KAFD DMC’s representative issues this isolation permits for the execution of work by the contractor named below. The contractor must liaise with the KAFD’s Fit-Out
Coordinator before work commences. All works must be strictly controlled to reduce any risk of injury or damage to property. The contractor must comply with the KAFD
Health and Safety Policy (copies of which are distributed at the Contractor’s Induction meeting) and current legislation, including relevant Codes of Practice. Isolations are
made on a case-by-case basis. Tampering with any isolation and or locking device by anyone other than an approved and appointed competent person (appointed by KAFD
DMC), will be ground for immediate removal from the working environment.
Project Reference: modify the locations of the smoke Exact Location: B 3.05 16 TH FLOOR
detector
Contractor Name: TAMAM OMER ALANAZYI EST Tenant Name: King Salman Park EST
Nature of Work The project is to modify the locations of the smoke detector and sprinkler at the headquarters of the King Salman Park EST
Comments
Details of Isolation Date & Time Normal Position Revised Position
(e.g. logged in fire log)
Must be emptied 16th floor
B 3.05 16 TH FLOOR 4-12-2022 6 PM modify the locations of the smoke detector
water s of firefighting net
Is Contractor Competent Fire Watch in Is Building Security Notified of Requirement Is the insurance company
Y/N Y/N Y/N
Place for Extra Patrol? notified