A. Details: (To be filled/ approved by Refining Operations Contract Holder Department/ Sponsoring Department/
Requester)
1. Name : DESCON
2. Contact/Contract No. : GC20106100
-----------------------
3. Refining Operations Contract Holder Department/ Sponsoring Department:
Turnaround Planning OAT(R)/ Asset Integrity OA(R)
4. Justlficatlon for the request:
Required for placing Tools/ Material Containers and Ablution Units required for RFCC Units TA
E.7
Ref. Ind.: OAT/5(R) Ref. Ind.: OAT(R
Note:- Only Explosion Proof Lighting permitted and DG shall be kept at a safe location away from this Area
B. Approval from Asset Holder: {To be filled/ approved by Asset Holder)
1. Remarks from Asset Holder;
A sign must be placed and a warning against doing any HW without OFST SS approval
C. .
Approval from Safety· (To be filled/ approved by QPR Safety Division)
1. Remarks from Safety:
Note Permit to work (PTW) procedure shall be followed after approval and attach the approved
copy while processing PTW.
ABULUTION
TOOL CONTAINER MAT. CONTAINER
UNIT
TOOL CONTAINER MAT. CONTAINER LIGHT VEHICLE
PARKING
Pipe
PLANT NORTH
QATAR PETROLEUM
REFINERY
QP CONDENSATE REFINERY SHUTDOWN 2022