A. SCOPE OF WORKS
UNIT RATE
ITEM NO. ITEM DESCRIPTION UNIT QTY TOTAL AMOUNT
MATERIAL LABOR OTHERS TOTAL
I Electrical Works
Supply and Installation 1.00 LOT 185,000.00 55,500.00 11,100.00 251,600.00 251,600.00
Main Control Panel for STP
Features:
Equipped by overload Relay, Voltage Regulator,
Magnetic Contactor, Stop/Start Button and light
indicator,Trip light Indicator
Main: 150 AT/AF, 2 pole, 25Kaic
2- 40AT/AF, 2 pole, 25Kaic (Roots Blower w/ timer)
2- 20AT/AF, 2 pole, 25Kaic (Transfer Pump Controlled
by Float Switch)
2- 20AT/AF, 2 pole, 25Kaic (Ozone Generator w/ timer)
2- 20AT/AF, 2 pole, 25Kaic (Re-Circulation Pump w/
timer)
2- 25AT/AF, 2 pole, 25Kaic (Discharge Pump Controlled
by Float Switch)
sub-total II 251,600.00
II Multi Media Depth Filter
Manual (Parallel Connection) Supply Only
FRP Tank 24x72 TB 4” MB Pentair with riser tube and 3.00 LOT 53,000.00 - 53,000.00 159,000.00
bottom lateral
Runxin Manual Valve Filter With top strainer 3.00 LOT 45,000.00 - 45,000.00 135,000.00
Anthracite 25kgs/bag 12x40 24.00 LOT 2,500.00 - 2,500.00 60,000.00
Gravel #5 25 kgs/bag 12.00 LOT 680.00 - 680.00 8,160.00
Gravel #10 25 kgs/bag 12.00 LOT 680.00 - 680.00 8,160.00
Silica Sand 25 kgs/bag 15.00 LOT 880.00 - 880.00 13,200.00
Monitoring Gauges 3.00 LOT 1,200.00 - 1,200.00 3,600.00
Horizontal Pump 1.5hp 220V, 60Hz, Single phase 2.00 LOT 65,000.00 - 65,000.00 130,000.00
sub-total IV 517,120.00
SUB-TOTAL PROJECT COST 768,720.00