Gasco Engineering Private Limited

INSPECTION TEST PLAN ( Equipment Installation) Date: 24/12/2013

PROJECT: Kadanwari Alternate PW Tanks Installation Project CLIENT: OMV PAKISTAN

LOCATION: Kadanwari Plant Project No:

Scope of Inspection
S. Inspection / Compliance
Description of Inspection Frequency Record Certificate Reference Doc / Criteria Remarks
No. Client Method / Acceptance criteria
Gasco
(OMV Pakistan)

Stationary Equipment Installation (DOC # GEL-ITP-PW-04, Rev:0)


1 IMTE

GEL--SOP-EER-04/ Specification for


Check calibration certificates from
1.1 Check for Calibration certificates W R 100% Calibration certificates Installation and Testing of
approved third party
Mechanical Equipment

2 IFC DWGs

Project DWGs
GEL--SOP-EER-04/
GEL SOP EER 04/ Specification for
Check for the latest version of IFC
2.1 IFC DWGS H M Each Document register Installation and Testing of
DWGS
Mechanical Equipment

3 Material

GEL--SOP-EER-04/ Specification for


Receiving inspection form
3.1 Equipment receiving inspection H W 100% Cross-Checking with BOQ & DWGs Installation and Testing of
GEL-QA/QC-F-102
Mechanical Equipment
BOQ / MTO

4 Equipment Installation

GEL--SOP-EER-04/ Specification for


Check surface of foundation
GEL-QA/QC-F-050 Installation and Testing of
4.1 Foundation Surface Condition and surface preparation. H W 100% cleaned and chipped and
Mechanical Equipment
released for installation

GEL--SOP-EER-04/ Specification for


GEL-QA/QC-F-051 Installation and Testing of
4.2 Orientation position, elevation and leveling H W 100% Check for elevation and leveling
GEL-QA/QC-F-103 Mechanical Equipment

GEL--SOP-EER-04/ Specification for


GEL-QA/QC-F-051 Installation and Testing of
4.3 Nozzle orientation H H 100% Check nozzle orientation
GEL-QA/QC-F-103 Mechanical Equipment

1 of 2
Gasco Engineering Private Limited

INSPECTION TEST PLAN ( Equipment Installation) Date: 24/12/2013

PROJECT: Kadanwari Alternate PW Tanks Installation Project CLIENT: OMV PAKISTAN

LOCATION: Kadanwari Plant Project No:

Scope of Inspection
S. Inspection / Compliance
Description of Inspection Frequency Record Certificate Reference Doc / Criteria Remarks
No. Client Method / Acceptance criteria
Gasco
(OMV Pakistan)

± 1mm horizontal and .17mm per GEL--SOP-EER-04/ Specification for


meter for vertical are the Installation and Testing of
GEL-QA/QC-F-051
4.4 Plumbness H W 100% misalignment limits. Check for Mechanical Equipment
GEL-QA/QC-F-103
equipment verticality and
alignment limits

GEL--SOP-EER-04/ Specification for


Installation and Testing of
GEL-QA/QC-F-051
4.5 Compliance as per lay-out H H 100% Check compliance as per lay-out Mechanical Equipment
GEL-QA/QC-F-103

GEL--SOP-EER-04/ Specification for


Installation and Testing of
GEL-QA/QC-F-051
4.6 Bolt tightening W M 100% Check bolt tightening Mechanical Equipment
GEL-QA/QC-F-103

GEL--SOP-EER-04/ Specification for


Installation and Testing of
4.7 Check of appurtenances W W 100% Check as per attached format GEL-QA/QC-F-104 Mechanical Equipment

GEL--SOP-EER-04/ Specification for


Installation and Testing of
Check with equipment DWGs
4.8 Final BOX-UP H H If applicable GEL-QA/QC-F-104 Mechanical Equipment
and vendor data

LEGENDS

RW : RANDOM WITNESS R : Review

W : WITNESS H : HOLD POINT M : Monitoring

Company GEPL OMV (PAKISTAN)

Signature:

Name: AMAN AHMED

Date: 24/12/2013

2 of 2