5.587 12.207 1.994
ft= (t/m2) 106.102 106.102
15-15 6.60 0.66 94.23
fb= (t/m2) -12.670 -12.670
Average Stress (T/m 2) in CG of cables 116.92 89.87
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 895.209 0.601
16-16 876.84 0.588 0.586
15-15 847.45 0.569
1000 hour relaxation loss 2 nd stage cables= 1.07 %
Final (0.5x10^6 hours) relaxation loss 2 nd stage cables= 3.223 %
% Loss in 1 st stage cables= 3.113 %
% Loss in 2 nd stage cables= 2.235 %
Stress Constn
1st stage 2nd stage due to DL
Load Due Nett
Section Location prestress prestress up to
to 14th Stress
after loss after loss 15th
Segment
Segment
Loss 3.113% 2.235%
ft= (t/m2) 91.711 107.835 -17.742 -35.680 146.124
17-17
fb= (t/m2) -8.444 -17.393 20.787 41.804 36.754
ft= (t/m2) 106.996 -4.745 -23.149 79.101
16-16
fb= (t/m2) -15.470 5.587 27.253 17.370
Hence OK
DAYS 7 22 37 52
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 409 T/m2
3 rd stage
Stress
prestress Stress
1st stage 2nd stage due to Depth of Stress at
with due to DL
Section Location Prestress Prestress Truss & Total Depth (m) CG of CG of
elastic up to14th
with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 3.551% 2.689% 0.162%
ft= (t/m2) 91.296 106.499 118.12 -39.105 -23.013 253.801
17-17 7.5 0.660 233.47
fb= (t/m2) -8.405 -15.399 -26.24 45.816 26.963 22.731
ft= (t/m2) 103.408 118.50 -18.596 -18.663 184.650
16-16 7.04 0.660 167.95
fb= (t/m2) -12.349 -24.97 21.893 21.972 6.543
ft= (t/m2) 119.34 -4.906 -13.267 101.162
15-15 6.60 0.493 93.52
fb= (t/m2) -22.85 5.804 15.696 -1.347
ft= (t/m2) 102.18 102.181
14-14 6.19 0.660 90.36
fb= (t/m2) -8.66 -8.660
Average Stress (T/m 2) in CG of cables 1 st stage= 200.71
Average Stress (T/m 2) in CG of cables 2 nd stage= 130.73
Average Stress (T/m 2) in CG of cables 3 rd stage= 91.94
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Shrinkage Loss in 1st Shrinkage Loss in 2Shrinkage Loss in 3
cables: stage stage stage cables: nd stage rd stage Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd
Creep loss Creep loss stage stage stage
Creep Creep Creep loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.87E-06 5.598 3.12E-06 6.092 5.63E-06 10.984 7.80E-06 15.202 1.1E-05 21.934 3.5E-05 67.408 5.598 28.026 78.392
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 902.37 0.606
16-16 890.03 0.597
0.587
15-15 888.67 0.596
14-14 819.48 0.550
1000 hour relaxation loss 3 rd stage cables= 1.09 %
Final (0.5x10^6 hours) relaxation loss 3 rd stage cables= 3.272 %
% Loss in 1 st stage cables= 3.607 %
% Loss in 2 nd stage cables= 2.945 %
% Loss in 3 rd stage cables= 1.967 %
Stress Constn
1st stage 2nd stage 3rd stage due to DL
Load Due Nett
Section Location prestress prestress prestress up to
to 13th Stress
after loss after loss after loss 14th
Segment
Segment
Loss 3.607% 2.945% 1.967%
ft= (t/m2) 91.244 106.219 115.99 -39.105 -63.090 211.255
17-17
fb= (t/m2) -8.401 -15.358 -25.77 45.816 73.917 70.205
ft= (t/m2) 103.136 116.36 -18.596 -49.614 151.284
16-16
fb= (t/m2) -12.316 -24.52 21.893 58.411 43.466
ft= (t/m2) 0.000 117.18 -4.906 -33.066 79.206
15-15
fb= (t/m2) 0.000 -22.43 5.804 39.117 22.488
Hence OK
DAYS 7 22 37 52 67
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 418 T/m2
4 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage due to Depth of Stress at
with due to DL
Section Location Prestress Prestress Prestress Truss & Total Depth (m) CG of CG of
elastic up to13th
with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 4.458% 3.806% 2.882% 0.399%
ft= (t/m2) 90.438 105.277 114.90 232.89 -79.436 -30.684 433.395
17-17 7.5 0.526 404.98
fb= (t/m2) -8.326 -15.222 -25.53 -51.74 93.068 35.950 28.197
ft= (t/m2) 102.221 115.27 232.75 -50.298 -26.958 372.991
16-16 7.04 0.526 345.52
fb= (t/m2) -12.207 -24.29 -49.05 59.216 31.738 5.403
ft= (t/m2) 116.08 231.93 -26.014 -22.112 299.885
15-15 6.60 0.409 280.72
fb= (t/m2) -22.22 -44.40 30.775 26.160 -9.694
ft= (t/m2) 231.84 -8.826 -13.925 209.087
14-14 6.19 0.437 193.58
fb= (t/m2) -37.85 10.492 16.553 -10.803
ft= (t/m2) 183.72 183.722
13-13 5.68 0.660 162.94
fb= (t/m2) 4.81 4.805
Average Stress (T/m 2) in CG of cables 1 st stage= 375.25
Average Stress (T/m 2) in CG of cables 2 nd stage= 313.12
Average Stress (T/m 2) in CG of cables 3 rd stage= 237.15
Average Stress (T/m 2) in CG of cables 4 th stage= 178.26
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3
Shrinkage Loss in 4
cables: stage stage stage stage cables: nd stage rd stage th stage Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th
Creep loss Creep loss stage stage stage stage
Creep Creep Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
3.54E-06 6.906 4.01E-06 7.820 4.56E-06 8.891 8.31E-06 16.209 5.08E-06 9.903 6.4E-06 12.553 8.7E-06 17.041 3.5E-05 68.195 6.906 20.373 25.931 84.405
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 891.695 0.598
16-16 876.16 0.588
15-15 865.60 0.581 0.575
14-14 865.60 0.581
13-13 783.41 0.526
1000 hour relaxation loss 4 th stage cables= 0.93 %
Final (0.5x10^6 hours) relaxation loss 4 th stage cables= 2.803 %
% Loss in 1 st stage cables= 4.526 %
% Loss in 2 nd stage cables= 3.992 %
% Loss in 3 rd stage cables= 3.118 %
% Loss in 4 th stage cables= 2.120 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage due to DL
Load Due Nett
Section Location prestress prestress prestress prestress up to
to 12th Stress
after loss after loss after loss after loss 13th
Segment
Segment
Loss 4.53% 3.99% 3.12% 2.12%
ft= (t/m2) 90.374 105.073 114.62 228.87 -79.436 -83.879 375.628
17-17
fb= (t/m2) -8.321 -15.192 -25.47 -50.85 93.068 98.274 91.512
ft= (t/m2) 102.024 114.99 228.73 -50.298 -72.559 322.890
16-16
fb= (t/m2) -12.183 -24.23 -48.20 59.216 85.425 60.020
ft= (t/m2) 115.80 227.92 -26.014 -58.029 259.679
15-15
fb= (t/m2) -22.17 -43.64 30.775 68.650 33.617
ft= (t/m2) 227.83 -8.826 -40.603 178.403
14-14
fb= (t/m2) -37.19 10.492 48.266 21.564
Hence OK
DAYS 7 22 37 52 67 82
CREEP CO-EFFICIENT 0.00 0.00 0.00 0.00 0.00 0.00
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420 3817160
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 429 T/m2
5 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage 4th stage due to Depth of Stress at
with due to DL
Section Location Prestress Prestress Prestress Prestress Truss & Total Depth (m) CG of CG of
elastic up to12th
with loss with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 5.316% 4.791% 3.962% 3.010% 0.393%
ft= (t/m2) 89.626 104.199 113.63 226.79 227.08 -132.385 -38.355 590.578
17-17 7.5 0.469 556.84
fb= (t/m2) -8.252 -15.066 -25.24 -50.39 -50.45 155.104 44.938 50.638
ft= (t/m2) 101.175 113.99 226.65 234.14 -96.092 -35.253 544.616
16-16 7.04 0.469 509.79
fb= (t/m2) -12.082 -24.02 -47.77 -49.35 113.130 41.504 21.418
ft= (t/m2) 114.79 225.85 232.89 -62.624 -30.957 479.950
15-15 6.60 0.381 452.32
fb= (t/m2) -21.98 -43.24 -44.59 74.086 36.623 0.902
ft= (t/m2) 225.76 232.80 -34.425 -23.208 400.929
14-14 6.19 0.392 375.14
fb= (t/m2) -36.86 -38.01 40.922 27.588 -6.354
ft= (t/m2) 218.73 -8.825 -14.462 195.442
13-13 5.68 0.493 178.81
fb= (t/m2) -24.23 10.557 17.300 3.623
ft= (t/m2) 171.03 171.034
12-12 5.22 0.660 151.77
fb= (t/m2) 18.76 18.757
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
3.65E-06 7.111 4.09E-06 7.982 4.55E-06 8.878 4.86E-06 9.481 7.35E-06 14.335 3.63E-06 7.077 4.4E-06 8.490 5.3E-06 10.257 7.0E-06 13.622 2.1E-05 40.907 7.111 16.472 19.134 23.104 55.242
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 869.377 0.583
16-16 881.33 0.591
15-15 869.15 0.583
0.569
14-14 869.15 0.583
13-13 828.22 0.556
12-12 768.69 0.516
1000 hour relaxation loss 5 th stage cables= 0.86 %
Final (0.5x10^6 hours) relaxation loss 5 th stage cables= 2.581 %
% Loss in 1 st stage cables= 5.386 %
% Loss in 2 nd stage cables= 4.941 %
% Loss in 3 rd stage cables= 4.136 %
% Loss in 4 th stage cables= 3.221 %
% Loss in 5 th stage cables= 1.768 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage 5th stage due to DL
Load Due Nett
Section Location prestress prestress prestress prestress prestress up to
to 11th Stress
after loss after loss after loss after loss after loss 12th
Segment
Segment
Loss 5.39% 4.94% 4.14% 3.22% 1.77%
ft= (t/m2) 89.560 104.034 113.42 226.30 223.94 -132.385 -103.768 521.100
17-17
fb= (t/m2) -8.246 -15.042 -25.20 -50.28 -49.76 155.104 121.576 128.158
16-16 ft= (t/m2) 101.015 113.78 226.16 230.91 -96.092 -94.489 481.289
fb= (t/m2) -12.063 -23.98 -47.66 -48.66 113.130 111.242 92.004
15-15 ft= (t/m2) 114.59 225.36 229.68 -62.624 -81.864 425.130
fb= (t/m2) -21.94 -43.15 -43.97 74.086 96.847 61.875
ft= (t/m2) 225.27 229.59 -34.425 -66.093 354.340
14-14
fb= (t/m2) -36.78 -37.48 40.922 78.566 45.229
ft= (t/m2) 215.71 -8.825 -41.185 165.700
13-13
fb= (t/m2) -23.90 10.557 49.267 35.924
Hence OK
DAYS 7 22 37 52 67 82 97
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04 3.56E-04 3.51E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04 3.48E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420 3817160 3830662
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 432 T/m2
6 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage due to Depth of Stress at
with due to DL
Section Location Prestress Prestress Prestress Prestress Prestress Truss & Total Depth (m) CG of CG of
elastic up to11th
with loss with loss with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 6.174% 5.741% 4.982% 4.117% 2.739% 0.402%
ft= (t/m2) 88.814 103.159 112.42 224.20 221.73 238.82 -197.086 -46.026 746.032
17-17 7.5 0.392 711.03
fb= (t/m2) -8.177 -14.916 -24.98 -49.81 -49.26 -60.93 230.909 53.925 76.753
ft= (t/m2) 100.165 112.78 224.07 228.63 246.81 -155.000 -43.548 713.901
16-16 7.04 0.392 676.45
fb= (t/m2) -11.961 -23.77 -47.22 -48.18 -60.80 182.483 51.269 41.817
ft= (t/m2) 113.57 223.27 227.41 251.30 -113.653 -39.802 662.092
15-15 6.60 0.317 631.07
fb= (t/m2) -21.74 -42.75 -43.54 -57.80 134.455 47.087 15.715
ft= (t/m2) 223.18 227.32 251.69 -75.613 -32.491 594.090
14-14 6.19 0.316 563.97
fb= (t/m2) -36.44 -37.11 -51.60 89.883 38.623 3.354
ft= (t/m2) 213.58 246.10 -34.471 -24.103 401.099
13-13 5.68 0.370 375.48
fb= (t/m2) -23.66 -38.70 41.235 28.833 7.705
ft= (t/m2) 233.86 -8.577 -14.567 210.719
12-12 5.22 0.393 195.32
fb= (t/m2) -21.78 10.323 17.533 6.078
ft= (t/m2) 182.36 182.356
11-11 4.80 0.460 167.27
fb= (t/m2) 25.14 25.137
Average Stress (T/m 2) in CG of cables 1 st stage= 693.74
2
Average Stress (T/m ) in CG of cables 2 nd stage= 653.76
2
Average Stress (T/m ) in CG of cables 3 rd stage= 597.52
2
Average Stress (T/m ) in CG of cables 4 th stage= 469.72
2
Average Stress (T/m ) in CG of cables 5 th stage= 285.40
Average Stress (T/m 2) in CG of cables 6 th stage= 181.30
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
3.65E-06 7.108 4.06E-06 7.913 4.45E-06 8.672 4.72E-06 9.199 4.85E-06 9.454 2.74E-06 5.338 3.2E-06 6.208 3.7E-06 7.150 4.3E-06 8.475 5.7E-06 11.167 7.108 14.120 15.822 17.673 20.621
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 882.674 0.592
16-16 894.88 0.601
15-15 901.48 0.605
14-14 901.48 0.605 0.587
13-13 892.03 0.599
12-12 869.94 0.584
11-11 783.89 0.526
1000 hour relaxation loss 6 th stage cables= 1.09 %
Final (0.5x10^6 hours) relaxation loss 6 th stage cables= 3.274 %
% Loss in 1 st stage cables= 6.244 %
% Loss in 2 nd stage cables= 5.870 %
% Loss in 3 rd stage cables= 5.127 %
% Loss in 4 th stage cables= 4.278 %
% Loss in 5 th stage cables= 2.927 %
% Loss in 6 th stage cables= 1.940 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage due to DL
Load Due Nett
Section Location prestress prestress prestress prestress prestress prestress up to
to 10th Stress
after loss after loss after loss after loss after loss after loss 11th
Segment
Segment
Loss 6.24% 5.87% 5.13% 4.28% 2.93% 1.94%
ft= (t/m2) 88.748 103.018 112.25 223.82 221.30 235.14 -197.086 -122.913 664.274
17-17
fb= (t/m2) -8.171 -14.895 -24.94 -49.73 -49.17 -59.99 230.909 144.007 168.019
ft= (t/m2) 100.028 112.61 223.69 228.19 243.00 -155.000 -115.571 636.939
16-16
fb= (t/m2) -11.945 -23.73 -47.14 -48.09 -59.86 182.483 136.063 127.775
ft= (t/m2) 113.40 222.89 226.97 247.42 -113.653 -104.751 592.275
15-15
fb= (t/m2) -21.71 -42.67 -43.46 -56.90 134.455 123.923 93.633
ft= (t/m2) 222.81 226.88 247.80 -75.613 -90.540 531.340
14-14
fb= (t/m2) -36.37 -37.04 -50.81 89.883 107.628 73.289
ft= (t/m2) 213.16 242.30 -34.471 -67.166 353.823
13-13
fb= (t/m2) -23.62 -38.10 41.235 80.347 59.862
ft= (t/m2) 230.25 -8.577 -40.594 181.081
12-12
fb= (t/m2) -21.44 10.323 48.857 37.738
Hence OK
vii) BETWEEN 7 th AND 8 th STAGE STRESSING: (BETN 97 DAYS & 112 DAYS)
DAYS 7 22 37 52 67 82 97 112
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04 3.56E-04 3.51E-04 3.47E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04 3.48E-04 3.50E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420 3817160 3830662 3841384
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 435 T/m2
7 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage due to Depth of Stress at
with due to DL
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Truss & Total Depth (m) CG of CG of
elastic up to10th
with loss with loss with loss with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 6.938% 6.572% 5.867% 5.066% 3.787% 2.803% 0.380%
ft= (t/m2) 88.091 102.250 111.37 221.98 219.34 233.07 226.88 -272.82 -53.697 876.464
17-17 7.5 0.344 841.78
fb= (t/m2) -8.110 -14.784 -24.74 -49.32 -48.73 -59.47 -57.89 319.64 62.913 119.513
ft= (t/m2) 99.282 111.73 221.85 226.17 240.86 234.52 -226.21 -58.063 850.129
16-16 7.04 0.344 812.91
fb= (t/m2) -11.856 -23.55 -46.75 -47.66 -59.34 -57.77 266.32 68.359 87.748
ft= (t/m2) 112.52 221.06 224.96 245.24 240.31 -178.19 -61.915 803.975
15-15 6.60 0.279 772.82
fb= (t/m2) -21.54 -42.32 -43.07 -56.40 -55.27 210.80 73.247 65.442
ft= (t/m2) 220.97 224.87 245.62 240.68 -131.39 -64.983 735.779
14-14 6.19 0.273 705.99
fb= (t/m2) -36.07 -36.71 -50.36 -49.34 156.18 77.247 60.938
ft= (t/m2) 211.28 240.16 242.14 -75.83 -67.489 550.258
13-13 5.68 0.309 524.28
fb= (t/m2) -23.41 -37.77 -38.08 90.71 80.733 72.193
ft= (t/m2) 228.23 233.88 -33.56 -67.981 360.563
12-12 5.22 0.303 344.20
fb= (t/m2) -21.25 -21.78 40.39 81.819 79.174
ft= (t/m2) 215.01 -8.13 -66.602 140.281
11-11 4.80 0.146 138.66
fb= (t/m2) -3.24 9.84 80.625 87.228
ft= (t/m2) 166.66 166.658
10-10 4.42 0.460 153.37
fb= (t/m2) 39.02 39.023
2
Average Stress (T/m ) in CG of cables 1 st stage= 827.35
Average Stress (T/m 2) in CG of cables 2 nd stage= 792.87
Average Stress (T/m 2) in CG of cables 3 rd stage= 739.40
Average Stress (T/m 2) in CG of cables 4 th stage= 615.13
Average Stress (T/m 2) in CG of cables 5 th stage= 434.24
Average Stress (T/m 2) in CG of cables 6 th stage= 241.43
Average Stress (T/m 2) in CG of cables 7 th stage= 146.02
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
3.48E-06 6.782 3.82E-06 7.453 4.12E-06 8.031 4.31E-06 8.397 4.39E-06 8.555 2.14E-06 4.174 2.4E-06 4.756 2.7E-06 5.336 3.1E-06 6.042 3.6E-06 7.102 6.782 12.209 13.367 14.439 15.657
Creep Loss in 6th stage Shrinkage Loss in 6th Creep Loss in 7th Shrinkage Loss in
cables: stage cables: stage cables: 7th stage cables: Total C&S Total C&S
Change of Change of Shrinkage Change of Creep Change of Shrinkage Loss 6th Loss 7th
Creep loss stage stage
Creep Shrinkage loss Creep loss Shrinkage loss
(kg/cm2)
strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
4.39E-06 8.563 4.79E-06 9.346 5.97E-06 11.649 1.48E-05 28.835 17.909 40.485
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 838.365 0.563
16-16 850.11 0.570
15-15 861.85 0.578
14-14 861.85 0.578
0.568
13-13 892.03 0.599
12-12 869.94 0.584
11-11 828.69 0.556
10-10 768.93 0.516
1000 hour relaxation loss 7 th stage cables= 0.85 %
Final (0.5x10^6 hours) relaxation loss 7 th stage cables= 2.551 %
% Loss in 1 st stage cables= 7.005 %
% Loss in 2 nd stage cables= 6.684 %
% Loss in 3 rd stage cables= 5.989 %
% Loss in 4 th stage cables= 5.198 %
% Loss in 5 th stage cables= 3.929 %
% Loss in 6 th stage cables= 2.966 %
% Loss in 7 th stage cables= 1.607 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage due to DL
Load Due Nett
Section Location prestress prestress prestress prestress prestress prestress prestress up to
to 9th Stress
after loss after loss after loss after loss after loss after loss after loss 10th
Segment
Segment
Loss 7.01% 6.68% 5.99% 5.20% 3.93% 2.97% 1.61%
ft= (t/m2) 88.027 102.127 111.23 221.67 219.01 232.68 224.09 -272.824 -141.472 784.539
17-17
fb= (t/m2) -8.104 -14.766 -24.71 -49.25 -48.66 -59.37 -57.17 319.645 165.751 223.360
ft= (t/m2) 99.163 111.58 221.54 225.83 240.46 231.63 -226.210 -135.978 768.014
16-16
fb= (t/m2) -11.842 -23.52 -46.69 -47.59 -59.24 -57.06 266.319 160.088 180.469
ft= (t/m2) 112.37 220.75 224.62 244.83 237.34 -178.190 -126.872 734.858
15-15
fb= (t/m2) -21.51 -42.26 -43.01 -56.31 -54.59 210.803 150.093 143.214
ft= (t/m2) 220.67 224.54 245.21 237.71 -131.386 -114.136 682.607
14-14
fb= (t/m2) -36.02 -36.66 -50.28 -48.74 156.183 135.677 120.165
ft= (t/m2) 210.96 239.76 239.16 -75.833 -92.196 521.850
13-13
fb= (t/m2) -23.37 -37.70 -37.61 90.714 110.289 102.316
12-12 ft= (t/m2) 227.84 230.99 -33.558 -66.335 358.944
fb= (t/m2) -21.22 -21.51 40.389 79.838 77.497
ft= (t/m2) 212.36 -8.129 -38.993 165.241
11-11
fb= (t/m2) -3.20 9.840 47.204 53.846
Hence OK
viii) BETWEEN 8 th AND 9 th STAGE STRESSING: (BETN 112 DAYS & 127 DAYS)
8 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage due to Depth of Stress at
with due to DL
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Truss & Total Depth (m) CG of CG of
elastic up to9th
with loss with loss with loss with loss with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 7.650% 7.331% 6.669% 5.920% 4.719% 3.762% 2.467% 0.362%
ft= (t/m2) 87.417 101.419 110.42 219.98 217.21 230.77 222.13 224.72 -359.04 -61.368 993.674
17-17 7.5 0.310 959.85
fb= (t/m2) -8.048 -14.664 -24.53 -48.88 -48.26 -58.88 -56.67 -57.34 420.65 71.900 175.277
ft= (t/m2) 98.475 110.78 219.85 223.98 238.49 229.60 232.32 -309.07 -60.137 984.278
16-16 7.04 0.310 946.81
fb= (t/m2) -11.760 -23.35 -46.33 -47.20 -58.75 -56.56 -57.23 363.87 70.800 133.483
ft= (t/m2) 111.56 219.07 222.78 242.82 235.27 238.09 -255.50 -57.492 956.603
15-15 6.60 0.253 923.79
fb= (t/m2) -21.36 -41.94 -42.65 -55.85 -54.11 -54.29 302.26 68.015 100.066
ft= (t/m2) 218.99 222.69 243.20 235.64 238.46 -200.93 -51.058 906.992
14-14 6.19 0.246 874.10
fb= (t/m2) -35.75 -36.36 -49.86 -48.31 -48.89 238.85 60.694 80.370
ft= (t/m2) 209.23 237.79 237.07 239.96 -132.00 -43.386 748.667
13-13 5.68 0.272 716.38
fb= (t/m2) -23.18 -37.39 -37.28 -37.74 157.90 51.900 74.206
ft= (t/m2) 225.97 228.98 238.04 -73.96 -33.991 585.044
12-12 5.22 0.259 559.27
fb= (t/m2) -21.04 -21.32 -22.17 89.01 40.910 65.385
ft= (t/m2) 210.51 228.96 -31.86 -23.786 383.817
11-11 4.80 0.237 367.87
fb= (t/m2) -3.17 -3.45 38.57 28.795 60.744
ft= (t/m2) 209.43 -7.55 -13.672 188.204
10-10 4.42 0.293 178.46
fb= (t/m2) 15.13 9.19 16.641 40.960
ft= (t/m2) 165.46 165.462
9-9 4.09 0.460 153.01
fb= (t/m2) 54.89 54.893
Average Stress (T/m 2) in CG of cables 1 st stage= 953.33
Average Stress (T/m 2) in CG of cables 2 nd stage= 935.30
Average Stress (T/m 2) in CG of cables 3 rd stage= 898.94
Average Stress (T/m 2) in CG of cables 4 th stage= 795.24
Average Stress (T/m 2) in CG of cables 5 th stage= 637.82
Average Stress (T/m 2) in CG of cables 6 th stage= 463.57
Average Stress (T/m 2) in CG of cables 7 th stage= 273.16
Average Stress (T/m 2) in CG of cables 8 th stage= 165.74
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
3.30E-06 6.440 3.62E-06 7.053 3.88E-06 7.568 4.06E-06 7.916 4.18E-06 8.143 1.72E-06 3.350 1.9E-06 3.762 2.1E-06 4.150 2.4E-06 4.585 2.6E-06 5.150 6.440 10.815 11.718 12.501 13.293
Creep Loss in 6th stage Shrinkage Loss in 6th Creep Loss in 7th Shrinkage Loss in Creep Loss in 8th Shrinkage Loss in
cables: stage cables: stage cables: 7th stage cables: stage cables: 8th stage cables: Total C&S Total C&S Total C&S
Change of Change of Shrinkage Change of Creep Change of Shrinkage Change of Creep Change of Shrinkage Loss 6th Loss 7th Loss 8th
Creep loss stage stage stage
Creep Shrinkage loss Creep loss Shrinkage loss Creep loss Shrinkage loss
(kg/cm2)
strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
4.28E-06 8.342 3.09E-06 6.033 4.34E-06 8.460 4.08E-06 7.957 5.91E-06 11.531 1.28E-05 25.009 14.375 16.417 36.540
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 830.215 0.557
16-16 841.98 0.565
15-15 853.75 0.573
14-14 853.75 0.573
13-13 877.51 0.589 0.570
12-12 869.80 0.584
11-11 882.26 0.592
10-10 840.17 0.564
9-9 790.74 0.531
1000 hour relaxation loss 8 th stage cables= 0.87 %
Final (0.5x10^6 hours) relaxation loss 8 th stage cables= 2.612 %
% Loss in 1 st stage cables= 7.714 %
% Loss in 2 nd stage cables= 7.430 %
% Loss in 3 rd stage cables= 6.776 %
% Loss in 4 th stage cables= 6.034 %
% Loss in 5 th stage cables= 4.840 %
% Loss in 6 th stage cables= 3.893 %
% Loss in 7 th stage cables= 2.619 %
% Loss in 8 th stage cables= 1.573 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage
due to DL Load Due Nett
Section Location prestress prestress prestress prestress prestress prestress prestress prestress
up to 9th to 8th Stress
after loss after loss after loss after loss after loss after loss after loss after loss
Segment Segment
Loss 7.71% 7.43% 6.78% 6.03% 4.84% 3.89% 2.62% 1.57%
ft= (t/m2) 87.356 101.310 110.30 219.72 216.94 230.45 221.78 221.99 -359.036 -159.600 891.211
17-17
fb= (t/m2) -8.043 -14.648 -24.50 -48.82 -48.20 -58.80 -56.59 -56.64 420.651 186.989 291.402
ft= (t/m2) 98.370 110.65 219.59 223.69 238.16 229.24 229.49 -309.069 -155.876 884.247
16-16
fb= (t/m2) -11.747 -23.32 -46.28 -47.14 -58.67 -56.47 -56.54 363.870 183.514 247.217
ft= (t/m2) 111.43 218.81 222.49 242.49 234.90 235.20 -255.496 -148.406 861.419
15-15
fb= (t/m2) -21.33 -41.89 -42.60 -55.77 -54.03 -53.63 302.258 175.568 208.569
14-14 ft= (t/m2) 218.72 222.41 242.87 235.27 235.56 -200.927 -137.069 816.833
fb= (t/m2) -35.71 -36.31 -49.79 -48.23 -48.30 238.847 162.937 183.441
ft= (t/m2) 208.96 237.47 236.70 237.04 -131.997 -116.472 671.702
13-13
fb= (t/m2) -23.15 -37.34 -37.22 -37.28 157.900 139.329 162.232
ix) BETWEEN 9 th AND 10 th STAGE STRESSING: (BETN 127 DAYS & 142 DAYS)
9 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage due to Depth of Stress at
with due to DL
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Truss & Total Depth (m) CG of CG of
elastic up to8th
with loss with loss with loss with loss with loss with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 7.846% 7.555% 6.903% 6.182% 5.019% 4.085% 2.849% 1.824% 0.091%
ft= (t/m2) 87.231 101.174 110.15 219.37 216.53 229.99 221.26 221.42 111.15 -455.31 -69.040 993.940
17-17 7.5 0.297 965.31
fb= (t/m2) -8.031 -14.629 -24.47 -48.74 -48.11 -58.68 -56.45 -56.50 -28.36 533.44 80.888 270.359
ft= (t/m2) 98.238 110.50 219.24 223.27 237.69 228.70 228.91 114.92 -403.09 -68.432 989.940
16-16 7.04 0.297 957.78
fb= (t/m2) -11.731 -23.29 -46.20 -47.05 -58.55 -56.34 -56.39 -28.31 474.56 80.566 227.252
ft= (t/m2) 111.28 218.46 222.08 242.01 234.35 234.60 117.78 -345.01 -66.337 969.206
15-15 6.60 0.243 940.55
fb= (t/m2) -21.30 -41.83 -42.52 -55.66 -53.90 -53.50 -27.09 408.15 78.479 190.836
ft= (t/m2) 218.38 221.99 242.39 234.71 234.96 117.96 -283.60 -60.341 926.453
14-14 6.19 0.236 897.46
fb= (t/m2) -35.65 -36.24 -49.70 -48.12 -48.17 -24.18 337.12 71.729 166.780
ft= (t/m2) 208.57 237.00 236.14 236.44 118.71 -202.24 -53.027 781.593
13-13 5.68 0.259 752.93
fb= (t/m2) -23.11 -37.27 -37.14 -37.18 -18.67 241.93 63.433 151.993
ft= (t/m2) 225.22 228.08 234.55 117.77 -128.98 -43.702 632.935
12-12 5.22 0.244 609.55
fb= (t/m2) -20.97 -21.24 -21.84 -10.97 155.23 52.598 132.808
ft= (t/m2) 209.68 225.60 115.67 -70.36 -33.301 447.291
11-11 4.80 0.221 432.10
fb= (t/m2) -3.16 -3.40 -1.74 85.17 40.313 117.184
ft= (t/m2) 206.36 109.13 -29.67 -22.787 263.032
10-10 4.42 0.259 252.69
fb= (t/m2) 14.90 7.88 36.11 27.735 86.628
ft= (t/m2) 101.69 -6.93 -13.672 81.085
9-9 4.09 0.348 77.72
fb= (t/m2) 16.53 8.48 16.641 41.649
ft= (t/m2) 84.23 84.234
8-8 3.80 0.460 77.74
fb= (t/m2) 30.60 30.603
Average Stress (T/m 2) in CG of cables 1 st stage= 961.54
Average Stress (T/m 2) in CG of cables 2 nd stage= 949.17
Average Stress (T/m 2) in CG of cables 3 rd stage= 919.01
Average Stress (T/m 2) in CG of cables 4 th stage= 825.20
Average Stress (T/m 2) in CG of cables 5 th stage= 681.24
Average Stress (T/m 2) in CG of cables 6 th stage= 520.82
Average Stress (T/m 2) in CG of cables 7 th stage= 342.39
Average Stress (T/m 2) in CG of cables 8 th stage= 165.21
Average Stress (T/m 2) in CG of cables 9 th stage= 77.73
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.81E-06 5.475 3.05E-06 5.943 3.24E-06 6.317 3.36E-06 6.548 3.42E-06 6.673 1.41E-06 2.742 1.6E-06 3.046 1.7E-06 3.321 1.9E-06 3.612 2.0E-06 3.960 5.475 8.989 9.638 10.159 10.633
Creep Loss in 6th stage Shrinkage Loss in 6th Creep Loss in 7th Shrinkage Loss in Creep Loss in 8th Shrinkage Loss in Creep Loss in 9th Shrinkage Loss in
cables: stage cables: stage cables: 7th stage cables: stage cables: 8th stage cables: stage cables: 9th stage cables: Total C&S Total C&S Total C&S Total C&S
Change of Change of Shrinkage Change of Creep Change of Shrinkage Change of Creep Change of Shrinkage Change of Creep Change of Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th
Creep loss stage stage stage stage
Creep Shrinkage loss Creep loss Shrinkage loss Creep loss Shrinkage loss Creep loss Shrinkage loss
(kg/cm2)
strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
5.75E-06 11.206 2.27E-06 4.431 3.79E-06 7.388 2.66E-06 5.188 3.71E-06 7.234 3.52E-06 6.871 4.26E-06 8.307 1.27E-05 24.782 15.636 12.575 14.105 33.089
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 819.069 0.550
16-16 830.73 0.557
15-15 842.39 0.565
14-14 842.39 0.565
13-13 880.82 0.591
0.571
12-12 896.70 0.602
11-11 889.03 0.597
10-10 873.22 0.586
9-9 846.82 0.568
8-8 783.04 0.525
1000 hour relaxation loss 9 th stage cables= 0.88 %
Final (0.5x10^6 hours) relaxation loss 9 th stage cables= 2.650 %
% Loss in 1 st stage cables= 7.901 %
% Loss in 2 nd stage cables= 7.637 %
% Loss in 3 rd stage cables= 6.991 %
% Loss in 4 th stage cables= 6.275 %
% Loss in 5 th stage cables= 5.116 %
% Loss in 6 th stage cables= 4.227 %
% Loss in 7 th stage cables= 2.966 %
% Loss in 8 th stage cables= 1.955 %
% Loss in 9 th stage cables= 1.283 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage
due to DL Load Due Nett
Section Location prestress prestress prestress prestress prestress prestress prestress prestress prestress
up to 8th to 7th Stress
after loss after loss after loss after loss after loss after loss after loss after loss after loss
Segment Segment
Loss 7.90% 7.64% 6.99% 6.28% 5.12% 4.23% 2.97% 1.96% 1.28%
ft= (t/m2) 87.180 101.084 110.04 219.16 216.31 229.65 221.00 221.13 109.83 -455.305 -177.454 882.612
17-17
fb= (t/m2) -8.026 -14.616 -24.45 -48.69 -48.06 -58.59 -56.38 -56.42 -28.02 533.442 207.907 398.085
ft= (t/m2) 98.150 110.39 219.02 223.04 237.33 228.43 228.60 113.55 -403.090 -175.435 879.994
16-16
fb= (t/m2) -11.721 -23.27 -46.16 -47.01 -58.47 -56.27 -56.32 -27.97 474.562 206.541 353.922
ft= (t/m2) 111.17 218.24 221.85 241.65 234.07 234.28 116.38 -345.007 -169.533 863.101
15-15
fb= (t/m2) -21.28 -41.78 -42.48 -55.58 -53.83 -53.43 -26.77 408.153 200.562 313.567
ft= (t/m2) 218.16 221.76 242.03 234.43 234.65 116.56 -283.596 -159.527 824.460
14-14
fb= (t/m2) -35.62 -36.21 -49.62 -48.06 -48.11 -23.90 337.119 189.634 285.242
ft= (t/m2) 208.36 236.65 235.85 236.12 117.30 -202.238 -140.191 691.847
13-13
fb= (t/m2) -23.09 -37.21 -37.09 -37.13 -18.45 241.925 167.701 256.658
ft= (t/m2) 224.88 227.81 234.23 116.37 -128.980 -115.538 558.770
12-12
fb= (t/m2) -20.94 -21.22 -21.81 -10.84 155.234 139.056 219.484
ft= (t/m2) 209.43 225.29 114.29 -70.355 -88.040 390.618
11-11
fb= (t/m2) -3.15 -3.39 -1.72 85.169 106.577 183.477
ft= (t/m2) 206.08 107.83 -29.667 -60.244 223.997
10-10
fb= (t/m2) 14.88 7.79 36.109 73.325 132.104
9-9 ft= (t/m2) 100.48 -6.932 -34.094 59.450
fb= (t/m2) 16.33 8.479 41.702 66.513
Hence OK
x) BETWEEN 10 th AND 11 th STAGE STRESSING: (BETN 142 DAYS & 157 DAYS)
10 th
stage Stress
Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to Depth of Stress at
due to DL
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with Truss & Total Depth (m) CG of CG of
up to7th
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic working cables cables:
Segment
shortenin load
Loss g loss
7.989% 7.713% 7.063% 6.366% 5.232% 4.354% 3.127% 2.139% 1.493% 0.078%
ft= (t/m2) 87.096 101.000 109.96 218.94 216.04 229.35 220.63 220.71 109.59 109.17 -561.37 -76.711 984.409
17-17 7.5 0.285 961.30
fb= (t/m2) -8.019 -14.603 -24.43 -48.64 -48.00 -58.52 -56.29 -56.32 -27.96 -27.85 657.71 89.875 376.948
ft= (t/m2) 98.069 110.31 218.81 222.77 237.02 228.05 228.17 113.31 112.88 -507.95 -76.727 984.711
16-16 7.04 0.285 958.33
fb= (t/m2) -11.711 -23.25 -46.11 -46.95 -58.39 -56.18 -56.21 -27.91 -27.81 598.01 90.331 333.818
ft= (t/m2) 111.09 218.03 221.58 241.33 233.68 233.85 116.13 115.71 -446.33 -75.182 969.869
15-15 6.60 0.235 945.91
fb= (t/m2) -21.27 -41.74 -42.42 -55.50 -53.75 -53.33 -26.71 -26.61 528.03 88.942 295.636
ft= (t/m2) 217.95 221.49 241.71 234.04 234.21 116.31 115.89 -378.94 -69.624 933.027
14-14 6.19 0.228 908.58
fb= (t/m2) -35.58 -36.16 -49.56 -47.98 -48.02 -23.85 -23.76 450.46 82.764 268.315
ft= (t/m2) 208.10 236.33 235.46 235.68 117.05 116.64 -286.02 -62.668 800.578
13-13 5.68 0.248 776.42
fb= (t/m2) -23.06 -37.16 -37.03 -37.06 -18.41 -18.34 342.15 74.966 246.052
ft= (t/m2) 224.59 227.43 233.79 116.12 115.74 -198.02 -53.414 666.227
12-12 5.22 0.232 646.25
fb= (t/m2) -20.91 -21.18 -21.77 -10.81 -10.78 238.33 64.287 217.160
ft= (t/m2) 209.08 224.87 114.05 113.68 -122.96 -42.816 495.909
11-11 4.80 0.209 482.62
fb= (t/m2) -3.15 -3.39 -1.72 -1.71 148.85 51.831 190.716
ft= (t/m2) 205.69 107.60 111.13 -65.66 -31.902 326.862
10-10 4.42 0.237 317.36
fb= (t/m2) 14.86 7.77 8.02 79.91 38.829 149.392
ft= (t/m2) 100.26 104.87 -27.29 -22.787 155.060
9-9 4.09 0.293 150.72
fb= (t/m2) 16.30 17.05 33.38 27.735 94.459
ft= (t/m2) 98.11 -6.33 -12.062 79.721
8-8 3.80 0.293 77.21
fb= (t/m2) 24.49 7.78 14.819 47.088
ft= (t/m2) 82.00 82.002
7-7 3.55 0.460 76.09
fb= (t/m2) 36.35 36.354
Average Stress (T/m 2) in CG of cables 1 st stage= 959.81
2
Average Stress (T/m ) in CG of cables 2 nd stage= 952.12
Average Stress (T/m 2) in CG of cables 3 rd stage= 927.24
Average Stress (T/m 2) in CG of cables 4 th stage= 842.50
Average Stress (T/m 2) in CG of cables 5 th stage= 711.34
Average Stress (T/m 2) in CG of cables 6 th stage= 564.44
Average Stress (T/m 2) in CG of cables 7 th stage= 399.99
Average Stress (T/m 2) in CG of cables 8 th stage= 234.04
Average Stress (T/m 2) in CG of cables 9 th stage= 113.96
Average Stress (T/m 2) in CG of cables 10 th stage= 76.65
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.40E-06 4.689 2.59E-06 5.055 2.74E-06 5.336 2.82E-06 5.497 2.86E-06 5.573 1.17E-06 2.280 1.3E-06 2.511 1.4E-06 2.714 1.5E-06 2.920 1.6E-06 3.153 4.689 7.567 8.050 8.417 8.726
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables: 10th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.88E-06 5.613 2.87E-06 5.589 2.81E-06 5.485 2.77E-06 5.398 2.49E-06 4.858 1.77E-06 3.442 1.97E-06 3.846 2.31E-06 4.509 3.46E-06 6.755 1.01E-05 19.722 9.055 9.436 9.994 12.153 24.580
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 804.335 0.540
16-16 815.89 0.548
15-15 827.45 0.555
14-14 827.45 0.555
13-13 858.06 0.576
12-12 873.56 0.586 0.566
11-11 873.67 0.586
10-10 889.08 0.597
9-9 873.22 0.586
8-8 846.82 0.568
7-7 783.04 0.525
1000 hour relaxation loss 10 th stage cables= 0.82 %
Final (0.5x10^6 hours) relaxation loss 10 th stage cables= 2.462 %
% Loss in 1 st stage cables= 8.035 %
% Loss in 2 nd stage cables= 7.782 %
% Loss in 3 rd stage cables= 7.137 %
% Loss in 4 th stage cables= 6.443 %
% Loss in 5 th stage cables= 5.311 %
% Loss in 6 th stage cables= 4.436 %
% Loss in 7 th stage cables= 3.215 %
% Loss in 8 th stage cables= 2.232 %
% Loss in 9 th stage cables= 1.606 %
% Loss in 10 th stage cables= 1.128 %
xi) BETWEEN 11 th AND 12 th STAGE STRESSING: (BETN 157 DAYS & 172 DAYS)
11 th
stage Stress
10th Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to DL due to Depth of Stress at
stage
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with Truss & Total Depth (m) CG of CG of
Prestress up to 6th
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic working cables cables:
with loss Segment
shortenin load
Loss g loss
8.081% 7.811% 7.157% 6.477% 5.366% 4.499% 3.308% 2.349% 1.752% 1.306% 0.062%
ft= (t/m2) 87.009 100.893 109.85 218.68 215.74 229.00 220.22 220.24 109.30 107.83 107.18 -677.12 -84.382 964.433
17-17 7.5 0.275 947.20
fb= (t/m2) -8.011 -14.588 -24.40 -48.59 -47.93 -58.43 -56.19 -56.19 -27.89 -27.51 -27.35 793.32 98.863 495.104
ft= (t/m2) 97.965 110.20 218.55 222.45 236.66 227.62 227.68 113.01 111.49 110.82 -623.48 -85.022 967.957
16-16 7.04 0.275 947.82
fb= (t/m2) -11.699 -23.22 -46.06 -46.88 -58.30 -56.08 -56.09 -27.84 -27.47 -27.30 734.03 100.097 453.184
ft= (t/m2) 110.97 217.77 221.26 240.96 233.24 233.34 115.82 114.28 113.60 -559.26 -84.027 957.978
15-15 6.60 0.227 939.26
fb= (t/m2) -21.25 -41.69 -42.36 -55.42 -53.64 -53.21 -26.64 -26.29 -26.13 661.62 99.406 414.394
ft= (t/m2) 217.69 221.18 241.34 233.60 233.70 116.00 114.46 113.78 -486.68 -78.908 926.163
14-14 6.19 0.220 906.50
fb= (t/m2) -35.54 -36.11 -49.48 -47.89 -47.92 -23.78 -23.47 -23.33 578.53 82.764 373.784
ft= (t/m2) 207.81 235.97 235.02 235.17 116.74 115.21 114.52 -383.00 -62.668 814.774
13-13 5.68 0.238 795.55
fb= (t/m2) -23.02 -37.11 -36.96 -36.98 -18.36 -18.12 -18.01 458.16 86.500 356.096
ft= (t/m2) 224.24 227.00 233.29 115.81 114.32 113.63 -280.68 -63.126 684.491
12-12 5.22 0.222 668.87
fb= (t/m2) -20.88 -21.14 -21.73 -10.78 -10.65 -10.58 337.81 75.975 318.022
ft= (t/m2) 208.69 224.39 113.75 112.29 111.61 -189.21 -52.330 529.186
11-11 4.80 0.199 518.85
fb= (t/m2) -3.14 -3.38 -1.71 -1.69 -1.68 229.05 63.348 280.789
ft= (t/m2) 205.25 107.32 109.76 59.43 -115.01 -41.017 325.724
10-10 4.42 0.221 320.86
fb= (t/m2) 14.82 7.75 7.93 7.85 139.99 49.923 228.262
ft= (t/m2) 100.00 103.59 107.49 -60.54 -31.902 218.635
9-9 4.09 0.259 215.14
fb= (t/m2) 16.25 16.84 17.47 74.05 38.829 163.440
ft= (t/m2) 96.91 106.58 -24.98 -20.104 158.406
8-8 3.80 0.237 155.15
fb= (t/m2) 24.19 26.60 30.69 24.698 106.184
ft= (t/m2) 106.25 -5.79 -11.264 89.188
7-7 3.55 0.293 86.45
fb= (t/m2) 34.86 7.14 13.891 55.897
ft= (t/m2) 83.75 83.747
6-6 3.35 0.460 78.12
fb= (t/m2) 42.68 42.682
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.07E-06 4.030 2.22E-06 4.320 2.33E-06 4.535 2.39E-06 4.659 2.41E-06 4.709 9.85E-07 1.921 1.1E-06 2.100 1.2E-06 2.254 1.2E-06 2.406 1.3E-06 2.571 4.030 6.420 6.789 7.065 7.280
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables: 10th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.42E-06 4.723 2.39E-06 4.653 2.34E-06 4.570 2.36E-06 4.596 2.40E-06 4.688 1.42E-06 2.765 1.55E-06 3.014 1.73E-06 3.367 2.28E-06 4.450 2.74E-06 5.351 7.488 7.667 7.937 9.046 10.040
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 789.58 0.530
16-16 800.91 0.537
15-15 812.25 0.545
14-14 812.25 0.545
13-13 857.94 0.576
12-12 873.49 0.586
0.573
11-11 857.59 0.575
10-10 869.96 0.584
9-9 894.86 0.600
8-8 919.77 0.617
7-7 944.67 0.634
6-6 815.95 0.548
1000 hour relaxation loss 11 th stage cables= 0.91 %
Final (0.5x10^6 hours) relaxation loss 11 th stage cables= 2.743 %
% Loss in 1 st stage cables= 8.120 %
% Loss in 2 nd stage cables= 7.870 %
% Loss in 3 rd stage cables= 7.219 %
% Loss in 4 th stage cables= 6.542 %
% Loss in 5 th stage cables= 5.432 %
% Loss in 6 th stage cables= 4.568 %
% Loss in 7 th stage cables= 3.380 %
% Loss in 8 th stage cables= 2.423 %
% Loss in 9 th stage cables= 1.837 %
% Loss in 10 th stage cables= 1.399 %
% Loss in 11 th stage cables= 1.203 %
xii) BETWEEN 12 th AND 13 th STAGE STRESSING: (BETN 172 DAYS & 187 DAYS)
12 th
stage Stress
10th 11th Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to DL due to Depth of Stress at
stage stage
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with Truss & Total Depth (m) CG of CG of
Prestress Prestress up to 5th
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic working cables cables:
with loss with loss Segment
shortenin load
Loss g loss
8.123% 7.852% 7.187% 6.521% 5.427% 4.569% 3.408% 2.475% 1.917% 1.510% 1.330% 0.051%
ft= (t/m2) 86.969 100.848 109.81 218.58 215.60 228.83 219.99 219.95 109.12 107.60 105.82 105.29 -802.59 -92.053 933.775
17-17 7.50 0.266 922.80
fb= (t/m2) -8.007 -14.581 -24.40 -48.56 -47.90 -58.38 -56.13 -56.12 -27.84 -27.46 -27.00 -26.86 940.32 107.850 624.924
ft= (t/m2) 97.922 110.16 218.45 222.31 236.49 227.39 227.39 112.82 111.26 109.42 108.89 -749.68 -93.316 939.495
16-16 7.04 0.266 926.09
fb= (t/m2) -11.693 -23.22 -46.04 -46.85 -58.26 -56.02 -56.02 -27.79 -27.41 -26.95 -26.82 882.61 109.862 585.392
ft= (t/m2) 110.94 217.67 221.12 240.79 233.00 233.04 115.63 114.05 112.16 111.64 -683.74 -92.872 933.421
15-15 6.60 0.221 920.49
fb= (t/m2) -21.24 -41.67 -42.34 -55.38 -53.59 -53.14 -26.59 -26.23 -25.80 -25.67 808.88 109.870 547.094
ft= (t/m2) 217.59 221.04 241.16 233.36 233.40 115.81 114.23 112.33 111.81 -606.74 -88.191 905.799
14-14 6.19 0.214 891.95
fb= (t/m2) -35.52 -36.09 -49.44 -47.84 -47.85 -23.74 -23.42 -23.03 -22.92 721.25 93.800 505.178
ft= (t/m2) 207.68 235.80 234.78 234.87 116.54 114.97 113.06 112.56 -493.01 -72.310 804.946
13-13 5.68 0.230 791.87
fb= (t/m2) -23.01 -37.08 -36.92 -36.94 -18.33 -18.08 -17.78 -17.70 589.76 98.033 481.953
ft= (t/m2) 224.08 226.77 232.99 115.62 114.08 112.18 111.72 -376.71 -72.837 687.889
12-12 5.22 0.214 677.51
fb= (t/m2) -20.87 -21.12 -21.70 -10.77 -10.62 -10.45 -10.40 453.39 87.663 435.132
ft= (t/m2) 208.48 224.10 113.55 112.05 110.19 109.76 -268.82 -61.845 547.479
11-11 4.80 0.192 541.06
fb= (t/m2) -3.14 -3.38 -1.71 -1.69 -1.66 -1.65 325.42 74.866 387.063
ft= (t/m2) 204.99 107.14 109.53 58.67 107.32 -177.41 -50.132 360.104
10-10 4.42 0.209 358.35
fb= (t/m2) 14.80 7.74 7.91 7.75 7.75 215.93 61.017 322.903
ft= (t/m2) 99.83 103.37 106.13 104.93 -106.31 -41.017 266.929
9-9 4.09 0.237 265.79
fb= (t/m2) 16.23 16.80 17.25 17.05 130.03 49.923 247.290
ft= (t/m2) 96.71 105.23 103.21 -55.56 -28.145 221.448
8-8 3.80 0.209 219.12
fb= (t/m2) 24.14 26.27 25.76 68.26 34.578 179.003
ft= (t/m2) 104.90 103.21 -22.92 -18.774 166.414
7-7 3.55 0.237 163.30
fb= (t/m2) 34.42 33.86 28.26 23.152 119.700
ft= (t/m2) 103.81 -5.34 -10.565 87.904
6-6 3.35 0.293 85.53
fb= (t/m2) 40.95 6.61 13.069 60.628
ft= (t/m2) 83.45 83.446
5-5 3.20 0.460 78.18
fb= (t/m2) 46.81 46.808
Average Stress (T/m 2) in CG of cables 1 st stage= 924.45
Average Stress (T/m 2) in CG of cables 2 nd stage= 923.29
Average Stress (T/m 2) in CG of cables 3 rd stage= 906.22
Average Stress (T/m 2) in CG of cables 4 th stage= 841.91
Average Stress (T/m 2) in CG of cables 5 th stage= 734.69
Average Stress (T/m 2) in CG of cables 6 th stage= 609.28
Average Stress (T/m 2) in CG of cables 7 th stage= 449.70
Average Stress (T/m 2) in CG of cables 8 th stage= 312.07
Average Stress (T/m 2) in CG of cables 9 th stage= 242.45
Average Stress (T/m 2) in CG of cables 10 th stage= 191.21
Average Stress (T/m 2) in CG of cables 11 th stage= 124.41
Average Stress (T/m 2) in CG of cables 12 th stage= 81.85
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.78E-06 3.464 1.90E-06 3.696 1.98E-06 3.862 2.03E-06 3.954 2.05E-06 3.988 8.4E-07 1.638 9.1E-07 1.781 9.7E-07 1.900 1.0E-06 2.015 1.1E-06 2.137 3.464 5.477 5.762 5.969 6.125
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables: 10th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.05E-06 3.993 1.72E-06 3.345 1.95E-06 3.808 1.97E-06 3.841 2.01E-06 3.929 1.17E-06 2.274 1.25E-06 2.440 1.36E-06 2.658 1.71E-06 3.343 1.81E-06 3.539 6.267 5.786 6.466 7.185 7.467
Creep Loss in 11th Shrinkage Loss in 11th Creep Loss in 12th Shrinkage Loss in
stage cables: stage cables: stage cables: 12th stage cables: Total C&S Total C&S
Change of Change of Shrinkage Change of Creep Change of Shrinkage Loss 11th Loss 12th
Creep loss stage stage
Creep Shrinkage loss Creep loss Shrinkage loss
(kg/cm2)
strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.22E-06 4.319 2.44E-06 4.763 2.61E-06 5.094 8.27E-06 16.131 9.082 21.225
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 775.53 0.520
16-16 786.82 0.528
15-15 798.12 0.536
14-14 798.12 0.536
13-13 842.85 0.566
12-12 858.26 0.576
11-11 843.31 0.566 0.568
10-10 858.37 0.576
9-9 873.43 0.586
8-8 890.58 0.598
7-7 917.60 0.616
6-6 944.62 0.634
5-5 824.57 0.553
1000 hour relaxation loss 12 th stage cables= 0.86 %
Final (0.5x10^6 hours) relaxation loss 12 th stage cables= 2.566 %
% Loss in 1 st stage cables= 8.157 %
% Loss in 2 nd stage cables= 7.902 %
% Loss in 3 rd stage cables= 7.239 %
% Loss in 4 th stage cables= 6.576 %
% Loss in 5 th stage cables= 5.483 %
% Loss in 6 th stage cables= 4.626 %
% Loss in 7 th stage cables= 3.462 %
% Loss in 8 th stage cables= 2.535 %
% Loss in 9 th stage cables= 1.984 %
% Loss in 10 th stage cables= 1.580 %
% Loss in 11 th stage cables= 1.415 %
% Loss in 12 th stage cables= 1.104 %
xiii) BETWEEN 13 th AND 14 th STAGE STRESSING: (BETN 187 DAYS & 202 DAYS)
13 th
stage Stress
10th 11th 12th Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to DL due to Depth of Stress at
stage stage stage
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with Truss & Total Depth (m) CG of CG of
Prestress Prestress Prestress up to 4th
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic working cables cables:
with loss with loss with loss Segment
shortenin load
Loss g loss
8.115% 7.837% 7.154% 6.499% 5.416% 4.566% 3.424% 2.521% 2.000% 1.626% 1.483% 1.200% 0.040%
ft= (t/m2) 86.976 100.865 109.85 218.63 215.62 228.84 219.95 219.85 109.03 107.48 105.66 104.08 103.37 -937.96 -99.724 892.504
17-17 7.50 0.259 888.16
fb= (t/m2) -8.008 -14.584 -24.41 -48.58 -47.91 -58.39 -56.12 -56.10 -27.82 -27.42 -26.96 -26.55 -26.37 1098.93 116.838 766.559
ft= (t/m2) 97.938 110.20 218.50 222.34 236.49 227.35 227.28 112.72 111.13 109.25 107.64 106.90 -886.72 -101.611 899.406
16-16 7.04 0.259 893.20
fb= (t/m2) -11.695 -23.22 -46.05 -46.86 -58.26 -56.01 -55.99 -27.77 -27.38 -26.91 -26.52 -26.34 1043.94 119.628 730.574
ft= (t/m2) 110.98 217.72 221.15 240.79 232.96 232.93 115.53 113.91 111.98 110.35 109.60 -819.90 -101.717 896.292
15-15 6.60 0.215 889.69
fb= (t/m2) -21.25 -41.68 -42.34 -55.38 -53.58 -53.12 -26.57 -26.20 -25.76 -25.38 -25.21 969.97 120.334 693.837
ft= (t/m2) 217.64 221.06 241.17 233.32 233.29 115.71 114.09 112.16 110.52 109.77 -739.19 -97.474 872.072
14-14 6.19 0.208 864.65
fb= (t/m2) -35.53 -36.09 -49.45 -47.84 -47.83 -23.72 -23.39 -22.99 -22.66 -22.51 878.70 104.835 651.522
ft= (t/m2) 207.70 235.81 234.74 234.76 116.45 114.83 112.89 111.27 110.51 -616.09 -81.951 780.910
13-13 5.68 0.223 774.74
fb= (t/m2) -23.01 -37.08 -36.92 -36.92 -18.31 -18.06 -17.75 -17.50 -17.38 736.99 109.566 623.630
ft= (t/m2) 224.09 226.73 232.88 115.52 113.95 112.01 110.43 109.68 -486.11 -82.549 676.631
12-12 5.22 0.207 672.33
fb= (t/m2) -20.87 -21.12 -21.69 -10.76 -10.61 -10.43 -10.28 -10.21 585.05 99.352 568.437
ft= (t/m2) 208.44 223.99 113.46 111.92 110.02 108.50 107.75 -361.70 -71.359 551.037
11-11 4.80 0.186 549.42
fb= (t/m2) -3.14 -3.37 -1.71 -1.69 -1.66 -1.63 -1.62 437.86 86.384 509.423
ft= (t/m2) 204.89 107.05 109.41 58.58 106.08 105.35 -252.70 -59.247 379.410
10-10 4.42 0.199 381.83
fb= (t/m2) 14.80 7.73 7.90 7.74 7.66 7.61 307.57 72.111 433.117
ft= (t/m2) 99.75 103.25 105.96 103.72 103.00 -164.41 -50.132 301.142
9-9 4.09 0.221 303.56
fb= (t/m2) 16.21 16.78 17.22 16.86 16.74 201.10 61.017 345.935
ft= (t/m2) 96.59 105.07 102.03 101.31 -97.82 -36.187 270.991
8-8 3.80 0.192 270.73
fb= (t/m2) 24.11 26.23 25.47 25.29 120.18 44.457 265.728
ft= (t/m2) 104.73 102.02 100.98 -51.11 -26.284 230.342
7-7 3.55 0.209 228.48
fb= (t/m2) 34.37 33.48 33.13 63.03 34.578 198.576
ft= (t/m2) 102.62 101.25 -21.20 -17.608 165.054
6-6 3.35 0.237 162.47
fb= (t/m2) 40.48 39.93 26.23 21.781 128.422
ft= (t/m2) 102.09 -5.00 -9.999 87.098
5-5 3.20 0.293 85.00
fb= (t/m2) 45.59 6.20 12.399 64.189
ft= (t/m2) 81.09 81.095
4-4 3.09 0.460 76.23
fb= (t/m2) 48.42 48.416
Average Stress (T/m 2) in CG of cables 1 st stage= 890.68
Average Stress (T/m 2) in CG of cables 2 nd stage= 891.45
Average Stress (T/m 2) in CG of cables 3 rd stage= 877.17
Average Stress (T/m 2) in CG of cables 4 th stage= 819.69
Average Stress (T/m 2) in CG of cables 5 th stage= 723.53
Average Stress (T/m 2) in CG of cables 6 th stage= 610.88
Average Stress (T/m 2) in CG of cables 7 th stage= 465.63
Average Stress (T/m 2) in CG of cables 8 th stage= 342.70
Average Stress (T/m 2) in CG of cables 9 th stage= 287.14
Average Stress (T/m 2) in CG of cables 10 th stage= 249.60
Average Stress (T/m 2) in CG of cables 11 th stage= 195.47
Average Stress (T/m 2) in CG of cables 12 th stage= 123.74
Average Stress (T/m 2) in CG of cables 13 th stage= 80.62
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.52E-06 2.970 1.62E-06 3.155 1.68E-06 3.285 1.72E-06 3.354 1.73E-06 3.377 7.2E-07 1.404 7.8E-07 1.523 8.3E-07 1.616 8.7E-07 1.706 9.2E-07 1.798 2.970 4.678 4.901 5.060 5.175
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables: 10th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.73E-06 3.378 1.71E-06 3.334 1.69E-06 3.296 1.71E-06 3.331 1.75E-06 3.407 9.74E-07 1.899 1.03E-06 2.017 1.11E-06 2.163 1.36E-06 2.650 1.37E-06 2.668 5.277 5.351 5.458 5.981 6.075
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables:
Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 11th Loss 12th Loss 13th
Creep loss Creep loss stage stage stage
Creep Creep Creep loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.79E-06 3.485 1.98E-06 3.852 2.32E-06 4.528 1.62E-06 3.150 2.19E-06 4.272 7.57E-06 14.766 6.635 8.123 19.294
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 761.30 0.511
16-16 772.38 0.518
15-15 783.46 0.526
14-14 783.46 0.526
13-13 827.36 0.555
12-12 842.47 0.565
11-11 827.78 0.555
0.563
10-10 842.56 0.565
9-9 857.33 0.575
8-8 874.10 0.587
7-7 897.63 0.602
6-6 921.16 0.618
5-5 944.69 0.634
4-4 808.64 0.543
1000 hour relaxation loss 13 th stage cables= 0.79 %
Final (0.5x10^6 hours) relaxation loss 13 th stage cables= 2.360 %
% Loss in 1 st stage cables= 8.145 %
% Loss in 2 nd stage cables= 7.880 %
% Loss in 3 rd stage cables= 7.199 %
% Loss in 4 th stage cables= 6.545 %
% Loss in 5 th stage cables= 5.464 %
% Loss in 6 th stage cables= 4.614 %
% Loss in 7 th stage cables= 3.474 %
% Loss in 8 th stage cables= 2.572 %
% Loss in 9 th stage cables= 2.056 %
% Loss in 10 th stage cables= 1.682 %
% Loss in 11 th stage cables= 1.545 %
% Loss in 12 th stage cables= 1.276 %
% Loss in 13 th stage cables= 1.007 %
xiv) BETWEEN 14 th AND 15 th STAGE STRESSING: (BETN 202 DAYS & 217 DAYS)
14 th
stage Stress
10th 11th 12th 13th Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to Depth of Stress at
stage stage stage stage due to DL
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with Truss & Total Depth (m) CG of CG of
Prestress Prestress Prestress Prestress up to 3rd
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic working cables cables:
with loss with loss with loss with loss Segment
shortenin load
Loss g loss
8.059% 7.766% 7.060% 6.413% 5.336% 4.491% 3.370% 2.493% 2.007% 1.664% 1.556% 1.314% 1.072% 0.030%
ft= (t/m2) 87.029 100.943 109.96 218.83 215.81 229.02 220.07 219.91 109.02 107.43 105.58 103.96 102.30 101.54 -1083.59 -106.237 841.585
17-17 7.50 0.252 844.18
fb= (t/m2) -8.013 -14.595 -24.43 -48.62 -47.95 -58.43 -56.15 -56.11 -27.82 -27.41 -26.94 -26.52 -26.10 -25.91 1269.54 124.469 919.011
ft= (t/m2) 98.013 110.31 218.70 222.52 236.68 227.48 227.35 112.71 111.09 109.17 107.51 105.80 105.03 -1034.92 -108.713 848.731
16-16 7.04 0.252 850.12
fb= (t/m2) -11.704 -23.25 -46.09 -46.90 -58.31 -56.04 -56.01 -27.77 -27.37 -26.89 -26.49 -26.06 -25.88 1218.42 127.989 887.664
ft= (t/m2) 111.09 217.92 221.33 240.98 233.09 233.00 115.52 113.87 111.90 110.23 108.46 107.70 -968.06 -109.353 847.700
15-15 6.60 0.210 847.89
fb= (t/m2) -21.27 -41.72 -42.38 -55.42 -53.61 -53.13 -26.57 -26.19 -25.74 -25.35 -24.95 -24.77 1145.24 129.367 853.503
ft= (t/m2) 217.84 221.25 241.36 233.45 233.36 115.70 114.05 112.07 110.40 108.63 107.87 -884.32 -105.576 826.093
14-14 6.19 0.204 825.62
fb= (t/m2) -35.56 -36.12 -49.49 -47.86 -47.84 -23.72 -23.38 -22.98 -22.63 -22.27 -22.12 1051.21 114.571 811.804
ft= (t/m2) 207.87 235.99 234.87 234.83 116.44 114.79 112.80 111.14 109.37 108.63 -752.46 -90.549 743.724
13-13 5.68 0.217 745.11
fb= (t/m2) -23.03 -37.11 -36.94 -36.93 -18.31 -18.05 -17.74 -17.48 -17.20 -17.08 900.12 119.742 779.996
ft= (t/m2) 224.26 226.86 232.95 115.51 113.90 111.93 110.31 108.54 107.84 -609.01 -91.210 651.877
12-12 5.22 0.201 656.43
fb= (t/m2) -20.88 -21.13 -21.69 -10.76 -10.61 42.71 -10.45 -10.11 -10.04 732.98 109.776 769.787
ft= (t/m2) 208.56 224.06 113.45 111.88 109.94 108.38 106.64 105.97 -467.94 -79.935 541.003
11-11 4.80 0.181 544.99
fb= (t/m2) -3.14 -3.38 -1.71 -1.68 -1.65 -1.63 -1.61 -1.60 566.47 96.765 646.840
ft= (t/m2) 204.95 107.04 109.36 58.54 105.96 104.26 103.63 -340.91 -67.549 385.288
10-10 4.42 0.192 392.79
fb= (t/m2) 14.80 7.73 7.90 7.74 7.65 7.53 7.48 414.93 82.216 557.977
ft= (t/m2) 99.74 103.21 105.88 103.60 101.94 101.35 -234.81 -58.521 322.395
9-9 4.09 0.209 329.35
fb= (t/m2) 16.21 16.78 17.21 16.84 16.57 16.47 287.21 71.227 458.515
ft= (t/m2) 96.56 104.99 101.91 100.27 99.48 -151.70 -43.664 307.840
8-8 3.80 0.181 310.59
fb= (t/m2) 24.10 26.21 25.44 25.03 24.83 186.37 53.643 365.613
ft= (t/m2) 104.66 101.91 99.93 98.21 -90.24 -33.338 281.128
7-7 3.55 0.192 281.50
fb= (t/m2) 34.34 33.44 32.79 32.22 111.28 43.857 287.927
ft= (t/m2) 102.50 100.20 98.34 -47.42 -24.290 229.333
6-6 3.35 0.209 227.97
fb= (t/m2) 40.43 39.52 38.79 58.65 30.047 207.439
ft= (t/m2) 101.04 99.40 -19.88 -16.387 164.170
5-5 3.20 0.237 161.97
fb= (t/m2) 45.12 44.39 24.65 20.320 134.483
ft= (t/m2) 100.96 -4.75 -9.784 86.424
4-4 3.09 0.293 84.57
fb= (t/m2) 48.84 5.90 12.133 66.881
ft= (t/m2) 80.28 80.281
3-3 3.02 0.460 75.62
fb= (t/m2) 49.64 49.643
Average Stress (T/m 2) in CG of cables 1 st stage= 847.15
Average Stress (T/m 2) in CG of cables 2 nd stage= 849.00
Average Stress (T/m 2) in CG of cables 3 rd stage= 836.75
Average Stress (T/m 2) in CG of cables 4 th stage= 785.37
Average Stress (T/m 2) in CG of cables 5 th stage= 700.77
Average Stress (T/m 2) in CG of cables 6 th stage= 600.71
Average Stress (T/m 2) in CG of cables 7 th stage= 468.89
Average Stress (T/m 2) in CG of cables 8 th stage= 361.07
Average Stress (T/m 2) in CG of cables 9 th stage= 319.97
Average Stress (T/m 2) in CG of cables 10 th stage= 296.04
Average Stress (T/m 2) in CG of cables 11 th stage= 254.73
Average Stress (T/m 2) in CG of cables 12 th stage= 194.97
Average Stress (T/m 2) in CG of cables 13 th stage= 123.27
Average Stress (T/m 2) in CG of cables 14 th stage= 80.10
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.30E-06 2.536 1.38E-06 2.683 1.43E-06 2.785 1.45E-06 2.836 1.46E-06 2.853 6.2E-07 1.209 6.7E-07 1.310 7.1E-07 1.385 7.5E-07 1.456 7.8E-07 1.528 2.536 3.993 4.169 4.292 4.381
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables: 10th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.46E-06 2.852 2.49E-06 4.853 1.56E-06 3.045 1.58E-06 3.080 1.61E-06 3.147 8.2E-07 1.605 8.68E-07 1.692 9.20E-07 1.795 1.11E-06 2.165 1.09E-06 2.122 4.457 6.545 4.839 5.245 5.269
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Creep Loss in 14th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
stage cables: stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables: 14th stage cables:
Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 11th Loss 12th Loss 13th Loss 14th
Creep loss Creep loss stage stage stage stage
Creep Creep Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.65E-06 3.214 1.75E-06 3.416 1.72E-06 3.347 2.17E-06 4.226 1.22E-06 2.379 1.45E-06 2.820 1.98E-06 3.856 6.97E-06 13.601 5.593 6.236 7.203 17.827
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 747.76 0.502
16-16 758.80 0.509
15-15 769.85 0.517
14-14 769.85 0.517
13-13 813.18 0.546
12-12 828.24 0.556
11-11 814.02 0.546
10-10 828.74 0.556 0.558
9-9 843.47 0.566
8-8 858.19 0.576
7-7 872.92 0.586
6-6 894.60 0.600
5-5 919.63 0.617
4-4 944.66 0.634
3-3 804.51 0.540
1000 hour relaxation loss 14 th stage cables= 0.72 %
Final (0.5x10^6 hours) relaxation loss 14 th stage cables= 2.167 %
% Loss in 1 st stage cables= 8.084 %
% Loss in 2 nd stage cables= 7.803 %
% Loss in 3 rd stage cables= 7.098 %
% Loss in 4 th stage cables= 6.452 %
% Loss in 5 th stage cables= 5.376 %
% Loss in 6 th stage cables= 4.531 %
% Loss in 7 th stage cables= 3.431 %
% Loss in 8 th stage cables= 2.538 %
% Loss in 9 th stage cables= 2.056 %
% Loss in 10 th stage cables= 1.713 %
% Loss in 11 th stage cables= 1.608 %
% Loss in 12 th stage cables= 1.372 %
% Loss in 13 th stage cables= 1.139 %
% Loss in 14 th stage cables= 0.919 %
xv) BETWEEN 15 th AND 16th STAGE STRESSING: (BETN 217 DAYS & 232 DAYS)
DAYS 7 22 37 52 67 82 97 112 127 142 157 172 187 202 217 232
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04 3.56E-04 3.51E-04 3.47E-04 3.43E-04 3.40E-04 3.38E-04 3.36E-04 3.34E-04 3.32E-04 3.31E-04 3.29E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04 3.48E-04 3.50E-04 3.52E-04 3.53E-04 3.55E-04 3.56E-04 3.56E-04 3.57E-04 3.58E-04 3.58E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420 3817160 3830662 3841384 3850169 3857537 3863833 3869295 3874092 3878349 3882161 3885600
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 446 T/m2
15 th
10th 11th 12th 13th 14th stage Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress Depth of Stress at
stage stage stage stage stage due to DL
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with Total Depth (m) CG of CG of
Prestress Prestress Prestress Prestress Prestress up to 2nd
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic cables cables:
with loss with loss with loss with loss with loss Segment
shortenin
Loss g loss
7.951% 7.637% 6.903% 6.259% 5.185% 4.343% 3.258% 2.391% 1.940% 1.628% 1.560% 1.352% 1.147% 0.956% 0.019%
ft= (t/m2) 87.132 101.084 110.15 219.19 216.15 229.37 220.33 220.14 109.10 107.47 105.57 103.92 102.22 100.60 99.19 -1239.95 891.679
17-17 7.50 0.245 893.66
fb= (t/m2) -8.022 -14.615 -24.47 -48.70 -48.03 -58.52 -56.21 -56.17 -27.84 -27.42 -26.94 -26.51 -26.08 -25.67 -25.31 1452.74 952.227
ft= (t/m2) 98.150 110.50 219.06 222.88 237.05 227.74 227.59 112.79 111.13 109.16 107.47 105.72 104.06 102.61 -1194.77 901.129
16-16 7.04 0.245 901.87
fb= (t/m2) -11.721 -23.29 -46.17 -46.97 -58.40 -56.10 -56.07 -27.79 -27.38 -26.89 -26.48 -26.04 -25.64 -25.28 1406.61 922.413
ft= (t/m2) 111.28 218.28 221.69 241.36 233.36 233.24 115.60 113.91 111.90 110.18 108.38 106.71 105.23 -1128.67 902.442
15-15 6.60 0.206 902.05
fb= (t/m2) -21.30 -41.79 -42.45 -55.51 -53.67 -53.19 -26.59 -26.20 -25.74 -25.34 -24.93 -24.54 -24.20 1335.25 889.808
ft= (t/m2) 218.20 221.60 241.73 233.72 233.60 115.78 114.09 112.07 110.35 108.55 106.87 105.90 -1042.58 879.905
14-14 6.19 0.199 879.38
fb= (t/m2) -35.62 -36.18 -49.56 -47.92 -47.89 -23.74 -23.39 -22.98 -22.62 -22.26 -21.91 -21.71 1239.34 863.553
ft= (t/m2) 208.21 236.36 235.14 235.07 116.52 114.83 112.80 111.10 109.29 107.62 106.64 -902.53 791.047
13-13 5.68 0.211 792.24
fb= (t/m2) -23.07 -37.17 -36.98 -36.97 -18.32 -18.06 -17.74 -17.47 -17.19 -16.92 -16.77 1079.64 822.986
ft= (t/m2) 224.61 227.12 233.19 115.59 113.94 111.92 110.26 108.46 106.84 105.86 -745.78 712.030
12-12 5.22 0.196 713.90
fb= (t/m2) -20.92 -21.15 -21.72 -10.76 -10.61 -10.42 -10.27 -10.10 -9.95 -9.86 897.58 761.821
ft= (t/m2) 208.80 224.29 113.53 111.92 109.94 108.33 106.56 104.99 104.03 -587.83 604.570
11-11 4.80 0.177 607.85
fb= (t/m2) -3.14 -3.38 -1.71 -1.69 -1.65 -1.63 -1.60 -1.58 -1.57 711.60 693.644
ft= (t/m2) 205.16 107.11 109.40 58.54 105.92 104.19 102.67 101.74 -442.25 452.479
10-10 4.42 0.186 458.96
fb= (t/m2) 14.82 7.73 7.90 7.74 7.65 7.52 7.42 7.35 538.27 606.396
ft= (t/m2) 99.81 103.25 105.88 103.56 101.86 100.41 99.49 -317.65 396.615
9-9 4.09 0.199 401.89
fb= (t/m2) 16.22 16.78 17.21 16.83 16.56 16.32 16.17 388.53 504.629
ft= (t/m2) 96.59 104.99 101.87 100.19 98.56 97.66 -217.26 382.592
8-8 3.80 0.173 384.14
fb= (t/m2) 24.11 26.21 25.43 25.01 24.60 24.38 266.91 416.642
ft= (t/m2) 104.65 101.87 99.86 97.30 96.41 -140.33 359.749
7-7 3.55 0.181 358.60
fb= (t/m2) 34.34 33.42 32.76 31.92 31.63 173.06 337.137
ft= (t/m2) 102.46 100.13 97.43 96.43 -83.96 312.487
6-6 3.35 0.192 309.50
fb= (t/m2) 40.41 39.49 38.43 38.04 103.86 260.224
ft= (t/m2) 100.96 98.48 97.25 -44.58 252.110
5-5 3.20 0.209 247.91
fb= (t/m2) 45.09 43.98 43.43 55.28 187.779
ft= (t/m2) 100.03 98.57 -18.96 179.637
4-4 3.09 0.237 175.04
fb= (t/m2) 48.39 47.69 23.56 119.635
ft= (t/m2) 115.20 -4.61 110.584
3-3 3.02 0.293 106.08
fb= (t/m2) 58.29 5.74 64.025
ft= (t/m2) 79.85 79.849
2-2 3.00 0.460 75.26
fb= (t/m2) 49.94 49.940
Average Stress (T/m 2) in CG of cables 1 st stage= 897.77
Average Stress (T/m 2) in CG of cables 2 nd stage= 901.96
Average Stress (T/m 2) in CG of cables 3 rd stage= 890.71
Average Stress (T/m 2) in CG of cables 4 th stage= 835.81
Average Stress (T/m 2) in CG of cables 5 th stage= 753.07
Average Stress (T/m 2) in CG of cables 6 th stage= 660.88
Average Stress (T/m 2) in CG of cables 7 th stage= 533.40
Average Stress (T/m 2) in CG of cables 8 th stage= 430.42
Average Stress (T/m 2) in CG of cables 9 th stage= 393.01
Average Stress (T/m 2) in CG of cables 10 th stage= 371.37
Average Stress (T/m 2) in CG of cables 11 th stage= 334.05
Average Stress (T/m 2) in CG of cables 12 th stage= 278.70
Average Stress (T/m 2) in CG of cables 13 th stage= 211.48
Average Stress (T/m 2) in CG of cables 14 th stage= 140.56
Average Stress (T/m 2) in CG of cables 15 th stage= 90.67
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.25E-06 2.430 1.32E-06 2.565 1.36E-06 2.655 1.38E-06 2.695 1.39E-06 2.709 5.4E-07 1.053 5.8E-07 1.134 6.1E-07 1.197 6.4E-07 1.255 6.7E-07 1.312 2.430 3.698 3.852 3.950 4.021
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables: 10th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.39E-06 2.714 2.37E-06 4.625 1.49E-06 2.912 1.51E-06 2.947 1.54E-06 3.006 7.0E-07 1.372 7.37E-07 1.438 7.76E-07 1.514 9.26E-07 1.806 8.93E-07 1.742 4.086 6.063 4.426 4.753 4.747
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Creep Loss in 14th Creep Loss in 15th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
stage cables: stage cables: stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables: 14th stage cables: 15th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 11th Loss 12th Loss 13th Loss 14th Loss 15th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.57E-06 3.065 1.64E-06 3.206 1.63E-06 3.187 1.68E-06 3.271 2.15E-06 4.197 9.74E-07 1.900 1.10E-06 2.135 1.30E-06 2.543 1.80E-06 3.505 6.46E-06 12.600 4.965 5.341 5.730 6.776 16.796
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 730.41 0.490
16-16 741.24 0.497
15-15 752.08 0.505
14-14 755.70 0.507
13-13 798.23 0.536
12-12 813.01 0.546
11-11 799.03 0.536
10-10 813.48 0.546
0.558
9-9 827.92 0.556
8-8 842.36 0.565
7-7 856.81 0.575
6-6 877.17 0.589
5-5 899.69 0.604
4-4 922.20 0.619
3-3 1084.60 0.728
2-2 801.38 0.538
1000 hour relaxation loss 15 th stage cables= 0.73 %
Final (0.5x10^6 hours) relaxation loss 15 th stage cables= 2.192 %
% Loss in 1 st stage cables= 7.975 %
% Loss in 2 nd stage cables= 7.671 %
% Loss in 3 rd stage cables= 6.938 %
% Loss in 4 th stage cables= 6.295 %
% Loss in 5 th stage cables= 5.221 %
% Loss in 6 th stage cables= 4.380 %
% Loss in 7 th stage cables= 3.315 %
% Loss in 8 th stage cables= 2.432 %
% Loss in 9 th stage cables= 1.985 %
% Loss in 10 th stage cables= 1.672 %
% Loss in 11 th stage cables= 1.606 %
% Loss in 12 th stage cables= 1.402 %
% Loss in 13 th stage cables= 1.200 %
% Loss in 14 th stage cables= 1.019 %
% Loss in 15 th stage cables= 0.906 %
xvi) BETWEEN 16th AND 17th STAGE STRESSING: (BETN 232 DAYS & 247 DAYS)
DAYS 7 22 37 52 67 82 97 112 127 142 157 172 187 202 217 232 247
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04 3.56E-04 3.51E-04 3.47E-04 3.43E-04 3.40E-04 3.38E-04 3.36E-04 3.34E-04 3.32E-04 3.31E-04 3.29E-04 3.28E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04 3.48E-04 3.50E-04 3.52E-04 3.53E-04 3.55E-04 3.56E-04 3.56E-04 3.57E-04 3.58E-04 3.58E-04 3.59E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420 3817160 3830662 3841384 3850169 3857537 3863833 3869295 3874092 3878349 3882161 3885600 3888724
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 447 T/m2
16th
10th 11th 12th 13th 14th 15th stage Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress Depth of Stress at
stage stage stage stage stage stage due to DL
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with Total Depth (m) CG of CG of
Prestress Prestress Prestress Prestress Prestress Prestress up to 1st
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic cables cables:
with loss with loss with loss with loss with loss with loss Segment
shortenin
Loss g loss
7.584% 7.230% 6.441% 5.794% 4.706% 3.870% 2.813% 1.969% 1.568% 1.299% 1.311% 1.145% 0.982% 0.839% 0.781% -0.037%
ft= (t/m2) 87.479 101.530 110.69 220.28 217.24 230.51 221.34 221.09 109.51 107.83 105.84 104.13 102.39 100.72 98.44 96.57 -1466.92 768.67
17-17 7.50 0.240 782.19
fb= (t/m2) -8.054 -14.680 -24.59 -48.94 -48.27 -58.81 -56.47 -56.41 -27.94 -27.51 -27.01 -26.57 -26.12 -25.70 -25.12 -24.64 1718.67 1191.83
ft= (t/m2) 98.583 111.05 220.15 224.01 238.22 228.79 228.57 113.22 111.50 109.44 107.70 105.89 104.18 101.83 99.93 -1427.81 775.23
16-16 7.04 0.240 788.69
fb= (t/m2) -11.772 -23.40 -46.39 -47.21 -58.69 -56.36 -56.31 -27.89 -27.47 -26.96 -26.53 -26.09 -25.67 -25.09 -24.62 1680.97 1170.53
ft= (t/m2) 111.83 219.36 222.81 242.55 234.44 234.25 116.04 114.29 112.18 110.41 108.56 106.83 104.43 102.51 -1363.95 776.55
15-15 6.60 0.202 787.75
fb= (t/m2) -21.41 -42.00 -42.66 -55.78 -53.92 -53.42 -26.69 -26.29 -25.80 -25.39 -24.97 -24.57 -24.02 -23.58 1613.59 1143.10
ft= (t/m2) 219.28 222.72 242.93 234.80 234.61 116.22 114.47 112.35 110.59 108.73 107.00 105.09 104.19 -1275.63 757.35
14-14 6.19 0.195 768.72
fb= (t/m2) -35.80 -36.36 -49.81 -48.14 -48.10 -23.83 -23.47 -23.03 -22.67 -22.29 -21.94 -21.55 -21.36 1516.38 1118.03
ft= (t/m2) 209.26 237.53 236.22 236.09 116.96 115.22 113.08 111.33 109.47 107.75 105.83 104.94 -1125.36 678.31
13-13 5.68 0.207 692.64
fb= (t/m2) -23.19 -37.35 -37.15 -37.13 -18.39 -18.12 -17.78 -17.51 -17.21 -16.94 -16.64 -16.50 1346.20 1072.28
ft= (t/m2) 225.72 228.16 234.20 116.03 114.32 112.21 110.49 108.64 106.96 105.06 104.21 -950.88 615.12
12-12 5.22 0.192 629.23
fb= (t/m2) -21.02 -21.25 -21.81 -10.80 -10.65 -10.45 -10.29 -10.12 -9.96 -9.78 -9.70 1144.44 998.60
ft= (t/m2) 209.76 225.26 113.96 112.29 110.22 108.56 106.74 105.12 103.24 102.43 -769.82 527.76
11-11 4.80 0.173 541.63
fb= (t/m2) -3.16 -3.39 -1.72 -1.69 -1.66 -1.63 -1.61 -1.58 -1.55 -1.54 931.90 912.36
ft= (t/m2) 206.05 107.52 109.77 58.68 106.14 104.36 102.80 100.96 100.19 -598.43 398.04
10-10 4.42 0.181 414.65
fb= (t/m2) 14.88 7.76 7.93 7.75 7.67 7.54 7.42 7.29 7.24 728.36 803.841
ft= (t/m2) 100.19 103.59 106.15 103.78 102.03 100.53 98.73 98.00 -447.82 365.178
9-9 4.09 0.192 379.97
fb= (t/m2) 16.28 16.84 17.25 16.87 16.58 16.34 16.05 15.93 547.76 679.904
ft= (t/m2) 96.92 105.25 102.08 100.36 98.67 96.91 96.21 -323.00 373.411
8-8 3.80 0.167 382.08
fb= (t/m2) 24.19 26.27 25.48 25.05 24.63 24.19 24.02 396.81 570.644
ft= (t/m2) 104.92 102.08 100.02 97.41 95.67 95.00 -224.11 370.998
7-7 3.55 0.173 375.89
fb= (t/m2) 34.43 33.49 32.82 31.96 31.39 31.17 276.37 471.629
ft= (t/m2) 102.68 100.29 97.54 95.70 94.41 -148.49 342.119
6-6 3.35 0.181 344.01
fb= (t/m2) 40.50 39.56 38.47 37.75 37.23 183.69 377.198
ft= (t/m2) 101.13 98.59 96.51 94.60 -92.38 298.451
5-5 3.20 0.192 297.89
fb= (t/m2) 45.16 44.03 43.10 42.24 114.56 289.090
ft= (t/m2) 100.15 97.82 96.07 -52.06 241.978
4-4 3.09 0.209 239.61
fb= (t/m2) 48.45 47.32 46.48 64.66 206.914
ft= (t/m2) 114.32 97.97 -24.44 187.849
3-3 3.02 0.237 183.93
fb= (t/m2) 57.85 49.57 30.39 137.808
ft= (t/m2) 79.24 100.28 -7.36 172.161
2-2 3.00 0.293 166.12
fb= (t/m2) 49.56 51.48 9.15 110.187
ft= (t/m2) 80.74 80.738
1-1 3.00 0.877 71.90
fb= (t/m2) 50.50 50.495
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
9.92E-07 1.934 1.04E-06 2.034 1.08E-06 2.099 1.09E-06 2.126 1.09E-06 2.134 4.8E-07 0.936 5.1E-07 0.993 5.4E-07 1.049 5.6E-07 1.096 5.9E-07 1.142 1.934 3.027 3.148 3.222 3.276
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables: 10th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.10E-06 2.136 1.87E-06 3.640 1.18E-06 2.296 1.20E-06 2.330 1.22E-06 2.384 6.1E-07 1.189 6.36E-07 1.241 6.66E-07 1.298 7.88E-07 1.537 7.52E-07 1.466 3.326 4.881 3.594 3.867 3.849
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Creep Loss in 14th Creep Loss in 15th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
stage cables: stage cables: stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables: 14th stage cables: 15th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 11th Loss 12th Loss 13th Loss 14th Loss 15th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
1.25E-06 2.436 1.30E-06 2.529 1.30E-06 2.540 1.34E-06 2.609 1.44E-06 2.803 8.06E-07 1.571 8.80E-07 1.716 9.92E-07 1.934 1.19E-06 2.312 1.65E-06 3.210 4.008 4.245 4.474 4.921 6.013
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 710.66 0.477
16-16 721.46 0.484
15-15 732.26 0.491
14-14 743.06 0.499
13-13 784.57 0.526
12-12 799.29 0.536
11-11 786.27 0.528
10-10 800.67 0.537
9-9 815.07 0.547 0.542
8-8 829.47 0.557
7-7 843.87 0.566
6-6 858.27 0.576
5-5 874.63 0.587
4-4 898.27 0.603
3-3 921.91 0.619
2-2 808.64 0.543
1-1 809.85 0.543
1000 hour relaxation loss 16th stage cables= 0.53 %
Final (0.5x10^6 hours) relaxation loss 16th stage cables= 1.586 %
% Loss in 1 st stage cables= 7.603 %
% Loss in 2 nd stage cables= 7.258 %
% Loss in 3 rd stage cables= 6.470 %
% Loss in 4 th stage cables= 5.823 %
% Loss in 5 th stage cables= 4.736 %
% Loss in 6 th stage cables= 3.901 %
% Loss in 7 th stage cables= 2.859 %
% Loss in 8 th stage cables= 2.003 %
% Loss in 9 th stage cables= 1.604 %
% Loss in 10 th stage cables= 1.335 %
% Loss in 11 th stage cables= 1.349 %
% Loss in 12 th stage cables= 1.185 %
% Loss in 13 th stage cables= 1.024 %
% Loss in 14 th stage cables= 0.884 %
% Loss in 15 th stage cables= 0.837 %
% Loss in 16th stage cables= 0.638 %
XVII) BETWEEN 247 DAYS & 322 DAYS I.E AFTER LAYING OF SIDL
DAYS 82 97 112 127 142 157 172 187 202 217 232 247 262 277 292 307 322
CREEP CO-EFFICIENT ON
3.56E-04 3.51E-04 3.47E-04 3.43E-04 3.40E-04 3.38E-04 3.36E-04 3.34E-04 3.32E-04 3.31E-04 3.29E-04 3.28E-04 3.27E-04 3.26E-04 3.25E-04 3.24E-04 3.23E-04
322 DAYS
CREEP CO-EFFICIENT ON
5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04 3.56E-04 3.51E-04 3.47E-04 3.43E-04 3.40E-04 3.38E-04 3.36E-04 3.34E-04 3.32E-04 3.31E-04 3.29E-04 3.28E-04
247 DAYS
SHRINKAGE STRAIN ON
3.45E-04 3.48E-04 3.50E-04 3.52E-04 3.53E-04 3.55E-04 3.56E-04 3.56E-04 3.57E-04 3.58E-04 3.58E-04 3.59E-04 3.59E-04 3.60E-04 3.60E-04 3.60E-04 3.60E-04
322 DAYS
SHRINKAGE STRAIN ON
2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04 3.48E-04 3.50E-04 3.52E-04 3.53E-04 3.55E-04 3.56E-04 3.56E-04 3.57E-04 3.58E-04 3.58E-04 3.59E-04
247 DAYS
MODULUS OF
ELASTICITY OF 3817160 3830662 3841384 3850169 3857537 3863833 3869295 3874092 3878349 3882161 3885600 3888724 3891577 3894198 3896615 3898854 3900936
CONCRETE (T/m2)
17th
10th 11th 12th 13th 14th 15th 16th stage
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress Stress Depth of Stress at
stage stage stage stage stage stage stage
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with due to DL Total Depth (m) CG of CG of
Prestress Prestress Prestress Prestress Prestress Prestress Prestress
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic up to SIDL cables cables:
with loss with loss with loss with loss with loss with loss with loss
shortenin
Loss g loss
7.603% 7.258% 6.470% 5.823% 4.736% 3.901% 2.859% 2.003% 1.604% 1.335% 2.965% 2.707% 2.250% 2.049% 2.000% 1.020% 0.973%
ft= (t/m2) 87.461 101.499 110.66 220.21 217.18 230.44 221.24 221.02 109.47 107.79 104.07 102.49 101.08 99.49 97.23 95.55 0.00 -1601.22 625.64
17-17 7.50 0.240 648.82
fb= (t/m2) -8.052 -14.676 -24.59 -48.93 -48.25 -58.79 -56.45 -56.39 -27.93 -27.50 -26.55 -26.15 -25.79 -25.38 -24.81 -24.38 0.00 1876.01 1351.39
ft= (t/m2) 98.553 111.01 220.08 223.94 238.14 228.68 228.49 113.18 111.46 107.61 105.99 104.54 102.91 100.58 98.87 0.00 -1551.67 642.36
16-16 7.04 0.240 665.37
fb= (t/m2) -11.769 -23.40 -46.38 -47.19 -58.67 -56.34 -56.29 -27.88 -27.46 -26.51 -26.11 -25.75 -25.35 -24.78 -24.36 0.00 1826.80 1318.56
ft= (t/m2) 111.80 219.30 222.74 242.47 234.33 234.17 116.00 114.25 110.30 108.67 107.17 105.53 103.14 101.43 0.00 -1474.82 656.47
15-15 6.60 0.202 675.41
fb= (t/m2) -21.40 -41.99 -42.65 -55.77 -53.89 -53.40 -26.68 -26.28 -25.37 -24.99 -24.65 -24.27 -23.72 -23.33 0.00 1744.75 1276.37
ft= (t/m2) 219.21 222.65 242.85 234.69 234.53 116.18 114.43 110.47 108.84 107.34 105.69 103.80 103.09 0.00 -1371.38 652.40
14-14 6.19 0.195 670.73
fb= (t/m2) -35.79 -36.35 -49.79 -48.12 -48.09 -23.82 -23.46 -22.65 -22.31 -22.01 -21.67 -21.28 -21.14 0.00 1630.19 1233.73
ft= (t/m2) 209.19 237.45 236.11 236.01 116.92 115.17 111.19 109.57 108.07 106.43 104.53 103.84 0.00 -1199.08 595.41
13-13 5.68 0.207 616.01
fb= (t/m2) -23.18 -37.34 -37.13 -37.12 -18.39 -18.11 -17.48 -17.23 -16.99 -16.74 -16.44 -16.33 0.00 1434.38 1161.91
ft= (t/m2) 225.65 228.06 234.12 115.99 114.28 110.33 108.75 107.25 105.66 103.77 103.10 0.00 -1002.08 554.87
12-12 5.22 0.192 573.49
fb= (t/m2) -21.01 -21.24 -21.80 -10.80 -10.64 -10.28 -10.13 -9.99 -9.84 -9.66 -9.60 0.00 1206.06 1061.06
ft= (t/m2) 209.66 225.18 113.92 112.25 108.37 106.85 105.37 103.83 101.97 101.35 0.00 -800.19 488.57
11-11 4.80 0.173 505.18
fb= (t/m2) -3.16 -3.39 -1.72 -1.69 -1.63 -1.61 -1.59 -1.56 -1.54 -1.53 0.00 968.67 949.26
ft= (t/m2) 205.98 107.48 109.73 57.70 104.47 103.02 101.54 99.72 99.13 0.00 -611.78 376.98
10-10 4.42 0.181 395.09
fb= (t/m2) 14.88 7.76 7.92 7.63 7.54 7.44 7.33 7.20 7.16 0.00 744.62 819.483
ft= (t/m2) 100.15 103.55 104.37 102.14 100.73 99.30 97.52 96.97 0.00 -448.10 356.624
9-9 4.09 0.192 371.77
fb= (t/m2) 16.28 16.83 16.97 16.60 16.37 16.14 15.85 15.76 0.00 548.10 678.902
ft= (t/m2) 96.88 103.49 100.47 99.07 97.47 95.72 95.20 0.00 -314.10 374.198
8-8 3.80 0.167 382.26
fb= (t/m2) 24.18 25.83 25.08 24.73 24.33 23.89 23.76 0.00 385.89 557.693
ft= (t/m2) 103.16 100.47 98.74 96.22 94.50 94.00 0.00 -209.90 377.186
7-7 3.55 0.173 380.80
fb= (t/m2) 33.85 32.96 32.40 31.57 31.00 30.84 0.00 258.85 451.478
ft= (t/m2) 101.05 99.01 96.35 94.52 93.41 42.83 -131.71 395.465
6-6 3.35 0.541 409.23
fb= (t/m2) 39.86 39.05 38.00 37.28 36.84 126.83 162.92 480.792
ft= (t/m2) 99.84 97.39 95.33 93.60 51.96 -75.18 362.933
5-5 3.20 0.580 369.65
fb= (t/m2) 44.58 43.49 42.57 41.80 134.34 93.22 400.004
ft= (t/m2) 98.92 96.62 95.05 86.33 -36.55 340.378
4-4 3.09 0.640 350.73
fb= (t/m2) 47.86 46.74 45.99 204.35 45.40 390.341
ft= (t/m2) 112.91 96.94 93.60 -12.13 291.310
3-3 3.02 0.735 301.22
fb= (t/m2) 57.14 49.05 210.76 15.09 332.033
ft= (t/m2) 78.27 99.22 87.93 0.25 265.671
2-2 3.00 0.896 274.26
fb= (t/m2) 48.95 50.94 194.84 -0.32 294.414
ft= (t/m2) 82.64 82.645
1-1 3.00 1.543 134.33
fb= (t/m2) 183.13 183.128
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
3.26E-06 6.356 3.59E-06 7.003 3.72E-06 7.255 3.78E-06 7.365 3.80E-06 7.409 1.7E-06 3.296 1.8E-06 3.505 1.9E-06 3.662 2.0E-06 3.804 2.0E-06 3.940 6.356 10.508 10.917 11.170 11.349
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables: 10th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
3.81E-06 7.429 6.49E-06 12.659 4.09E-06 7.985 4.16E-06 8.113 4.25E-06 8.294 2.1E-06 4.076 2.16E-06 4.217 2.24E-06 4.370 2.62E-06 5.107 2.46E-06 4.790 11.505 16.876 12.355 13.219 13.084
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Creep Loss in 14th Creep Loss in 15th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
stage cables: stage cables: stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables: 14th stage cables: 15th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 11th Loss 12th Loss 13th Loss 14th Loss 15th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
4.38E-06 8.546 4.52E-06 8.824 4.64E-06 9.057 4.83E-06 9.410 5.14E-06 10.020 2.58E-06 5.021 2.72E-06 5.306 2.91E-06 5.675 3.17E-06 6.187 3.58E-06 6.977 13.567 14.130 14.732 15.597 16.997
Creep Loss in 16th Shrinkage Loss in 16th Creep Loss in 17th Shrinkage Loss in
stage cables: stage cables: Total C&S stage cables: 15th stage cables: Total C&S
Change of Change of Shrinkage Loss 16th Change of Creep Change of Shrinkage Loss 16th
Creep loss
Creep Shrinkage loss stage Creep loss Shrinkage loss stage
(kg/cm2)
strain= strain= (kg/cm2) strain= 2
(kg/cm ) strain= (kg/cm2)
6.26E-06 12.215 1.20E-07 0.234 12.449 4.16E-06 8.114 3.95E-06 7.707 15.821
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
17-17 710.66 0.477
16-16 721.46 0.484
15-15 732.26 0.491
14-14 743.06 0.499
13-13 784.57 0.526
12-12 799.29 0.536
11-11 786.27 0.528
10-10 800.67 0.537
9-9 815.07 0.547 0.536
8-8 829.47 0.557
7-7 843.87 0.566
6-6 719.09 0.483
5-5 741.16 0.497
4-4 893.05 0.599
3-3 911.90 0.612
2-2 880.43 0.591
1-1 855.87 0.574
1000 hour relaxation loss 17th stage cables= 0.44 %
Final (0.5x10^6 hours) relaxation loss 17th stage cables= 1.334 %
% Loss in 1 st stage cables= 7.666 %
% Loss in 2 nd stage cables= 7.354 %
% Loss in 3 rd stage cables= 6.570 %
% Loss in 4 th stage cables= 5.925 %
% Loss in 5 th stage cables= 4.839 %
% Loss in 6 th stage cables= 4.005 %
% Loss in 7 th stage cables= 3.016 %
% Loss in 8 th stage cables= 2.118 %
% Loss in 9 th stage cables= 1.727 %
% Loss in 10 th stage cables= 1.457 %
% Loss in 11 th stage cables= 3.091 %
% Loss in 12 th stage cables= 2.838 %
% Loss in 13 th stage cables= 2.388 %
% Loss in 14 th stage cables= 2.195 %
% Loss in 15 th stage cables= 2.158 %
% Loss in 16th stage cables= 1.136 %
% Loss in 17th stage cables= 1.565 %
XVIII) AFTER 322 DAYS & INFINITY I.E AFTER APPLYING OF LIVE LOAD
DAYS 82 97 112 127 142 157 172 187 202 217 232 247 262 277 292 307 322
RESIDUAL CREEP CO-
3.56E-04 3.51E-04 3.47E-04 3.43E-04 3.40E-04 3.38E-04 3.36E-04 3.34E-04 3.32E-04 3.31E-04 3.29E-04 3.28E-04 3.27E-04 3.26E-04 3.25E-04 3.24E-04 3.23E-04
EFFICIENT ON 322 DAYS
SHRINKAGE STRAIN ON
3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04
INFINITY DAYS
SHRINKAGE STRAIN ON
3.45E-04 3.48E-04 3.50E-04 3.52E-04 3.53E-04 3.55E-04 3.56E-04 3.56E-04 3.57E-04 3.58E-04 3.58E-04 3.59E-04 3.59E-04 3.60E-04 3.60E-04 3.60E-04 3.60E-04
322 DAYS
MODULUS OF
ELASTICITY OF 3817160 3830662 3841384 3850169 3857537 3863833 3869295 3874092 3878349 3882161 3885600 3888724 3891577 3894198 3896615 3898854 3900936
CONCRETE (T/m2)
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in 1st Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage stage cables: nd stage rd stage th stage th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.11E-04 412.080 2.14E-04 417.417 2.15E-04 418.427 2.12E-04 414.073 2.09E-04 408.201 3.5E-06 6.863 3.7E-06 7.123 3.8E-06 7.316 3.8E-06 7.477 3.9E-06 7.623 412.080 424.540 425.743 421.550 415.823
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables: 10th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.06E-04 402.545 3.50E-04 682.089 2.18E-04 425.294 2.18E-04 424.984 2.18E-04 425.429 4.0E-06 7.760 4.05E-06 7.893 4.12E-06 8.025 4.71E-06 9.180 4.31E-06 8.403 410.305 689.982 433.319 434.164 433.831
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Creep Loss in 14th Creep Loss in 15th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
stage cables: stage cables: stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables: 14th stage cables: 15th stage cables:
Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change of Creep Change of Creep Change of Creep Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Change of Shrinkage Loss 11th Loss 12th Loss 13th Loss 14th Loss 15th
Creep loss Creep loss stage stage stage stage stage
Creep Creep Creep loss Creep loss Creep loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss Shrinkage loss
(kg/cm2) (kg/cm2)
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2)
2.19E-04 426.382 2.19E-04 426.543 2.18E-04 424.917 2.17E-04 423.436 2.16E-04 421.871 4.39E-06 8.551 4.47E-06 8.711 4.56E-06 8.887 4.66E-06 9.083 4.77E-06 9.306 434.933 435.254 433.804 432.518 431.177
Creep Loss in 16th Shrinkage Loss in 16th Creep Loss in 17th Shrinkage Loss in
stage cables: stage cables: Total C&S stage cables: 15th stage cables: Total C&S
Change of Change of Shrinkage Loss 16th Change of Creep Change of Shrinkage Loss 16th
Creep loss
Creep Shrinkage loss stage Creep loss Shrinkage loss stage
(kg/cm2)
strain= strain= (kg/cm2) strain= 2
(kg/cm ) strain= (kg/cm2)
2.15E-04 418.436 2.93E-06 5.708 424.145 2.10E-04 410.125 4.79E-06 9.340 419.465
XIX) FINAL STRESS AT INFINITY WHEN PRESTRESS IS 0.9 TIMES [CL-7.9.5.(6), IRC-112:2011]
16-16 ft= (t/m2) 99.994 112.64 224.74 229.58 242.55 227.89 233.99 115.87 114.37 109.92 108.50 107.30 105.87 103.45 102.55 0.00 -1427.81 -123.86 -278.06 190.11 409.49 877.66
16-16
fb= (t/m2) -11.941 -23.74 -47.36 -48.38 -59.75 -56.14 -57.64 -28.55 -28.18 -27.08 -26.73 -26.43 -26.08 -25.48 -25.26 0.00 1680.97 145.82 327.36 -223.82 1635.40 1084.22
ft= (t/m2) 113.44 223.94 228.36 246.96 233.51 239.81 118.76 117.24 102.43 111.24 110.00 108.56 106.09 105.20 0.00 -1363.95 -110.87 -281.11 192.52 409.60 883.24
15-15
fb= (t/m2) -21.72 -42.87 -43.72 -56.80 -53.71 -54.69 -27.31 -26.96 -25.91 -25.58 -25.30 -24.97 -24.40 -22.00 0.00 1613.59 131.16 332.56 -227.76 1601.36 1041.04
ft= (t/m2) 223.85 228.27 247.34 233.88 240.18 118.94 106.74 102.59 101.28 100.16 98.85 106.76 106.92 0.00 -1275.63 -95.74 -279.28 190.95 365.11 835.34
14-14
fb= (t/m2) -36.54 -37.27 -50.71 -47.95 -49.24 -24.39 -24.07 -23.14 -22.84 -22.59 -22.29 -21.89 -21.92 0.00 1516.38 113.81 331.99 -226.98 1557.34 998.36
ft= (t/m2) 214.47 241.85 235.30 241.69 119.70 118.18 113.58 112.16 110.92 109.50 107.51 107.70 0.00 -1125.36 -73.71 -267.95 197.49 365.52 830.96
13-13
fb= (t/m2) -23.76 -38.03 -37.00 -38.01 -18.82 -18.59 -17.86 -17.64 -17.44 -17.22 -16.91 -16.94 0.00 1346.20 88.18 320.53 -236.25 1476.70 919.92
ft= (t/m2) 229.82 227.27 239.75 118.75 117.27 112.70 111.32 110.08 108.70 106.73 106.94 0.00 -950.88 -51.20 -247.65 200.56 339.60 787.81
12-12
fb= (t/m2) -21.40 -21.17 -22.33 -11.06 -10.92 -9.54 -10.37 -10.25 -10.12 -9.94 -9.96 0.00 1144.44 61.62 298.05 -241.39 1357.06 817.61
ft= (t/m2) 208.94 230.60 116.63 115.19 110.70 109.37 108.16 106.82 104.88 105.11 0.00 -769.82 -30.37 -220.81 198.52 295.40 714.74
11-11
fb= (t/m2) -3.15 -3.47 -1.76 -1.73 -1.67 -1.65 -1.63 -1.61 -1.58 -1.58 0.00 931.90 36.77 267.31 -240.32 1216.15 708.52
ft= (t/m2) 210.94 110.03 112.59 58.94 106.94 105.74 104.46 102.56 102.82 0.00 -598.43 -13.36 -190.65 186.49 212.60 589.74
10-10
fb= (t/m2) 15.23 7.95 8.13 7.79 7.72 7.64 7.54 7.41 7.43 0.00 728.36 16.26 232.04 -226.98 1053.49 594.47
ft= (t/m2) 102.53 106.26 106.62 104.55 103.39 102.16 100.30 100.57 0.00 -447.82 -0.28 -160.11 171.37 218.16 549.64
9-9
fb= (t/m2) 16.67 17.27 17.33 16.99 16.80 16.60 16.30 16.35 0.00 547.76 0.34 195.84 -209.61 878.27 472.81
8-8 ft= (t/m2) 99.41 105.72 102.85 101.69 100.27 98.45 98.74 0.00 -323.00 8.89 -131.33 153.55 261.70 546.58
fb= (t/m2) 24.81 26.39 25.67 25.38 25.03 24.58 24.65 0.00 396.81 -10.93 161.34 -188.64 723.73 373.75
7-7 ft= (t/m2) 105.38 102.84 101.35 98.99 97.19 97.49 0.00 -224.11 14.21 -105.43 133.82 287.92 527.17
fb= (t/m2) 34.58 33.74 33.25 32.48 31.89 31.99 0.00 276.37 -17.52 130.01 -165.03 586.80 291.76
ft= (t/m2) 103.44 101.62 99.12 97.22 96.88 40.31 -148.49 16.79 -82.74 113.72 324.15 520.61
6-6
fb= (t/m2) 40.80 40.08 39.10 38.35 38.21 131.30 183.69 -20.77 102.35 -140.68 593.10 350.08
ft= (t/m2) 102.48 100.19 98.05 97.08 53.79 -92.38 17.21 -63.03 93.61 313.37 470.01
5-5
fb= (t/m2) 45.76 44.74 43.78 43.35 139.07 114.56 -21.34 78.16 -116.08 488.09 293.84
ft= (t/m2) 101.77 99.38 98.59 89.37 -52.06 15.51 -45.78 72.87 306.77 425.42
4-4
fb= (t/m2) 49.23 48.08 47.70 211.54 64.66 -19.26 56.87 -90.51 458.82 311.44
ft= (t/m2) 116.13 100.54 96.89 -24.44 12.31 -30.32 51.60 271.10 353.03
3-3
fb= (t/m2) 58.76 50.87 218.18 30.39 -15.30 37.71 -64.16 380.61 278.74
ft= (t/m2) 102.91 91.03 -7.36 7.61 -15.91 28.98 178.28 223.17
2-2
fb= (t/m2) 52.83 201.70 9.15 -9.46 19.79 -36.05 274.00 218.16
Hence OK
DAYS 7 22
CREEP CO-EFFICIENT 5.31E-04 4.13E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04
MODULUS OF
ELASTICITY OF 3432651 3664608
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 312 T/m2
DAYS 7 22 37
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 387 T/m2
2 nd stage
Stress
prestress Stress Depth of Stress at Depth of Stress at Depth of Stress at
1st stage due to
with due to DL Depth CG of CG of CG of CG of CG of all CG of
Section Location Prestress Truss & Total
elastic up to20th (m) cables:1 cables: 1 cables:2 cables: 2 stage cables: All
with loss working
shortening Segment st Stage st Stage nd Stage nd Stage cables Stage
load
loss
ft= (t/m2) 92.045 110.131 -17.742 -15.342 169.091
19-19 7.5 0.995 148.32 0.66 155.31 0.2503 163.87
fb= (t/m2) -8.474 -17.764 20.787 17.975 12.524
ft= (t/m2) 109.274 -4.745 -10.368 94.160
20-20 7.04 0.66 85.52
fb= (t/m2) -15.800 5.587 12.207 1.994
ft= (t/m2) 106.102 106.102
21-21 6.60 0.66 94.23
fb= (t/m2) -12.670 -12.670
2
Average Stress (T/m ) in CG of cables 116.92 89.87
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 895.209 0.601
20-20 876.84 0.588 0.586
21-21 847.45 0.569
1000 hour relaxation loss 2 nd stage cables= 1.07 %
Final (0.5x10^6 hours) relaxation loss 2 nd stage cables= 3.223 %
% Loss in 1 st stage cables= 3.113 %
% Loss in 2 nd stage cables= 2.235 %
Stress Constn
1st stage 2nd stage due to DL
Load Due Nett
Section Location prestress prestress up to
to 21th Stress
after loss after loss 20th
Segment
Segment
Loss 3.113% 2.235%
ft= (t/m2) 91.711 107.835 -17.742 -35.680 146.124
19-19
fb= (t/m2) -8.444 -17.393 20.787 41.804 36.754
ft= (t/m2) 106.996 -4.745 -23.149 79.101
20-20
fb= (t/m2) -15.470 5.587 27.253 17.370
Hence OK
DAYS 7 22 37 52
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 409 T/m2
3 rd stage
Stress
prestress Stress
1st stage 2nd stage due to Depth of Stress at
with due to DL Depth
Section Location Prestress Prestress Truss & Total CG of CG of
elastic up to21th (m)
with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 3.551% 2.689% 0.162%
ft= (t/m2) 91.296 106.499 118.12 -39.105 -23.013 253.801
19-19 7.5 0.660 233.47
fb= (t/m2) -8.405 -15.399 -26.24 45.816 26.963 22.731
ft= (t/m2) 103.408 118.50 -18.596 -18.663 184.650
20-20 7.04 0.660 167.95
fb= (t/m2) -12.349 -24.97 21.893 21.972 6.543
ft= (t/m2) 119.34 -4.906 -13.267 101.162
21-21 6.60 0.493 93.52
fb= (t/m2) -22.85 5.804 15.696 -1.347
ft= (t/m2) 102.18 102.181
22-22 6.19 0.660 90.36
fb= (t/m2) -8.66 -8.660
2
Average Stress (T/m ) in CG of cables 1 st stage= 200.71
Average Stress (T/m2) in CG of cables 2 nd stage= 130.73
Average Stress (T/m2) in CG of cables 3 rd stage= 91.94
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Shrinkage Loss in Shrinkage Loss in 2
Shrinkage Loss in 3
cables: stage stage 1st stage cables: nd stage
rd stage Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd
Creep loss Creep loss of of of stage stage stage
Creep Creep of Creep loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain=
2.87E-06 5.598 3.12E-06 6.092 5.63E-06 10.984 7.80E-06 15.202 1.1E-05 21.934 3.5E-05 67.408 5.598 28.026 78.392
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 902.37 0.606
20-20 890.03 0.597
0.587
21-21 888.67 0.596
22-22 819.48 0.550
1000 hour relaxation loss 3 rd stage cables= 1.09 %
Final (0.5x10^6 hours) relaxation loss 3 rd stage cables= 3.272 %
% Loss in 1 st stage cables= 3.607 %
% Loss in 2 nd stage cables= 2.945 %
% Loss in 3 rd stage cables= 1.967 %
Stress Constn
1st stage 2nd stage 3rd stage due to DL
Load Due Nett
Section Location prestress prestress prestress up to
to 22th Stress
after loss after loss after loss 21th
Segment
Segment
Loss 3.607% 2.945% 1.967%
ft= (t/m2) 91.244 106.219 115.99 -39.105 -63.090 211.255
19-19
fb= (t/m2) -8.401 -15.358 -25.77 45.816 73.917 70.205
ft= (t/m2) 103.136 116.36 -18.596 -49.614 151.284
20-20
fb= (t/m2) -12.316 -24.52 21.893 58.411 43.466
ft= (t/m2) 117.18 -4.906 -33.066 79.206
21-21
fb= (t/m2) -22.43 5.804 39.117 22.488
Hence OK
DAYS 7 22 37 52 67
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 418 T/m2
4 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage due to Depth of Stress at
with due to DL Depth
Section Location Prestress Prestress Prestress Truss & Total CG of CG of
elastic up to22th (m)
with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 4.458% 3.806% 2.882% 0.402%
ft= (t/m2) 90.438 105.277 114.90 232.89 -79.436 -30.684 433.388
19-19 7.5 0.526 404.97
fb= (t/m2) -8.326 -15.222 -25.53 -51.74 93.068 35.950 28.198
ft= (t/m2) 102.221 115.27 232.75 -50.298 -26.958 372.984
20-20 7.04 0.526 345.52
fb= (t/m2) -12.207 -24.29 -49.05 59.216 31.738 5.404
ft= (t/m2) 116.08 231.92 -26.014 -22.112 299.879
21-21 6.60 0.409 280.71
fb= (t/m2) -22.22 -44.40 30.775 26.160 -9.693
ft= (t/m2) 231.83 -8.826 -13.925 209.080
22-22 6.19 0.437 193.57
fb= (t/m2) -37.85 10.492 16.553 -10.802
ft= (t/m2) 183.72 183.717
23-23 5.68 0.660 162.93
fb= (t/m2) 4.81 4.805
2
Average Stress (T/m ) in CG of cables 1 st stage= 375.24
Average Stress (T/m2) in CG of cables 2 nd stage= 313.11
Average Stress (T/m2) in CG of cables 3 rd stage= 237.14
Average Stress (T/m2) in CG of cables 4 th stage= 178.25
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3
Shrinkage Loss in 4
cables: stage stage stage 1st stage cables: nd stage rd stage
th stage Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th
Creep loss Creep loss of of of of stage stage stage stage
Creep Creep of Creep loss of Creep loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain=
3.54E-06 6.906 4.01E-06 7.820 4.56E-06 8.891 8.31E-06 16.209 5.08E-06 9.903 6.4E-06 12.553 8.7E-06 17.041 3.5E-05 68.195 6.906 20.372 25.931 84.404
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 891.695 0.598
20-20 876.16 0.588
21-21 865.60 0.581 0.575
22-22 865.60 0.581
23-23 783.41 0.526
1000 hour relaxation loss 4 th stage cables= 0.93 %
Final (0.5x10^6 hours) relaxation loss 4 th stage cables= 2.803 %
% Loss in 1 st stage cables= 4.526 %
% Loss in 2 nd stage cables= 3.992 %
% Loss in 3 rd stage cables= 3.118 %
% Loss in 4 th stage cables= 2.123 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage due to DL
Load Due Nett
Section Location prestress prestress prestress prestress up to
to 23th Stress
after loss after loss after loss after loss 22th
Segment
Segment
Loss 4.53% 3.99% 3.12% 2.12%
ft= (t/m2) 90.374 105.073 114.62 228.86 -79.436 -83.879 375.621
19-19
fb= (t/m2) -8.321 -15.192 -25.47 -50.85 93.068 98.274 91.514
ft= (t/m2) 102.024 114.99 228.73 -50.298 -72.559 322.883
20-20
fb= (t/m2) -12.183 -24.23 -48.20 59.216 85.425 60.021
ft= (t/m2) 115.80 227.91 -26.014 -58.029 259.673
21-21
fb= (t/m2) -22.17 -43.64 30.775 68.650 33.619
ft= (t/m2) 227.83 -8.826 -40.603 178.397
22-22
fb= (t/m2) -37.19 10.492 48.266 21.565
Hence OK
DAYS 7 22 37 52 67 82
CREEP CO-EFFICIENT 0.00 0.00 0.00 0.00 0.00 0.00
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420 3817160
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 429 T/m2
5 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage 4th stage due to Depth of Stress at
with due to DL Depth
Section Location Prestress Prestress Prestress Prestress Truss & Total CG of CG of
elastic up to23th (m)
with loss with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 5.316% 4.790% 3.960% 3.019% 0.394%
ft= (t/m2) 89.626 104.200 113.63 226.77 227.07 -132.385 -38.355 590.557
19-19 7.5 0.469 556.83
fb= (t/m2) -8.252 -15.066 -25.25 -50.38 -50.45 155.104 44.938 50.643
ft= (t/m2) 101.176 113.99 226.63 234.14 -96.092 -35.253 544.595
20-20 7.04 0.469 509.77
fb= (t/m2) -12.082 -24.02 -47.76 -49.34 113.130 41.504 21.422
ft= (t/m2) 114.80 225.83 231.94 -62.624 -30.957 478.978
21-21 6.60 0.381 451.41
fb= (t/m2) -21.98 -43.24 -44.41 74.086 36.623 1.089
ft= (t/m2) 225.74 231.85 -34.425 -23.208 399.955
22-22 6.19 0.392 374.24
fb= (t/m2) -36.85 -37.85 40.922 27.588 -6.192
ft= (t/m2) 218.73 -8.825 -14.462 195.439
23-23 5.68 0.493 178.81
fb= (t/m2) -24.23 10.557 17.300 3.623
ft= (t/m2) 171.03 171.031
24-24 5.22 0.660 151.76
fb= (t/m2) 18.76 18.757
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
3.65E-06 7.111 4.09E-06 7.978 4.55E-06 8.868 4.86E-06 9.472 7.35E-06 14.330 3.63E-06 7.077 4.4E-06 8.490 5.3E-06 10.257 7.0E-06 13.622 2.1E-05 40.907 7.111 16.468 19.124 23.094 55.237
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 869.377 0.583
20-20 881.33 0.591
21-21 869.15 0.583
0.569
22-22 869.15 0.583
23-23 828.22 0.556
24-24 768.69 0.516
1000 hour relaxation loss 5 th stage cables= 0.86 %
Final (0.5x10^6 hours) relaxation loss 5 th stage cables= 2.581 %
% Loss in 1 st stage cables= 5.386 %
% Loss in 2 nd stage cables= 4.940 %
% Loss in 3 rd stage cables= 4.134 %
% Loss in 4 th stage cables= 3.230 %
% Loss in 5 th stage cables= 1.769 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage 5th stage due to DL
Load Due Nett
Section Location prestress prestress prestress prestress prestress up to
to 24th Stress
after loss after loss after loss after loss after loss 23th
Segment
Segment
Loss 5.39% 4.94% 4.13% 3.23% 1.77%
ft= (t/m2) 89.560 104.035 113.42 226.28 223.94 -132.385 -103.768 521.080
19-19
fb= (t/m2) -8.246 -15.042 -25.20 -50.27 -49.76 155.104 121.576 128.163
ft= (t/m2) 101.016 113.79 226.14 230.91 -96.092 -94.489 481.269
20-20
fb= (t/m2) -12.063 -23.98 -47.66 -48.66 113.130 111.242 92.008
ft= (t/m2) 114.59 225.34 228.74 -62.624 -81.864 424.172
21-21
fb= (t/m2) -21.94 -43.14 -43.79 74.086 96.847 62.060
ft= (t/m2) 225.25 228.65 -34.425 -66.093 353.380
22-22
fb= (t/m2) -36.77 -37.33 40.922 78.566 45.388
ft= (t/m2) 215.71 -8.825 -41.185 165.697
23-23
fb= (t/m2) -23.90 10.557 49.267 35.925
Hence OK
DAYS 7 22 37 52 67 82 97
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04 3.56E-04 3.51E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04 3.48E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420 3817160 3830662
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 432 T/m2
6 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage due to Depth of Stress at
with due to DL Depth
Section Location Prestress Prestress Prestress Prestress Prestress Truss & Total CG of CG of
elastic up to24th (m)
with loss with loss with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 6.173% 5.740% 4.980% 4.134% 2.740% 0.404%
ft= (t/m2) 88.814 103.160 112.42 224.16 221.72 238.82 -197.086 -46.026 745.989
19-19 7.5 0.392 710.99
fb= (t/m2) -8.177 -14.916 -24.98 -49.80 -49.26 -60.93 230.909 53.925 76.763
ft= (t/m2) 100.166 112.78 224.03 228.63 246.81 -155.000 -43.548 713.857
20-20 7.04 0.392 676.40
fb= (t/m2) -11.961 -23.77 -47.21 -48.18 -61.00 182.483 51.269 41.628
ft= (t/m2) 113.58 223.23 226.47 251.29 -113.653 -39.802 661.119
21-21 6.60 0.317 630.15
fb= (t/m2) -21.74 -42.74 -43.36 -57.80 134.455 47.087 15.903
ft= (t/m2) 223.14 226.39 251.69 -75.613 -32.491 593.115
22-22 6.19 0.316 563.05
fb= (t/m2) -36.43 -36.96 -51.60 89.883 38.623 3.516
ft= (t/m2) 213.57 246.09 -34.471 -24.103 401.091
23-23 5.68 0.370 375.47
fb= (t/m2) -23.66 -38.70 41.235 28.833 7.706
ft= (t/m2) 233.86 -8.577 -14.567 210.714
24-24 5.22 0.393 195.32
fb= (t/m2) -21.78 10.323 17.533 6.078
ft= (t/m2) 182.35 182.352
25-25 4.80 0.460 167.27
fb= (t/m2) 25.14 25.136
Average Stress (T/m2) in CG of cables 1 st stage= 693.69
Average Stress (T/m2) in CG of cables 2 nd stage= 653.28
Average Stress (T/m2) in CG of cables 3 rd stage= 596.60
Average Stress (T/m2) in CG of cables 4 th stage= 469.26
Average Stress (T/m2) in CG of cables 5 th stage= 285.39
Average Stress (T/m2) in CG of cables 6 th stage= 181.29
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
3.64E-06 7.107 4.06E-06 7.909 4.44E-06 8.665 4.71E-06 9.193 4.85E-06 9.450 2.74E-06 5.338 3.2E-06 6.208 3.7E-06 7.150 4.3E-06 8.475 5.7E-06 11.167 7.107 14.117 15.815 17.667 20.618
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 882.67 0.592
20-20 894.88 0.601
21-21 901.48 0.605
22-22 901.48 0.605 0.587
23-23 892.03 0.599
24-24 869.94 0.584
25-25 783.89 0.526
1000 hour relaxation loss 6 th stage cables= 1.09 %
Final (0.5x10^6 hours) relaxation loss 6 th stage cables= 3.274 %
% Loss in 1 st stage cables= 6.244 %
% Loss in 2 nd stage cables= 5.869 %
% Loss in 3 rd stage cables= 5.124 %
% Loss in 4 th stage cables= 4.295 %
% Loss in 5 th stage cables= 2.929 %
% Loss in 6 th stage cables= 1.942 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage due to DL
Load Due Nett
Section Location prestress prestress prestress prestress prestress prestress up to
to 25th Stress
after loss after loss after loss after loss after loss after loss 24th
Segment
Segment
Loss 6.24% 5.87% 5.12% 4.29% 2.93% 1.94%
ft= (t/m2) 88.748 103.019 112.25 223.79 221.30 235.13 -197.086 -122.913 664.231
19-19
fb= (t/m2) -8.171 -14.895 -24.94 -49.72 -49.17 -59.99 230.909 144.007 168.029
ft= (t/m2) 100.029 112.61 223.65 228.18 243.00 -155.000 -115.571 636.896
20-20
fb= (t/m2) -11.945 -23.73 -47.13 -48.09 -60.06 182.483 136.063 127.589
ft= (t/m2) 113.40 222.85 226.04 247.41 -113.653 -104.751 591.305
21-21
fb= (t/m2) -21.71 -42.67 -43.28 -56.90 134.455 123.923 93.820
ft= (t/m2) 222.77 225.95 247.80 -75.613 -90.540 530.367
22-22
fb= (t/m2) -36.37 -36.89 -50.81 89.883 107.628 73.450
ft= (t/m2) 213.16 242.29 -34.471 -67.166 353.816
23-23
fb= (t/m2) -23.62 -38.10 41.235 80.347 59.863
ft= (t/m2) 230.25 -8.577 -40.594 181.076
24-24
fb= (t/m2) -21.44 10.323 48.857 37.739
Hence OK
vii) BETWEEN 7 th AND 8 th STAGE STRESSING: (BETN 97 DAYS & 112 DAYS)
DAYS 7 22 37 52 67 82 97 112
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04 3.56E-04 3.51E-04 3.47E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04 3.48E-04 3.50E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420 3817160 3830662 3841384
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 435 T/m2
7 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage due to Depth of Stress at
with due to DL Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Truss & Total CG of CG of
elastic up to25th (m)
with loss with loss with loss with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 6.938% 6.571% 5.865% 5.090% 3.788% 2.811% 0.384%
ft= (t/m2) 88.091 102.251 111.37 221.93 219.34 233.05 226.88 -272.82 -53.697 876.383
19-19 7.5 0.344 841.71
fb= (t/m2) -8.110 -14.784 -24.74 -49.31 -48.73 -59.46 -57.89 319.64 62.913 119.532
ft= (t/m2) 99.283 111.73 221.79 226.16 240.84 234.51 -226.21 -58.063 850.047
20-20 7.04 0.344 812.82
fb= (t/m2) -11.856 -23.55 -46.74 -47.66 -59.53 -57.77 266.32 68.359 87.572
ft= (t/m2) 112.52 221.00 224.04 245.22 240.30 -178.19 -61.915 802.974
21-21 6.60 0.279 771.87
fb= (t/m2) -21.54 -42.31 -42.89 -56.40 -55.27 210.80 73.247 65.636
ft= (t/m2) 220.92 223.95 245.61 240.67 -131.39 -64.983 734.776
22-22 6.19 0.273 704.99
fb= (t/m2) -36.07 -36.56 -50.36 -50.24 156.18 77.247 60.211
ft= (t/m2) 211.27 240.15 242.13 -75.83 -67.489 550.227
23-23 5.68 0.309 524.25
fb= (t/m2) -23.41 -37.76 -38.08 90.71 80.733 72.198
ft= (t/m2) 228.21 233.87 -33.56 -67.981 360.537
24-24 5.22 0.303 344.17
fb= (t/m2) -21.25 -21.78 40.39 81.819 79.177
ft= (t/m2) 215.00 -8.13 -66.602 140.273
25-25 4.80 0.146 138.66
fb= (t/m2) -3.24 9.84 80.625 87.228
ft= (t/m2) 166.65 166.652
26-26 4.42 0.460 153.36
fb= (t/m2) 39.02 39.022
Average Stress (T/m2) in CG of cables 1 st stage= 827.26
Average Stress (T/m2) in CG of cables 2 nd stage= 792.35
Average Stress (T/m2) in CG of cables 3 rd stage= 738.43
Average Stress (T/m2) in CG of cables 4 th stage= 614.62
Average Stress (T/m2) in CG of cables 5 th stage= 434.21
Average Stress (T/m2) in CG of cables 6 th stage= 241.41
Average Stress (T/m2) in CG of cables 7 th stage= 146.01
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
3.48E-06 6.781 3.82E-06 7.450 4.12E-06 8.026 4.30E-06 8.392 4.39E-06 8.552 2.14E-06 4.174 2.4E-06 4.756 2.7E-06 5.336 3.1E-06 6.042 3.6E-06 7.102 6.781 12.206 13.362 14.434 15.654
Creep Loss in 6th stage Shrinkage Loss in 6th Creep Loss in 7th Shrinkage Loss in
cables: stage cables: stage cables: 7th stage cables:
Total C&S Total C&S
Change of Change of Shrinkage Change Creep Change Shrinkage Loss 6th Loss 7th
Creep loss of stage stage
Creep Shrinkage loss of Creep loss loss
(kg/cm2) Shrinkage
strain= strain= (kg/cm2) strain= (kg/cm2) (kg/cm2)
strain=
4.39E-06 8.560 4.79E-06 9.346 5.97E-06 11.646 1.48E-05 28.835 17.906 40.482
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 838.37 0.563
20-20 850.11 0.570
21-21 861.85 0.578
22-22 861.85 0.578
0.567
23-23 877.51 0.589
24-24 869.80 0.584
25-25 828.69 0.556
26-26 768.93 0.516
1000 hour relaxation loss 7 th stage cables= 0.83 %
Final (0.5x10^6 hours) relaxation loss 7 th stage cables= 2.505 %
% Loss in 1 st stage cables= 7.005 %
% Loss in 2 nd stage cables= 6.682 %
% Loss in 3 rd stage cables= 5.987 %
% Loss in 4 th stage cables= 5.221 %
% Loss in 5 th stage cables= 3.931 %
% Loss in 6 th stage cables= 2.974 %
% Loss in 7 th stage cables= 1.596 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage due to DL
Load Due Nett
Section Location prestress prestress prestress prestress prestress prestress prestress up to
to 26th Stress
after loss after loss after loss after loss after loss after loss after loss 25th
Segment
Segment
Loss 7.01% 6.68% 5.99% 5.22% 3.93% 2.97% 1.60%
ft= (t/m2) 88.027 102.129 111.23 221.62 219.01 232.66 224.12 -272.824 -141.472 784.494
19-19
fb= (t/m2) -8.105 -14.767 -24.71 -49.24 -48.66 -59.36 -57.18 319.645 165.751 223.370
ft= (t/m2) 99.165 111.59 221.48 225.83 240.44 231.65 -226.210 -135.978 767.969
20-20
fb= (t/m2) -11.842 -23.52 -46.68 -47.59 -59.43 -57.07 266.319 160.088 180.284
ft= (t/m2) 112.37 220.70 223.70 244.81 237.37 -178.190 -126.872 733.896
21-21
fb= (t/m2) -21.51 -42.25 -42.83 -56.30 -54.59 210.803 150.093 143.399
ft= (t/m2) 220.61 223.62 245.19 237.74 -131.386 -114.136 681.643
22-22
fb= (t/m2) -36.02 -36.51 -50.27 -49.63 156.183 135.677 119.441
ft= (t/m2) 210.96 239.74 239.18 -75.833 -92.196 521.857
23-23
fb= (t/m2) -23.37 -37.70 -37.61 90.714 110.289 102.315
ft= (t/m2) 227.83 231.02 -33.558 -66.335 358.954
24-24
fb= (t/m2) -21.22 -21.52 40.389 79.838 77.496
ft= (t/m2) 212.39 -8.129 -38.993 165.266
25-25
fb= (t/m2) -3.20 9.840 47.204 53.846
Hence OK
VIII) BETWEEN 8 th AND 9 th STAGE STRESSING: (BETN 112 DAYS & 127 DAYS)
8 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage due to Depth of Stress at
with due to DL Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Truss & Total CG of CG of
elastic up to26th (m)
with loss with loss with loss with loss with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 7.650% 7.330% 6.667% 5.949% 4.720% 3.775% 2.457% 0.361%
ft= (t/m2) 87.417 101.420 110.43 219.92 217.21 230.74 222.15 224.72 -359.04 -61.368 993.600
19-19 7.5 0.310 959.78
fb= (t/m2) -8.048 -14.664 -24.53 -48.86 -48.26 -58.87 -56.68 -57.34 420.65 71.900 175.294
ft= (t/m2) 98.476 110.78 219.78 223.97 238.45 229.63 232.32 -309.07 -60.137 984.203
20-20 7.04 0.310 946.73
fb= (t/m2) -11.760 -23.35 -46.32 -47.20 -58.94 -56.57 -57.23 363.87 70.800 133.307
ft= (t/m2) 111.56 219.00 221.86 242.79 235.29 238.09 -255.50 -57.492 955.618
21-21 6.60 0.253 922.85
fb= (t/m2) -21.36 -41.93 -42.48 -55.84 -54.12 -54.30 302.26 68.015 100.256
ft= (t/m2) 218.92 221.78 243.17 235.66 238.46 -200.93 -51.058 906.005
22-22 6.19 0.246 873.12
fb= (t/m2) -35.74 -36.21 -49.86 -49.19 -48.89 238.85 60.694 79.658
ft= (t/m2) 209.23 237.76 237.09 239.96 -132.00 -43.386 748.656
23-23 5.68 0.272 716.37
fb= (t/m2) -23.18 -37.39 -37.28 -37.74 157.90 51.900 74.207
ft= (t/m2) 225.94 229.00 238.04 -73.96 -33.991 585.037
24-24 5.22 0.259 559.26
fb= (t/m2) -21.04 -21.33 -22.17 89.01 40.910 65.385
ft= (t/m2) 210.53 228.96 -31.86 -23.786 383.838
25-25 4.80 0.237 367.89
fb= (t/m2) -3.17 -3.45 38.57 28.795 60.744
ft= (t/m2) 209.43 -7.55 -13.672 188.205
26-26 4.42 0.293 178.46
fb= (t/m2) 15.13 9.19 16.641 40.960
ft= (t/m2) 165.46 165.463
27-27 4.09 0.460 153.01
fb= (t/m2) 54.89 54.893
2
Average Stress (T/m ) in CG of cables 1 st stage= 953.25
Average Stress (T/m2) in CG of cables 2 nd stage= 934.79
Average Stress (T/m2) in CG of cables 3 rd stage= 897.99
Average Stress (T/m2) in CG of cables 4 th stage= 794.74
Average Stress (T/m2) in CG of cables 5 th stage= 637.81
Average Stress (T/m2) in CG of cables 6 th stage= 463.58
Average Stress (T/m2) in CG of cables 7 th stage= 273.17
Average Stress (T/m2) in CG of cables 8 th stage= 165.74
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
3.30E-06 6.439 3.62E-06 7.051 3.88E-06 7.564 4.06E-06 7.913 4.17E-06 8.141 1.72E-06 3.350 1.9E-06 3.762 2.1E-06 4.150 2.4E-06 4.585 2.6E-06 5.150 6.439 10.813 11.714 12.498 13.291
Creep Loss in 6th stage Shrinkage Loss in 6th Creep Loss in 7th Shrinkage Loss in Creep Loss in 8th Shrinkage Loss in
cables: stage cables: stage cables: 7th stage cables: stage cables: 8th stage cables:
Total C&S Total C&S Total C&S
Change of Change of Shrinkage Change Creep Change Shrinkage Change Creep Change Shrinkage Loss 6th Loss 7th Loss 8th
Creep loss of of stage stage stage
Creep Shrinkage loss of Creep loss loss of Creep loss loss
(kg/cm2) Shrinkage Shrinkage
strain= strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) strain= (kg/cm2) (kg/cm2)
strain= strain=
4.28E-06 8.340 3.09E-06 6.033 4.34E-06 8.458 4.08E-06 7.957 5.91E-06 11.529 1.28E-05 25.009 14.373 16.415 36.538
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 830.22 0.557
20-20 841.98 0.565
21-21 853.75 0.573
22-22 853.75 0.573
23-23 869.44 0.583 0.570
24-24 885.13 0.594
25-25 882.26 0.592
26-26 840.17 0.564
27-27 790.74 0.531
1000 hour relaxation loss 8 th stage cables= 0.88 %
Final (0.5x10^6 hours) relaxation loss 8 th stage cables= 2.632 %
% Loss in 1 st stage cables= 7.714 %
% Loss in 2 nd stage cables= 7.429 %
% Loss in 3 rd stage cables= 6.773 %
% Loss in 4 th stage cables= 6.063 %
% Loss in 5 th stage cables= 4.841 %
% Loss in 6 th stage cables= 3.906 %
% Loss in 7 th stage cables= 2.610 %
% Loss in 8 th stage cables= 1.579 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage due to DL
Load Due Nett
Section Location prestress prestress prestress prestress prestress prestress prestress prestress up to
to 27th Stress
after loss after loss after loss after loss after loss after loss after loss after loss 26th
Segment
Segment
Loss 7.71% 7.43% 6.77% 6.06% 4.84% 3.91% 2.61% 1.58%
ft= (t/m2) 87.356 101.312 110.30 219.65 216.93 230.42 221.81 221.97 -359.036 -159.600 891.121
19-19
fb= (t/m2) -8.043 -14.648 -24.51 -48.80 -48.20 -58.79 -56.59 -56.64 420.651 186.989 291.423
ft= (t/m2) 98.371 110.65 219.52 223.69 238.13 229.27 229.48 -309.069 -155.876 884.157
20-20
fb= (t/m2) -11.747 -23.32 -46.26 -47.14 -58.86 -56.48 -56.53 363.870 183.514 247.044
ft= (t/m2) 111.43 218.74 221.58 242.46 234.93 235.18 -255.496 -148.406 860.419
21-21
fb= (t/m2) -21.33 -41.88 -42.42 -55.76 -54.03 -53.63 302.258 175.568 208.763
ft= (t/m2) 218.65 221.50 242.84 235.29 235.55 -200.927 -137.069 815.831
22-22
fb= (t/m2) -35.70 -36.16 -49.79 -49.11 -48.29 238.847 162.937 182.733
ft= (t/m2) 208.96 237.44 236.72 237.03 -131.997 -116.472 671.675
23-23
fb= (t/m2) -23.15 -37.34 -37.23 -37.28 157.900 139.329 162.236
ft= (t/m2) 225.64 228.64 235.13 -73.957 -91.251 524.201
24-24
fb= (t/m2) -21.01 -21.29 -21.90 89.011 109.825 134.634
ft= (t/m2) 210.20 226.16 -31.860 -63.856 340.639
25-25
fb= (t/m2) -3.17 -3.41 38.569 77.302 109.298
ft= (t/m2) 206.87 -7.553 -36.705 162.613
26-26
fb= (t/m2) 14.94 9.193 30.904 55.038
Hence OK
IX) BETWEEN 9 th AND 10 th STAGE STRESSING: (BETN 127 DAYS & 142 DAYS)
9 th stage
Stress
prestress Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage due to Depth of Stress at
with due to DL Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Truss & Total CG of CG of
elastic up to27th (m)
with loss with loss with loss with loss with loss with loss with loss with loss working cables cables:
shortenin Segment
load
g loss
Loss 7.846% 7.554% 6.900% 6.211% 5.019% 4.097% 2.839% 1.833% 0.091%
ft= (t/m2) 87.231 101.175 110.15 219.31 216.53 229.97 221.28 221.40 111.15 -455.31 -69.040 993.851
19-19 7.5 0.297 965.22
fb= (t/m2) -8.031 -14.629 -24.47 -48.73 -48.11 -58.67 -56.46 -56.49 -28.36 533.44 80.888 270.379
ft= (t/m2) 98.239 110.50 219.17 223.27 237.66 228.73 228.89 114.92 -403.09 -68.432 989.850
20-20 7.04 0.297 957.69
fb= (t/m2) -11.731 -23.29 -46.19 -47.05 -58.74 -56.35 -56.39 -28.31 474.56 80.566 227.080
ft= (t/m2) 111.28 218.39 221.17 241.98 234.37 234.58 117.78 -345.01 -66.337 968.208
21-21 6.60 0.243 939.60
fb= (t/m2) -21.30 -41.81 -42.34 -55.65 -53.90 -53.49 -27.09 408.15 78.479 191.030
ft= (t/m2) 218.31 221.08 242.36 234.74 234.94 117.96 -283.60 -60.341 925.453
22-22 6.19 0.236 896.48
fb= (t/m2) -35.64 -36.09 -49.69 -49.00 -48.17 -24.18 337.12 71.729 166.074
ft= (t/m2) 208.57 236.97 236.16 236.42 118.71 -202.24 -53.027 781.565
23-23 5.68 0.259 752.91
fb= (t/m2) -23.11 -37.26 -37.14 -37.18 -18.67 241.93 63.433 151.998
ft= (t/m2) 225.19 228.10 234.53 115.72 -128.98 -43.702 630.858
24-24 5.22 0.244 607.58
fb= (t/m2) -20.97 -21.24 -21.84 -10.78 155.23 52.598 133.001
ft= (t/m2) 209.70 225.57 115.67 -70.36 -33.301 447.292
25-25 4.80 0.221 432.10
fb= (t/m2) -3.16 -3.40 -1.74 85.17 40.313 117.184
ft= (t/m2) 206.34 111.11 -29.67 -22.787 264.995
26-26 4.42 0.259 254.55
fb= (t/m2) 14.90 8.02 36.11 27.735 86.769
ft= (t/m2) 101.69 -6.93 -13.672 81.085
27-27 4.09 0.348 77.72
fb= (t/m2) 16.53 8.48 16.641 41.649
ft= (t/m2) 84.23 84.234
28-28 3.80 0.460 77.74
fb= (t/m2) 30.60 30.603
2
Average Stress (T/m ) in CG of cables 1 st stage= 961.46
Average Stress (T/m2) in CG of cables 2 nd stage= 948.64
Average Stress (T/m2) in CG of cables 3 rd stage= 918.04
Average Stress (T/m2) in CG of cables 4 th stage= 824.69
Average Stress (T/m2) in CG of cables 5 th stage= 680.24
Average Stress (T/m2) in CG of cables 6 th stage= 519.84
Average Stress (T/m2) in CG of cables 7 th stage= 343.32
Average Stress (T/m2) in CG of cables 8 th stage= 166.14
Average Stress (T/m2) in CG of cables 9 th stage= 77.73
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
2.81E-06 5.474 3.05E-06 5.941 3.24E-06 6.314 3.36E-06 6.545 3.42E-06 6.669 1.41E-06 2.742 1.6E-06 3.046 1.7E-06 3.321 1.9E-06 3.612 2.0E-06 3.960 5.474 8.987 9.635 10.157 10.629
Creep Loss in 6th stage Shrinkage Loss in 6th Creep Loss in 7th Shrinkage Loss in Creep Loss in 8th Shrinkage Loss in Creep Loss in 9th Shrinkage Loss in
cables: stage cables: stage cables: 7th stage cables: stage cables: 8th stage cables: stage cables: 9th stage cables:
Total C&S Total C&S Total C&S Total C&S
Change of Change of Shrinkage Change Creep Change Shrinkage Change Creep Change Shrinkage Change Creep Change Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th
Creep loss of of of stage stage stage stage
Creep Shrinkage loss of Creep loss loss of Creep loss loss of Creep loss loss
(kg/cm2) Shrinkage Shrinkage Shrinkage
strain= strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) strain= (kg/cm2) (kg/cm2) strain= (kg/cm2) (kg/cm2)
strain= strain= strain=
5.74E-06 11.198 2.27E-06 4.431 3.79E-06 7.388 2.66E-06 5.188 3.71E-06 7.237 3.52E-06 6.871 4.26E-06 8.305 1.27E-05 24.782 15.628 12.576 14.108 33.087
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 819.07 0.550
20-20 830.73 0.557
21-21 842.39 0.565
22-22 842.56 0.565
23-23 857.94 0.576
0.568
24-24 873.49 0.586
25-25 889.03 0.597
26-26 873.22 0.586
27-27 846.82 0.568
28-28 783.04 0.525
1000 hour relaxation loss 9 th stage cables= 0.84 %
Final (0.5x10^6 hours) relaxation loss 9 th stage cables= 2.535 %
% Loss in 1 st stage cables= 7.900 %
% Loss in 2 nd stage cables= 7.636 %
% Loss in 3 rd stage cables= 6.988 %
% Loss in 4 th stage cables= 6.303 %
% Loss in 5 th stage cables= 5.116 %
% Loss in 6 th stage cables= 4.239 %
% Loss in 7 th stage cables= 2.956 %
% Loss in 8 th stage cables= 1.964 %
% Loss in 9 th stage cables= 1.244 %
Stress Constn
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage due to DL
Load Due Nett
Section Location prestress prestress prestress prestress prestress prestress prestress prestress prestress up to
to 28th Stress
after loss after loss after loss after loss after loss after loss after loss after loss after loss 27th
Segment
Segment
Loss 7.90% 7.64% 6.99% 6.30% 5.12% 4.24% 2.96% 1.96% 1.24%
ft= (t/m2) 87.180 101.085 110.05 219.09 216.31 229.62 221.02 221.11 109.87 -455.305 -177.454 882.566
19-19
fb= (t/m2) -8.026 -14.616 -24.45 -48.68 -48.06 -58.59 -56.39 -56.42 -28.03 533.442 207.907 398.095
ft= (t/m2) 98.152 110.40 218.96 223.04 237.30 228.45 228.58 113.59 -403.090 -175.435 879.949
20-20
fb= (t/m2) -11.721 -23.27 -46.14 -47.01 -58.65 -56.28 -56.31 -27.98 474.562 206.541 353.739
ft= (t/m2) 111.18 218.18 220.94 241.62 234.09 234.26 116.42 -345.007 -169.533 862.150
21-21
fb= (t/m2) -21.28 -41.77 -42.30 -55.57 -53.84 -53.42 -26.78 408.153 200.562 313.750
ft= (t/m2) 218.10 220.86 242.00 234.45 234.63 116.60 -283.596 -159.527 823.507
22-22
fb= (t/m2) -35.60 -36.06 -49.62 -48.94 -48.10 -23.91 337.119 189.634 284.528
ft= (t/m2) 208.36 236.62 235.88 236.10 117.34 -202.238 -140.191 691.865
23-23
fb= (t/m2) -23.09 -37.21 -37.09 -37.13 -18.45 241.925 167.701 256.655
ft= (t/m2) 224.85 227.83 234.21 114.39 -128.980 -115.538 556.763
24-24
fb= (t/m2) -20.94 -21.22 -21.81 -10.65 155.234 139.056 219.670
ft= (t/m2) 209.45 225.27 114.33 -70.355 -88.040 390.663
25-25
fb= (t/m2) -3.15 -3.39 -1.72 85.169 106.577 183.476
ft= (t/m2) 206.06 109.83 -29.667 -60.244 225.979
26-26
fb= (t/m2) 14.88 7.93 36.109 73.325 132.247
ft= (t/m2) 100.52 -6.932 -34.094 59.490
27-27
fb= (t/m2) 16.34 8.479 41.702 66.519
Hence OK
X) BETWEEN 10 th AND 11 th STAGE STRESSING: (BETN 142 DAYS & 157 DAYS)
10 th
stage Stress
Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to DL due to Depth of Stress at
Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with Truss & Total CG of CG of
up to28th (m)
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic working cables cables:
Segment
shortenin load
g loss
Loss 7.989% 7.712% 7.061% 6.392% 5.232% 4.365% 3.117% 2.152% 1.457% 0.079%
ft= (t/m2) 87.096 101.002 109.96 218.88 216.04 229.32 220.65 220.68 109.63 109.17 -561.37 -76.711 984.352
19-19 7.5 0.285 961.24
fb= (t/m2) -8.019 -14.604 -24.43 -48.63 -48.00 -58.51 -56.30 -56.31 -27.97 -27.85 657.71 89.875 376.961
ft= (t/m2) 98.070 110.31 218.75 222.77 236.99 228.07 228.14 113.35 112.88 -507.95 -76.727 984.654
20-20 7.04 0.285 958.26
fb= (t/m2) -11.711 -23.25 -46.10 -46.95 -58.57 -56.19 -56.20 -27.92 -27.81 598.01 90.331 333.639
ft= (t/m2) 111.09 217.97 220.67 241.30 233.70 233.81 116.17 115.71 -446.33 -75.182 968.907
21-21 6.60 0.235 944.99
fb= (t/m2) -21.27 -41.73 -42.25 -55.50 -53.75 -53.32 -26.72 -26.61 528.03 88.942 295.822
ft= (t/m2) 217.89 220.59 241.68 234.06 234.18 116.35 115.89 -378.94 -69.624 932.063
22-22 6.19 0.228 907.63
fb= (t/m2) -35.57 -36.01 -49.55 -48.86 -48.01 -23.85 -23.76 450.46 82.764 267.605
ft= (t/m2) 208.10 236.30 235.48 235.65 117.09 116.64 -286.02 -62.668 800.580
23-23 5.68 0.248 776.42
fb= (t/m2) -23.06 -37.16 -37.03 -37.06 -18.41 -18.34 342.15 74.966 246.051
ft= (t/m2) 224.56 227.45 233.76 114.14 115.74 -198.02 -53.414 664.208
24-24 5.22 0.232 644.33
fb= (t/m2) -20.91 -21.18 -21.77 -10.63 -10.78 238.33 64.287 217.347
ft= (t/m2) 209.10 224.84 114.09 113.68 -122.96 -42.816 495.938
25-25 4.80 0.209 482.65
fb= (t/m2) -3.15 -3.39 -1.72 -1.71 148.85 51.831 190.715
ft= (t/m2) 205.67 109.59 111.12 -65.66 -31.902 328.825
26-26 4.42 0.237 319.22
fb= (t/m2) 14.85 7.91 8.02 79.91 38.829 149.533
ft= (t/m2) 100.30 104.87 -27.29 -22.787 155.095
27-27 4.09 0.293 150.75
fb= (t/m2) 16.30 17.05 33.38 27.735 94.465
ft= (t/m2) 98.11 -6.33 -12.062 79.720
28-28 3.80 0.293 77.21
fb= (t/m2) 24.49 7.78 14.819 47.088
ft= (t/m2) 82.00 82.001
29-29 3.55 0.460 76.09
fb= (t/m2) 36.35 36.354
Average Stress (T/m2) in CG of cables 1 st stage= 959.75
Average Stress (T/m2) in CG of cables 2 nd stage= 951.62
Average Stress (T/m2) in CG of cables 3 rd stage= 926.31
Average Stress (T/m2) in CG of cables 4 th stage= 842.02
Average Stress (T/m2) in CG of cables 5 th stage= 710.38
Average Stress (T/m2) in CG of cables 6 th stage= 563.49
Average Stress (T/m2) in CG of cables 7 th stage= 400.94
Average Stress (T/m2) in CG of cables 8 th stage= 234.99
Average Stress (T/m2) in CG of cables 9 th stage= 113.98
Average Stress (T/m2) in CG of cables 10 th stage= 76.65
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
2.40E-06 4.689 2.59E-06 5.054 2.74E-06 5.333 2.82E-06 5.495 2.86E-06 5.570 1.17E-06 2.280 1.3E-06 2.511 1.4E-06 2.714 1.5E-06 2.920 1.6E-06 3.153 4.689 7.565 8.047 8.415 8.723
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables:
10th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
2.88E-06 5.609 2.87E-06 5.590 2.81E-06 5.487 2.77E-06 5.397 2.49E-06 4.857 1.77E-06 3.442 1.97E-06 3.846 2.31E-06 4.509 3.46E-06 6.755 1.01E-05 19.722 9.052 9.436 9.995 12.152 24.579
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 804.34 0.540
20-20 815.89 0.548
21-21 827.45 0.555
22-22 842.39 0.565
23-23 842.85 0.566
24-24 858.26 0.576 0.565
25-25 873.67 0.586
26-26 889.08 0.597
27-27 873.22 0.586
28-28 846.82 0.568
29-29 783.04 0.525
1000 hour relaxation loss 10 th stage cables= 0.81 %
Final (0.5x10^6 hours) relaxation loss 10 th stage cables= 2.427 %
% Loss in 1 st stage cables= 8.035 %
% Loss in 2 nd stage cables= 7.781 %
% Loss in 3 rd stage cables= 7.134 %
% Loss in 4 th stage cables= 6.469 %
% Loss in 5 th stage cables= 5.312 %
% Loss in 6 th stage cables= 4.448 %
% Loss in 7 th stage cables= 3.205 %
% Loss in 8 th stage cables= 2.245 %
% Loss in 9 th stage cables= 1.571 %
% Loss in 10 th stage cables= 1.117 %
XI) BETWEEN 11 th AND 12 th STAGE STRESSING: (BETN 157 DAYS & 172 DAYS)
11 th
stage Stress Stress
10th
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to DL due to Depth of Stress at
stage Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with up to Truss & Total CG of CG of
Prestress (m)
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic 29th working cables cables:
with loss
shortenin Segment load
g loss
Loss 8.080% 7.810% 7.154% 6.501% 5.366% 4.510% 3.299% 2.366% 1.721% 1.298% 0.062%
ft= (t/m2) 87.009 100.894 109.85 218.63 215.74 228.97 220.24 220.20 109.34 107.83 107.18 -677.12 -84.382 964.380
19-19 7.5 0.275 947.15
fb= (t/m2) -8.011 -14.588 -24.41 -48.57 -47.93 -58.42 -56.19 -56.18 -27.90 -27.51 -27.35 793.32 98.863 495.116
ft= (t/m2) 97.966 110.20 218.49 222.45 236.63 227.64 227.64 113.04 111.50 110.82 -623.48 -85.022 967.903
20-20 7.04 0.275 947.76
fb= (t/m2) -11.699 -23.22 -46.05 -46.88 -58.49 -56.08 -56.08 -27.85 -27.47 -27.30 734.03 100.097 453.004
ft= (t/m2) 110.98 217.72 220.36 240.93 233.26 233.30 115.86 114.29 113.60 -559.26 -84.027 957.021
21-21 6.60 0.227 938.34
fb= (t/m2) -21.25 -41.68 -42.19 -55.41 -53.65 -53.20 -26.65 -26.29 -26.13 661.62 99.406 414.579
ft= (t/m2) 217.63 220.28 241.31 233.63 233.66 116.04 114.47 113.77 -486.68 -78.908 925.204
22-22 6.19 0.220 905.55
fb= (t/m2) -35.53 -35.96 -49.48 -48.77 -47.91 -23.79 -23.47 -23.33 578.53 82.764 373.074
ft= (t/m2) 207.81 235.95 235.04 235.13 116.78 115.22 114.51 -383.00 -62.668 814.772
23-23 5.68 0.238 795.55
fb= (t/m2) -23.02 -37.10 -36.96 -36.98 -18.36 -18.12 -18.01 458.16 86.500 356.096
ft= (t/m2) 224.22 227.02 233.25 113.83 114.32 113.63 -280.68 -63.126 682.474
24-24 5.22 0.222 666.95
fb= (t/m2) -20.88 -21.14 -21.72 -10.60 -10.65 -10.58 337.81 75.975 318.208
ft= (t/m2) 208.71 224.35 113.78 112.30 111.61 -189.21 -52.330 529.210
25-25 4.80 0.199 518.88
fb= (t/m2) -3.14 -3.38 -1.71 -1.69 -1.68 229.05 63.348 280.789
ft= (t/m2) 205.22 109.30 109.77 59.43 -115.01 -41.017 327.679
26-26 4.42 0.221 322.72
fb= (t/m2) 14.82 7.89 7.93 7.85 139.99 49.923 228.403
ft= (t/m2) 100.03 103.59 107.49 -60.54 -31.902 218.674
27-27 4.09 0.259 215.17
fb= (t/m2) 16.26 16.84 17.47 74.05 38.829 163.447
ft= (t/m2) 96.92 106.58 -24.98 -20.104 158.413
28-28 3.80 0.237 155.16
fb= (t/m2) 24.19 26.60 30.69 24.698 106.186
ft= (t/m2) 106.24 -5.79 -11.264 89.187
29-29 3.55 0.293 86.45
fb= (t/m2) 34.86 7.14 13.891 55.897
ft= (t/m2) 83.75 83.746
30-30 3.35 0.460 78.12
fb= (t/m2) 42.68 42.682
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
2.07E-06 4.030 2.21E-06 4.319 2.32E-06 4.533 2.39E-06 4.657 2.41E-06 4.706 9.85E-07 1.921 1.1E-06 2.100 1.2E-06 2.254 1.2E-06 2.406 1.3E-06 2.571 4.030 6.419 6.787 7.063 7.278
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables:
10th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep 2 Creep 2 of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm ) (kg/cm ) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
2.42E-06 4.720 2.39E-06 4.654 2.34E-06 4.571 2.36E-06 4.595 2.40E-06 4.687 1.42E-06 2.765 1.55E-06 3.014 1.73E-06 3.367 2.28E-06 4.450 2.74E-06 5.351 7.485 7.667 7.938 9.045 10.038
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 789.58 0.530
20-20 800.91 0.537
21-21 812.25 0.545
22-22 827.45 0.555
23-23 827.36 0.555
24-24 842.47 0.565
0.571
25-25 857.59 0.575
26-26 869.96 0.584
27-27 894.86 0.600
28-28 919.77 0.617
29-29 944.67 0.634
30-30 815.95 0.548
XII) BETWEEN 12 th AND 13 th STAGE STRESSING: (BETN 172 DAYS & 187 DAYS)
12 th
stage Stress Stress
10th 11th
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to DL due to Depth of Stress at
stage stage Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with up to Truss & Total CG of CG of
Prestress Prestress (m)
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic 30th working cables cables:
with loss with loss
shortenin Segment load
g loss
Loss 8.122% 7.851% 7.184% 6.541% 5.427% 4.578% 3.399% 2.496% 1.890% 1.506% 1.302% 0.051%
ft= (t/m2) 86.969 100.850 109.81 218.53 215.60 228.81 220.01 219.91 109.15 107.61 105.85 105.29 -802.59 -92.053 933.749
19-19 7.50 0.266 922.78
fb= (t/m2) -8.007 -14.582 -24.40 -48.55 -47.90 -58.38 -56.13 -56.11 -27.85 -27.46 -27.01 -26.86 940.32 107.850 624.929
ft= (t/m2) 97.923 110.17 218.40 222.31 236.46 227.41 227.34 112.85 111.27 109.45 108.89 -749.68 -93.316 939.469
20-20 7.04 0.266 926.06
fb= (t/m2) -11.694 -23.22 -46.03 -46.85 -58.44 -56.02 -56.01 -27.80 -27.41 -26.96 -26.82 882.61 109.862 585.206
ft= (t/m2) 110.94 217.62 220.22 240.76 233.02 232.99 115.66 114.05 112.19 111.64 -683.74 -92.872 932.492
21-21 6.60 0.221 919.60
fb= (t/m2) -21.24 -41.67 -42.16 -55.37 -53.59 -53.13 -26.60 -26.23 -25.80 -25.67 808.88 109.870 547.272
ft= (t/m2) 217.54 220.13 241.14 233.38 233.35 115.84 114.23 112.36 111.81 -606.74 -88.191 904.868
22-22 6.19 0.214 891.03
fb= (t/m2) -35.51 -35.94 -49.44 -48.72 -47.84 -23.75 -23.42 -23.04 -22.92 721.25 93.800 504.464
ft= (t/m2) 207.67 235.78 234.80 234.82 116.58 114.97 113.09 112.56 -493.01 -72.310 804.964
23-23 5.68 0.230 791.89
fb= (t/m2) -23.01 -37.08 -36.92 -36.93 -18.33 -18.08 -17.78 -17.70 589.76 98.033 481.951
ft= (t/m2) 224.06 226.79 232.94 113.64 114.08 112.22 111.72 -376.71 -72.837 685.894
24-24 5.22 0.214 675.61
fb= (t/m2) -20.86 -21.12 -21.69 -10.58 -10.62 -10.45 -10.40 453.39 87.663 435.317
ft= (t/m2) 208.50 224.05 113.59 112.06 110.23 109.76 -268.82 -61.845 547.518
25-25 4.80 0.192 541.09
fb= (t/m2) -3.14 -3.38 -1.71 -1.69 -1.66 -1.65 325.42 74.866 387.062
ft= (t/m2) 204.94 109.11 109.54 58.69 107.32 -177.41 -50.132 362.056
26-26 4.42 0.209 360.21
fb= (t/m2) 14.80 7.88 7.91 7.76 7.75 215.93 61.017 323.045
ft= (t/m2) 99.86 103.38 106.16 104.93 -106.31 -41.017 266.993
27-27 4.09 0.237 265.85
fb= (t/m2) 16.23 16.80 17.26 17.05 130.03 49.923 247.300
ft= (t/m2) 96.71 105.26 103.21 -55.56 -28.145 221.483
28-28 3.80 0.209 219.15
fb= (t/m2) 24.14 26.27 25.76 68.26 34.578 179.011
ft= (t/m2) 104.93 103.21 -22.92 -18.774 166.445
29-29 3.55 0.237 163.33
fb= (t/m2) 34.43 33.86 28.26 23.152 119.710
ft= (t/m2) 103.81 -5.34 -10.565 87.904
30-30 3.35 0.293 85.53
fb= (t/m2) 40.95 6.61 13.069 60.628
ft= (t/m2) 83.45 83.446
31-31 3.20 0.460 78.18
fb= (t/m2) 46.81 46.808
Average Stress (T/m2) in CG of cables 1 st stage= 924.42
Average Stress (T/m2) in CG of cables 2 nd stage= 922.83
Average Stress (T/m2) in CG of cables 3 rd stage= 905.31
Average Stress (T/m2) in CG of cables 4 th stage= 841.46
Average Stress (T/m2) in CG of cables 5 th stage= 733.75
Average Stress (T/m2) in CG of cables 6 th stage= 608.35
Average Stress (T/m2) in CG of cables 7 th stage= 450.65
Average Stress (T/m2) in CG of cables 8 th stage= 313.03
Average Stress (T/m2) in CG of cables 9 th stage= 242.50
Average Stress (T/m2) in CG of cables 10 th stage= 191.24
Average Stress (T/m2) in CG of cables 11 th stage= 124.43
Average Stress (T/m2) in CG of cables 12 th stage= 81.85
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.78E-06 3.464 1.89E-06 3.695 1.98E-06 3.861 2.03E-06 3.953 2.04E-06 3.986 8.4E-07 1.638 9.1E-07 1.781 9.7E-07 1.900 1.0E-06 2.015 1.1E-06 2.137 3.464 5.476 5.760 5.968 6.122
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables:
10th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep 2 Creep 2 of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm ) (kg/cm ) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
2.05E-06 3.991 1.72E-06 3.344 1.95E-06 3.808 1.97E-06 3.840 2.01E-06 3.928 1.17E-06 2.274 1.25E-06 2.440 1.36E-06 2.658 1.71E-06 3.343 1.81E-06 3.539 6.265 5.785 6.466 7.184 7.466
Change of Change of Shrinkage Change Creep Change Shrinkage Loss 11th Loss 12th
Creep loss of stage stage
Creep Shrinkage loss of Creep loss loss
(kg/cm2) Shrinkage
strain= strain= (kg/cm2) strain= (kg/cm2) (kg/cm2)
strain=
2.21E-06 4.318 2.44E-06 4.763 2.61E-06 5.093 8.27E-06 16.131 9.081 21.224
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 775.53 0.520
20-20 786.82 0.528
21-21 798.12 0.536
22-22 812.25 0.545
23-23 813.18 0.546
24-24 828.24 0.556
25-25 843.31 0.566 0.566
26-26 858.37 0.576
27-27 873.43 0.586
28-28 890.58 0.598
29-29 917.60 0.616
30-30 944.62 0.634
31-31 824.57 0.553
1000 hour relaxation loss 12 th stage cables= 0.83 %
Final (0.5x10^6 hours) relaxation loss 12 th stage cables= 2.478 %
% Loss in 1 st stage cables= 8.157 %
% Loss in 2 nd stage cables= 7.901 %
% Loss in 3 rd stage cables= 7.237 %
% Loss in 4 th stage cables= 6.595 %
% Loss in 5 th stage cables= 5.483 %
% Loss in 6 th stage cables= 4.635 %
% Loss in 7 th stage cables= 3.453 %
% Loss in 8 th stage cables= 2.556 %
% Loss in 9 th stage cables= 1.957 %
% Loss in 10 th stage cables= 1.576 %
% Loss in 11 th stage cables= 1.386 %
% Loss in 12 th stage cables= 1.075 %
XIII) BETWEEN 13 th AND 14 th STAGE STRESSING: (BETN 187 DAYS & 202 DAYS)
13 th
stage Stress Stress
10th 11th 12th
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to DL due to Depth of Stress at
stage stage stage Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with up to Truss & Total CG of CG of
Prestress Prestress Prestress (m)
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic 31th working cables cables:
with loss with loss with loss
shortenin Segment load
g loss
Loss 8.115% 7.836% 7.152% 6.514% 5.417% 4.572% 3.415% 2.547% 1.976% 1.625% 1.458% 1.171% 0.040%
ft= (t/m2) 86.976 100.867 109.85 218.60 215.62 228.82 219.97 219.79 109.06 107.48 105.68 104.11 103.37 -937.96 -99.724 892.506
19-19 7.50 0.259 888.16
fb= (t/m2) -8.008 -14.584 -24.41 -48.57 -47.91 -58.38 -56.12 -56.08 -27.83 -27.42 -26.97 -26.56 -26.37 1098.93 116.838 766.558
ft= (t/m2) 97.939 110.20 218.46 222.34 236.48 227.37 227.22 112.75 111.13 109.28 107.67 106.90 -886.72 -101.611 899.408
20-20 7.04 0.259 893.20
fb= (t/m2) -11.696 -23.23 -46.04 -46.86 -58.45 -56.01 -55.98 -27.78 -27.38 -26.92 -26.52 -26.34 1043.94 119.628 730.381
ft= (t/m2) 110.98 217.69 220.24 240.78 232.98 232.87 115.56 113.92 112.01 110.39 109.60 -819.90 -101.717 895.391
21-21 6.60 0.215 888.82
fb= (t/m2) -21.25 -41.68 -42.17 -55.38 -53.59 -53.10 -26.58 -26.20 -25.76 -25.39 -25.21 969.97 120.334 694.009
ft= (t/m2) 217.60 220.16 241.15 233.35 233.23 115.74 114.09 112.19 110.56 109.77 -739.19 -97.474 871.169
22-22 6.19 0.208 863.75
fb= (t/m2) -35.52 -35.94 -49.44 -48.71 -47.82 -23.73 -23.39 -23.00 -22.67 -22.51 878.70 104.835 650.803
ft= (t/m2) 207.70 235.79 234.76 234.70 116.47 114.84 112.92 111.30 110.51 -616.09 -81.951 780.945
23-23 5.68 0.223 774.77
fb= (t/m2) -23.01 -37.08 -36.92 -36.91 -18.32 -18.06 -17.76 -17.50 -17.38 736.99 109.566 623.625
ft= (t/m2) 224.07 226.75 232.82 113.54 113.95 112.04 110.47 109.68 -486.11 -82.549 674.654
24-24 5.22 0.207 670.44
fb= (t/m2) -20.87 -21.12 -21.68 -10.57 -10.61 -10.43 -10.29 -10.21 585.05 99.352 568.620
ft= (t/m2) 208.46 223.93 113.49 111.92 110.05 108.53 107.75 -361.70 -71.359 551.086
25-25 4.80 0.186 549.47
fb= (t/m2) -3.14 -3.37 -1.71 -1.69 -1.66 -1.63 -1.62 437.86 86.384 509.422
ft= (t/m2) 204.84 109.02 109.41 58.60 106.12 105.35 -252.70 -59.247 381.373
26-26 4.42 0.199 383.71
fb= (t/m2) 14.79 7.87 7.90 7.74 7.66 7.61 307.57 72.111 433.260
ft= (t/m2) 99.77 103.25 105.99 103.75 103.00 -164.41 -50.132 301.226
27-27 4.09 0.221 303.64
fb= (t/m2) 16.22 16.78 17.23 16.86 16.74 201.10 61.017 345.949
ft= (t/m2) 96.60 105.09 102.06 101.31 -97.82 -36.187 271.050
28-28 3.80 0.192 270.78
fb= (t/m2) 24.11 26.23 25.47 25.29 120.18 44.457 265.743
ft= (t/m2) 104.76 102.06 100.98 -51.11 -26.284 230.400
29-29 3.55 0.209 228.53
fb= (t/m2) 34.37 33.49 33.13 63.03 34.578 198.595
ft= (t/m2) 102.65 101.25 -21.20 -17.608 165.085
30-30 3.35 0.237 162.50
fb= (t/m2) 40.49 39.93 26.23 21.781 128.434
ft= (t/m2) 102.09 -5.00 -9.999 87.098
31-31 3.20 0.293 85.00
fb= (t/m2) 45.59 6.20 12.399 64.189
ft= (t/m2) 81.09 81.095
32-32 3.09 0.460 76.23
fb= (t/m2) 48.42 48.416
2
Average Stress (T/m ) in CG of cables 1 st stage= 890.68
Average Stress (T/m2) in CG of cables 2 nd stage= 891.01
Average Stress (T/m2) in CG of cables 3 rd stage= 876.29
Average Stress (T/m2) in CG of cables 4 th stage= 819.26
Average Stress (T/m2) in CG of cables 5 th stage= 722.60
Average Stress (T/m2) in CG of cables 6 th stage= 609.96
Average Stress (T/m2) in CG of cables 7 th stage= 466.59
Average Stress (T/m2) in CG of cables 8 th stage= 343.68
Average Stress (T/m2) in CG of cables 9 th stage= 287.21
Average Stress (T/m2) in CG of cables 10 th stage= 249.66
Average Stress (T/m2) in CG of cables 11 th stage= 195.52
Average Stress (T/m2) in CG of cables 12 th stage= 123.75
Average Stress (T/m2) in CG of cables 13 th stage= 80.62
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stageth stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.52E-06 2.970 1.62E-06 3.155 1.68E-06 3.284 1.72E-06 3.353 1.73E-06 3.375 7.2E-07 1.404 7.8E-07 1.523 8.3E-07 1.616 8.7E-07 1.706 9.2E-07 1.798 2.970 4.677 4.900 5.058 5.173
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables:
10th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.73E-06 3.376 1.71E-06 3.334 1.69E-06 3.296 1.71E-06 3.330 1.75E-06 3.407 9.74E-07 1.899 1.03E-06 2.017 1.11E-06 2.163 1.36E-06 2.650 1.37E-06 2.668 5.275 5.351 5.459 5.981 6.075
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables:
13th stage cables: Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Loss 11th Loss 12th Loss 13th
Creep loss Creep loss of of of stage stage stage
Creep 2 Creep 2 of Creep loss loss loss loss
(kg/cm ) (kg/cm ) Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain=
1.79E-06 3.485 1.97E-06 3.851 2.32E-06 4.528 1.62E-06 3.150 2.19E-06 4.272 7.57E-06 14.766 6.634 8.123 19.293
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 761.30 0.511
20-20 772.38 0.518
21-21 783.46 0.526
22-22 798.12 0.536
23-23 798.23 0.536
24-24 813.01 0.546
25-25 827.78 0.555
0.561
26-26 842.56 0.565
27-27 857.33 0.575
28-28 874.10 0.587
29-29 897.63 0.602
30-30 921.16 0.618
31-31 944.69 0.634
32-32 808.64 0.543
1000 hour relaxation loss 13 th stage cables= 0.76 %
Final (0.5x10^6 hours) relaxation loss 13 th stage cables= 2.281 %
% Loss in 1 st stage cables= 8.145 %
% Loss in 2 nd stage cables= 7.878 %
% Loss in 3 rd stage cables= 7.196 %
% Loss in 4 th stage cables= 6.560 %
% Loss in 5 th stage cables= 5.464 %
% Loss in 6 th stage cables= 4.620 %
% Loss in 7 th stage cables= 3.465 %
% Loss in 8 th stage cables= 2.598 %
% Loss in 9 th stage cables= 2.032 %
% Loss in 10 th stage cables= 1.682 %
% Loss in 11 th stage cables= 1.519 %
% Loss in 12 th stage cables= 1.246 %
% Loss in 13 th stage cables= 0.980 %
XIV) BETWEEN 14 th AND 15 th STAGE STRESSING: (BETN 202 DAYS & 217 DAYS)
14 th
stage Stress Stress
10th 11th 12th 13th
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to DL due to Depth of Stress at
stage stage stage stage Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with up to Truss & Total CG of CG of
Prestress Prestress Prestress Prestress (m)
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic 32th working cables cables:
with loss with loss with loss with loss
shortenin Segment load
g loss
Loss 8.059% 7.765% 7.058% 6.422% 5.336% 4.494% 3.361% 2.523% 1.987% 1.667% 1.533% 1.284% 1.046% 0.030%
ft= (t/m2) 87.030 100.944 109.96 218.81 215.81 229.01 220.10 219.84 109.04 107.43 105.60 103.99 102.33 101.54 -1083.59 -106.237 841.613
19-19 7.50 0.252 844.21
fb= (t/m2) -8.013 -14.595 -24.43 -48.62 -47.95 -58.43 -56.16 -56.09 -27.82 -27.41 -26.95 -26.53 -26.11 -25.91 1269.54 124.469 919.004
ft= (t/m2) 98.014 110.31 218.68 222.52 236.67 227.50 227.28 112.74 111.09 109.19 107.54 105.82 105.03 -1034.92 -108.713 848.761
20-20 7.04 0.252 850.14
fb= (t/m2) -11.705 -23.25 -46.09 -46.90 -58.50 -56.04 -55.99 -27.77 -27.37 -26.90 -26.49 -26.07 -25.88 1218.42 127.989 887.466
ft= (t/m2) 111.09 217.90 220.43 240.98 233.11 232.93 115.55 113.87 111.93 110.26 108.49 107.70 -968.06 -109.353 846.828
21-21 6.60 0.210 847.05
fb= (t/m2) -21.27 -41.72 -42.20 -55.42 -53.62 -53.12 -26.57 -26.19 -25.74 -25.36 -24.95 -24.77 1145.24 129.367 853.670
ft= (t/m2) 217.82 220.35 241.35 233.48 233.29 115.72 114.04 112.10 110.43 108.66 107.87 -884.32 -105.576 825.218
22-22 6.19 0.204 824.75
fb= (t/m2) -35.56 -35.97 -49.48 -48.74 -47.83 -23.73 -23.38 -22.98 -22.64 -22.28 -22.12 1051.21 114.571 811.079
ft= (t/m2) 207.87 235.99 234.89 234.75 116.46 114.79 112.83 111.18 109.40 108.63 -752.46 -90.549 743.773
23-23 5.68 0.217 745.16
fb= (t/m2) -23.03 -37.11 -36.94 -36.92 -18.31 -18.05 -17.74 -17.48 -17.20 -17.08 900.12 119.742 779.988
ft= (t/m2) 224.26 226.88 232.88 113.53 113.90 111.95 110.34 108.57 107.84 -609.01 -91.210 649.914
24-24 5.22 0.201 652.51
fb= (t/m2) -20.88 -21.13 -21.69 -10.57 -10.61 -10.43 -10.28 -10.11 -10.04 732.98 109.776 717.017
ft= (t/m2) 208.58 223.99 113.47 111.88 109.97 108.41 106.67 105.97 -467.94 -79.935 541.058
25-25 4.80 0.181 545.05
fb= (t/m2) -3.14 -3.37 -1.71 -1.68 -1.66 -1.63 -1.61 -1.60 566.47 96.765 646.839
ft= (t/m2) 204.89 109.00 109.36 58.55 105.99 104.29 103.63 -340.91 -67.549 387.259
26-26 4.42 0.192 394.68
fb= (t/m2) 14.80 7.87 7.90 7.74 7.65 7.53 7.48 414.93 82.216 558.119
ft= (t/m2) 99.76 103.21 105.91 103.63 101.97 101.35 -234.81 -58.521 322.495
27-27 4.09 0.209 329.44
fb= (t/m2) 16.22 16.78 17.22 16.84 16.57 16.47 287.21 71.227 458.531
ft= (t/m2) 96.55 105.01 101.94 100.29 99.48 -151.70 -43.664 307.919
28-28 3.80 0.181 310.67
fb= (t/m2) 24.10 26.21 25.44 25.03 24.83 186.37 53.643 365.633
ft= (t/m2) 104.68 101.94 99.96 98.21 -90.24 -33.338 281.210
29-29 3.55 0.192 281.57
fb= (t/m2) 34.35 33.45 32.80 32.22 111.28 43.857 287.953
ft= (t/m2) 102.53 100.23 98.34 -47.42 -24.290 229.390
30-30 3.35 0.209 228.03
fb= (t/m2) 40.44 39.53 38.79 58.65 30.047 207.462
ft= (t/m2) 101.07 99.40 -19.88 -16.387 164.197
31-31 3.20 0.237 162.00
fb= (t/m2) 45.13 44.39 24.65 20.320 134.495
ft= (t/m2) 100.96 -4.75 -9.784 86.424
32-32 3.09 0.293 84.57
fb= (t/m2) 48.84 5.90 12.133 66.881
ft= (t/m2) 81.55 81.546
33-33 3.02 0.460 76.81
fb= (t/m2) 50.43 50.426
2
Average Stress (T/m ) in CG of cables 1 st stage= 847.18
Average Stress (T/m2) in CG of cables 2 nd stage= 848.59
Average Stress (T/m2) in CG of cables 3 rd stage= 835.90
Average Stress (T/m2) in CG of cables 4 th stage= 784.95
Average Stress (T/m2) in CG of cables 5 th stage= 698.83
Average Stress (T/m2) in CG of cables 6 th stage= 598.78
Average Stress (T/m2) in CG of cables 7 th stage= 469.87
Average Stress (T/m2) in CG of cables 8 th stage= 362.06
Average Stress (T/m2) in CG of cables 9 th stage= 320.06
Average Stress (T/m2) in CG of cables 10 th stage= 296.12
Average Stress (T/m2) in CG of cables 11 th stage= 254.80
Average Stress (T/m2) in CG of cables 12 th stage= 195.01
Average Stress (T/m2) in CG of cables 13 th stage= 123.29
Average Stress (T/m2) in CG of cables 14 th stage= 80.69
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.30E-06 2.536 1.38E-06 2.683 1.43E-06 2.784 1.45E-06 2.835 1.46E-06 2.850 6.2E-07 1.209 6.7E-07 1.310 7.1E-07 1.385 7.5E-07 1.456 7.8E-07 1.528 2.536 3.992 4.168 4.291 4.378
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables:
10th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep 2 Creep 2 of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm ) (kg/cm ) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.46E-06 2.849 2.49E-06 4.851 1.56E-06 3.044 1.58E-06 3.079 1.61E-06 3.146 8.2E-07 1.605 8.68E-07 1.692 9.20E-07 1.795 1.11E-06 2.165 1.09E-06 2.122 4.454 6.543 4.839 5.244 5.268
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Creep Loss in 14th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
stage cables: stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables:
14th stage cables: Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 11th Loss 12th Loss 13th Loss 14th
Creep loss Creep loss of of of of stage stage stage stage
Creep 2 Creep 2 of Creep loss of Creep loss loss loss loss loss
(kg/cm ) (kg/cm ) Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain=
1.65E-06 3.213 1.75E-06 3.415 1.72E-06 3.346 2.17E-06 4.235 1.22E-06 2.379 1.45E-06 2.820 1.98E-06 3.856 6.97E-06 13.601 5.592 6.235 7.202 17.836
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 747.76 0.502
20-20 758.80 0.509
21-21 769.85 0.517
22-22 783.46 0.526
23-23 784.57 0.526
24-24 799.29 0.536
25-25 814.02 0.546
26-26 828.74 0.556 0.556
27-27 843.47 0.566
28-28 858.19 0.576
29-29 872.92 0.586
30-30 894.60 0.600
31-31 919.63 0.617
32-32 944.66 0.634
33-33 817.18 0.548
1000 hour relaxation loss 14 th stage cables= 0.70 %
Final (0.5x10^6 hours) relaxation loss 14 th stage cables= 2.115 %
% Loss in 1 st stage cables= 8.084 %
% Loss in 2 nd stage cables= 7.801 %
% Loss in 3 rd stage cables= 7.096 %
% Loss in 4 th stage cables= 6.461 %
% Loss in 5 th stage cables= 5.376 %
% Loss in 6 th stage cables= 4.534 %
% Loss in 7 th stage cables= 3.422 %
% Loss in 8 th stage cables= 2.569 %
% Loss in 9 th stage cables= 2.036 %
% Loss in 10 th stage cables= 1.716 %
% Loss in 11 th stage cables= 1.585 %
% Loss in 12 th stage cables= 1.342 %
% Loss in 13 th stage cables= 1.113 %
% Loss in 14 th stage cables= 0.901 %
XV) BETWEEN 15 th AND 16th STAGE STRESSING: (BETN 217 DAYS & 232 DAYS)
DAYS 7 22 37 52 67 82 97 112 127 142 157 172 187 202 217 232
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04 3.56E-04 3.51E-04 3.47E-04 3.43E-04 3.40E-04 3.38E-04 3.36E-04 3.34E-04 3.32E-04 3.31E-04 3.29E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04 3.48E-04 3.50E-04 3.52E-04 3.53E-04 3.55E-04 3.56E-04 3.56E-04 3.57E-04 3.58E-04 3.58E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420 3817160 3830662 3841384 3850169 3857537 3863833 3869295 3874092 3878349 3882161 3885600
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 446 T/m2
15 th
stage Stress
10th 11th 12th 13th 14th
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to DL Depth of Stress at
stage stage stage stage stage Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with up to Total CG of CG of
Prestress Prestress Prestress Prestress Prestress (m)
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic 33th cables cables:
with loss with loss with loss with loss with loss
shortenin Segment
g loss
Loss 7.951% 7.636% 6.900% 6.261% 5.185% 4.342% 3.249% 2.426% 1.925% 1.635% 1.540% 1.322% 1.121% 0.936% 0.020%
ft= (t/m2) 87.132 101.085 110.15 219.19 216.15 229.38 220.35 220.06 109.11 107.47 105.60 103.95 102.25 100.62 99.20 -1239.95 891.734
19-19 7.50 0.245 893.71
fb= (t/m2) -8.022 -14.616 -24.47 -48.70 -48.03 -58.52 -56.22 -56.15 -27.84 -27.42 -26.94 -26.52 -26.09 -25.67 -25.31 1452.74 952.213
ft= (t/m2) 98.151 110.50 219.05 222.88 237.05 227.76 227.50 112.81 111.12 109.18 107.50 105.74 104.08 102.62 -1194.77 901.189
20-20 7.04 0.245 901.92
fb= (t/m2) -11.721 -23.29 -46.16 -46.97 -58.59 -56.11 -56.05 -27.79 -27.37 -26.90 -26.48 -26.05 -25.64 -25.28 1406.61 922.207
ft= (t/m2) 111.28 218.28 220.78 241.36 233.38 233.16 115.62 113.90 111.92 110.22 108.41 106.73 105.24 -1128.67 901.601
21-21 6.60 0.206 901.24
fb= (t/m2) -21.30 -41.79 -42.27 -55.51 -53.68 -53.17 -26.59 -26.20 -25.74 -25.35 -24.93 -24.55 -24.20 1335.25 889.967
ft= (t/m2) 218.19 220.70 241.74 233.75 233.52 115.80 114.08 112.09 110.39 108.58 106.89 105.91 -1042.58 879.065
22-22 6.19 0.199 878.54
fb= (t/m2) -35.62 -36.03 -49.56 -48.79 -47.88 -23.74 -23.39 -22.98 -22.63 -22.26 -21.91 -21.72 1239.34 862.820
ft= (t/m2) 208.21 236.36 235.16 234.99 116.54 114.82 112.82 111.13 109.31 107.64 106.66 -902.53 791.119
23-23 5.68 0.211 792.30
fb= (t/m2) -23.07 -37.17 -36.98 -36.96 -18.33 -18.06 -17.74 -17.48 -17.19 -16.93 -16.77 1079.64 822.974
ft= (t/m2) 224.61 227.14 233.11 113.60 113.93 111.94 110.30 108.49 106.86 105.89 -745.78 710.093
24-24 5.22 0.196 712.05
fb= (t/m2) -20.92 -21.15 -21.71 -10.58 -10.61 -10.43 -10.27 -10.10 -9.95 -9.86 897.58 762.000
ft= (t/m2) 208.82 224.21 113.55 111.91 109.96 108.37 106.59 105.01 104.06 -587.83 604.645
25-25 4.80 0.177 607.92
fb= (t/m2) -3.14 -3.38 -1.71 -1.68 -1.66 -1.63 -1.60 -1.58 -1.57 711.60 693.644
ft= (t/m2) 205.09 109.07 109.39 58.55 105.95 104.21 102.69 101.76 -442.25 454.477
26-26 4.42 0.186 460.88
fb= (t/m2) 14.81 7.88 7.90 7.74 7.65 7.53 7.42 7.35 538.27 606.541
ft= (t/m2) 99.82 103.24 105.90 103.59 101.89 100.43 99.52 -317.65 396.751
27-27 4.09 0.199 402.02
fb= (t/m2) 16.23 16.78 17.21 16.84 16.56 16.32 16.18 388.53 504.652
ft= (t/m2) 96.59 105.01 101.90 100.22 98.58 97.69 -217.26 382.714
28-28 3.80 0.173 384.26
fb= (t/m2) 24.11 26.21 25.44 25.01 24.61 24.38 266.91 416.672
ft= (t/m2) 104.67 101.90 99.89 97.32 96.44 -140.33 359.880
29-29 3.55 0.181 358.72
fb= (t/m2) 34.35 33.43 32.77 31.93 31.64 173.06 337.180
ft= (t/m2) 102.49 100.15 97.44 96.24 -83.96 312.369
30-30 3.35 0.192 309.38
fb= (t/m2) 40.43 39.50 38.43 37.96 103.86 260.177
ft= (t/m2) 100.99 98.50 97.12 -44.58 252.028
31-31 3.20 0.209 247.83
fb= (t/m2) 45.10 43.99 43.37 55.28 187.742
ft= (t/m2) 100.05 98.51 -18.96 179.592
32-32 3.09 0.237 175.00
fb= (t/m2) 48.40 47.66 23.56 119.614
ft= (t/m2) 100.34 -4.61 95.723
33-33 3.02 0.293 91.93
fb= (t/m2) 50.77 5.74 56.505
ft= (t/m2) 80.16 80.160
34-34 3.00 0.460 75.56
fb= (t/m2) 50.13 50.134
2
Average Stress (T/m ) in CG of cables 1 st stage= 897.82
Average Stress (T/m2) in CG of cables 2 nd stage= 901.58
Average Stress (T/m2) in CG of cables 3 rd stage= 889.89
Average Stress (T/m2) in CG of cables 4 th stage= 835.42
Average Stress (T/m2) in CG of cables 5 th stage= 752.18
Average Stress (T/m2) in CG of cables 6 th stage= 659.98
Average Stress (T/m2) in CG of cables 7 th stage= 534.40
Average Stress (T/m2) in CG of cables 8 th stage= 431.45
Average Stress (T/m2) in CG of cables 9 th stage= 393.14
Average Stress (T/m2) in CG of cables 10 th stage= 371.49
Average Stress (T/m2) in CG of cables 11 th stage= 334.05
Average Stress (T/m2) in CG of cables 12 th stage= 278.61
Average Stress (T/m2) in CG of cables 13 th stage= 211.42
Average Stress (T/m2) in CG of cables 14 th stage= 133.46
Average Stress (T/m2) in CG of cables 15 th stage= 83.74
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.25E-06 2.430 1.31E-06 2.564 1.36E-06 2.654 1.38E-06 2.695 1.39E-06 2.708 5.4E-07 1.053 5.8E-07 1.134 6.1E-07 1.197 6.4E-07 1.255 6.7E-07 1.312 2.430 3.698 3.851 3.949 4.020
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables:
10th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.39E-06 2.712 2.37E-06 4.624 1.49E-06 2.913 1.51E-06 2.947 1.54E-06 3.005 7.0E-07 1.372 7.37E-07 1.438 7.76E-07 1.514 9.26E-07 1.806 8.93E-07 1.742 4.084 6.062 4.426 4.753 4.747
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Creep Loss in 14th Creep Loss in 15th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
stage cables: stage cables: stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables: 14th stage cables:
15th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 11th Loss 12th Loss 13th Loss 14th Loss 15th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep 2 Creep 2 of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm ) (kg/cm ) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.57E-06 3.064 1.64E-06 3.205 1.63E-06 3.186 1.66E-06 3.245 2.10E-06 4.088 9.74E-07 1.900 1.10E-06 2.135 1.30E-06 2.543 1.80E-06 3.505 6.46E-06 12.600 4.964 5.341 5.729 6.750 16.687
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 730.44 0.490
20-20 741.30 0.497
21-21 752.15 0.505
22-22 769.85 0.517
23-23 770.28 0.517
24-24 784.75 0.527
25-25 799.22 0.536
26-26 813.69 0.546
0.551
27-27 828.17 0.556
28-28 842.64 0.565
29-29 857.11 0.575
30-30 875.41 0.587
31-31 898.51 0.603
32-32 921.60 0.618
33-33 944.69 0.634
34-34 804.51 0.540
1000 hour relaxation loss 15 th stage cables= 0.64 %
Final (0.5x10^6 hours) relaxation loss 15 th stage cables= 1.907 %
% Loss in 1 st stage cables= 7.975 %
% Loss in 2 nd stage cables= 7.670 %
% Loss in 3 rd stage cables= 6.936 %
% Loss in 4 th stage cables= 6.297 %
% Loss in 5 th stage cables= 5.221 %
% Loss in 6 th stage cables= 4.379 %
% Loss in 7 th stage cables= 3.306 %
% Loss in 8 th stage cables= 2.468 %
% Loss in 9 th stage cables= 1.969 %
% Loss in 10 th stage cables= 1.679 %
% Loss in 11 th stage cables= 1.587 %
% Loss in 12 th stage cables= 1.372 %
% Loss in 13 th stage cables= 1.174 %
% Loss in 14 th stage cables= 0.999 %
% Loss in 15 th stage cables= 0.811 %
XVI) BETWEEN 16th AND 17th STAGE STRESSING: (BETN 232 DAYS & 247 DAYS)
DAYS 7 22 37 52 67 82 97 112 127 142 157 172 187 202 217 232 247
CREEP CO-EFFICIENT 5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04 3.56E-04 3.51E-04 3.47E-04 3.43E-04 3.40E-04 3.38E-04 3.36E-04 3.34E-04 3.32E-04 3.31E-04 3.29E-04 3.28E-04
SHRINKAGE STRAIN 2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04 3.48E-04 3.50E-04 3.52E-04 3.53E-04 3.55E-04 3.56E-04 3.56E-04 3.57E-04 3.58E-04 3.58E-04 3.59E-04
MODULUS OF
ELASTICITY OF 3432651 3664608 3736275 3774613 3799420 3817160 3830662 3841384 3850169 3857537 3863833 3869295 3874092 3878349 3882161 3885600 3888724
CONCRETE (T/m2)
Allowable compressive stress 2880 T/m2
Allowable tensile stress 447 T/m2
16th
stage Stress
10th 11th 12th 13th 14th 15th
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress due to DL Depth of Stress at
stage stage stage stage stage stage Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with up to Total CG of CG of
Prestress Prestress Prestress Prestress Prestress Prestress (m)
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic 34th cables cables:
with loss with loss with loss with loss with loss with loss
shortenin Segment
g loss
Loss 8.297% 7.992% 7.270% 6.648% 5.592% 4.746% 3.692% 2.851% 2.351% 2.064% 1.933% 1.722% 1.527% 1.356% 1.170% 0.122%
ft= (t/m2) 86.805 100.695 109.71 218.28 215.22 228.41 219.34 219.11 108.64 107.00 105.17 103.53 101.83 100.19 98.06 95.56 -1261.37 956.18
19-19 7.50 0.240 956.15
fb= (t/m2) -7.992 -14.559 -24.37 -48.50 -47.82 -58.28 -55.96 -55.91 -27.72 -27.30 -26.84 -26.41 -25.98 -25.56 -25.02 -24.38 1477.83 955.23
ft= (t/m2) 97.773 110.06 218.15 221.92 236.05 226.72 226.51 112.32 110.64 108.75 107.07 105.31 103.64 101.44 100.35 -1216.73 969.96
20-20 7.04 0.240 968.45
fb= (t/m2) -11.676 -23.20 -45.97 -46.77 -58.34 -55.85 -55.80 -27.67 -27.26 -26.79 -26.38 -25.94 -25.53 -24.99 -24.72 1432.47 925.58
ft= (t/m2) 110.84 217.38 219.84 240.34 232.32 232.14 115.12 113.41 111.47 109.77 107.97 106.27 104.03 101.43 -1150.82 971.49
21-21 6.60 0.202 969.15
fb= (t/m2) -21.22 -41.62 -42.09 -55.28 -53.43 -52.94 -26.48 -26.08 -25.64 -25.25 -24.83 -24.44 -23.92 -23.33 1361.45 894.90
ft= (t/m2) 217.29 219.75 240.72 232.68 232.50 115.29 113.58 111.64 109.94 108.13 106.44 104.70 103.07 -1064.47 951.28
22-22 6.19 0.195 948.70
fb= (t/m2) -35.47 -35.88 -49.35 -48.57 -47.67 -23.64 -23.29 -22.89 -22.54 -22.17 -21.82 -21.47 -21.13 1265.37 869.49
ft= (t/m2) 207.31 235.36 234.09 233.96 116.03 114.32 112.37 110.68 108.87 107.19 105.43 103.81 -923.42 866.02
23-23 5.68 0.207 864.81
fb= (t/m2) -22.97 -37.01 -36.81 -36.79 -18.25 -17.98 -17.67 -17.41 -17.12 -16.86 -16.58 -16.32 1104.63 832.86
ft= (t/m2) 223.66 226.10 232.09 113.10 113.44 111.50 109.85 108.04 106.41 104.67 103.07 -764.95 786.99
24-24 5.22 0.192 786.59
fb= (t/m2) -20.83 -21.06 -21.61 -10.53 -10.56 -10.38 -10.23 -10.06 -9.91 -9.75 -9.60 920.65 776.13
ft= (t/m2) 207.86 223.24 113.05 111.42 109.52 107.93 106.15 104.57 102.86 101.30 -604.78 683.13
25-25 4.80 0.173 684.20
fb= (t/m2) -3.13 -3.36 -1.70 -1.68 -1.65 -1.62 -1.60 -1.57 -1.55 -1.53 732.12 712.72
ft= (t/m2) 204.20 108.60 108.92 58.31 105.52 103.79 102.26 100.59 99.08 -456.73 534.53
26-26 4.42 0.181 538.48
fb= (t/m2) 14.75 7.84 7.87 7.71 7.62 7.49 7.39 7.27 7.16 555.90 630.981
ft= (t/m2) 99.39 102.79 105.48 103.17 101.47 100.00 98.38 96.90 -329.65 477.938
27-27 4.09 0.192 480.59
fb= (t/m2) 16.15 16.71 17.15 16.77 16.49 16.25 15.99 15.75 403.21 534.480
ft= (t/m2) 96.16 104.59 101.49 99.81 98.16 96.56 95.13 -226.94 464.959
28-28 3.80 0.167 464.37
fb= (t/m2) 24.00 26.11 25.33 24.91 24.50 24.10 23.74 278.80 451.507
ft= (t/m2) 104.26 101.49 99.47 96.90 95.33 93.92 -147.93 443.446
29-29 3.55 0.173 440.19
fb= (t/m2) 34.21 33.30 32.64 31.79 31.28 30.82 182.42 376.453
ft= (t/m2) 102.08 99.74 97.03 95.13 93.32 -89.72 397.583
30-30 3.35 0.181 392.49
fb= (t/m2) 40.26 39.34 38.27 37.52 36.81 110.99 303.192
ft= (t/m2) 100.58 98.08 96.01 94.22 -48.76 340.124
31-31 3.20 0.192 333.76
fb= (t/m2) 44.91 43.80 42.87 42.07 60.46 234.118
ft= (t/m2) 99.62 97.38 95.75 -21.73 271.014
32-32 3.09 0.209 264.09
fb= (t/m2) 48.20 47.11 46.32 27.00 168.622
ft= (t/m2) 99.18 97.71 -6.11 190.778
33-33 3.02 0.237 185.02
fb= (t/m2) 50.19 49.44 17.63 117.251
ft= (t/m2) 71.89 0.00 71.886
34-34 3.00 0.293 70.14
fb= (t/m2) 53.95 0.00 53.953
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.22E-06 2.370 1.28E-06 2.496 1.32E-06 2.579 1.34E-06 2.617 1.35E-06 2.631 4.8E-07 0.936 5.1E-07 0.993 5.4E-07 1.049 5.6E-07 1.096 5.9E-07 1.142 2.370 3.489 3.627 3.713 3.773
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables:
10th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep 2 Creep 2 of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm ) (kg/cm ) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.35E-06 2.637 2.31E-06 4.500 1.46E-06 2.841 1.47E-06 2.874 1.50E-06 2.925 6.1E-07 1.189 6.36E-07 1.241 6.66E-07 1.298 7.88E-07 1.537 7.52E-07 1.466 3.826 5.741 4.140 4.410 4.391
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Creep Loss in 14th Creep Loss in 15th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
stage cables: stage cables: stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables: 14th stage cables:
15th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 11th Loss 12th Loss 13th Loss 14th Loss 15th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep 2 Creep 2 of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm ) (kg/cm ) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
1.53E-06 2.976 1.58E-06 3.083 1.58E-06 3.079 1.61E-06 3.134 1.61E-06 3.145 8.06E-07 1.571 8.80E-07 1.716 9.92E-07 1.934 1.19E-06 2.312 1.65E-06 3.210 4.547 4.799 5.013 5.446 6.354
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 704.37 0.473
20-20 725.65 0.487
21-21 725.65 0.487
22-22 755.80 0.507
23-23 750.48 0.504
24-24 764.66 0.513
25-25 778.85 0.523
26-26 793.04 0.532
0.536
27-27 807.22 0.542
28-28 821.41 0.551
29-29 835.60 0.561
30-30 849.78 0.570
31-31 872.51 0.585
32-32 896.69 0.602
33-33 920.88 0.618
34-34 770.55 0.517
1000 hour relaxation loss 16th stage cables= 0.45 %
Final (0.5x10^6 hours) relaxation loss 16th stage cables= 1.339 %
% Loss in 1 st stage cables= 8.320 %
% Loss in 2 nd stage cables= 8.024 %
% Loss in 3 rd stage cables= 7.303 %
% Loss in 4 th stage cables= 6.682 %
% Loss in 5 th stage cables= 5.626 %
% Loss in 6 th stage cables= 4.780 %
% Loss in 7 th stage cables= 3.745 %
% Loss in 8 th stage cables= 2.889 %
% Loss in 9 th stage cables= 2.392 %
% Loss in 10 th stage cables= 2.105 %
% Loss in 11 th stage cables= 1.976 %
% Loss in 12 th stage cables= 1.766 %
% Loss in 13 th stage cables= 1.573 %
% Loss in 14 th stage cables= 1.407 %
% Loss in 15 th stage cables= 1.229 %
% Loss in 16th stage cables= 0.721 %
XVIII) BETWEEN 247 DAYS & 322 DAYS I.E AFTER LAYING OF SIDL
DAYS 82 97 112 127 142 157 172 187 202 217 232 247 262 277 292 307 322
CREEP CO-EFFICIENT
3.56E-04 3.51E-04 3.47E-04 3.43E-04 3.40E-04 3.38E-04 3.36E-04 3.34E-04 3.32E-04 3.31E-04 3.29E-04 3.28E-04 3.27E-04 3.26E-04 3.25E-04 3.24E-04 3.23E-04
ON 322 DAYS
CREEP CO-EFFICIENT
5.31E-04 4.13E-04 3.87E-04 3.72E-04 3.63E-04 3.56E-04 3.51E-04 3.47E-04 3.43E-04 3.40E-04 3.38E-04 3.36E-04 3.34E-04 3.32E-04 3.31E-04 3.29E-04 3.28E-04
ON 247 DAYS
SHRINKAGE STRAIN ON
3.45E-04 3.48E-04 3.50E-04 3.52E-04 3.53E-04 3.55E-04 3.56E-04 3.56E-04 3.57E-04 3.58E-04 3.58E-04 3.59E-04 3.59E-04 3.60E-04 3.60E-04 3.60E-04 3.60E-04
322 DAYS
SHRINKAGE STRAIN ON
2.30E-04 3.14E-04 3.29E-04 3.37E-04 3.42E-04 3.45E-04 3.48E-04 3.50E-04 3.52E-04 3.53E-04 3.55E-04 3.56E-04 3.56E-04 3.57E-04 3.58E-04 3.58E-04 3.59E-04
247 DAYS
MODULUS OF
ELASTICITY OF 3817160 3830662 3841384 3850169 3857537 3863833 3869295 3874092 3878349 3882161 3885600 3888724 3891577 3894198 3896615 3898854 3900936
CONCRETE (T/m2)
18th
10th 11th 12th 13th 14th 15th 16th stage Stress
1st stage 2nd stage 3rd stage 4th stage 5th stage 6th stage 7th stage 8th stage 9th stage prestress Depth of Stress at
stage stage stage stage stage stage stage due to DL Depth
Section Location Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress Prestress with Total CG of CG of
Prestress Prestress Prestress Prestress Prestress Prestress Prestress up to (m)
with loss with loss with loss with loss with loss with loss with loss with loss with loss elastic cables cables:
with loss with loss with loss with loss with loss with loss with loss SIDL
shortenin
g loss
Loss 8.320% 8.024% 7.303% 6.682% 5.626% 4.780% 3.745% 2.889% 2.392% 3.079% 2.883% 2.649% 2.470% 2.418% 2.454% 1.538% 1.446%
ft= (t/m2) 86.782 100.660 109.67 218.20 215.15 228.33 219.22 219.02 108.59 105.89 104.16 102.55 100.85 99.11 96.78 94.20 0.00 -1440.79 768.38
19-19 7.50 0.240 781.13
fb= (t/m2) -7.990 -14.554 -24.37 -48.48 -47.80 -58.26 -55.93 -55.88 -27.71 -27.02 -26.58 -26.17 -25.73 -25.29 -24.69 -24.04 0.00 1688.05 1167.56
ft= (t/m2) 97.739 110.02 218.07 221.84 235.96 226.59 226.42 112.27 109.49 107.70 106.06 104.30 102.52 100.12 98.93 0.00 -1384.74 793.31
20-20 7.04 0.240 804.61
fb= (t/m2) -11.672 -23.19 -45.96 -46.75 -58.32 -55.82 -55.78 -27.66 -26.97 -26.53 -26.13 -25.70 -25.26 -24.66 -24.37 0.00 1630.26 1125.49
ft= (t/m2) 110.80 217.30 219.76 240.25 232.19 232.05 115.07 112.23 110.39 108.73 106.93 105.13 102.68 99.99 0.00 -1303.77 809.73
21-21 6.60 0.202 817.93
fb= (t/m2) -21.21 -41.60 -42.07 -55.26 -53.40 -52.92 -26.46 -25.81 -25.39 -25.01 -24.59 -24.18 -23.61 -23.00 0.00 1542.39 1077.87
ft= (t/m2) 217.21 219.67 240.63 232.55 232.41 115.25 112.41 110.56 108.90 107.10 105.30 103.34 101.61 0.00 -1199.12 807.82
22-22 6.19 0.195 814.87
fb= (t/m2) -35.46 -35.86 -49.34 -48.54 -47.65 -23.63 -23.05 -22.67 -22.33 -21.96 -21.59 -21.19 -20.83 0.00 1425.43 1031.34
ft= (t/m2) 207.24 235.28 233.96 233.87 115.98 113.14 111.28 109.64 107.82 106.03 104.06 102.34 0.00 -1030.08 750.56
23-23 5.68 0.207 758.24
fb= (t/m2) -22.96 -37.00 -36.79 -36.78 -18.24 -17.79 -17.50 -17.24 -16.96 -16.67 -16.36 -16.09 0.00 1232.23 961.84
ft= (t/m2) 223.58 225.98 232.00 113.06 112.26 110.42 108.81 107.01 105.26 103.31 101.61 0.00 -841.75 701.55
24-24 5.22 0.192 707.73
fb= (t/m2) -20.82 -21.05 -21.61 -10.53 -10.45 -10.28 -10.13 -9.96 -9.80 -9.62 -9.46 0.00 1013.08 869.36
ft= (t/m2) 207.75 223.15 113.00 110.27 108.46 106.91 105.14 103.44 101.52 99.87 0.00 -653.16 626.35
25-25 4.80 0.173 631.58
fb= (t/m2) -3.13 -3.36 -1.70 -1.66 -1.63 -1.61 -1.58 -1.56 -1.53 -1.50 0.00 790.69 771.42
ft= (t/m2) 204.12 108.55 107.79 57.75 104.53 102.79 101.16 99.29 97.67 0.00 -480.08 503.57
26-26 4.42 0.181 509.56
fb= (t/m2) 14.74 7.84 7.78 7.63 7.55 7.42 7.31 7.17 7.05 0.00 575.55 650.053
ft= (t/m2) 99.35 101.72 104.46 102.20 100.50 98.93 97.10 95.53 0.00 -332.53 467.252
27-27 4.09 0.192 470.52
fb= (t/m2) 16.15 16.54 16.98 16.61 16.34 16.08 15.78 15.53 0.00 406.74 536.741
ft= (t/m2) 95.17 103.57 100.53 98.85 97.10 95.31 93.78 0.00 -214.42 469.897
28-28 3.80 0.167 468.33
fb= (t/m2) 23.76 25.85 25.09 24.67 24.24 23.79 23.41 0.00 263.42 434.234
ft= (t/m2) 103.25 100.53 98.52 95.86 94.09 92.59 40.67 -124.16 501.352
29-29 3.55 0.173 500.90
fb= (t/m2) 33.88 32.98 32.33 31.45 30.87 30.38 146.97 153.11 491.978
ft= (t/m2) 101.11 98.79 95.99 93.89 92.00 72.52 -58.41 495.899
30-30 3.35 0.541 492.86
fb= (t/m2) 39.88 38.96 37.86 37.03 36.29 214.77 72.25 477.052
ft= (t/m2) 99.61 97.02 94.76 92.88 133.32 -12.61 504.984
31-31 3.20 0.580 509.87
fb= (t/m2) 44.48 43.33 42.32 41.48 344.70 15.64 531.947
ft= (t/m2) 98.55 96.11 94.39 173.03 17.29 479.375
32-32 3.09 0.640 489.43
fb= (t/m2) 47.68 46.50 45.66 409.55 -21.48 527.913
ft= (t/m2) 97.89 96.32 181.87 34.04 410.130
33-33 3.02 0.735 426.04
fb= (t/m2) 49.53 48.74 409.56 -32.30 475.530
ft= (t/m2) 70.87 183.52 40.15 294.545
34-34 3.00 0.896 329.01
fb= (t/m2) 53.19 406.65 -49.95 409.895
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
3.93E-06 7.670 4.34E-06 8.464 4.50E-06 8.776 4.58E-06 8.931 4.62E-06 9.003 1.7E-06 3.296 1.8E-06 3.505 1.9E-06 3.662 2.0E-06 3.804 2.0E-06 3.940 7.670 11.968 12.439 12.736 12.943
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables:
10th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep 2 Creep 2 of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm ) (kg/cm ) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
4.64E-06 9.042 7.92E-06 15.437 5.00E-06 9.758 5.07E-06 9.886 5.20E-06 10.140 2.1E-06 4.076 2.16E-06 4.217 2.24E-06 4.370 2.62E-06 5.107 2.46E-06 4.790 13.118 19.654 14.127 14.993 14.930
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Creep Loss in 14th Creep Loss in 15th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
stage cables: stage cables: stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables: 14th stage cables:
15th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 11th Loss 12th Loss 13th Loss 14th Loss 15th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
5.36E-06 10.444 5.54E-06 10.794 5.79E-06 11.292 6.06E-06 11.812 6.39E-06 12.456 2.58E-06 5.021 2.72E-06 5.306 2.91E-06 5.675 3.17E-06 6.187 3.58E-06 6.977 15.465 16.100 16.967 17.999 19.433
Creep Loss in 16th Shrinkage Loss in 16th Creep Loss in 17thShrinkage Loss in
stage cables: stage cables: Total C&S stage cables: 15th stage cables: Total C&S
Change of Change of Shrinkage Loss 16th Change Creep Change Shrinkage
Loss 16th
Creep loss of
Creep Shrinkage loss stage of Creep loss loss stage
(kg/cm2) Shrinkage
strain= strain= (kg/cm2) strain= (kg/cm2) (kg/cm2)
strain=
8.53E-06 16.636 1.20E-07 0.234 16.870 5.14E-06 10.032 3.95E-06 7.707 17.739
RELAXATION LOSS:
Section Pull (T) % OF UTS AVERAGE
19-19 704.37 0.473
20-20 725.65 0.487
21-21 725.65 0.487
22-22 755.80 0.507
23-23 750.48 0.504
24-24 764.66 0.513
25-25 778.85 0.523
26-26 793.04 0.532
0.501
27-27 807.22 0.542
28-28 821.41 0.551
29-29 764.18 0.513
30-30 794.84 0.533
31-31 801.14 0.538
32-32 769.19 0.516
33-33 663.77 0.445
34-34 527.42 0.354
1000 hour relaxation loss 18th stage cables= 0.01 %
Final (0.5x10^6 hours) relaxation loss 18th stage cables= 0.041 %
% Loss in 1 st stage cables= 8.396 %
% Loss in 2 nd stage cables= 8.133 %
% Loss in 3 rd stage cables= 7.417 %
% Loss in 4 th stage cables= 6.798 %
% Loss in 5 th stage cables= 5.744 %
% Loss in 6 th stage cables= 4.900 %
% Loss in 7 th stage cables= 3.928 %
% Loss in 8 th stage cables= 3.021 %
% Loss in 9 th stage cables= 2.532 %
% Loss in 10 th stage cables= 3.218 %
% Loss in 11 th stage cables= 3.027 %
% Loss in 12 th stage cables= 2.799 %
% Loss in 13 th stage cables= 2.628 %
% Loss in 14 th stage cables= 2.585 %
% Loss in 15 th stage cables= 2.635 %
% Loss in 16th stage cables= 1.695 %
% Loss in 18th stage cables= 1.625 %
XVIII) AFTER 322 DAYS & INFINITY I.E AFTER APPLYING OF LIVE LOAD
DAYS 82 97 112 127 142 157 172 187 202 217 232 247 262 277 292 307 322
RESIDUAL CREEP CO-
EFFICIENT ON 322 3.56E-04 3.51E-04 3.47E-04 3.43E-04 3.40E-04 3.38E-04 3.36E-04 3.34E-04 3.32E-04 3.31E-04 3.29E-04 3.28E-04 3.27E-04 3.26E-04 3.25E-04 3.24E-04 3.23E-04
DAYS
SHRINKAGE STRAIN ON
3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04 3.64E-04
INFINITY DAYS
SHRINKAGE STRAIN ON
3.45E-04 3.48E-04 3.50E-04 3.52E-04 3.53E-04 3.55E-04 3.56E-04 3.56E-04 3.57E-04 3.58E-04 3.58E-04 3.59E-04 3.59E-04 3.60E-04 3.60E-04 3.60E-04 3.60E-04
322 DAYS
MODULUS OF
ELASTICITY OF 3817160 3830662 3841384 3850169 3857537 3863833 3869295 3874092 3878349 3882161 3885600 3888724 3891577 3894198 3896615 3898854 3900936
CONCRETE (T/m2)
Creep Loss in 1st stage Creep Loss in 2 nd Creep Loss in 3 rd Creep Loss in 4 th Creep Loss in 5 th Shrinkage Loss in Shrinkage Loss in 2 Shrinkage Loss in 3 Shrinkage Loss in 4
Shrinkage Loss in 5
cables: stage stage stage stage 1st stage cables: nd stage rd stage th stage
th stage Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Loss 1st Loss2 nd Loss3 rd Loss4 th Loss5 th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
2.55E-04 497.315 2.59E-04 504.500 2.60E-04 506.119 2.57E-04 501.821 2.54E-04 495.361 3.5E-06 6.863 3.7E-06 7.123 3.8E-06 7.316 3.8E-06 7.477 3.9E-06 7.623 497.315 511.623 513.435 509.298 502.984
Creep Loss in 6th stage Creep Loss in 7th Creep Loss in 8th Creep Loss in 9th Creep Loss in 10th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
cables: stage cables: stage cables: stage cables: stage cables: 6th stage cables: 7th stage cables: 8th stage cables: 9th stage cables:
10th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 6th Loss 7th Loss 8th Loss 9th Loss 10th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep 2 Creep 2 of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm ) (kg/cm ) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
2.51E-04 488.919 4.25E-04 829.321 2.65E-04 517.472 2.65E-04 516.177 2.65E-04 517.353 4.0E-06 7.760 4.05E-06 7.893 4.12E-06 8.025 4.71E-06 9.180 4.31E-06 8.403 496.679 837.214 525.497 525.357 525.756
Creep Loss in 11th Creep Loss in 12th Creep Loss in 13th Creep Loss in 14th Creep Loss in 15th Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in Shrinkage Loss in
Shrinkage Loss in
stage cables: stage cables: stage cables: stage cables: stage cables: 11th stage cables: 12th stage cables: 13th stage cables: 14th stage cables:
15th stage cables: Total C&S Total C&S Total C&S Total C&S Total C&S
Change of Change of Change Creep Change Creep Change Creep Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Change Shrinkage Loss 11th Loss 12th Loss 13th Loss 14th Loss 15th
Creep loss Creep loss of of of of of stage stage stage stage stage
Creep Creep of Creep loss of Creep loss of Creep loss loss loss loss loss loss
(kg/cm2) (kg/cm2) Shrinkage Shrinkage Shrinkage Shrinkage Shrinkage
strain= strain= strain= (kg/cm2) strain= (kg/cm2) strain= (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)
strain= strain= strain= strain= strain=
2.66E-04 518.280 2.66E-04 518.482 2.66E-04 518.846 2.65E-04 517.066 2.63E-04 512.169 4.39E-06 8.551 4.47E-06 8.711 4.56E-06 8.887 4.66E-06 9.083 4.77E-06 9.306 526.831 527.193 527.733 526.149 521.475
XIX) FINAL STRESS AT INFINITY WHEN PRESTRESS IS 0.9 TIMES [CL-7.9.5.(6), IRC-112:2011]
Hence OK
XX) FINAL STRESS AT INFINITY WHEN PRESTRESS IS 1.1 TIMES [CL-7.9.5.(6), IRC-112:2011]
Mult= .176*b*d2*fck+(2/3)*.8*(Bf-b)*(db-t/2)*t*fck
= 143796.1 T-m
b=Width of web= 1200 mm
d= Total depth= 7260 mm
fck= 60 Mpa
Bf= 8800 mm
t= 450 mm
The section is safe.
Mid Section
Mu=M1+M2 1.35DL+1.75 SIDL+1.5LL+1.5BRAKING+0.9WIND
Mu=Design Moment= 1885.05 T-m
M1=.9*fp*Asp*db1 17137.39 T-m >1885.051 T-m
2
fp= Ultimate tensile strength of steel= 186743 t/m
No. of cables at support section = 12
Total area of cable=Asp= 319.2 cm2 = 3.19E-02 m2
db = the depth of beam from the maximum compression edge to the centre of gravity of tendons
= 2.875 m for composite section
Mult= .176*b*d2*fck+(2/3)*.8*(Bf-b)*(db-t/2)*t*fck
= 7866.8 T-m
b=Width of web= 1200 mm
d= Total depth= 2875 mm
fck= 60 Mpa
Bf= 15 mm
t= 250 mm
The section is safe.
16. DESIGN OF END BLOCK FOR BURSTING TENSILE FORCE: (Cl-13.5.1, IRC-112:2011)
Hence Ok
Design of Substructure
2
Area of section = 19.64 m
Grade of concrete : M 60
Grade of steel = Fe 500
Ecm of concrete = 37000 N/mm2 (From table 6.5, IRC:112-2011, page no. 38)
Es of steel = 200000 N/mm2
(From clause6.3.5, IRC:112-2011, page no. 32)
Design compressive strength of concrete = σc = fcd = αfck/γm = 26.800 N/mm2
(From clause6.3.5, IRC:112-2011, page no. 32)
Design peak strength of steel = fy/γs = 434.7826 N/mm2
SAP Output
At Top Support At Middle At Bottom Face
Loads V MAX ML MT HL HT V MAX ML MT HL HT VMAX ML MT HL HT
Dead Load 45988 90479 0 3653 0 51824 47057 0 3653 0 57659 7299 0 3653 0
SIDL 3328 8644 0 351 0 3328 4472 0 351 0 3328 745 0 351 0
Surfacing 3301 8576 0 349 0 3301 4437 0 349 0 3301 739 0 349 0
Class A(3L/1S) LL1 1836 14131 1884 482 17 1836 8439 1812 482 17 1836 2856 1745 482 17
70R Wh.+ Class A(3L/1S) LL2 1720 13291 2801 454 23 1720 7938 2692 454 23 1720 2692 612 454 23
Special Vehicle (1L/1S) LL3 3876 29125 1528 995 10 3876 17366 1470 885 10 3876 5821 1413 995 10
Braking Class A 5 4031 0 272 0 5 807 0 272 0 5 3227 0 272 0
Braking 70R 7 5750 0 387 0 7 1151 0 387 0 7 4603 0 387 0
Wind Horizontal loangitudinal 8 6280 0 423 0 8 1256 0 423 0 8 5027 0 423 0
Wind Horizontal transverse 1 0 6498 0 1029 1 0 15443 0 1458 1 0 32759 0 1458
Wind Vertical UP -2605 6767 0 275 0 -2605 3501 0 275 0 -2605 583 0 275 0
Wind Vertical Down 2605 6767 0 275 0 2605 3501 0 275 0 2605 583 0 275 0
Seismic 94 81664 0 5495 0 94 16338 0 5495 0 94 65369 0 5495 0
Heating -101 96738 0 6981 0 -101 13751 0 6981 0 -101 90114 0 6981 0
Cooling 126 96738 0 6981 0 126 13751 0 6981 0 126 90114 0 6981 0
LOAD COMBINATION
ULS SLS
Loads COMB1 COMB2 COMB3 COMB4 COMB5 COMB6 COMB7 COMB8 COMB9 COMB10 COMB11 COMB12 COMB13 COMB14 COMB15 COMB16 COMB17COMB18
Dead Load 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.00 1.00 1.00 1.00 1.00 1.00
SIDL 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.00 1.00 1.00 1.00 1.00 1.00
Surfacing 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.00 1.00 1.00 1.00 1.00 1.00
Class A(3L/1S) LL1 1.50 - - 1.50 - - 1.50 - - 0.20 - - 1.00 - - 1.00 - -
70R Wh.+ Class A(3L/1S) LL2 - 1.50 - - 1.50 - - 1.50 - - 0.20 - - 1.00 - - 1.00 -
Special Vehicle (1L/1S) LL3 - - 1.50 - - 1.50 - - 1.50 - - 0.20 - - 1.00 - - 1.00
Braking Class A 1.50 - - 1.50 - - 1.50 - - 0.20 - - 1.00 - - 1.00 - -
Braking 70R - 1.50 - - 1.50 - - 1.50 - - 0.20 - - 1.00 - - 1.00 -
Wind Horizontal loangitudinal - - - 0.90 0.90 0.00 - - - - - - 0.60 0.60 0.00 - - -
Wind Horizontal transverse - - - - - - 0.90 0.90 0.00 - - - - - - 0.60 0.60 0.00
Wind Vertical UP - - - - - - - - - - - - - - - - - -
Wind Vertical Down - - - 0.90 0.90 0.00 0.90 0.90 0.00 - - - 0.60 0.60 0.00 0.60 0.60 0.00
Seismic - - - - - - - - - 1.50 1.50 0.00 - - - - - -
Heating - - - - - - - - - - - - - - - - - -
Cooling - - - - - - - - - - - - 0.60 0.60 0.00 0.60 0.60 0.00
LOAD COMBINATION FOR ABUTMENT SHAFT BASE (For Ultimate Limit State)
outer moment outer moment
LOAD At Support At Middle At Bottom
SL COMBINATION V MAX ML MT HL HT V MAX ML MT HL HT VMAX ML MT HL HT
NON SEISMIC
1 COMB1 75114.9 176067.1 2826.0 7147.2 25.5 82993.5 91197.9 2718.0 7147.2 25.5 90870.7 21277.2 2617.5 7147.2 25.5
2 COMB2 74943.9 177385.6 4201.5 7277.7 34.5 82822.5 90962.4 4038.0 7277.7 34.5 90699.7 23095.2 918.0 7277.7 34.5
3 COMB3 78167.4 192511.6 2292.0 7508.7 15.0 86046.0 103377.9 2205.0 7343.7 15.0 93923.2 20884.2 2119.5 7508.7 15.0
4 COMB4 77466.1 187809.1 2826.0 7775.4 25.5 85344.7 95479.4 2718.0 7775.4 25.5 93222.0 26325.7 2617.5 7775.4 25.5
5 COMB5 77295.1 189127.6 4201.5 7905.9 34.5 85173.7 95243.9 4038.0 7905.9 34.5 93051.0 28143.7 918.0 7905.9 34.5
WIND
6 COMB6 78167.4 192511.6 2292.0 7508.7 15.0 86046.0 103377.9 2205.0 7343.7 15.0 93923.2 20884.2 2119.5 7508.7 15.0
7 COMB7 77460.0 182157.4 8674.2 7394.7 951.6 85338.6 94348.8 16616.3 7394.7 1337.7 93215.9 21801.9 32100.8 7394.7 1337.7
8 COMB8 77289.0 183475.9 10049.7 7525.2 960.6 85167.6 94113.3 17936.3 7525.2 1346.7 93044.9 23619.9 30401.3 7525.2 1346.7
9 COMB9 78167.4 192511.6 2292.0 7508.7 15.0 86046.0 103377.9 2205.0 7343.7 15.0 93923.2 20884.2 2119.5 7508.7 15.0
10 COMB10 72862.6 274952.5 376.8 14409.5 3.4 80741.2 103685.1 362.4 14409.5 3.4 88618.4 111422.8 349.0 14409.5 3.4
SEISMIC
11 COMB11 72839.8 275128.3 560.2 14426.9 4.6 80718.4 103653.7 538.4 14426.9 4.6 88595.6 111665.2 122.4 14426.9 4.6
12 COMB12 73128.6 154649.1 305.6 6215.2 2.0 81007.2 80802.1 294.0 6193.2 2.0 88884.4 13316.9 282.6 6215.2 2.0
LOAD COMBINATION FOR ABUTMENT SHAFT BASE (For Servicibility Limit State)
LOAD At Support At Middle At Bottom
SL COMBINATION V MAX ML MT HL HT V MAX ML MT HL HT VMAX ML MT HL HT
13 COMB13 56101.10 191731.85 1884.00 9714.40 17.00 61937.10 76316.95 1812.00 9714.40 17.00 67772.10 72300.10 1745.00 9714.40 17.00
14 COMB14 55987.10 192610.85 2801.00 9801.40 23.00 61823.10 76159.95 2692.00 9801.40 23.00 67658.10 73512.10 612.00 9801.40 23.00
NON SEISMIC
15 COMB15 56493.00 136824.00 1528.00 5348.00 10.00 62329.00 73332.00 1470.00 5238.00 10.00 68164.00 14604.00 1413.00 5348.00 10.00
16 COMB16 56097.05 187964.00 5782.80 9460.60 634.40 61933.05 75563.20 11077.50 9460.60 891.80 67768.05 69284.20 21400.55 9460.60 891.80
17 COMB17 55983.05 188843.00 6699.80 9547.60 640.40 61819.05 75406.20 11957.50 9547.60 897.80 67654.05 70496.20 20267.55 9547.60 897.80
18 COMB18 56493.00 136824.00 1528.00 5348.00 10.00 62329.00 73332.00 1470.00 5238.00 10.00 68164.00 14604.00 1413.00 5348.00 10.00
(MEdr/MRd)^a =
Pu/fck.D2 Mu/fckD3 MRd MEdr/MRd a=
COMB11 0.059 0.037 277500 0.402 2 0.17 OK
COMB7 0.062 0.038 285000 0.076 2 0.01 OK
COMB3 0.063 0.039 292500 0.071 2 0.01 OK
COMB11 0.059 0.037 277500 0.402 2 0.17 OK
Deff 492.2 cm
Perimeter 1546.292 cm
Provide 32 mm @ 140 mm c/c. IN 2 LAYERS
No.= 107
Ast= 1721.09 sq.cm 0.88 % OK
Assume NA at a depth of 372.0000 cm from extreme compression fibre.
x/D= 0.7440
A= 0.22
B= 0.59
C= 0.32
Distance of CG of effective segment from the centre of circle= 55 cm
Effective area of segment= 147500 sq.cm
Effective moment of inertia of segment about ists own centroid= 1.25E+09 cm4
Transfomed are due to area of steel= 7582.1 sq.cm
Effective total area= 155082.1 sq.cm
Distance of CGeff of effective segment from the physical centroid of whole section is=
e'= 52.311 cm
e-e'= 55.55485 cm
Ieff= 1.5E+09 cm4
Distance of NA below CGeff= 173.7726 cm
compared to 174.311 cm Hence OK
Now,
(Eq. 12.6, IRC:112-2011, page-125)
Where, sc = stress in the tension reinforcement = 14.57 Mpa
e = Es/Ecm = 5.4054
fct.eff = mean value of tensile strength of concrete = 4 Mpa
.eff = As/Ac.eff Where, Ac.eff = Effective area of concrete in tension, surrounding
the reinforcement of depth h c.eff
Where, hc.eff = lesser of the followings
2.5(h-d);(h-x/3);or h/2
Where, A = level of steel centroid
B = Effective tension area, Ac.eff
1,2 = greater and lesser tensile strain
Now in situations where spacing of bonded reinforcement within the tension zone is reasonably
close (i.e <=5(c+ /2)), the maximum crack spacing,
(MEdr/MRd)^a =
Pu/fck.D2 Mu/fckD3 MRd MEdr/MRd a=
COMB10 0.054 0.035 262500 0.395 2 0.16 OK
COMB8 0.057 0.036 270000 0.355 2 0.13 OK
COMB3 0.057 0.036 270000 0.383 2 0.15 OK
COMB11 0.054 0.035 262500 0.395 2 0.16 OK
Deff 492.2 cm
Perimeter 1546.292 cm
Provide 32 mm @ 140 mm c/c. IN 2 LAYERS
No.= 107
Ast= 1721.09 sq.cm 0.88 % OK
Assume NA at a depth of 337.0000 cm from extreme compression fibre.
x/D= 0.6740
A= 0.25
B= 0.56
C= 0.29
Distance of CG of effective segment from the centre of circle= 61.5 cm
Effective area of segment= 141000 sq.cm
Effective moment of inertia of segment about ists own centroid= 1.13E+09 cm4
Transfomed are due to area of steel= 7582.1 sq.cm
Effective total area= 148582.1 sq.cm
Distance of CGeff of effective segment from the physical centroid of whole section is=
e'= 58.36167 cm
e-e'= 64.10316 cm
Ieff= 1.38E+09 cm4
Distance of NA below CGeff= 144.9589 cm
compared to 145.3617 cm Hence OK
Clear cover = 50 mm
2
Total reinforcement provided in one side= 43027 mm
Effective depth "d" = 3408 mm
Crack width check:
Now,
(Eq. 12.6, IRC:112-2011, page-125)
Where, sc = stress in the tension reinforcement = 22.12 Mpa
e = Es/Ecm = 5.4054
fct.eff = mean value of tensile strength of concrete = 4 Mpa
.eff = As/Ac.eff Where, Ac.eff = Effective area of concrete in tension, surrounding
the reinforcement of depth h c.eff
Where, hc.eff = lesser of the followings
2.5(h-d);(h-x/3);or h/2
Where, A = level of steel centroid
B = Effective tension area, Ac.eff
1,2 = greater and lesser tensile strain
Now in situations where spacing of bonded reinforcement within the tension zone is reasonably
close (i.e <=5(c+ /2)), the maximum crack spacing,
(MEdr/MRd)^a =
Pu/fck.D2 Mu/fckD3 MRd MEdr/MRd a=
COMB11 0.049 0.05 375000 0.734 2 0.54 OK
COMB8 0.052 0.051 382500 0.480 2 0.23 OK
COMB3 0.052 0.051 382500 0.503 2 0.25 OK
COMB11 0.049 0.05 375000 0.734 2 0.54 OK
Deff 489.8 cm
Perimeter 1538.752 cm
Provide 32 mm @ 140 mm c/c. IN 4 LAYERS
No.= 107
Ast= 3440.435 sq.cm 1.75 % OK
Assume NA at a depth of 180 cm from extreme compression fibre.
x/D= 0.3600
A= 0.57
B= 0.26
C= 0.04
Distance of CG of effective segment from the centre of circle= 142.5 cm
Effective area of segment= 65000 sq.cm
Effective moment of inertia of segment about ists own centroid= 1.37E+08 cm4
Transfomed are due to area of steel= 15156.51 sq.cm
Effective total area= 80156.51 sq.cm
Distance of CGeff of effective segment from the physical centroid of whole section is=
e'= 115.5552 cm
e-e'= 225.402 cm
Ieff= 8.37E+08 cm4
Distance of NA below CGeff= 46.31177 cm
compared to 45.55518 cm Hence OK
Crack width, Wk = Sr.max( sm- cm) Where, Sr.max = Maximum crack spacing
sm = mean strain in the reinforcement under the relavant combination of loads
cm = mean strain in the concrete between cracks.
Now,
(Eq. 12.6, IRC:112-2011, page-125)
Where, sc = stress in the tension reinforcement = 244.51 Mpa
e = Es/Ecm = 5.4054
fct.eff = mean value of tensile strength of concrete = 4 Mpa
.eff = As/Ac.eff Where, Ac.eff = Effective area of concrete in tension, surrounding
the reinforcement of depth h c.eff
Where, hc.eff = lesser of the followings
2.5(h-d);(h-x/3);or h/2
Where, A = level of steel centroid
B = Effective tension area, Ac.eff
1, 2 = greater and lesser tensile strain
Now in situations where spacing of bonded reinforcement within the tension zone is reasonably
close (i.e <=5(c+ /2)), the maximum crack spacing,
LOAD COMBINATION
ULS SLS
COMF COMF COMF COMF COMF COMF COMF COMF1 COMF COMF COMF1 COMF1 COMF COMF COMF1 COMF COMF COMF COMF
COMF4 COMF6
Loads 1 2 3 5 7 8 9 0 11 12 3 4 15 16 7 18 19 20 21
Dead Load 1.35 1.35 1.35 1.35 1.35 1.35 1.00 1.00 1.00 1.00 1.00 1.00 1.35 1.35 1.35 1.00 1.00 1.00 1.00 1.00 1.00
SIDL 1.35 1.35 1.35 1.35 1.35 1.35 1.00 1.00 1.00 1.00 1.00 1.00 1.35 1.35 1.35 1.00 1.00 1.00 1.00 1.00 1.00
Surfacing 1.75 1.75 1.75 1.75 1.75 1.75 1.00 1.00 1.00 1.00 1.00 1.00 1.75 1.75 1.75 1.00 1.00 1.00 1.00 1.00 1.00
Class A(3L/1S) LL1 1.50 - - 1.50 - - 1.30 - - 1.30 - - 0.20 - - 1.00 - - 1.00 - -
70R Wh.+ Class A(3L/1S) LL2 - 1.50 - - 1.50 - - 1.30 - - 1.30 - - 0.20 - - 1.00 - - 1.00 -
Special Vehicle (1L/1S) LL3 - - 1.50 - - 1.50 - - 1.30 - - 1.30 - - 0.20 - - 1.00 - - 1.00
Braking Class A 1.50 - - 1.50 - - 1.30 - - 1.30 - - 0.20 - - 1.00 - - 1.00 - -
Braking 70R - 1.50 - - 1.50 - - 1.30 - - 1.30 - - 0.20 - - 1.00 - - 1.00 -
Wind Horizontal loangitudinal 0.90 0.90 0.90 - - - 0.80 0.80 0.80 - - - - - - 0.60 0.60 0.60 - - -
Wind Horizontal transverse - - - 0.90 0.90 0.90 - - - 0.80 0.80 0.80 - - - - - - 0.60 0.60 0.60
Wind Vertical UP - - - - - - - - - - - - - - - - - - - - -
Wind Vertical Down 0.90 0.90 0.90 0.90 0.90 0.90 0.80 0.80 0.80 0.80 0.80 0.80 - - - 0.60 0.60 0.60 0.60 0.60 0.60
Seismic - - - - - - - - - - - - 1.50 1.50 1.50 - - - - - -
Heating - - - - - - - - - - - - - - - - - - - - -
Cooling 0.90 0.90 0.90 0.90 0.90 0.90 0.80 0.80 0.80 0.80 0.80 0.80 0.50 0.50 0.50 0.60 0.60 0.60 0.60 0.60 0.60
SL LOAD COMBINATION
VMAX ML MT HL HT
COMF18
18 99512 73043 1413 10040 10
COMF19
19 97472 69284 27952 9461 1183
COMF20
20 97358 70496 26819 9548 1189
COMF21
21 99507 69022 27620 9702 1176
17.8 5.00
17.8
Self weight of pile cap = 14257.8 KN
Load combination for pile load (with unfactored load)
in KN
LOAD TABLE
Loads Vu MAX MLu MT HLu HT
Dead Load 57659 7299 0 3653 0
SIDL 3328 745 0 351 0
Surfacing 3301 739 0 349 0
Class A(3L/1S) LL1 1836 2856 1745 482 17
70R Wh.+ Class A(3L/1S) LL2 1720 2692 612 454 23
Special Vehicle (1L/1S) LL3 3876 5821 1413 995 10
Braking Class A 5 3227 0 272 0
Braking 70R 7 4603 0 387 0
Wind Horizontal loangitudinal 10 6702 0 564 0
Wind Horizontal transverse 1 0 43679 0 1944
Wind Vertical UP -2605 583 0 275 0
Wind Vertical Down 2605 583 0 275 0
Seismic 94 65369 0 5495 0
Heating -101 90114 0 6981 0
Cooling 126 90114 0 6981 0
LOAD COMBINATION
NON SEISMIC SEISMIC HORIZONTAL CAPACITY
COMP COMP COMP1 COMP COMP1 COMP1 COMPH COMP COMP
COMP1 COMP2 COMP3 COMP4 COMP5 COMP6 COMP7 COMP8
Loads 9 10 1 12 3 4 1 H2 H3
Dead Load 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
SIDL 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Surfacing 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Class A(3L/1S) LL1 1.00 - - 1.00 - - 1.00 - - 1.00 - - - - 1.00 - -
70R Wh.+ Class A(3L/1S) LL2 - 1.00 - - 1.00 - - 1.00 - - 1.00 - - - - 1.00 -
Special Vehicle (1L/1S) LL3 - - 1.00 - - 1.00 - - 1.00 - - 1.00 - - - - 1.00
Braking Class A 1.00 - - 1.00 - - 1.00 - - 1.00 - - - - 1.00 - -
Braking 70R - 1.00 - - 1.00 - - 1.00 - - 1.00 - - - - 1.00 -
Wind Horizontal loangitudinal 1.00 1.00 1.00 - - - 1.00 1.00 1.00 - - - - - - - -
Wind Horizontal transverse - - - 1.00 1.00 1.00 - - - 1.00 1.00 1.00 - - - - -
Wind Vertical UP - - - - - - 1.00 1.00 1.00 1.00 1.00 1.00 - - - - -
Wind Vertical Down 1.00 1.00 1.00 1.00 1.00 1.00 - - - - - - - - - - -
Seismic - - - - - - - - - - - - 1.00 1.00 - - -
Heating - - - - - - 1.00 1.00 1.00 1.00 1.00 1.00 - 1.00 - - -
Cooling 1.00 1.00 1.00 1.00 1.00 1.00 - - - - - - 1.00 - - - -
LOAD
SL COMBINATION VMAX ML MT HL HT
Load Case V ML MT HL HT HR
MLmax COMP13 94211.75 164266.00 0 16829.00 0 16829 Considering
Vmax COMP13 94211.75 164266.00 0 16829.00 0 16829 Seismic
MLmax COMP2 98459.75 113477.00 612 13014.00 23 13014
MTmax COMP4 98564.75 94913.75 45424.00 12363.00 1961 12518
Normal Case
Vmax COMP3 100608.75 112003.00 13168.00
1413 10 13168
Vmin COMP7 0.00 112265 1745 12927 17 12927
HLmax COMPH3 5348.00 10.00 5348 Horizontal
capacity
TRAFFIC
DIRECTION
1
6
No. of piles = 16
1.4
1 8 9 16
ML 5
2 7 10 15
MT
17.8
3 11 14
6
4 12 13
5
5 17.8
5.9
1.4
3.75
2.5
Load Case
V/N ML/ZL1 ML/ZL2 MT/ZT1 MT/ZT2
COMF14 8047.416 2350.83 783.61 1.84 0.61
COMF4 8339.348 1543.57 514.52 628.93 209.64
COMF3 8530.635 1628.15 542.72 31.79 10.60
COMF11 6151.403 1362.36 454.12 536.08 178.69
Loads on piles(KN)
Vertical Loads on piles
Pile marks 1,4,13,16 Pile marks 5,8,9,12 Pile marks 2,3,14,15 Pile marks 2,3,6,7
Load Case
Vmax Vmin Vmax Vmin Vmax Vmin Vmax Vmin
COMF14 10400.085 5694.748 10398.861 5695.972 8832.863 7261.970 8831.639 7263.194
COMF4 10511.843 6166.852 10092.557 6586.138 9482.799 7195.896 9063.513 7615.182
COMF3 10190.576 6870.694 10169.381 6891.889 9105.144 7956.126 9083.949 7977.321
COMF11 8049.847 4252.960 7692.459 4610.348 7141.606 5161.201 6784.218 5518.589
Moment in
Load Case Max Load Min Load
each piles
COMF14 10400.085 5694.748 4089.635
COMF4 10511.843 6166.852 3148.083
COMF3 10190.576 6870.694 3320.275
COMF11 8049.847 4252.960 2593.424
Grade of concrete = M 60
Grade of steel = Fe 500
Width of section considered = 1.0 m
Dia of pier = 5 m
Section is checked for ULS
Design moment = 8998.24 KN-m (for 1m width)
Width of section = 1.0 m
Depth of section = 3.75 m
"E" value of steel = 200000 Mpa
"E" value of concrete = 32000 Mpa
Design compressive strength of concrete =
fcd=afck/gm = 26.80 Mpa Where, a = 0.67
gm = 1.5
Design peak strength of steel = fy/gs = 434.783 Mpa Where, gs = 1.15
Concrete failure strain = Ôcu1 = 0.0035 (Table 6.5, IRC:112-2011, page-38)
Concrete limiting strain = Ôc2 = 0.002 (Table 6.5, IRC:112-2011, page-38)
Yield strain of steel = 0.87fy/Es = 0.00218
Limiting strain of steel = (0.87fy/Es+0.002) = 0.00418
SECTION Formula
Design shear force (KN) = 2152.118
Maximum Allowable shear Ref: cl-10.3.3.2, Eq-10.8,
VRd,max(KN)= αcw*bwIRC-112:2011
*z*v1*fcd/(tanθ+ cotθ) 21165.300
αcw= 1 for σ cp =0, Ref: Eq-10.9, 1.000
bw(mm)= IRC-112:2011 1000
z(mm)= 0.9*d for RCC 3264
v1= for fck<80MPa 0.5
fcd= Design value of concrete 0.67*fck/γm 26.8
θ °= 45
Check SAFE
Maximum Allowable shear for Ref: cl-10.3.2, Eq-10.1, IRC-
112:2011*f )0.33+
[0.12*K*(80*ρ 1 ck
VRd.c(KN)= 1289.52
0.15*σcp]*bw*d
Vrd.c min = 1195.1
Vmin = 0.329
K= 1.235
ρ1 = 0.003
σcp = 0
Governing shear resistance = Maximum of VRd.c & VRd.c,min 1289.5
Requi
red
shear reinforcement =
a
Basic Control
Perimeter u1
2d
As the basic control perimeter is exceeding the pile cap dimension, we will check the
punching shear at reduced control perimeter which is at inner face of piles
a
a= 13.254 m Distance of reduced control perimeter from pier face =
b= 13.254 m 3.627 m
2 2
Now, b = 1+1.8√((el/a) +(et/b) ) (b = Factors accounting for effects of bending
= 1.030 moment and axial load acting on loaded area)
So, total load for punching shear = Load from abutment shaft+ Wt. within reduced control perimeter
VEd = 110392.123 KN
Shear stress, vEd = bVEd/ud = 0.592 Mpa
a= 6.00 m
b= 6.00 m
Now, b = 1+1.8√((el/a)2+(et/b)2) (b = Factors accounting for effects of bending
= 1.067 moment and axial load acting on loaded area)
Now, reduced control perimeter, u = 24.000 m
So, total load for punching shear = Load from pier shaft
VEd = 93923.20 KN
Shear stress, vEd = bVEd/ud = 1.151 Mpa
2d
Vertical
Reduced Control
Pile No. Force Shear stress Status
perimeter at distance a
VEd.red
1 9917.686 8.688 0.3148 OK
2 5212.349 14.575 0.0986 OK
No. of piles = 16
1.4
1 8 9 16
2 7 10 15
17.8
3 11 14
6
4 12 13
5
5
5.9
1.4
D
3.75
3.75
D
2.5
Load Case
V/N ML/ZL1 ML/ZL2 MT/ZT1 MT/ZT2
COMF17 6085.209 1117.76 3.06 148.29 0.12
COMF19 6091.997 1039.26 139.76 141.91 5.92
COMF18 6219.522 1095.65 7.07 150.60 0.05
COMF20 6084.872 1057.44 134.10 143.21 5.95
Loads on piles(KN)
Vertical Loads on piles
Pile marks 1,4,13,16 Pile marks 5,8,9,12 Pile marks 2,3,14,15 Pile marks 2,3,6,7
Load Case
Vmax Vmin Vmax Vmin Vmax Vmin Vmax Vmin
COMF17 7351.260 4819.158 7203.085 4967.333 6236.559 5933.859 6088.384 6082.034
COMF19 7273.169 4910.825 7137.177 5046.817 6373.668 5810.326 6237.676 5946.318
COMF18 7465.773 4973.271 7315.223 5123.821 6377.187 6061.857 6226.637 6212.407
COMF20 7285.529 4884.215 7148.262 5021.482 6362.183 5807.561 6224.916 5944.828
Moment in
Load Case Max Load Min Load
each piles
COMF17 7351.260 4819.158 2256.486
COMF19 7273.169 4910.825 2176.210
COMF18 7465.773 4973.271 2291.631
COMF20 7285.529 4884.215 2196.085
Grade of concrete = M 60
Grade of steel = Fe 500
Width of section considered = 1m
2
Total reinforcement provided = 10718 mm
Effective depth "d" = 3627 mm
Netral axis depth = x = 633.31
CG of compressive force = 211.100 mm from most compressed surface
Now moment, M = (Stress in steel)x(area of steel)x(d-CG of compressive force) =
Now,
2=0 x
h
d
hc.eff
1 B
Now in situations where spacing of bonded reinforcement within the tension zone is reasonably
close (i.e <=5(c+ /2)), the maximum crack spacing,
DESIGN OF PILES
Loads on piles
Moment
Load Case
in each
From Load Max Load Min Load
piles (KN-
Comb
m)
D
COMF14 10400.08 5694.748 4089.635
COMF4 10511.84 6166.852 3148.083
COMF3 10190.58 6870.694 3320.275
COMF11 8049.847 4252.96 2593.424
d'
PILE CAP
Main reinforcement provided 32 mm dia. 150 mm c/c in 2
2
Steel in 1m strip = 10718 mm layer
2
As.min =( 0.26fctm/fyk)btd= 5280.912 mm OK
2
or, 0.0013btd = 4715.1 mm OK
Distribution reinforcement provided at bottom and both direction at top
32 mm dia. 150 mm c/c
OK
Provide surface reinforcement 25 mm dia. 23 Nos. each face
PILE
Main reinforcement provided 32 mm dia. 58 Nos. in layer 1
Continue all bars upto end of pile
Distribution reinforcement provided
10 mm dia. 150 mm c/c
Ductile detailing of pile
Maximum axial force, seismic case: VEd = 10190.58 KN
Normalised axial force for seismic case, hk = 0.05934 < 0.08
Now provided reinforcement of 10 mm dia.
Maximum spacing ties in the longitudinal direction, SLmax = 160 mm
(As per clause 17.2.1.3, IRC:112-2011, page-195, SL ≤ 5 times dia. Of smallest
longitudinal bar, SL ≤ 1/5 times smallest dimension of confined core for
rectengular section)
Provide spacing of ties in longitudinal direction, SL = 160 mm
2
Area of hoop reinforcement provided: AsP = 78.5 mm
Diameter of the spiral hoop bar; Dsp = 10 mm
Where,
1 Upto 3x pile dia. From pile head = upto 7.5 m from pile head
2 Both side upto 2x pile dia. From length of fixity point = upto 5 m both side
of length of fixity.
Geotechnical investigation
report
REPORT ON
GEOTECHNICAL INVESTIGATION WORK
FOR CONSTRUCTION OF HIGH LEVEL RCC BRIDGE ACROSS
RIVER KRISHNA CONNECTING SOMASILA IN MAHABUBNAGAR
DISTRICT AND SIDDESWARAM IN KURNOOL DISTRICT.
1. INTRODUCTION
R&B Department- Telangana State Government has proposed the construction of HLB
across river Krishna connecting Somasila in Mahaboobnagar district and SIddeswaram in
Kurnool district in Telengana State. For the preparation of detailed project report and
designing of Foundation structures coming under this project, it was necessary to conduct a
detailed Geotechnical Investigation work to obtain engineering properties of the underlying
soil and the entire job was awarded to M/s. C. E. Testing Company Pvt. Ltd, Kolkata.
The scope of the work comprised of sinking 31 boreholes up to a maximum depth of about
20m. The boreholes of 150 mm in diameter in soil were advanced by Shell and Auger
method. In rock, rotary core drilling of “NX” size was adopted. The scope also included
conducting Standard Penetration Tests, collecting disturbed samples at regular intervals for
identification and logging purposes, collecting undisturbed tube samples at suitable intervals
or at change of strata whichever is earlier and testing these in the laboratory.
Based on the above, this report presents the Soil Profile, laboratory and field Test Results.
On the basis of field tests and laboratory test results and their analysis thereof, the most
suitable type of foundation is suggested. The field profile is sometimes modified in the light
of laboratory test results.
The subsoils are of medium to good quality The subsoil is characterised by a soft to medium
silty clay layer followed by stiff to very stiff to hard clayey silt layer for some boreholes.
Underlying the above a weathered rock layer is encountered and that continued up to the
terminating depth for all the boreholes.
Considering the nature of the subsoil as revealed from field tests and laboratory tests,
suitable type of foundation is recommended. However, this is discussed in details later.
2. FIELD INVESTIGATIONS
2.1. GENERAL:
In an attempt for optimisation in the design of foundation for these proposed structures to be
constructed at this site, Geotechnical Investigation was envisaged. The entire Investigation
programme had been divided mainly into two parts, I) Field works & II) Laboratory tests.
I) Field works unfold the sub-surface deposit types and their characteristics and
II) Laboratory tests part would help determining the relevant physical and geotechnical
properties of the sub-surface deposits leading to finalisation of foundation depths of
the structures and the bearing capacity with particular reference to the sub-surface
types and their strength parameters and settlement potentials at the site.
A list of the bore holes with the Co-ordinates, reduced level, terminating depth, standing
water level and depth of top of rock are presented in tabular form below.
Bore Hole Co-ordinate, (M) Reduced Level Terminating Standing Water Depth of Top
No. Easting Northing (M) Depth (M) Level (M) of Rock (m)
BH-01 214572.434 1776004.280 268.052 15.00 4.85m below EGL 0.50
BH-02 214588.336 1775956.876 265.089 15.00 4.75m below EGL 0.50
BH-03 214604.238 1775909.472 262.266 15.00 4.70m below EGL 1.00
BH-04 214620.139 1775862.068 260.120 15.00 4.60m below EGL 1.00
BH-05 214636.041 1775814.665 255.723 15.00 0.55m below EGL 0.50
BH-06 214651.943 1775767.261 251.536 15.00 2.00m above EGL 2.50
BH-07 214667.845 1775719.857 248.192 15.50 4.00m above EGL 5.50
BH-08 214683.746 1775672.453 244.121 15.00 6.10m above EGL 4.00
BH-09 214721.911 1775558.683 241.090 15.00 10.80m above EGL 5.00
BH-10 214760.075 1775444.914 239.290 15.00 14.00m above EGL 3.00
BH-D 214773.985 1775403.447 239.040 15.00 14.30m above EGL 1.50
BH-11 214798.239 1775331.144 237.840 15.00 15.50m above EGL 3.50
BH-12 214836.403 1775217.375 237.621 19.50 12.40m above EGL 9.50
BH-13 214874.568 1775103.605 244.021 18.00 5.80m above EGL 6.00
BH-14 214890.469 1775056.201 244.421 18.00 5.40m above EGL 8.00
BH-15 214906.371 1775008.797 245.021 19.50 5.10m above EGL 9.50
BH-16 214922.273 1774961.394 250.231 18.00 0.50m above EGL 8.00
BH-17 214938.175 1774913.990 253.540 17.50 0.50m below EGL 7.50
BH-18 214954.076 1774866.586 254.435 15.00 0.50m below EGL 5.50
BH-19 214969.978 1774819.182 254.970 15.00 0.50m below EGL 2.00
BH-20 214985.880 1774771.778 254.733 15.00 0.90m below EGL 3.00
BH-21 215001.782 1774724.374 255.376 15.00 0.80m below EGL 8.00
BH-22 215017.683 1774676.970 258.052 15.00 2.00m below EGL 0.50
BH-23 215033.585 1774629.566 256.543 15.00 1.05m below EGL 1.00
BH-24 215049.487 1774582.162 255.241 15.00 1.50m below EGL 1.30
Bore Hole Co-ordinate, (M) Reduced Level Terminating Standing Water Depth of Top
No. Easting Northing (M) Depth (M) Level (M) of Rock (m)
BH-25 215065.389 1774534.758 256.319 15.00 2.80m below EGL 1.40
BH-26 215081.291 1774487.354 258.257 15.00 3.05m below EGL 0.50
BH-27 215097.192 1774439.950 262.072 15.00 9.50m below EGL 1.00
BH-28 215113.094 1774392.546 265.543 15.00 9.80m below EGL 0.50
BH-29 215128.996 1774345.142 269.710 15.00 Not found 1.20
BH-30 215144.898 1774297.738 271.939 15.00 Not found 1.00
2.2. BORING:
Boring was carried out by Shell and Auger method to sink nominal 150mm diameter bore
holes to depths envisaged by using a mechanical winch. Undisturbed soil samples were
collected at suitable intervals or at change of strata whichever is earlier by open drive
sampling method since it was intended to ascertain the sub-soil characteristics.
2.3. SAMPLING:
Nominal 100 mm diameter undisturbed samples were recovered. The sampling equipment
used consists of a two-tier assembly of sample tubes 450 mm in length fitted at its lower
end. The sampling assembly was driven by means of a jarring link to its full length or as far
downs as was found practicable. After withdrawal the ends of the tubes were sealed with
wax and capped before onward transmission to the laboratory. At close intervals in depth
disturbed samples were collected for identification and logging purpose. These were tagged
and packed in polythene packets and transported to the laboratory.
3. LABORATORY TESTING
For proper identification and classification of the sub-soil deposits and for deriving adequate
information regarding its relevant physical and geotechnical properties at the site under
investigation, the following laboratory tests were conducted on the soil and rock samples
collected from the exploratory bore holes:
On Soil Samples:
1. Grain size analysis (Sieve as well as Hydrometer).
2. Determination of Liquid Limit , Plastic Limit.
3. Determination of Natural Moisture Content.
4. Determination of Specific Gravity.
5. Determination of Bulk & Dry Unit Weight.
6. Strength determination by Triaxial Unconsolidated Undrained Test (UU).
7. Strength Determination of Unconfined Compression Test on "UDS" (UNCONFD).
8. Strength Determination of Unconfined Compression Test on REMOULDED samples.
9. Strength determination by Direct Shear Test under quick drained condition (CU).
10. One-dimensional Consolidation Test for determining settlement potentiality.
11. Chemical tests on few soil samples to determine pH value, Sulphate and Chloride
content.
On Rock Samples:
1. Determination of Bulk Density, Water Absorption, Specific Gravity & Porosity of Rock.
2. Determination of Unconfined compressive strength of rock (In-situ and saturated
condition).
3. Determination of Point Load Strength Index.
4. Determination of Young’s Modulus.
Laboratory test results are presented in a tabular form in the Appendix. The results are self
explanatory excepting that of consolidation tests. The compressibility for a pressure range
has been separated into 2 components through the compression ratio. As a first step dial
gauge reading is plotted against square root of time and by extrapolation dial reading at zero
time, is obtained. The compression ratio is given as
All the tests were conducted as per relevant Indian Standard Specifications.
The subsoils are of medium to good quality The subsoil is characterised by a soft to medium
silty clay layer followed by stiff to very stiff to hard clayey silt layer for some boreholes.
Underlying the above a weathered rock layer is encountered and that continued up to the
terminating depth for all the boreholes. The description of each layer along with its average
properties is presented below.
4.2.1. STRATUM - I:
The soil in this layer is composed of soft to medium deep/brownish/ blackish grey clayey silt
with sand mixture and decomposed rock pieces. Kankar have been observed in the layer.
The average soil properties of this layer revealed from routine laboratory test on some “UDS”
samples collected from this layer are presented below.
Bulk Density, gms/cc 1.90 Specific gravity 2.66
Dry Density, gms/cc 1.50 Natural Water Content, % 27
Liquid limit % 75 Void ratio
Plastic limit % 31 GRAIN SIZE
TRSH-UU: Sand % 09
Cohesion kg/sqcm 0.44 Silt % 83
Friction angle ° 0 Clay % 08
4.2.5. STRATUM - V:
This layer consists of completely weathered, deep/pinkish grey, medium to coarse grained
decomposed rock observed only in a limited no. of boreholes.
The following two types of tests were performed on the rock samples viz.
1. Unconfined Compressive Strength determination of the rock samples after 24 hours
full submergence and thereafter air drying before testing (i.e. saturated condition).
2. Point Load strength index.
The average properties of this layer as revealed from the routine laboratory test are as
follows.
Bulk Density, gms/cc 2.295
Dry Density, gms/cc 2.291 Sat. UC Strength, kg/sqcm 464
Water Absorption % 0.176
Specific Gravity 2.300 Point load strength Index, kg/sqcm 43.17
Porosity % 0.4033 Young’s Modulus, kg/sqcm 56133
5. DISCUSSIONS
Similarly for BH- 02, 03 & 04 use a net allowable bearing capacity of 75 t/sqm for foundation
placed 0.60m inside rock layer
AROUND BH-28
Borehole Minimum unconfined Minimum depth of foundation
location compressive strength in kg/sqcm in metre inside rock layer
1.50m as per clause no.
28 117
705.2.2 [IRC:78-2014]
RMR Approach:
Calculated RMR = 15 as per IS: 13365(Part1)-1998, Annex B
a) The minimum value of Unconfined compressive strength of layer I is taken as 117
kg/sqcm, corresponding rating = 02
b) RQD value, a minimum of 10% is considered as per codal provision (IS 13365, Part 1),
corresponding rating = 03
c) Spacing of discontinuity taken as close. corresponding rating = 05
d) Condition of discontinuity considered as 5mm thick soft gauge 5mm wide continious
discontinuity corresponding rating = 00
e) Ground water condition taken as Wet. corresponding rating = 07
f) Dip Angle Joint Orientation taken as favourable (based on geological formation),
corresponding rating = (-)2
So, RMR = 2+3+5+00+07+(-)2 = 15
So, from Table-3 of IS: 12070 (Amendment 1, Nov. 2008) qns = 41.25t/sqm (by interpolation) for
12mm settlement.
Considering the above use a net allowable bearing capacity of 40 t/sqm.
Similarly for BH-28 use a net allowable bearing capacity of 40 t/sqm for foundation placed
1.50m inside rock layer
5.2.2. RECOMMENDATIONS:
Based on the above calculation, the following bearing capacity values are recommended.
Note:
In case any loose pocket is observed at the founding level, then the same should be excavated out and the
same shall be filled up with PCC
For BH-07 to 18 and BH-21 locations pile foundation is proposed. Bored cast in-situ piles are
preferred due to typical geological formation, availability of construction agencies, ease of
construction and less sound pollution. Such piles may be placed at a suitable depth below
Maximum scour level / inside rock layer depending on structural requirement/ relevant codal
provisions.
While calculating the pile capacity, let us assume that
a) The stiffness of the rock layer (stratum-V) is much higher than other stratums,
hence the effect of other layers are neglected while calculating pile capacity.
b) Assumed Grade of Concrete = M35
c) Diameter of pile used = 2500mm.
Pile Capacity Calculation around BH-11 (2500mm diameter Pile)
Length of pile inside rock layer i.e. length of socket = 2.50m
Refer to IRC: 78 - 2014
From the subsoil profile, it is seen that rock is available at 3.50 m below EGL
Let us neglect the soil upto top of rock for pile capacity calculation
Ultimate Pile capacity, Qu = Re + Raf = Cub.Nc.Ab + Cus.As
Where, Re = Ultimate End Bearing & Raf = Ultimate side socket shear
Cub = Average shear strength below base of Pile based on "N" value
Cus = Ultimate shear strength along socket length based on "N" value
Ab = Base area of Pile
As = Socket side area
Nc = 9
However due to uncertain behavior of rock and wide variation of rock quality the vertical pile
capacity value is restricted to 1200 T
5.3. RECOMMENDATIONS:
With reference to the above and considering subsoil condition, the recommended pile
capacity values for different founding depths are presented below considering each borehole
separately.
Pile Diameter = 2500mm
µ = 0.25
2 x Characteristics length = 2 x T = 6.142m > Length of pile below maximum scour level
(L = 1.25m)
Hence, the pile will behave as rigid short pile and Brom’s method is used to determine
lateral load.
From the above curve Fig. 16.9 (after Broms), P / (Kp d3 γ’) = 0.7937 for L/D ratio = 1.25/2.5
= 0.50 considering fixed head piles.
[Now, Kp= Rankin’s passive earth pressure coefficient = tan2(45°+37°/2) = 4.023 ; d = Pile
Here T = 3.071 m
Overhang = 9.433m
Load P1= 24T, Moment Mt= 24x9.433 = 226.392 T-m
2.43xP1xT3/EI = 1689.846/5671970.45 = 0.0003m
Pile
Pile socket Recommended Uplift
Diameter
Length (M) Pile Capacity(T)
(mm)
1.25 400
2500 2.50 800
5.00 1800
It is seen that the values are on a safer side. So, either Ordinary Portland Cement or
Portland slag Cement or Portland Pozzolana cement can be used for concreting.
1. The subsoils are of medium to good quality. The subsoil is characterised by a soft to
medium silty clay layer followed by stiff to very stiff to hard clayey silt layer for some
boreholes. Underlying the above a weathered rock layer is encountered and that
continued up to the terminating depth for all the boreholes.
3. Open Foundation:-
The determination of bearing capacity of open foundation are presented in the previous
section. The recommended bearing capacity values are presented below.
Note : In case any loose pocket is observed at the founding level, then the same should be excavated
out and the same shall be filled up with PCC
4. Pile Foundation:-
The determination of pile capacity (vertical and lateral) for bored cast-in-situ piles is
presented in the previous section. The recommended pile capacity values for
different depths are presented below.
Pile Diameter = 2500 mm
Note :
a. Pile load test should be conducted to ascertain the pile capacity as per IS: 2911,Part IV.
b. BOPC = Bottom of Pile Cap
c. Maximum scour level is considered at top of rock layer.
Pile
Pile socket Recommended Uplift
Diameter
Length (M) Pile Capacity(T)
(mm)
1.25 400
2500 2.50 800
5.00 1800
5. Chemical test was carried out on few soil samples to determine the pH value,
Sulphate and Chloride. It is seen that the values are within permissible limits (as
per IS:456-2000) and so no special cement will be required for foundation concrete.
Either Ordinary Portland cement or Portland slag cement or Portland
Pozzolana cement can be used for concreting.
GEOLOGICAL LOGGING
BH No. 01
00.00 – 00.50m : Overburden.
00.50 – 15.00m : Slightly weathered, greyish white, medium to fine grained, tightly compacted,
hard and strong Granite.
Continuous core recovery, and are thin (upto 08.00m, >15 nos/m) to medium
0
spaced (15-8 nos/m), dominantly base parallel with inclined fractures (45 dip at
11.00-12.00m). Isolated segmented pieces are core shaped small sizes (upto
09.00m) followed by small to medium size pieces. Open fractured surfaces are
non-planar, rough and slightly altered. Rock quality is very poor to poor with
locally fair quality.
BH No. 02
00.00 – 00.50m : Overburden.
00.50 – 15.00m : Slightly weathered to almost fresh, greyish white, medium to fine grained,
densely compacted, hard and strong Granite.
Discontinuous (upto 03.00m) to continuous core recovery, and are thin (upto
10.00m) to medium spaced (>15 to 15-8 nos/m), dominantly random (upto
03.00m) to base parallel with vertical fractures (4.00-5.00m, 9.00-10.00, 14.00-
15.00m). Isolated segmented pieces are completely broken (03.00m) to small
sizes (upto 10.00m) followed by medium size core shaped pieces. Open
fractured surfaces are non-planar, rough and slightly altered (upto 8.00m) to
almost clean. Rock quality is very poor to poor (upto 10.00m) then poor with
locally fair quality.
BH No. 03
00.00 – 01.00m : Overburden.
01.00 – 15.00m : Slightly weathered to almost fresh, greyish white, medium to fine grained,
densely compacted, hard and strong Granite.
Discontinuous (upto 03.00) to continuous core recovery, and are thinly spaced
(>15 nos/m), dominantly base parallel with locally vertical fracture (at 06.00-
07.00m). Isolated segmented pieces are core shaped small sizes (upto
04.00m) followed by small to medium size pieces. Open fractured surfaces are
non-planar, rough and slightly altered. Rock quality is very poor (upto 04.00m)
to poor.
BH No. 04
00.00 – 01.00m : Overburden.
01.00 – 15.00m : Slightly weathered to almost fresh, greyish white, fine grained, tightly
compacted, hard and strong Granite.
Continuous core recovery, and are thin (upto 14.00m) to medium spaced (>15
0
to 15-8 nos/m), dominantly base parallel with inclined fractures 35 dip at 14.00
- 15.00m. Isolated segmented pieces are core shaped small to medium sizes
(upto 14.00m) followed by medium with locally massive size pieces. Open
fractured surfaces are non-planar, rough and slightly altered to clean. Rock
quality is very poor to poor (upto 14.00m) to fair.
BH No. 05
00.00 – 00.50m : Overburden.
00.50 – 15.00m : Slightly weathered (upto 10.00m) to almost fresh, greyish white, fine grained,
tightly compacted, hard and strong Granite.
Continuous core recovery, and are thinly spaced (>15 nos/m), dominantly base
parallel with vertical fractures (03.00 – 04.00m) and locally inclined fractures
0
(45 dip). Isolated segmented pieces are core shaped small to medium size
pieces. Open fractured surfaces are non-planar, rough and altered. Rock
quality is very poor to poor with locally fair quality.
BH No. 06
00.00 – 02.50m : Overburden.
02.50 – 15.00m : Slightly weathered, greyish white, fine grained, tightly compacted, hard and
strong Dolomitic Limestone.
Discontinuous (upto 5.00m) to continuous core recovery, and are thinly spaced
(>15 nos/m) with pockets of medium spaced (15-8 nos/m at 11.00-12.00m),
dominantly base parallel with rarely vertical fractures and locally inclined
0
fractures (45 dip). Isolated segmented pieces are core shaped small with
medium size pieces. Open fractured surfaces are non-planar, rough and slightly
altered. Rock quality is very poor to poor.
BH No. 07
00.00 – 05.50m : Overburden.
05.50 – 15.50m : Moderately weathered, bedded, light brownish white, medium to fine grained,
tightly compacted, hard and strong Dolomitic Limestone.
Discontinuous (upto 7.50m) to continuous core recovery, and are thinly spaced
(>15 nos/m), dominantly base parallel with rarely randomly oriented fractures
0 0
and with pockets of inclined fractures (50 dip at 5.50-6.50m, 70 dip at 12.50-
0
13.50m and 45 dip at 13.50-14.50m, and vertical fractures at 5.50-6.50m,
8.50-9.50m and 12.50-13.50m depth. Isolated segmented pieces are core
shaped small with broken sizes with locally medium size pieces. Open fractured
surfaces are planar, smooth and slightly altered. Rock quality is very poor (upto
10.50m) followed by poor with locally fair quality.
BH No. 08
00.00 – 04.00m : Overburden.
04.00 – 15.00m : Moderately weathered, bedded, light brownish white, medium to fine grained,
tightly compacted, hard and strong Dolomitic Limestone.
Discontinuous (upto 9.00m) to continuous core recovery, and are thin (upto
11.00m) to medium spaced (>15 to 15-8 nos/m), dominantly base parallel with
0
rarely randomly oriented fractures and with pockets of inclined fractures (70
0 0
dip at 4.00-5.00m, 45 dip at 07.00-08.00m and 11.00-12.00mn and 65 dip at
13.00-14.00m, and vertical fractures at 5.00-6.00m and 09.00-11.00m depth.
Isolated segmented pieces are core shaped small with broken sizes and also
medium with locally massive size pieces. Open fractured surfaces are planar,
smooth and slightly altered. Rock quality is very poor (upto 12.00m) followed by
poor.
BH No. 09
00.00 – 05.00m : Overburden.
05.00 – 15.00m : Slightly weathered, bedded, light grey, fine grained, tightly compacted, hard and
strong Dolomitic Limestone.
Discontinuous (upto 10.00m) to continuous core recovery, and are thin (upto
10.00m) to medium spaced (>15 to 15-8 nos/m), dominantly base parallel with
0
pockets of inclined fractures (70 dip at 12.00-13.00m). Isolated segmented
pieces are core shaped small with locally medium to massive size pieces. Open
fractured surfaces are planar, slightly smooth and slightly altered. Rock quality
is very poor (upto 11.00m) to poor with locally fair.
BH No. 10
00.00 – 03.00m : Overburden.
03.00 – 15.00m : Slightly weathered, bedded, greyish white, fine grained, tightly compacted, hard
and strong Dolomitic Limestone.
Discontinuous (upto 06.00m) to continuous core recovery, and are thin (>15
nos/m, upto 06.00m) to medium spaced (15-8 nos/m, upto 08.00m) followed by
widely spaced (8-5 nos/m), dominantly base parallel with rarely randomly
0
oriented fractures (upto 6.00m) with pockets of inclined fractures (50 dip at
07.00-08.00m) and vertical fracture (at 0600-08.00m depth). Isolated
segmented pieces are core shaped small mixed with few broken with locally
medium to massive size pieces. Open fractured surfaces are planar, slightly
smooth and slightly altered. Rock quality is very poor (upto 08.00m) to poor
(upto 11.00m) followed by fair to good fair.
BH No. 11
00.00 – 03.50m : Overburden.
03.50 – 15.00m : Slightly weathered, bedded, greyish white, fine grained, tightly compacted, hard
and strong Limestone.
Discontinuous (upto 06.50m) to continuous core recovery, and are thin (>15
nos/m, upto 07.50m) to medium spaced (15-8 nos/m), dominantly base parallel
0
with pockets of inclined fractures (45 dip at 05.50-06.50m). Isolated
segmented pieces are core shaped small mixed with medium size pieces.
Open fractured surfaces are planar, slightly smooth and slightly altered. Rock
quality is very poor to poor (upto 13.50m) followed by fair quality.
BH No. OD
00.00 – 01.50m : Overburden.
01.50 – 15.00m : Slightly weathered, greyish black, medium to fine grained, densely compacted,
hard and very strong Dolerite.
Discontinuous (upto 5.50m) to continuous core recovery, and are thin (upto
06.00m) to medium spaced (upto 09.50m) followed by thin (upto 10.50m) then
medium spaced (>15 to 8-5 nos/m). Dominantly base parallel with rarely
0
random fractured and pockets of inclined fractured (80 dip at 06.50-07.50m,
0 0
45 dip at 07.50-08.50m and 80 dip at 09.50-10.50m and 14.50-15.00m).
Isolated segmented pieces are core shaped small with few broken sizes and
medium to massive sizes with locally huge massive size pieces. Open fractured
surfaces are non-planar, rough and slightly altered. Rock quality is very poor
(upto 07.50m) to poor (upto 11.50m) followed by fair quality.
BH No. 12
00.00 – 09.50m : Overburden.
09.50 – 19.50m : Moderately weathered, bedded, brownish white, fine grained, tightly compacted,
hard and strong Dolomitic Limestone.
Discontinuous (upto 11.50m) to continuous core recovery, and are thin (upto
13.50m) to medium spaced (>15 to 15-8 nos/m), dominantly base parallel
0
mixed with random and pockets of inclined fractures (65 dip at 15.50-16.50m).
Isolated segmented pieces are core shaped small mixed with broken sizes and
with locally medium size pieces. Open fractured surfaces are planar, slightly
smooth and slightly altered. Rock quality is very poor to poor (upto 11.50m)
followed by fair (upto upto 15.50m) to good.
BH No. 13
00.00 – 06.00m : Overburden.
06.00 – 09.00m : Completely weathered, decomposed and disintegrated rock particles collected
as sludge.
09.00 – 18.00m : Moderately weathered, deep brownish grey, medium to fine grained, densely
compacted, hard and strong Dolerite.
Discontinuous core recovery, and are thinly spaced (>15 nos/m). Dominantly
base parallel mixed with randomly oriented fractured and pockets of inclined
0 0
fractured (40 dip at 09.00-10.00m, 70 dip at 10.00-11.00) and vertical
fractured at 13.00-15.00m and 17.00-18.00m. Isolated segmented pieces are
core shaped small with few broken sizes and few medium size pieces. Open
fractured surfaces are apparently planar, slightly smooth and slightly altered.
Rock quality is very poor (upto 12.00m) to poor.
BH No. 14
00.00 – 08.00m : Overburden.
08.00 – 18.00m : Slightly weathered, bedded, light grey, fine grained, tightly compacted, hard and
strong Limestone.
Discontinuous (upto 13.00m) to continuous core recovery, and are thin (>15
nos/m, upto 15.00m) to medium spaced (15-8 nos/m), dominantly base parallel
0 0
with few random and pockets of inclined fractures (45 dip at 13.00-14.00m, 30
dip at 17.00-18.00m). Isolated segmented pieces are core shaped small mixed
with broken sizes and few medium size pieces. Open fractured surfaces are
planar, slightly smooth and slightly altered to clean. Rock quality is very poor to
poor (upto 17.00m) followed by fair quality.
BH No. 15
00.00 – 09.50m : Overburden.
09.50 – 19.50m : Slightly weathered, bedded, brownish white, medium to fine grained, densely
compacted, hard and strong Limestone with pockets of broken pieces of
Dolerite.
Discontinuous core recovery, and are thinly spaced (>15 nos/m). Dominantly
0
base parallel with rarely random fractured and pockets of inclined fractured (45
dip at 18.50-19.50m) and also vertical fracture (at 17.50-18.50m). Isolated
segmented pieces are core shaped small with few broken sizes and locally
medium size pieces. Open fractured surfaces are planar, slightly smooth and
slightly altered. Rock quality is very poor (upto 18.50m) to poor.
BH No. 16
00.00 – 08.00m : Overburden.
08.00 – 18.00m : Slightly weathered, bedded, light grey, fine grained, densely compacted, hard
and strong Limestone.
Discontinuous (upto 09.00m) to continuous core recovery, and are thin (upto
13.00m) to medium spaced (>15 to 15-8 nos/m). Dominantly base parallel with
0
rarely random fractured and pockets of inclined fractured (30 dip at 12.00-
13.00m and 14.00-15.00m) and also vertical fracture (at 10.00-11.00m).
Isolated segmented pieces are core shaped small with few broken sizes and
locally medium size pieces. Open fractured surfaces are planar, slightly smooth
and slightly altered. Rock quality is very poor to poor with locally fair quality.
BH No. 17
00.00 – 07.50m : Overburden.
07.50 – 17.50m : High (upto 11.00m) to slightly weathered, yellowish black (upto 11.00m) to
greyish black, medium to fine grained, tightly compacted, hard and strong
Dolerite.
Discontinuous (upto 10.00m) to continuous core recovery, and are thin (upto
15.00m) to medium spaced (>15 to 15-8 nos/m), dominantly base parallel with
rarely inclined fractured. Isolated segmented pieces are core shaped small to
medium size pieces. Open fractured surfaces are non-planar, apparently rough
and altered. Rock quality is poor.
BH No. 18
00.00 – 05.50m : Overburden.
05.50 – 15.00m : Moderately weathered, dirty greyish black, medium to fine grained, tightly
compacted, hard and strong Dolerite.
Continuous core recovery, and are medium spaced (15-8 nos/m), dominantly
base parallel with almost vertical fractures (11.00-12.00m, 13.00-14.00m).
Isolated segmented pieces are core shaped small to medium size pieces. Open
fractured surfaces are non-planar, apparently rough and altered. Rock quality is
poor.
BH No. 19
00.00 – 02.00m : Overburden.
02.00 – 15.00m : Slightly weathered, greyish black, fine grained, tightly compacted, hard and
strong Dolerite.
Continuous core recovery, and are thinly spaced (upto 09.50m, >15 nos/m), to
medium spaced (15-8 nos/m), dominantly base parallel with pockets of inclined
0 0
fractured (40 -45 dip at 03.00 – 04.00m, 06.00-07.00m and 09.00 – 10.00m
depth). Isolated segmented pieces are core shaped small mixed with sub-
angular to sub-rounded pieces (upto 09.50m) followed by medium size pieces.
Open fractured surfaces are non-planar, rough and slightly altered. Rock quality
is very poor (upto 09.50m) followed by poor to fair.
BH No. 20
00.00 – 03.00m : Overburden.
03.00 – 15.00m : Slightly weathered, greyish black, fine grained, tightly compacted, hard and
strong Dolerite.
Discontinuous (upto 4.00m) to continuous core recovery, and are thin (upto
09.00m) to medium spaced (>15 – 15-8 nos/m). Dominantly base parallel with
rarely inclined fractured. Isolated segmented pieces are core shaped small
sizes (upto 09.00m) followed by medium with locally massive size pieces. Open
fractured surfaces are non-planar, rough and slightly altered. Rock quality is
very poor (upto 09.00m) followed by fair quality.
BH No. 21
00.00 – 08.00m : Overburden.
08.00 – 15.00m : Slightly weathered (upto 09.00m) to almost fresh, greyish black, fine grained,
tightly compacted, hard and strong Dolerite.
BH No. 22
00.00 – 00.50m : Overburden.
00.50 – 15.00m : Slightly weathered (upto 04.00m) to almost fresh, greyish black, medium to fine
grained, tightly compacted, hard and strong Dolerite.
Continuous core recovery, and are thin (upto 04.00m, >15 nos/m) to medium
spaced (upto 07.00m, 15-8 nos/m) followed by thickly spaced (8-5 nos/m),
dominantly base parallel with random (upto 04.0m) and vertical fractures (at
0
3.00-4.00m, 4.00-5.00m, 6.00-7.00m, 11.00-12.00m) and inclined fractures (40
0 0
dip at 6.00-7.00m, 50 dip 9.00-10.00m, 45 dip at 11.00-12.00m and 14.00-
15.00m). Isolated segmented pieces are core shaped small sizes (upto 4.00m)
followed by medium to massive size pieces. Open fractured surfaces are non-
planar, slightly rough and almost clean. Rock quality is very poor to poor (upto
04.00m depth) then fair (upto 13.00m) followed by good quality.
BH No. 23
00.00 – 01.00m : Overburden.
01.00 – 15.00m : Slightly weathered to almost fresh, greyish black, medium to fine grained,
densely compacted, hard and strong Dolerite.
Continuous core recovery, and are medium to locally widely spaced (upto
09.00m, 8-5 nos/m) followed by medium spaced (15-8 nos/m), dominantly base
0 0
parallel with inclined fractures (50 dip at 6.00-7.00m, 45 dip at 9.00-10.00m,
11.00-12.00m). Isolated segmented pieces are core shaped massive to huge
massive sizes (upto 09.00m) followed by small to medium with locally massive
size pieces, Open fractured surfaces are non-planar, rough and slightly altered.
Rock quality is excellent (upto 07.00m depth) to good (upto 09.00m) followed by
poor to fair.
BH No. 24
00.00 – 01.30m : Overburden.
01.30 – 15.00m : Almost fresh, greyish white, fine grained, densely compacted, very hard and
very strong Quartzite.
Continuous core recovery, and are thin to medium spaced (>15-8 nos/m),
dominantly base parallel with pockets of vertical fractures (at 2.00-3.00m).
Isolated segmented pieces are core shaped small to medium size pieces. Open
fractured surfaces are non-planar, slightly rough and clean. Rock quality is poor
with locally fair.
BH No. 25
00.00 – 01.40m : Overburden.
01.40 – 15.00m : 01.00-02.00m: Moderately weathered, reddish grey, fine grained, moderately
compacted, moderately hard and moderately strong Calcareous Shale.
fine grained, tightly compacted, very hard and very strong Dolerite.
Discontinuous (upto 03.00m) to continuous core recovery, and are thin (>15
nos/m, upto 06.00m) to medium spaced (upto 12.00m, 15-8 nos/m) followed by
0
widely spaced (8-5 nos/m), dominantly base parallel with inclined fractures (40
0
– 45 dip at 3.00-5.00m, 6.00-7.00m, 10.00-11.00m) and vertical fractures (at
6.00-7.00m). Isolated segmented pieces are core shaped small to medium with
broken size pieces (upto 7.00m) to medium sizes (upto 12.00m) followed by
massive to huge massive size pieces. Open fractured surfaces are apparently
planar, slightly rough and slightly altered (upto 7.00m) to clean. Rock quality is
very poor to poor (upto 07.00m depth) then poor to fair (upto 12.00m) followed
by good with locally excellent.
BH No. 26
00.00 – 00.50m : Overburden.
00.50 – 15.00m : Slightly weathered, greyish white, fine grained, densely compacted, very hard
and very strong Quartzite with pockets of slightly weathered, fine grained,
reddish grey, moderately hard and moderately strong Calcareous Shale (at
2.10-3.30m depth).
Continuous core recovery, and are thin (upto 7.00m) to medium spaced (>15 to
15-8 nos/m), dominantly base parallel with pockets of vertical fractures (at 6.00-
0 0
7.00m) and inclined fractured (35 -45 dip at 2.00-3.00m, 5.00-6.00m). Isolated
segmented pieces are core shaped small sizes (upto 5.00m) to small to
medium size pieces. Open fractured surfaces are non-planar, slightly rough and
slightly altered. Rock quality is very poor (upto 5.00m) then poor to fair.
BH No. 27
00.00 – 01.00m : Overburden.
01.00 – 15.00m : Slightly weathered to almost fresh, light reddish grey, fine grained, densely
compacted, hard and strong Dolomitic Limestone.
Continuous core recovery, and are thin (upto 10.00m) to medium spaced (>15
to 15-8 nos/m), dominantly base parallel mixed with rarely random fractured
0
and with pockets of inclined fractures (45 dip at 8.00-9.00m and 10.00-
11.00m). Isolated segmented pieces are core shaped small sizes with broken
pieces (upto 10.00m) followed by small to medium size pieces. Open fractured
surfaces are non-planar, slightly rough and slightly altered. Rock quality is very
poor (upto 10.00m) then poor to fair.
BH No. 28
00.00 – 00.50m : Overburden.
00.50 – 15.00m : 00.50-11.00m:
Slightly weathered, light reddish grey, fine grained, moderately compacted,
moderately hard and moderately strong Conglomerate.
Discontinuous (upto 8.00m) to continuous core recovery, and are thin (upto
11.00m) to medium spaced (>15 to 15-8 nos/m), dominantly base parallel
0
mixed with rarely random fractured and with pockets of inclined fractures (35
0
dip at 10.00-11.00m and 45 dip at 14.00-15.00m) and vertical fractured (at
11.00-12.00m). Isolated segmented pieces are core shaped small with few
medium size pieces (upto 9.00m) followed by medium size pieces. Open
fractured surfaces are non-planar, slightly rough and slightly altered. Rock
BH No. 29
00.00 – 01.20m : Overburden.
01.20 – 15.00m : Slightly weathered, reddish grey (upto 3.50m, 6.00-7.00m depth) to grayish
white, fine grained, moderate (upto 3.50m, 6.00-7.00m depth) to tightly
compacted, moderately hard and moderately strong Calcareous Shale (upto
3.50m, 6.00-7.00m depth) followed by hard and strong Granite.
Discontinuous (upto 5.00m) to continuous core recovery, and are thinly spaced
(>15 nos/m), dominantly base parallel fractured. Isolated segmented pieces are
core shaped small with broken pieces (upto 7.00m) followed by small size
pieces. Open fractured surfaces are non-planar, slightly rough and slightly
altered. Rock quality is very poor to poor.
BH No. 30
00.00 – 01.00m : Overburden.
01.00 – 15.00m : Slightly weathered, reddish white, fine grained, tightly compacted, hard to very
hard and very strong Granite.
Discontinuous (upto 4.00m) to continuous core recovery, and are thinly spaced
(upto 12.00m, >15 nos/m) to medium spaced (15-8 nos/m), dominantly base
0 0
parallel with pockets of inclined fractured (45 dip at 6.00-7.00m, 40 dip at
12.00-13.00m). Isolated segmented pieces are completely broken fractured
pieces (upto 3.00m) to core shaped small sizes (upto 12.00m) followed by
medium size pieces. Open fractured surfaces are non-planar, rough and slightly
altered. Rock quality is very poor to poor (upto 12.00m) then fair quality.
Bore Sample Depth Sample Description Bulk Dry Spec. Nat. Void Strength Test Results Atter. Limits Grain Size
Hole Number M Dens. Dens. Grav. Mois. Ratio Pc/Pn Shear Cohesn Frictn LL PL SL Gravl Sand Silt Clay
gms/cc gms/cc % kg/sqcm kg/sqcm kg/sqcm Deg. % % % % % % %
BH01 DS01 0.30 Grayish brown clayey silt 2.64 5 95 (Silt+Clay)
with fine sand mixture.
July-16
BH06 SPT02 2.20 Brownish grey, silty sand 84 16 (Silt+Clay)
with traces of mica.
BH07 UDS01 2.00 Deep grey silty clay with 1.98 1.50 2.64 30 S 0.827 TRSH-UU 0.70 0 65 31 8 58 34
sand mixture and kankar. 32 T 3.0 0.718
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
30 C 2.0 0.699
1.0 0.683
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
UNCONFD 0.62 0
0.0 0.643
0.0 0.628
0.0 0.589
REMOULD 0.47 0
0.0 0.490
0.0 0.465
0.0 0.454
Design Report
Page 420
R0
Res-3549 / Page 2
Bore Sample Depth Sample Description Bulk Dry Spec. Nat. Void Strength Test Results Atter. Limits Grain Size
Hole Number M Dens. Dens. Grav. Mois. Ratio Pc/Pn Shear Cohesn Frictn LL PL SL Gravl Sand Silt Clay
gms/cc gms/cc % kg/sqcm kg/sqcm kg/sqcm Deg. % % % % % % %
BH08 SPT01 1.00 Brownish grey, clayey silt 9 91 (Silt+Clay)
with traces of sand
mixture.
July-16
BH12 SPT06 8.50 Brownish grey, clayey silt 8 92 (Silt+Clay)
with traces of sand
mixtures.
BH14 UDS01 2.50 Deep grey silty clay with 1.90 1.52 2.66 28 S TRSH-UU 0.40 0 68 30 7 70 23
sand mixture and kankar. 25 T 3.0 0.423
2.0 0.413
1.0 0.364
Design Report
Page 421
R0
Res-3549 / Page 3
Bore Sample Depth Sample Description Bulk Dry Spec. Nat. Void Strength Test Results Atter. Limits Grain Size
Hole Number M Dens. Dens. Grav. Mois. Ratio Pc/Pn Shear Cohesn Frictn LL PL SL Gravl Sand Silt Clay
gms/cc gms/cc % kg/sqcm kg/sqcm kg/sqcm Deg. % % % % % % %
BH14 SPT02 3.00 Brownish grey, clayey silt 79 29 5 95 (Silt+Clay)
/ silty clay with traces of
fine sand mixtures.
BH14 UDS02 5.50 Deep grey clayey silt 1.84 1.51 2.64 18 S DRSH-CQ 0.14 33 60 28 12
with sand mixture/clayey 22DR 0.5 0.449
silty sand. 1.0 0.804
2.0 1.416
July-16
with sand mixture and
traces of rock dust.
BH15 UDS02 6.00 Deep grey silty clay with 1.88 1.55 2.63 24 S DRSH-CQ 0.08 31 64 28 8
sand mixture. 21DR 0.5 0.366
1.0 0.661
2.0 1.296
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
traces of kankar.
Page 422
R0
Res-3549 / Page 4
Bore Sample Depth Sample Description Bulk Dry Spec. Nat. Void Strength Test Results Atter. Limits Grain Size
Hole Number M Dens. Dens. Grav. Mois. Ratio Pc/Pn Shear Cohesn Frictn LL PL SL Gravl Sand Silt Clay
gms/cc gms/cc % kg/sqcm kg/sqcm kg/sqcm Deg. % % % % % % %
BH16 UDS01 2.50 Deep grey silty clay with 1.92 1.48 2.67 28 S TRSH-UU 0.48 0 70 29 10 74 16
sand mixture. 30 T 3.0 0.499
2.0 0.484
1.0 0.457
BH16 UDS02 5.50 Brownish grey silty clay 1.95 1.48 2.66 29 S 0.973 TRSH-UU 0.86 0 64 31 12 73 15
with sand mixture and 31 T 3.0 0.880
kankar. 35 C 2.0 0.858
1.0 0.842
UNCONFD 0.79 0
0.0 0.813
0.0 0.794
0.0 0.763
July-16
REMOULD 0.58 0
0.0 0.601
0.0 0.580
0.0 0.560
BH17 UDS01 2.00 Deep grey silty clay with 1.90 1.45 2.66 29 S TRSH-UU 0.36 0 70 34 12 69 19
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Page 423
R0
Res-3549 / Page 5
Bore Sample Depth Sample Description Bulk Dry Spec. Nat. Void Strength Test Results Atter. Limits Grain Size
Hole Number M Dens. Dens. Grav. Mois. Ratio Pc/Pn Shear Cohesn Frictn LL PL SL Gravl Sand Silt Clay
gms/cc gms/cc % kg/sqcm kg/sqcm kg/sqcm Deg. % % % % % % %
BH17 UDS02 5.50 Deep/ brownish grey silty 1.91 1.51 2.63 24 S TRSH-UU 0.79 0 78 40 8 76 16
clay with decomposed 26 T 3.0 0.811
rock. 2.0 0.782
1.0 0.777
BH18 UDS01 2.00 Blackish grey clayey silt 1.88 1.50 2.64 27 S TRSH-UU 0.41 0 74 35 10 75 15
with sand mixture. 25 T 3.0 0.433
2.0 0.424
1.0 0.373
July-16
BH18 SPT03 5.00 Brownish grey, clayey silt 2.69 42 49 9
with sand mixture and
traces of kankar.
Page 424
R0
Res-3549 / Page 6
Bore Sample Depth Sample Description Bulk Dry Spec. Nat. Void Strength Test Results Atter. Limits Grain Size
Hole Number M Dens. Dens. Grav. Mois. Ratio Pc/Pn Shear Cohesn Frictn LL PL SL Gravl Sand Silt Clay
gms/cc gms/cc % kg/sqcm kg/sqcm kg/sqcm Deg. % % % % % % %
BH21 UDS01 3.00 Brownish grey clayey silt 1.88 1.49 2.63 24 S TRSH-UU 0.53 0 71 38 8 85 7
with sand mixture. 26 T 3.0 0.553
2.0 0.527
1.0 0.510
July-16
BH21 SPT03 5.00 Yellowish brown, clayey 2.69 45 42 13
silt with sand mixture and
traces of kankar.
BH21 UDS02 6.00 Brownish grey clayey silt 1.86 1.48 2.65 22 S DRSH-CQ 0.12 32 56 37 7
with sand mixture/ clayey 26DR 0.5 0.419
silty sand. 1.0 1.068
2.0 1.352
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
Page 425
R0
LABORATORY ROCK TEST RESULTS
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
1 2 1.00- Slightly weathered light greyish brown 2.378 2.362 0.67 1.5887 2.400 -- 281 -- -- 13685
2.00 medium to fine grained fractured rock.
1 9 8.00- Slightly weathered light greyish brown 2.519 2.510 0.36 0.9024 2.533 -- 485 -- -- 52177
9.00 medium to fine grained fractured rock.
1 15 14.00- Slightly weathered to fresh light greyish 2.648 2.646 0.06 0.1504 2.650 -- 661 -- -- 28826
15.00 brown medium to fine grained fractured
rock.
2 6 5.00- Slightly weathered light brownish grey 2.662 2.659 0.11 0.2988 2.667 -- -- -- 62.72 --
6.00 medium to fine grained fractured rock.
July-16
2 8 7.00- Slightly weathered light brownish grey 2.483 2.474 0.36 0.8872 2.496 -- 355 -- -- 3713
8.00 medium to fine grained fractured rock.
2 14 13.00- Slightly weathered to fresh whitish grey 2.641 2.638 0.09 0.2351 2.645 -- 650 -- -- 35759
14.00 medium to fine grained fractured rock.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
3 2 2.00- Highly weathered greyish brown medium 2.508 2.504 0.18 0.4569 2.515 -- -- -- 103.00 --
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
3 5 5.00- Slightly weathered light brownish grey 2.582 2.577 0.19 0.4801 2.660 -- 410 -- -- 35629
6.00 medium to fine grained fractured rock.
3 9 9.00- Slightly weathered to fresh light greyish 2.267 2.247 0.89 2.0103 2.670 -- 234 -- -- 20580
10.00 brown medium to coarse grained
fractured rock.
Design Report
Page 426
R0
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
3 11 11.00- Slightly weathered to fresh light greyish 2.618 2.615 0.15 0.3871 2.670 -- 632 -- -- 58276
12.00 brown medium to coarse grained
fractured rock.
4 2 2.00- Highly weathered greyish brown medium 2.603 2.599 0.16 0.4048 2.609 -- -- -- 141.77 --
3.00 grained fractured rock.
4 5 5.00- Slightly weathered light greyish brown 2.409 2.394 0.62 1.4790 2.680 -- 485 -- -- 26359
6.00 medium to fine grained fractured rock.
4 9 9.00- Slightly weathered to fresh whitish grey 2.592 2.585 0.27 0.6869 2.650 -- 507 -- -- 19981
10.00 medium to fine grained fractured rock.
4 11 11.00- Slightly weathered to fresh whitish grey 2.565 2.558 0.28 0.7129 2.650 -- 417 -- -- 43390
12.00 medium to fine grained fractured rock.
July-16
5 1 0.50- Moderately weathered brownish grey 2.368 2.367 0.04 0.0895 2.370 -- -- -- -- --
1.00 medium grained fractured rock
5 3 2.00- Moderately weathered brownish grey 2.412 2.406 0.23 0.5455 2.419 -- -- -- -- --
3.00 medium grained fractured rock
5 5 4.00- Moderately weathered brownish grey 2.518 2.498 0.77 1.9296 2.547 -- -- -- 89.10 --
5.00 medium grained fractured rock
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
5 7 6.00- Slightly weathered brownish grey 2.521 2.510 0.41 1.0361 2.537 -- -- -- 158.17 --
7.00 medium grained fractured rock
5 12 11.00- Slightly weathered brownish grey 2.592 2.586 0.20 0.5234 2.600 -- 369 -- -- 24817
12.00 medium grained fractured rock
6 1 2.50- Highly weathered brownish grey medium 2.574 2.570 0.16 0.4045 2.581 -- -- -- 158.17 --
3.00 grained fractured rock.
6 2 3.00- Highly weathered brownish grey medium 2.641 2.638 0.14 0.3590 2.647 -- -- -- 64.15 --
4.00 grained fractured rock.
Design Report
Page 427
R0
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
6 5 6.00- Slightly weathered brownish grey 2.349 2.318 1.33 3.0925 2.392 -- 290 -- -- 29199
7.00 medium grained fractured rock.
6 8 9.00- Slightly weathered brownish grey 2.518 2.497 0.86 2.1434 2.552 -- 428 -- -- 44017
10.00 medium grained fractured rock.
6 13 13.00- Slightly weathered brownish grey 2.592 2.589 0.12 0.3102 2.597 -- 448 -- -- 23866
14.00 medium grained fractured rock.
7 4 8.50- Slightly weathered whitish grey fine to 2.501 2.495 0.26 0.6401 2.511 -- -- -- 59.80
9.50 medium grained fractured rock.
7 5 9.50- Slightly weathered whitish grey fine to 2.637 2.636 0.03 0.0782 2.638 -- 453 -- -- 82296
10.50 medium grained fractured rock.
7 8 12.50- Slightly weathered to fresh brownish 2.637 2.635 0.07 0.1908 2.640 947 785 0.829 -- 47868
13.50 grey fine to medium grained rock.
July-16
7 10 14.50- Slightly weathered to fresh brownish 2.495 2.474 0.85 2.0989 2.527 -- 231 -- -- 57282
15.50 grey fine to medium grained rock.
8 3 6.00- Slightly weathered whitish grey fine to 2.632 2.630 0.07 0.1863 2.635 -- 654 -- -- 46211
7.00 medium grained fractured rock.
8 6 9.00- Slightly weathered to fresh whitish 2.674 2.673 0.03 0.0778 2.675 -- 450 -- -- 42579
10.00 brown fine to medium grained rock.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
8 10 13.00- Slightly weathered to fresh whitish 2.577 2.570 0.27 0.6998 2.588 -- 326 -- 73.06 48311
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
9 3 7.00- Moderately weathered whitish grey 2.889 2.888 0.02 0.0559 2.890 -- 230 -- 76.62 31249
8.00 medium grained fractured rock.
9 6 10.00- Slightly weathered whitish grey fine to 2.741 2.741 0.01 0.0217 2.741 -- 662 -- 88.36 47632
11.00 medium grained fractured rock.
9 10 14.00- Slightly weathered whitish grey fine to 2.857 2.856 0.02 0.0561 2.858 -- 178 -- -- 44612
15.00 medium grained fractured rock.
Design Report
Page 428
R0
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
10 2 4.00- Moderately weathered light grey medium 2.892 2.892 0.01 0.0207 2.893 -- 634 -- -- 51374
5.00 grained fractured rock
10 4 6.00- Slightly weathered light grey medium 2.751 2.750 0.01 0.0358 2.751 -- 362 -- -- 42990
7.00 grained fractured rock.
10 6 8.00- Slightly weathered whitish grey fine to 2.804 2.804 0.01 0.0141 2.804 627 251 0.400 -- 24825
9.00 medium grained fractured rock.
10 11 13.00- Slightly weathered whitish grey fine to 2.821 2.820 0.04 0.1178 2.823 -- 399 -- -- 46945
14.00 medium grained fractured rock.
11 2 4.50- Moderately weathered whitish grey 2.857 2.856 0.03 0.0887 2.858 345 332 0.963 -- 35005
5.50 medium grained fractured rock.
11 5 7.50- Slightly weathered whitish grey fine to 2.870 2.869 0.02 0.0617 2.871 -- 416 -- -- 62395
8.50 medium grained rock.
11 7 9.50- Slightly weathered to fresh whitish grey 2.567 2.560 0.25 0.6470 2.577 -- 234 -- -- 30926
July-16
10.50 fine to medium grained rock.
11 11 13.50- Slightly weathered to fresh whitish grey 2.601 2.597 0.15 0.3989 2.607 -- 303 -- -- 55070
15.00 fine to medium grained rock.
D 2 2.50- Moderately weathered whitish grey fine 2.807 2.806 0.06 0.1679 2.810 -- -- -- 34.06 --
3.50 grained fractured rock.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
D 6 6.50- Slightly weathered whitish grey fine to 3.073 3.071 0.06 0.1818 3.077 -- 120 -- -- 30235
7.50 medium grained fractured rock.
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
D 11 11.50- Slightly weathered to fresh light grey 2.890 2.889 0.04 0.1094 2.892 -- -- -- 49.88 --
12.50 medium grained fractured rock.
D 13 13.50- Slightly weathered to fresh light grey 2.981 2.977 0.13 0.4015 2.989 -- 320 -- 137.08 62938
15.00 medium grained fractured rock.
12 3 11.50- Moderately weathered whitish grey 2.835 2.834 0.05 0.1552 2.838 386 369 0.957 -- 45510
12.50 medium grained fractured rock.
Design Report
Page 429
R0
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
12 6 14.50- Slightly weathered whitish brown 2.499 2.492 0.27 0.6734 2.509 -- 423 -- -- 54707
15.50 medium grained fractured rock.
12 8 16.50- Slightly weathered whitish brown 2.652 2.650 0.07 0.1751 2.655 -- 376 -- 114.68 52357
17.50 medium grained fractured rock.
13 6 14.50- Highly weathered deep grey medium 3.100 3.098 0.06 0.1759 3.104 -- 464 -- -- 56133
15.50 grained fractured rock.
13 11 16.00- Highly weathered deep grey medium 3.053 3.050 0.08 0.2369 3.058 -- 493 -- -- 46724
17.00 grained fractured rock.
14 5 12.00- Moderately weathered blackish grey fine 2.725 2.724 0.03 0.0857 2.727 -- -- -- 27.02 --
13.00 to medium grained fractured rock.
14 6 13.00- Moderately weathered blackish grey fine 2.769 2.767 0.09 0.2452 2.773 -- 247 -- 35.83 19565
14.00 to medium grained fractured rock.
14 10 17.00- Slightly weathered blackish grey fine to 2.769 2.766 0.13 0.3477 2.776 -- 137 -- -- 32271
July-16
18.00 medium grained fractured rock.
15 1 9.50- Highly weathered pinkish grey medium 2.769 2.760 0.32 0.8885 2.785 -- -- -- 5.38 --
10.50 grained fractured rock.
15 4 12.50- Highly weathered pinkish to whitish grey 2.807 2.797 0.33 0.9364 2.824 -- 189 -- -- 30735
13.50 fine to medium grained fractured rock.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
15 8 16.50- Moderately weathered light grey fine to 2.881 2.880 0.05 0.1315 2.884 -- 287 -- -- 49794
17.50 medium grained fractured rock.
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
15 10 18.50- Slightly weathered light grey fine to 2.891 2.891 0.02 0.0490 2.892 -- 148 -- -- 43870
19.50 medium grained fractured rock.
16 2 9.00- Moderately weathered light grey fine 2.735 2.732 0.10 0.2768 2.739 -- 217 -- -- 33241
10.00 grained fractured rock.
16 6 13.00- Moderately weathered light grey fine 2.761 2.757 0.14 0.3914 2.768 176 149 0.846 -- 59168
14.00 grained fractured rock.
Design Report
Page 430
R0
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
16 8 15.00- Slightly weathered light grey fine grained 2.762 2.756 0.19 0.5367 2.771 -- -- -- 5.38 --
16.00 fractured rock.
17 1 7.50- Highly weathered brownish grey medium 2.635 2.551 3.28 8.3667 2.784 -- -- -- -- 31660
8.00 grained fractured rock.
17 3 9.00- Moderately weathered brownish grey 2.470 2.386 3.50 8.3462 2.604 -- -- -- -- --
10.00 medium grained fractured rock.
17 4 10.00- Moderately weathered brownish grey 2.888 2.845 1.53 4.3472 2.974 -- -- -- 7.13 --
11.00 medium grained fractured rock.
17 5 11.00- Slightly weathered brownish grey 2.832 2.795 1.32 3.6849 2.902 -- -- -- 5.35 --
12.00 medium grained fractured rock.
17 8 14.00- Slightly weathered light grey medium to 3.069 3.068 0.05 0.1578 3.073 -- 829 -- -- 36592
15.00 fine grained fractured rock.
18 1 5.50- Moderately weathered brownish grey 2.973 2.947 0.86 2.5202 3.024 -- -- -- 33.86 --
July-16
6.00 medium grained fractured rock.
18 4 8.00- Slightly weathered light grey medium to 2.985 2.970 0.53 1.5620 3.017 -- 590 -- -- 24892
9.00 fine grained fractured rock.
19 1 2.00- Moderately weathered light grey medium 3.069 3.067 0.04 0.1329 3.072 -- 914 -- -- 40196
3.00 grained fractured rock.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
19 2 3.00- Highly weathered light grey medium 2.861 2.858 0.13 0.3833 2.869 -- -- -- -- --
4.00 grained fractured rock.
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
19 4 5.00- Highly weathered light grey medium 2.864 2.857 0.24 0.6875 2.877 -- -- -- -- --
6.00 grained fractured rock.
19 9 10.00- Slightly weathered greyish brown 3.014 3.010 0.12 0.3609 3.021 -- 242 -- -- 22577
11.00 medium grained fractured rock.
20 1 3.00- Highly weathered brownish grey medium 3.009 3.002 0.23 0.7053 3.023 -- -- -- 121.66
4.00 grained fractured rock.
Design Report
Page 431
R0
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
20 2 4.00- Moderately weathered brownish grey 2.975 2.968 0.22 0.6600 2.988 -- -- -- -- --
5.00 medium grained fractured rock.
20 6 8.00- Slightly weathered brownish grey 3.030 3.025 0.16 0.4772 3.040 -- 458 -- -- 30793
9.00 medium grained fractured rock.
20 10 12.00- Slightly weathered greyish brown 3.088 3.087 0.05 0.1664 3.092 -- 523 -- -- 29941
13.00 medium grained fractured rock.
21 1 8.00- Moderately weathered blackish grey fine 2.804 2.775 1.06 2.9455 2.859 -- -- -- -- --
9.00 to medium grained fractured rock.
21 2 9.00- Slightly weathered blackish grey fine to 3.097 3.096 0.05 0.1660 3.101 -- 842 -- -- 31867
10.00 medium grained fractured rock.
21 4 11.00- Slightly weathered blackish grey fine to 3.089 3.088 0.04 0.1173 3.091 -- 689 -- -- 36630
12.00 medium grained fractured rock.
22 1 0.50- Highly weathered blackish grey medium 2.892 2.879 0.47 1.3612 2.918 -- -- -- 121.35
July-16
1.00 grained fractured rock.
22 3 2.00- Moderately weathered blackish grey 3.007 2.998 0.29 0.8800 3.024 -- 726 -- -- 29566
3.00 medium grained fractured rock.
22 5 4.00- Slightly weathered blackish grey medium 2.981 2.970 0.38 1.1249 3.003 -- 526 -- -- 29727
5.00 grained fractured rock.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
22 9 8.00- Fresh light greyish brown medium 3.037 3.034 0.10 0.2916 3.043 -- 774 -- -- 44835
9.00 grained fractured rock.
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
23 1 1.00- Moderately weathered brownish grey 3.027 3.024 0.10 0.3147 3.034 -- 266 -- -- 23700
2.00 medium grained fractured rock.
23 4 4.00- Slightly weathered brownish grey 3.044 3.043 0.03 0.0949 3.046 -- 592 -- -- 20660
5.00 medium grained fractured rock.
23 7 7.00- Slightly weathered brownish grey 3.007 3.005 0.04 0.1239 3.009 -- 568 -- -- 30412
8.00 medium grained fractured rock.
Design Report
Page 432
R0
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
24 1 1.30.2.0 Highly weathered light grey medium 2.734 2.729 0.19 0.5148 2.743 -- -- -- 31.22 --
0 grained fractured rock.
24 4 4.00- Moderately weathered light grey medium 2.725 2.719 0.23 0.6333 2.736 -- 448 -- -- 22225
5.00 grained fractured rock.
24 6 6.00- Slightly weathered light grey medium 2.711 2.706 0.20 0.5354 2.720 -- 339 -- -- 13877
7.00 grained fractured rock.
24 11 11.00- Slightly weathered greyish brown 3.012 3.011 0.03 0.0883 3.013 -- 482 -- -- 15196
12.00 medium grained fractured rock.
25 1 1.00- Highly weathered brownish grey medium 2.603 2.597 0.21 0.5435 2.611 -- -- -- 137.33 --
2.00 grained fractured rock.
25 3 3.00- Moderately weathered blackish grey 3.015 3.014 0.01 0.0452 3.016 -- 558 -- -- 49895
4.00 medium grained fractured rock.
25 4 4.00- Moderately weathered blackish grey 2.962 2.960 0.04 0.1171 2.964 -- -- -- 91.39 --
July-16
5.00 medium grained fractured rock.
25 7 7.00- Moderately weathered blackish grey 2.984 2.984 0.02 0.0525 2.985 -- 591 -- -- 41411
8.00 medium grained fractured rock.
26 1 0.50- Completely weathered light pinkish grey 2.869 2.869 0.02 0.0453 2.870 -- -- -- 52.01 --
1.00 medium grained fractured rock.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
26 2 1.00- Highly weathered light pinkish grey 2.877 2.877 0.03 0.0734 2.879 -- 313 -- -- 51291
2.00 medium grained fractured rock.
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
26 3 2.00- Moderately weathered light pinkish grey 2.880 2.880 0.01 0.0255 2.880 -- 282 -- -- 41159
3.00 medium grained fractured rock.
26 5 4.00- Slightly weathered light grey medium 2.814 2.814 0.01 0.0183 2.815 -- 603 -- -- 77270
5.00 grained fractured rock.
26 7 6.00- Slightly weathered to fresh light grey 2.899 2.897 0.06 0.1878 2.903 -- 200 -- -- 48607
7.00 medium grained fractured rock.
Design Report
Page 433
R0
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
27 1 1.00- Highly weathered brownish grey medium 2.986 2.983 0.09 0.2571 2.991 -- -- -- -- --
2.00 grained fractured rock.
27 2 2.00- Highly weathered light brownish grey 2.885 2.884 0.04 0.1101 2.887 -- -- -- 89.10 --
3.00 medium to fine grained fractured rock.
27 3 3.00- Moderately weathered brownish grey 2.903 2.903 0.01 0.0282 2.904 -- -- -- 87.32 --
4.00 medium grained fractured rock.
27 4 4.00- Moderately weathered brownish grey 2.695 2.693 0.06 0.1571 2.697 -- -- -- -- --
5.00 medium grained fractured rock.
27 6 6.00- Moderately weathered light brownish 2.866 2.865 0.02 0.0601 2.870 -- 287 -- -- 17099
7.00 grey medium to fine grained fractured
27 7 7.00- Moderately weathered light brownish 2.879 2.879 0.02 0.0459 2.870 -- 353 -- -- 20841
8.00 grey medium to fine grained fractured
27 8 8.00- Moderately weathered brownish grey 2.889 2.889 0.01 0.0258 2.889 -- 375 -- -- 63124
July-16
9.00 medium grained fractured rock.
27 9 9.00- Moderately weathered brownish grey 2.612 2.610 0.09 0.2467 2.616 -- -- -- -- --
10.00 medium grained fractured rock.
27 14 14.00- Slightly weathered light greyish brown 2.926 2.925 0.03 0.0982 2.870 -- 488 -- -- 31660
15.00 medium to fine grained fractured rock.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
28 1 0.50- Highly weathered brownish grey medium 1.847 1.845 0.12 0.2250 1.849 -- -- -- -- --
1.00 grained fractured rock.
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
28 2 2.00- Highly weathered brownish grey medium 2.112 2.109 0.13 0.2667 2.115 -- -- -- -- --
3.00 grained fractured rock.
28 3 2.00- Highly weathered brownish grey medium 1.878 1.876 0.12 0.2333 1.880 -- -- -- -- --
3.00 grained fractured rock.
28 5 4.00- Highly weathered brownish grey medium 2.548 2.541 0.28 0.7084 2.559 -- -- -- 145.78 --
5.00 grained fractured rock.
Design Report
Page 434
R0
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
28 6 6.00- Highly weathered brownish grey medium 2.622 2.617 0.22 0.5636 2.631 -- -- -- 40.98 --
7.00 grained fractured rock.
28 7 6.00- Highly weathered brownish grey medium 2.488 2.475 0.53 1.3021 2.507 -- -- -- 20.25 --
7.00 grained fractured rock.
28 8 7.00- Highly weathered brownish grey medium 2.596 2.592 0.17 0.4450 2.603 -- -- -- 74.84 --
8.00 grained fractured rock.
28 10 9.00- Highly weathered brownish grey medium 2.591 2.586 0.20 0.5049 2.600 -- -- -- 138.69 --
10.00 to fine grained fractured rock.
28 15 14.00- Highly weathered brownish grey medium 2.605 2.599 0.24 0.6329 2.660 -- 117 -- -- 11336
15.00 to fine grained fractured rock.
29 1 1.20- Highly weathered brownish grey medium 2.215 2.204 0.48 1.0667 2.228 -- -- -- -- --
2.00 grained fractured rock.
29 3 3.00- Highly weathered brownish grey medium 2.396 2.374 0.93 2.2143 2.428 -- -- -- -- --
July-16
4.00 grained fractured rock.
29 4 4.00- Highly weathered brownish grey medium 2.513 2.507 0.24 0.6000 2.522 -- -- -- -- --
5.00 grained fractured rock.
29 5 5.00- Highly weathered brownish grey medium 2.899 2.899 0.02 0.0542 2.901 -- -- -- 74.84 --
6.00 grained fractured rock.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
29 7 7.00- Highly weathered light grey medium 2.548 2.542 0.24 0.6203 2.558 -- 290 -- -- 25498
8.00 grained fractured rock.
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
30 1 1.00- Highly weathered light greyish brown 2.077 2.075 0.08 0.1750 2.079 -- -- -- -- --
2.00 medium grained fractured rock.
30 3 3.00- Highly weathered light greyish brown 2.260 2.250 0.46 1.0389 2.274 -- -- -- 34.33 --
4.00 medium grained fractured rock.
30 5 5.00- Highly weathered light greyish brown 2.331 2.276 2.39 5.4471 2.407 -- -- -- 12.65 --
6.00 medium grained fractured rock.
Design Report
Page 435
R0
BH Run Depth Description Density Water Porosity Specific Unconfined Compressive Coefficient Point Load Young's
No. No. (M) (gm/cc) Absorption % Gravity strength (kg/sqcm) of Strength Index Modulus
Bulk Dry (%) Dry Saturated softening (kg/sqcm) (kg/sqcm)
30 11 11.00- Highly weathered light brownish grey 2.689 2.688 0.03 0.0811 2.691 -- -- -- 160.38 --
12.00 medium grained fractured rock.
30 13 13.00- Highly weathered light brownish grey 2.659 2.657 0.08 0.2193 2.663 -- 774 -- -- 37321
14.00 medium grained fractured rock.
July-16
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Design Report
Page 436
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 30/9/2015 Level of Ground : 268.052 M Job No : 3549
Bore Hole No. : 1 Location : E=214572.434, N=1776004.280 Completion Date : 13/10/2015 Standing Water Level : 4.85 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
sand mixture & decomposed rock.
267.552 0.50 0.53 0.50 *SPT-01 0.50 R 0.50M
July-16
259.052 9.00 10.00 9.00 R10 75 38
258.052 10.00 11.00 10.00 R11 69 48
257.052 11.00 12.00 11.00 R12 77 17 12.00M
256.052 12.00 13.00 12.00 R13 75 30
255.052 13.00 14.00 13.00 R14 78 21 Slightly weathered to fresh, whitish
254.052 14.00 15.00 14.00 R15 86 51 grey, medium to coarse grained rock. 2.646 2.650 0.06 --/661
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Design Report
Page 437
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 10/10/2015 Level of Ground : 265.089 M Job No : 3549
Bore Hole No. : 2 Location : E=214588.336, N=1775956.876 Completion Date : 16/10/2015 Standing Water Level : 4.75 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
decomposed rock dust.
264.589 0.50 0.52 0.50 *SPT-01 0.50 R 0.50M
July-16
256.089 9.00 10.00 9.00 R10 87 0
10.00M
255.089 10.00 11.00 10.00 R11 84 0
254.089 11.00 12.00 11.00 R12 90 36
253.089 12.00 13.00 12.00 R13 88 20 Fresh, whitish grey, medium to coarse
252.089 13.00 14.00 13.00 R14 89 23 grained, fractured rock. 2.638 2.645 0.09 --/650
251.089 14.00 15.00 14.00 R15 90 26
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Design Report
Page 438
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 14/10/2015 Level of Ground : 262.266 M Job No : 3549
Bore Hole No. : 3 Location : E=214604.238, N=1775909.472 Completion Date : 19/10/2015 Standing Water Level : 4.70 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm2)
Angle of Shearing
Resistance in Deg.
SC
decomposed rock.
261.266 1.00 1.02 1.00 *SPT-01 1.00 R 1.00M
July-16
252.266 10.00 11.00 10.00 R10 87 13
251.266 11.00 12.00 11.00 R11 86 66 Fresh, light greyish brown, medium to 2.615 2.670 0.15 --/632
250.266 12.00 13.00 12.00 R12 92 41 coarse grained rock.
249.266 13.00 14.00 13.00 R13 86 37
248.266 14.00 15.00 14.00 R14 88 58
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Design Report
Page 439
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 18/10/2015 Level of Ground : 260.120 M Job No : 3549
Bore Hole No. : 4 Location : E=214620.139, N=1775862.068 Completion Date : 25/10/2015 Standing Water Level : 4.60 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
SM
& decomposed rock.
259.120 1.00 1.02 1.00 *SPT-01 1.00 R 1.00M
July-16
252.120 8.00 9.00 8.00 R8 71 27
9.00M
251.120 9.00 10.00 9.00 R9 82 12 2.585 2.650 0.27 --/507
250.120 10.00 11.00 10.00 R10 88 17
249.120 11.00 12.00 11.00 R11 91 12 2.558 2.650 0.28 --/417
Fresh, whitish grey, medium to coarse
248.120 12.00 13.00 12.00 R12 92 27
grained, fractured rock.
247.120 13.00 14.00 13.00 R13 84 23
246.120 14.00 15.00 14.00 R14 93 44
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Design Report
Page 440
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 3/12/2015 Level of Ground : 255.723 M Job No : 3549
Bore Hole No. : 5 Location : E=214636.041, N=1775814.665 Completion Date : 11/12/2015 Standing Water Level : 0.55 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
rock.
255.223 0.50 0.53 0.50 *SPT-01 0.50 R 0.50M
July-16
fresh, brownish grey, medium grained,
248.723 7.00 8.00 7.00 R8 80 32
highly fractured rock.
247.723 8.00 9.00 8.00 R9 82 30
246.723 9.00 10.00 9.00 R10 81 0 10.00M
245.723 10.00 11.00 10.00 R11 94 0
244.723 11.00 12.00 11.00 R12 90 53 2.586 2.600 0.20 --/369
243.723 12.00 13.00 12.00 R13 94 26 Fresh, light brownish grey, medium to
242.723 13.00 14.00 13.00 R14 90 74 coarse grained, fractured rock.
241.723 14.00 15.00 14.00 R15 91 46
15.00M
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay)
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Page 441
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 22/12/2015 Level of Ground : 251.536 M Job No : 3549
Bore Hole No. : 6 Location : E=214651.943, N=1775767.261 Completion Date : 30/12/2015 Standing Water Level : 2.00 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
250.536 1.00 1.45 1.00 SPT-01 1.00 10 56 22 5
1.50M
SM
with decomposed rock & boulders.
249.336 2.20 2.30 2.20 SPT-02 2.20 >100 84 16 # 7.56 0.0110 0.050
July-16
246.536 5.00 6.00 5.00 R4 51 0
Slightly weathered, whitish grey to
brownish grey, medium grained, highly
245.536 6.00 7.00 6.00 R5 65 20 2.318 2.392 1.33 --/290
fractured rock.
244.536 7.00 8.00 7.00 R6 61 0 8.00M
243.536 8.00 9.00 8.00 R7 77 20
242.536 9.00 10.00 9.00 R8 76 20 2.497 2.552 0.86 --/428
241.536 10.00 11.00 10.00 R9 75 0
Slightly weathered to fresh, whitish
240.536 11.00 12.00 11.00 R10 72 42 brown, medium to fine grained,
239.536 12.00 13.00 12.00 R11 84 0 fractured rock with blackish spots.
238.536 13.00 14.00 13.00 R12 87 26
237.536 14.00 15.00 14.00 R13 86 20 2.589 2.597 0.12 --/448
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
15.00M
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Design Report
Page 442
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 1/1/2016 Level of Ground : 248.192 M Job No : 3549
Bore Hole No. : 7 Location : E=214667.845, N=1775719.857 Completion Date : 6/1/2016 Standing Water Level : 4.00 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
247.192 1.00 1.45 1.00 SPT-01 1.00 13 Stiff, deep grey, silty clay with kankar.
CH
Observed boulders.
CH
244.692 3.50 3.50 DS-02 Observed boulders.
244.192 4.00 4.45 4.00 SPT-03 4.00 44
243.192 5.00 5.00 DS-03 5.00M
Very dense, brownish grey, silty sand
SM
with decomposed rock.
July-16
242.692 5.50 5.53 5.50 *SPT-04 5.50 R
5.50M
Page 443
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 6/2/2016 Level of Ground : 244.121 M Job No : 3549
Bore Hole No. : 8 Location : E=214683.746, N=1775672.453 Completion Date : 12/2/2016 Standing Water Level : 6.10 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
decomposed rock.
July-16
239.121 5.00 6.00 5.00 R2 51 0
Moderately to slightly weathered,
whitish grey to brownish grey, medium
238.121 6.00 7.00 6.00 R3 66 14 2.630 2.635 0.07 --/654
grained, fractured rock.
237.121 7.00 8.00 7.00 R4 65 13 8.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Design Report
Page 444
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 31/1/2016 Level of Ground : 241.090 M Job No : 3549
Bore Hole No. : 9 Location : E=214721.911, N=1775558.683 Completion Date : 4/2/2016 Standing Water Level : 10.80 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
239.090 2.00 2.45 2.00 *UDS-01 decomposed rock.
CH
decomposed rock.
236.090 5.00 5.03 5.00 *SPT-04 5.00 R
5.00M
Highly weathered, whitish grey,
July-16
medium grained, fractured rock.
236.090 5.00 6.00 5.00 R1 23 0
6.00M
235.090 6.00 7.00 6.00 R2 30 0
234.090 7.00 8.00 7.00 R3 46 22 2.888 2.890 0.02 --/230
Highly to moderately weathered,
whitish grey, medium grained,
fractured rock.
233.090 8.00 9.00 8.00 R4 40 0
232.090 9.00 10.00 9.00 R5 46 0
10.00M
231.090 10.00 11.00 10.00 R6 69 23 2.741 2.741 0.01 --/662
230.090 11.00 12.00 11.00 R7 61 33
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Design Report
Page 445
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 21/1/2016 Level of Ground : 239.290 M Job No : 3549
Bore Hole No. : 10 Location : E=214760.075, N=1775444.914 Completion Date : 30/1/2016 Standing Water Level : 14.00 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
decomposed rock.
238.290 1.00 1.45 1.00 SPT-01 1.00 6
1.45M
CH
decomposed rock.
236.990 2.30 2.75 2.30 SPT-02 2.30 15
July-16
233.290 6.00 7.00 6.00 R4 78 15 2.750 2.751 0.01 --/362
Moderately to slightly weathered /
232.290 7.00 8.00 7.00 R5 90 22
fresh, light grey, medium grained,
fractured rock.
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Design Report
Page 446
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 7/1/20165 Level of Ground : 237.840 M Job No : 3549
Bore Hole No. : 11 Location : E=214773.985, N=1775403.447 Completion Date : 13/1/2016 Standing Water Level : 14.00 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
236.840 1.00 1.45 1.00 SPT-01 1.00 1
1.45M
CH
235.040 2.80 2.80 DS-02
July-16
233.340 4.50 5.50 4.50 R2 56 34 2.856 2.858 0.03 345/332
232.340 5.50 6.50 5.50 R3 52 24
231.340 6.50 7.50 6.50 R4 76 25
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Design Report
Page 447
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 14/01/2016 Level of Ground : 238.266 M Job No : 3549
Bore Hole No. : D Location : E=214773.985, N=1775403.447 Completion Date : 21/1/2016 Standing Water Level : 14.30 m above EGL
Depth in Mete
S.P.T. blows Shearing Strength
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
%Gravel>72mm
Natural Moisture
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm2)
Angle of Shearing
Resistance in Deg.
237.266 1.00 1.45 1.00 SPT-01 1.00 18 Very stiff, deep grey, silty clay.
CH
Observed decomposed rock.
July-16
231.766 6.50 7.50 6.50 R6 64 24 7.50M 3.071 3.077 0.06 --/120
230.766 7.50 8.50 7.50 R7 83 65
229.766 8.50 9.50 8.50 R8 81 32
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
for soil samples SO4 content is expressed as SO3.
Design Report
Page 448
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Remarks
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
235.121 2.50 2.95 2.50 SPT-02 2.50 3 80 28
CH
231.121 6.50 6.50 DS-03
July-16
230.621 7.00 7.45 7.00 SPT-05 7.00 12 7.00M
Stiff, deep to brownish grey, silty clay
229.621 8.00 8.00 DS-04
with decomposed rock. Observed sand
CH
229.121 8.50 8.95 8.50 SPT-06 8.50 13 mixture. 8 92 #
228.121 9.50 9.54 9.50 *SPT-07 9.50 R 9.50M
Highly weathered, whitish grey,
medium grained, highly fractured rock.
Observed gravel.
228.121 9.50 10.50 9.50 R1 22 0
10.50M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
Design Report
Page 450
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 19/2/2016 Level of Ground : 244.021 M Job No : 3549
Bore Hole No. : 13 Location : E=214874.568, N=1775103.605 Completion Date : 22/2/2016 Standing Water Level : 5.80 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
242.021 2.00 2.45 2.00 *UDS-01 Very soft, deep grey, silty clay with
sand mixture. Observed decomposed
CH
241.521 2.50 2.95 2.50 SPT-02 2.50 1 rock.
July-16
237.021 7.00 7.03 7.00 *SPT-05 7.00 R
Completely weathered, deep grey,
237.021 7.00 8.00 7.00 R2 0 0
medium grained, decomposed rock.
236.021 8.00 8.02 8.00 *SPT-06 8.00 R
236.021 8.00 9.00 8.00 R3 0 0 9.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
Design Report
Page 451
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 13/2/2016 Level of Ground : 244.421 M Job No : 3549
Bore Hole No. : 14 Location : E=214890.469, N=1775056.201 Completion Date : 19/2/2016 Standing Water Level : 5.40 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
Observed kankar.
242.421 2.00 2.00 DS-02
CH
Observed kankar.
239.921 4.50 4.95 4.50 SPT-03 4.50 7
239.121 5.30 5.30 DS-04 5.50M
238.921 5.50 5.95 5.50 UDS-02 CQ 60 28 12 1.53 2.64 20 0.14 33
July-16
238.471 5.95 6.40 5.95 SPT-04 5.95 10 15 58 27 #
Stiff, deep grey, clayey silt with sand
237.421 7.00 7.00 DS-05
SC
mixture / clayey silty sand.
236.971 7.45 7.90 7.45 SPT-05 7.45 12
236.421 8.00 8.03 8.00 *SPT-06 8.00 R 8.00M
Page 452
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 13/2/2016 Level of Ground : 244.421 M Job No : 3549
Bore Hole No. : 14 Location : E=214890.469, N=1775056.201 Completion Date : 19/2/2016 Standing Water Level : 5.40 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
July-16
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Design Report
Page 453
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 8/2/2016 Level of Ground : 244.021 M Job No : 3549
Bore Hole No. : 15 Location : E=214906.371, N=1775008.797 Completion Date : 13/2/2016 Standing Water Level : 5.10 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
241.021 3.00 3.45 3.00 *UDS-01
around UDS-02.
July-16
236.521 7.50 7.50 DS-04 8.00M
236.021 8.00 8.45 8.00 SPT-05 8.00 10 74 28
235.021 9.00 9.00 DS-05 Stiff, brownish grey, clayey silt.
CH
234.521 9.50 9.54 9.50 *SPT-06 9.50 R 9.50M
Highly weathered, pinkish grey,
medium grained, fractured rock.
234.521 9.50 10.50 9.50 R1 29 11 10.50M 2.760 2.785 0.32 P=5.37
Highly weathered, pinkish grey,
233.521 10.50 11.50 10.50 R2 24 0 medium grained, fractured rock.
232.521 11.50 12.50 11.50 R3 29 0 11.50M
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Design Report
Page 454
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 2/19/2016 Level of Ground : 250.231 M Job No : 3549
Bore Hole No. : 16 Location : E=214922.273, N=1774961.394 Completion Date : 2/23/2016 Standing Water Level : 0.50 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
Observed kankar.
248.231 2.00 2.00 DS-02
CH
245.731 4.50 4.95 4.50 SPT-03 4.50 18 Observed kankar & sand mixture. 10 90 # 56 28
244.931 5.30 5.30 DS-04
244.731 5.50 5.95 5.50 UDS-02 UU 12 73 15 1.50 2.66 30 64 31 0.86 0
July-16
5.95M
244.281 5.95 6.40 5.95 SPT-04 5.95 25 51 49 # 8.76 0.0150 B.D.L.
Very stiff to hard, brownish grey,
243.231 7.00 7.00 DS-05
clayey silt with sand mixture / clayey
SC
242.931 7.30 7.75 7.30 SPT-05 7.30 33 silty sand.
242.231 8.00 8.04 8.00 *SPT-06 8.00 R 8.00M
Page 455
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 2/19/2016 Level of Ground : 250.231 M Job No : 3549
Bore Hole No. : 16 Location : E=214922.273, N=1774961.394 Completion Date : 2/23/2016 Standing Water Level : 0.50 M above EGL
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
July-16
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Design Report
Page 456
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 27/12/2015 Level of Ground : 253.540 M Job No : 3549
Bore Hole No. : 17 Location : E=214938.175, N=1774913.990 Completion Date : 31/12/2015 Standing Water Level : 0.50 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
251.540 2.00 2.45 2.00 UDS-01 UU 12 69 19 1.46 2.66 30 70 34 0.36 0
CH
246.240 7.30 7.30 DS-03 Observed sand pocket around SPT-04.
July-16
246.040 7.50 7.54 7.50 *SPT-05 7.50 R 7.50M
Highly weathered, brownish grey,
medium grained, highly fractured rock.
246.040 7.50 8.00 7.50 R1 22 0 8.00M 2.551 2.784 3.28
245.540 8.00 9.00 8.00 R2 34 0 Highly to moderately weathered,
244.540 9.00 10.00 9.00 R3 45 0 brownish grey, medium grained, highly 2.386 2.604 3.50
243.540 10.00 11.00 10.00 R4 48 0 fractured rock. 2.845 2.974 1.53 P=7.12
11.00M
Slightly weathered, brownish grey,
medium grained, highly fractured rock.
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
17.50M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Design Report
Page 457
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 16/12/2015 Level of Ground : 254.435 M Job No : 3549
Bore Hole No. : 18 Location : E=214954.076, N=1774866.586 Completion Date : 21/12/2015 Standing Water Level : 0.50 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
rock.
252.435 2.00 2.45 2.00 UDS-01 UU 10 75 15 1.49 2.64 26 74 35 0.41 0
CH
249.935 4.50 4.50 DS-03 rock.
5.00M
Hard, deep blackish grey, silty clay to
249.435 5.00 5.10 5.00 SPT-03 5.00 >100 42 49 9 2.69
clayey silt with sand & decomposed
CH
July-16
rock.
248.935 5.50 5.53 5.50 *SPT-04 5.50 R
5.50M
248.935 5.50 6.00 5.50 R1 50 10 Moderately weathered, brownish grey, 2.947 3.024 0.86 P=33.85
medium grained, highly fractured rock.
248.435 6.00 7.00 6.00 R2 42 0
7.00M
Moderately to slightly weathered,
247.435 7.00 8.00 7.00 R3 60 0
brownish grey, medium grained, highly
fractured rock.
246.435 8.00 9.00 8.00 R4 62 12 9.00M 2.970 3.017 0.53 --/590
245.435 9.00 10.00 9.00 R5 50 0
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
12.00M
242.435 12.00 13.00 12.00 R8 53 0
241.435 13.00 14.00 13.00 R9 58 0 Modeartely weathered, brownish grey,
240.435 14.00 15.00 14.00 R10 60 27 medium grained, fractured rock.
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Design Report
Page 458
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 15/12/2015 Level of Ground : 254.970 M Job No : 3549
Bore Hole No. : 19 Location : E=214969.978, N=1774819.182 Completion Date : 21/12/2015 Standing Water Level : 0.50 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
CH
with decomposed rock.
253.170 1.80 1.80 DS-02 86 33
252.970 2.00 3.00 2.00 R1 46 33 Highly/moderately weathered, light 3.067 3.072 0.04 --/914
251.970 3.00 4.00 3.00 R2 38 0 grey, medium grained, highly fractured 2.858 2.869 0.13
250.970 4.00 5.00 4.00 R3 45 0 rock.
249.970 5.00 6.00 5.00 R4 39 0 2.857 2.877 0.24
6.00M
248.970 6.00 7.00 6.00 R5 62 0
July-16
247.970 7.00 8.00 7.00 R6 69 0
246.970 8.00 9.00 8.00 R7 67 23
245.970 9.00 10.00 9.00 R8 74 0 Moderately to slightly weathered, light
244.970 10.00 11.00 10.00 R9 75 45 greyish brown, medium grained, 3.010 3.021 0.12 --/242
243.970 11.00 12.00 11.00 R10 66 30 fractured rock.
242.970 12.00 13.00 12.00 R11 60 40
241.970 13.00 14.00 13.00 R12 73 20
240.970 14.00 15.00 14.00 R13 70 10
15.00M
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Page 459
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 15/12/2015 Level of Ground : 254.733 M Job No : 3549
Bore Hole No. : 20 Location : E=214985.880, N=1774771.778 Completion Date : 26/12/2015 Standing Water Level : 0.90 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
253.733 1.00 1.45 1.00 SPT-01 1.00 8 Medium, blackish grey, silty clay to 87 34
clayey silt with boulders &
CH
decomposed rock.
252.233 2.50 2.80 2.50 SPT-02 2.50 >100 Very dense, blackish grey, silty sand 72 19 9 2.69
SM
with boulders & decomposed rock.
251.733 3.00 3.03 3.00 *SPT-03 3.00 R
3.00M
251.733 3.00 4.00 3.00 R1 29 0 3.002 3.023 0.23 P=121.66
Highly to moderately weathered,
250.733 4.00 5.00 4.00 R2 48 0 2.968 2.988 0.22
brownish grey, medium to fine grained,
249.733 5.00 6.00 5.00 R3 46 0 highly fractured rock.
248.733 6.00 7.00 6.00 R4 48 0
July-16
7.00M
Slightly weathered, brownish grey,
247.733 7.00 8.00 7.00 R5 61 0 medium to fine grained, highly
fractured rock.
246.733 8.00 9.00 8.00 R6 76 24 3.025 3.040 0.16 --/458
245.733 9.00 10.00 9.00 R7 94 70 9.00M
244.733 10.00 11.00 10.00 R8 95 57
243.733 11.00 12.00 11.00 R9 85 56
Fresh, light greyish brown, medium
242.733 12.00 13.00 12.00 R10 84 42 grained, moderately fractured rock. 3.087 3.092 0.05 --/523
241.733 13.00 14.00 13.00 R11 81 30
240.733 14.00 15.00 14.00 R12 87 60
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
15.00M
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Design Report
Page 460
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 10/12/2015 Level of Ground : 255.376 M Job No : 3549
Bore Hole No. : 21 Location : E=215001.782, N=1774724.374 Completion Date : 15/12/2015 Standing Water Level : 0.80 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
%Gravel>72mm
Natural Moisture
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm2)
Angle of Shearing
Resistance in Deg.
CH
253.876 1.50 1.95 1.50 SPT-01 1.50 4 5 66 29 2.70
252.376 3.00 3.45 3.00 UDS-01 Medium, brownish grey, silty clay / UU 8 85 7 1.50 2.63 25 71 38 0.53 0
CH
251.926 3.45 3.90 3.45 SPT-02 3.45 8 clayey silt with sand mixture. 86 34
250.876 4.50 4.50 DS-04 7.97 0.0190 0.050
5.00M
250.376 5.00 5.45 5.00 SPT-03 5.00 12 45 42 13 2.69
249.576 5.80 5.80 DS-05
July-16
Stiff, brownish grey, silty clay / clayey
249.376 6.00 6.45 6.00 UDS-02 CQ 56 37 7 1.50 2.65 24 0.12 32
silt with sand mixture / clayey silty
SC
248.926 6.45 6.90 6.45 SPT-04 6.45 14 60 35 5 2.68
sand.
247.876 7.50 7.50 DS-06
247.376 8.00 8.04 8.00 *SPT-05 8.00 R 8.00M
247.376 8.00 9.00 8.00 R1 53 0 2.775 2.859 1.06
246.376 9.00 10.00 9.00 R2 67 64 3.096 3.101 0.05 --/842
245.376 10.00 11.00 10.00 R3 86 75 Moderately to slightly weathered /
244.376 11.00 12.00 11.00 R4 85 63 fresh, blackish grey, fine to medium 3.088 3.091 0.04 --/689
243.376 12.00 13.00 12.00 R5 82 46 grained, fractured rock.
242.376 13.00 14.00 13.00 R6 86 8
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO 3.
Design Report
Page 461
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 10/12/2015 Level of Ground : 258.052 M Job No : 3549
Bore Hole No. : 22 Location : E=215017.683, N=1774676.970 Completion Date : 14/12/2015 Standing Water Level : 2.00 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
%Gravel>72mm
Natural Moisture
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm2)
Angle of Shearing
Resistance in Deg.
CH
257.552 0.50 0.53 0.50 *SPT-01 0.50 R
0.50M
257.552 0.50 1.00 0.50 R1 40 0 Highly to moderately weathered, light 2.879 2.918 0.47 P=121.34
blackish grey, medium grained, highly
257.052 1.00 2.00 1.00 R2 50 0 fractured rock.
July-16
251.052 7.00 8.00 7.00 R8 85 80
250.052 8.00 9.00 8.00 R9 83 65 3.034 3.043 0.10 --/774
249.052 9.00 10.00 9.00 R10 87 16
248.052 10.00 11.00 10.00 R11 84 70 Fresh, light greyish brown, medium
247.052 11.00 12.00 11.00 R12 96 19 grained, fractured rock.
246.052 12.00 13.00 12.00 R13 91 43
245.052 13.00 14.00 13.00 R14 94 89
244.052 14.00 15.00 14.00 R15 91 67
15.00M
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Page 462
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 29/11/2015 Level of Ground : 256.543 M Job No : 3549
Bore Hole No. : 23 Location : E=215003.585, N=1774629.566 Completion Date : 6/12/2015 Standing Water Level : 1.05 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
%Gravel>72mm
Natural Moisture
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm2)
Angle of Shearing
Resistance in Deg.
CH
decomposed rock.
255.543 1.00 1.03 1.00 *SPT-01 1.00 R
1.00M
Moderately weathered, brownish grey,
medium grained, fractured rock.
255.543 1.00 2.00 1.00 R1 44 11 3.024 3.034 0.10 --/266
2.00M
July-16
248.543 8.00 9.00 8.00 R8 85 30
9.00M
247.543 9.00 10.00 9.00 R9 87 0
246.543 10.00 11.00 10.00 R10 83 0
245.543 11.00 12.00 11.00 R11 86 10
Fresh, light grey, medium grained,
244.543 12.00 13.00 12.00 R12 86 63 fractured rock.
243.543 13.00 14.00 13.00 R13 87 27
242.543 14.00 15.00 14.00 R14 88 73
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO 3.
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Design Report
Page 463
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 22/11/2015 Level of Ground : 255.241 M Job No : 3549
Bore Hole No. : 24 Location : E=215049.487, N=1774582.162 Completion Date : 1/12/2015 Standing Water Level : 1.50 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
254.241 1.00 1.07 1.00 SPT-01 1.00 R Deep grey, silty clay with decomposed
CH
rock.
253.941 1.30 2.00 1.30 R1 31 0 Highly to moderately weathered, light 2.729 2.743 0.19 P=31.21
grey, medium to coarse grained,
253.241 2.00 3.00 2.00 R2 40 17 fractured rock.
252.241 3.00 4.00 3.00 R3 43 0 4.00M
Slightly weathered, light grey, coarse
251.241 4.00 5.00 4.00 R4 61 32 grained, fractured rock. 2.719 2.736 0.23 --/448
250.241 5.00 6.00 5.00 R5 70 0 5.00M
July-16
249.241 6.00 7.00 6.00 R6 76 16 Moderately/slightly weathered, 2.706 2.720 0.20 --/339
brownish grey, medium grained, highly
248.241 7.00 8.00 7.00 R7 65 0 fractured rock.
247.241 8.00 9.00 8.00 R8 52 0
246.241 9.00 10.00 9.00 R9 64 12 9.00M
245.241 10.00 11.00 10.00 R10 80 32
244.241 11.00 12.00 11.00 R11 72 10 Slightly weathered to fresh, light 3.011 3.013 0.03 --/482
243.241 12.00 13.00 12.00 R12 82 64 greyish brown, medium grained,
242.241 13.00 14.00 13.00 R13 91 48 fractured rock.
241.241 14.00 15.00 14.00 R14 90 55
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay) for soil samples SO 4 content is expressed as SO3.
Design Report
Page 464
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 20/11/2015 Level of Ground : 256.319 M Job No : 3549
Bore Hole No. : 25 Location : E=215065.389, N=1774534.758 Completion Date : 28/11/2015 Standing Water Level : 2.80 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
2
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
Natural Moisture
Plastic Limit (%)
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm )
Angle of Shearing
Resistance in Deg.
255.319 1.00 1.10 1.00 SPT-01 1.00 >100 Deep grey, silty clay with decomposed
CH
rock.
July-16
249.319 7.00 8.00 7.00 R7 61 28 grained, fractured rock. 2.984 2.985 0.02 --/591
248.319 8.00 9.00 8.00 R8 65 30
247.319 9.00 10.00 9.00 R9 87 16
10.00M
246.319 10.00 11.00 10.00 R10 86 23
245.319 11.00 12.00 11.00 R11 88 22
244.319 12.00 13.00 12.00 R12 88 51 Fresh, light greyish brown, medium
243.319 13.00 14.00 13.00 R13 86 40 grained, fractured rock.
242.319 14.00 15.00 14.00 R14 83 52
15.00M
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Page 465
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 10/11/2015 Level of Ground : 258.257 M Job No : 3549
Bore Hole No. : 26 Location : E=215081.291, N=1774487.354 Completion Date : 19/11/2015 Standing Water Level : 3.05 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
%Gravel>72mm
Natural Moisture
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm2)
Angle of Shearing
Resistance in Deg.
CH
257.757 0.50 0.53 0.50 *SPT-01 0.50 R 0.50M
July-16
253.257 5.00 6.00 5.00 R6 81 48
Slightly weathered to fresh, light grey,
252.257 6.00 7.00 6.00 R7 91 26 fine to medium grained rock. 2.897 2.903 0.06 --/200
251.257 7.00 8.00 7.00 R8 86 40
250.257 8.00 9.00 8.00 R9 87 23
9.00M
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
for soil samples SO 4 content is expressed as SO 3.
Design Report
Page 466
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 21/10/2015 Level of Ground : 262.072 M Job No : 3549
Bore Hole No. : 27 Location : E=215097.192, N=1774439.950 Completion Date : 3/11/2015 Standing Water Level : 9.50 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
%Gravel>72mm
Natural Moisture
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm2)
Angle of Shearing
Resistance in Deg.
SC
gravel & decomposed rock.
261.072 1.00 1.03 1.00 *SPT-01 1.00 R 1.00M
July-16
grey, medium grained, highly fractured
253.072 9.00 10.00 9.00 R9 53 0 rock. 2.610 2.616 0.09
252.072 10.00 11.00 10.00 R10 61 0 10.00M
251.072 11.00 12.00 11.00 R11 76 32
250.072 12.00 13.00 12.00 R12 71 38 Slightly weathered, light greyish brown,
249.072 13.00 14.00 13.00 R13 76 30 medium grained, fractured rock.
248.072 14.00 15.00 14.00 R14 70 36 2.925 2.870 0.03 --/488
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
Page 467
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 26/10/2015 Level of Ground : 265.543 M Job No : 3549
Bore Hole No. : 28 Location : E=215113.094, N=1774392.546 Completion Date : 1/11/2015 Standing Water Level : 9.80 M Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
%Gravel>72mm
Natural Moisture
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm2)
Angle of Shearing
Resistance in Deg.
SC
gravel & decomposed rock.
265.043 0.50 0.52 0.50 *SPT-01 0.50 R 0.50M
265.043 0.50 1.00 0.50 R1 20 0 Highly weathered, brownish grey, 1.845 1.849 0.12
264.543 1.00 2.00 1.00 R2 22 0 medium grained, fractured rock. 2.109 2.115 0.13
263.543 2.00 3.00 2.00 R3 26 0 1.876 1.880 0.12
262.543 3.00 4.00 3.00 R4 25 0 4.00M
261.543 4.00 5.00 4.00 R5 28 0 2.541 2.559 0.28 P=145.78
Highly weathered, brownish grey,
260.543 5.00 6.00 5.00 R6 30 0 medium grained, fractured rock. 2.617 2.631 0.22 P=40.98
259.543 6.00 7.00 6.00 R7 28 0 2.475 2.507 0.53 P=20.24
258.543 7.00 8.00 7.00 R8 27 0 7.00M 2.592 2.603 0.17 P=74.84
257.543 8.00 9.00 8.00 R9 29 0
July-16
256.543 9.00 10.00 9.00 R10 35 0 Highly weathered, deep brownish grey, 2.586 2.600 0.20 P=138.68
255.543 10.00 11.00 10.00 R11 36 0 medium grained, fractured rock.
254.543 11.00 12.00 11.00 R12 39 0
253.543 12.00 13.00 12.00 R13 38 0
252.543 13.00 14.00 13.00 R14 39 0
251.543 14.00 15.00 14.00 R15 34 17 2.599 2.660 0.24 --/117
15.00M
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal P = Point Load Strength Index (kg/sqcm)
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
# means (silt+clay)
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Page 468
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 14/11/2015 Level of Ground : 269.710 M Job No : 3549
Bore Hole No. : 29 Location : E=215128.996, N=1774345.142 Completion Date : 20/11/2015 Standing Water Level : Not found. Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
%Gravel>72mm
Natural Moisture
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm2)
Angle of Shearing
Resistance in Deg.
CH
decomposed rock.
268.510 1.20 1.23 1.20 *SPT-01 1.20 R
1.20M
July-16
261.710 8.00 9.00 8.00 R8 32 0
260.710 9.00 10.00 9.00 R9 28 0 Highly weathered, brownish grey to
light grey, fine to medium grained,
fractured rock.
15.00M
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
for soil samples SO 4 content is expressed as SO 3.
Design Report
Page 469
R0
SUMMARY OF FIELD AND LABORATORY TEST RESULTS
Project : Geotech Inv work for C/O HLB across River Krishna in Telangana. Commencement Date : 2/11/2015 Level of Ground : 271.939 M Job No : 3549
Bore Hole No. : 30 Location : E=215144.898, N=1774297.738 Completion Date : 9/11/2015 Standing Water Level : Not found. Sheet No :
Depth in Mete
S.P.T. blows Shearing Strength
below
per 30cm Characteristics
reference
Void Ratio
To
Content (%)
at Laboratory
reference level
Percent RQD
From
Value
Specific Gravity
%Gravel>72mm
Natural Moisture
% Clay<0.002mm
Elevation in Metre
%Sand 2.0-0.06mm
Shrinkage Limit (%)
% Silt 0.06-0.002mm
Symbolic representation
Unconfined Compressive
Depth in Metre
Percent Core Recovery
Strength of Rock (Kg/cm2)
Angle of Shearing
Resistance in Deg.
CH
rock.
270.939 1.00 1.02 1.00 *SPT-01 1.00 R 1.00M
July-16
medium grained, highly fractured rock.
263.939 8.00 9.00 8.00 R8 22 0
9.00M
Highly weathered, light greyish brown,
medium grained, highly fractured rock.
262.939 9.00 10.00 9.00 R9 26 0
10.00M
15.00M
Undisturbed (UDS) Penetrometer (SPT) Disturbed (DS) Water Sample (WS) R = Refusal
* means sample could not be recovered Note: Chemical Test results for Water Samples for Chloride & Sulphate is given as Mg/Litr &
for soil samples SO 4 content is expressed as SO 3.
Design Report
Page 470
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Project : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana.
Job No. 3549 Sheet No.
e-logp Curve
0.830
0.810
0.790
0.770
0.750
VOID RATIO
0.730
0.710
0.690
0.670
0.650
0.630
0.610
0.10 1.00 10.00
Project : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana.
Job No. 3549 Sheet No.
e-logp Curve
0.970
0.950
0.930
0.910
0.890
0.870
0.850
VOID RATIO
0.830
0.810
0.790
0.770
0.750
0.730
0.710
0.690
0.670
0.10 1.00 10.00
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
0.001 0.01 0.1 1 10 100
BH-01,DS-01, 0.30M
Grain size (mm) BH-02,DS-01, 0.30M
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
Project:- : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana. Job No.
R0 July-16 3549 Page 476
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Sheet No.:
C. E. Testing Company Pvt. Ltd.
GRAIN SIZE DISTRIBUTION CURVES
Hydrometer Sieve
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
0.001 0.01 0.1 1 10 100
BH-06,SPT-02, 2.20M
Grain size (mm) BH-07,UDS-01, 2.00M
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
Project:- : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana. Job No.
R0 July-16 3549 Page 477
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Sheet No.:
C. E. Testing Company Pvt. Ltd.
GRAIN SIZE DISTRIBUTION CURVES
Hydrometer Sieve
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
0.001 0.01 0.1 1 10 100
BH-12,SPT-06, 8.50M
Grain size (mm) BH-13,SPT-01, 1.00M
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
Project:- : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana. Job No.
R0 July-16 3549 Page 478
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Sheet No.:
C. E. Testing Company Pvt. Ltd.
GRAIN SIZE DISTRIBUTION CURVES
Hydrometer Sieve
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
0.001 0.01 0.1 1 10 100
BH-14,SPT-04, 5.95M
Grain size (mm) BH-15,SPT-02, 3.50M
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
Project:- : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana. Job No.
R0 July-16 3549 Page 479
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Sheet No.:
C. E. Testing Company Pvt. Ltd.
GRAIN SIZE DISTRIBUTION CURVES
Hydrometer Sieve
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
0.001 0.01 0.1 1 10 100
BH-15,SPT-04, 6.45M
Grain size (mm) BH-16,SPT-01, 1.00M
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
Project:- : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana. Job No.
R0 July-16 3549 Page 480
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Sheet No.:
C. E. Testing Company Pvt. Ltd.
GRAIN SIZE DISTRIBUTION CURVES
Hydrometer Sieve
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
0.001 0.01 0.1 1 10 100
BH-16,UDS-02, 5.50M
Grain size (mm) BH-16,SPT-04, 5.95M
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
Project:- : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana. Job No.
R0 July-16 3549 Page 481
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Sheet No.:
C. E. Testing Company Pvt. Ltd.
GRAIN SIZE DISTRIBUTION CURVES
Hydrometer Sieve
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
0.001 0.01 0.1 1 10 100
BH-17,SPT-04, 6.50M
Grain size (mm) BH-18,UDS-01, 2.00M
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
Project:- : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana. Job No.
R0 July-16 3549 Page 482
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Sheet No.:
C. E. Testing Company Pvt. Ltd.
GRAIN SIZE DISTRIBUTION CURVES
Hydrometer Sieve
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
0.001 0.01 0.1 1 10 100
BH-20,DS-01, 0.50M
Grain size (mm)BH-20,SPT-02, 2.50M
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
Project:- : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana. Job No.
R0 July-16 3549 Page 483
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Sheet No.:
C. E. Testing Company Pvt. Ltd.
GRAIN SIZE DISTRIBUTION CURVES
Hydrometer Sieve
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
0.001 0.01 0.1 1 10 100
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
Project:- :Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana. Job No.
R0 July-16 3549 Page 484
Consultancy services for Preparation of Detailed Project Report for Construction of HLB across Design Report
River Krishna connecting Somasila in Mahabubnagar District and Siddeswaram in Kurnool District.
Sheet No.:
C. E. Testing Company Pvt. Ltd.
GRAIN SIZE DISTRIBUTION CURVES
Hydrometer Sieve
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
0.001 0.01 0.1 1 10 100
BH-28,DS-01, 0.30M
Grain size (mm)BH-14,UDS-02, 5.50M
100
80
Percentage finer
60
40
20
0
0.002
0.075
0.425
4.75
Project:- : Soil Inv. for C/O Proposed Bridge over Krishna River at Telengana. Job No.
R0 July-16 3549 Page 485