You are on page 1of 2

Non-configured print.

Valid only on 2023-05-23


AP101B-5301-5G
Edition 1

PENETRANT TESTING WORK INSTRUCTIONS

CONTENTS

Work Instructions PFD/001 to 005 are not Sentry-specific and are therefore not issued

LIST OF WORK INSTRUCTIONS AND FIGURES

Work Instruction Category Examination


SENTRY/PFD/006 LEVEL 1 FLUORESCENT (SOLVENT REMOVABLE)
is now OBSOLETE Refer to SENTRY/PFD/006 page 1 instruction block.
SENTRY/PFD/007 LEVEL 1 FLUORESCENT (WATER REMOVABLE)
is now OBSOLETE Refer to SENTRY/PFD/007 page 1 instruction block.
SENTRY/PFD/400 LEVEL 1 DAYLIGHT VISIBLE (AEROSOL)
SENTRY/PFD/401 LEVEL 1 DAYLIGHT VISIBLE (THIXOTROPIC)
SENTRY/PFD/402 LEVEL 1 DAYLIGHT VISIBLE (THROUGH CRACK)
SENTRY/PFD/403A LEVEL 1 FLUORESCENT LEVEL 2 (THIXOTROPIC)
SENTRY/PFD/404 LEVEL 1 FLUORESCENT LEVEL 3
SENTRY/PFD/405 LEVEL 1 FLUORESCENT LEVEL 4 (THIXOTROPIC)
SENTRY/PFD/406 LEVEL 1 FLUORESCENT LEVEL 4 (NO DEVELOPER)
SENTRY/PFD/407 LEVEL 1 FLUORESCENT LEVEL 4 (THROUGH CRACK)

Aug 20 (Amdt 27) Section 7


Page 1 of 1
Non-configured print. Valid only on 2023-05-23
SENTRY/PFD/006 - OBSOLETE AP 101B-5301-5G
1st Edition

PENETRANT TESTING WORK INSTRUCTION No 006

PENETRANT TESTING WORK INSTRUCTION No 006 is no longer used within the MOD. For any
component inspection that references PENETRANT TESTING WORK INSTRUCTION No 006 from
the ADS, carry out PENETRANT TESTING WORK INSTRUCTION No 405 ensuring that the
component to be inspected is within the Annex A. This change in procedure has been directed from
71(IR) Sqn.

Section 7
Aug 20 (Amdt 27) Page 1

You might also like