A. SCOPE OF WORKS
UNIT RATE
ITEM NO. ITEM DESCRIPTION UNIT QTY TOTAL AMOUNT
MATERIAL LABOR OTHERS TOTAL
I PRELIMINARIES
Mobilization/Demobilization/Temporary Facility 1.00 ITEM 80,000.00
Testing and Commissioning 1.00 ITEM 120,000.00
Project Mngmnt. and Supervision 1.00 ITEM 50,000.00
Design and As-built 1.00 ITEM 150,000.00
sub-total I 400,000.00
II Electro-Mechanical Works
Proposed Sewage Treatment Plant of Domestic Waste 5CmD ( Design and Build ).1 Page 1 of 2 Sewage Treatment Plant 5CmD 3/28/2023
Date : March 28, 2023
Attention : ENGR .PANFILO TAN- ICC
President
Attention : ARCTH. ANGELITO ARRIBAC - ICC
Project Manager
Project : Proposed Sewage Treatment Plant 5CmD Domestic Waste
Location : Quezon City, Philippines
Owner :
Subject : Proposed Supply and Installation of Sewage Treatment Plant 5 CMD
A. SCOPE OF WORKS
UNIT RATE
ITEM NO. ITEM DESCRIPTION UNIT QTY TOTAL AMOUNT
MATERIAL LABOR OTHERS TOTAL
• Plastering 130.00 Sqm. 696.00 208.80 31.32 936.12 121,695.60
• Concrete pouring 4.20 Cu.M 5,500.00 1,650.00 247.50 7,397.50 31,069.50
• Formworks 7.00 Sqm. 950.00 285.00 42.75 1,277.75 8,944.25
• Waterproofing 140.00 Sqm. 1,240.00 372.00 55.80 1,667.80 233,492.00
Prepared by : Conformed:
Proposed Sewage Treatment Plant of Domestic Waste 5CmD ( Design and Build ).1 Page 2 of 2 Sewage Treatment Plant 5CmD 3/28/2023